CN217556706U - Simple high pier column pouring device - Google Patents
Simple high pier column pouring device Download PDFInfo
- Publication number
- CN217556706U CN217556706U CN202221334546.7U CN202221334546U CN217556706U CN 217556706 U CN217556706 U CN 217556706U CN 202221334546 U CN202221334546 U CN 202221334546U CN 217556706 U CN217556706 U CN 217556706U
- Authority
- CN
- China
- Prior art keywords
- hopper
- fixedly connected
- pipe
- lateral wall
- wall fixedly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Underground Or Underwater Handling Of Building Materials (AREA)
Abstract
The utility model discloses a device is pour to simple and easy high pier stud, include the hopper, be located the pipe of hopper downside, be located the adjustment festival of pipe downside, four first couples of hopper lateral wall fixedly connected with, four corresponding first chain rings of pipe lateral wall fixedly connected with, first chain ring hangs and establishes on the first couple that corresponds, four second couples of pipe lateral wall fixedly connected with, four second chain rings of adjustment festival lateral wall fixedly connected with, the second chain ring hangs and establishes on the second couple that corresponds. The utility model discloses in, adopt hopper, pipe, adjustment festival etc. to be the essential material, make simple and easy concrete vertical transportation instrument, the device can carry out pouring of concrete, produces the segregation phenomenon when can effectively preventing concrete placement to guarantee the quality of engineering, convenient operation.
Description
Technical Field
The utility model relates to a construction technical field specifically is a device is pour to simple and easy high pier stud.
Background
In the construction process of a bridge lower structure, a pier column construction phenomenon exists more or less, and when concrete is poured, the free falling height exceeds 2 meters, the separation phenomenon occurs, so that when the pier column exceeding 2 meters is poured, a tool is needed for pouring; which means a cylinder provided in order to prevent the concrete from being segregated during the vertical transfer of the concrete, through which the concrete slides down. For vertical transport of the concrete.
Traditional high pier stud pours the device bulky, and the assembly ability is relatively poor, can't splice the device of pouring as required, and it is inconvenient to use, and transports comparatively difficultly.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a device is pour to simple and easy high pier stud has solved the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a device is pour to simple and easy high pier stud, includes the hopper, is located the pipe of hopper downside, is located the adjustment festival of pipe downside, four first couples of hopper lateral wall fixedly connected with, the first chain link of four correspondences of pipe lateral wall fixedly connected with, first chain link hangs establishes on the first couple that corresponds, four second couples of pipe lateral wall fixedly connected with, four second chain links of adjustment festival lateral wall fixedly connected with, the second chain link hangs establishes on the second couple that corresponds.
Preferably, the hopper side wall is fixedly connected with four symmetrically arranged hanging rings, every two hanging rings are arranged on one side, and a supporting rod piece is inserted between the two corresponding hanging rings.
Preferably, the inner diameters of the guide pipe and the adjusting joint are reduced from top to bottom in sequence.
Preferably, the hopper is provided with an anti-blocking assembly, and the anti-blocking assembly comprises a driving mechanism and a dredging rod piece arranged on the driving mechanism.
Preferably, actuating mechanism is including the mounting bracket that is fixed in the hopper top, fixed mounting has the motor on the mounting bracket, motor output fixedly connected with driving piece, fixedly connected with gib block on the mounting bracket, mediation member one side fixedly connected with has the annular frame that the level set up, driving piece one end is inserted and is located in the annular frame, annular frame top fixedly connected with guide arm, the setting of gib block is run through in the activity of guide arm upper end.
Preferably, the cross-sectional area of the hopper interior decreases from top to bottom.
(III) advantageous effects
The utility model provides a device is pour to simple and easy high pier stud possesses following beneficial effect:
1. in the utility model, the hopper, the guide pipe, the adjusting joint and the like are adopted as main materials, the simple vertical concrete conveying tool is manufactured, the adjusting height can be selected according to the actual pouring condition, when the vertical concrete conveying tool is used, the adjusting length is firstly selected and connected with the hopper through the pipe orifice on the guide pipe, the vertical concrete conveying tool is hoisted to a pouring part through hoisting equipment, the hopper is hung on the top of a pier column template through a support rod piece to be fixed, the pouring of concrete can be carried out, the segregation phenomenon generated during the concrete pouring can be effectively prevented, the quality of engineering is ensured, and the operation is convenient; the general length of pipe is 1.5 meters, and the regulation festival is provided with 0.5m, 1.5m, can select the regulation festival number according to on-the-spot actual conditions, and this application only utilizes hopper and pipe device, and the preparation is simple and convenient, and is simple to use, convenient operation, and quality and safety are guaranteed.
2. The utility model discloses in, adopt and prevent blockking up the subassembly for dredge the member can be dredged along vertical direction reciprocating motion, thereby can prevent to take place to block up when pouring concrete, guarantee that concrete can be quick pours, improve the efficiency of work.
Drawings
Fig. 1 is a front perspective structural view of a simple high pier stud pouring device provided by the utility model;
fig. 2 is a top perspective structural view of a simple high pier stud pouring device provided by the present invention;
fig. 3 is the utility model provides a simple and easy high pier stud pouring device prevent blockking up subassembly structure chart.
In the figure: 1. a hopper; 2. a conduit; 3. adjusting; 4. supporting the rod member; 5. a hoisting ring; 6. a first hook; 7. a first link; 8. a second hook; 9. a second link; 10. an anti-clogging assembly; 101. a mounting frame; 102. a motor; 103. a guide strip; 104. a guide bar; 105. an annular frame; 106. a drive member; 107. and (6) dredging the rod piece.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: the utility model provides a device is pour to simple and easy high pier stud, including hopper 1, be located the pipe 2 of 1 downside of hopper, be located the adjustment festival 3 of 2 downside of pipe, the cross-sectional area from the top down of 1 inside part of hopper reduces in proper order, four first couples 6 of 1 lateral wall fixedly connected with of hopper, four first chain ring 7 that correspond of 2 lateral wall fixedly connected with of pipe, first chain ring 7 is hung and is established on the first couple 6 that corresponds, four second couples 8 of 2 lateral wall fixedly connected with of pipe, four second chain ring 9 of 3 lateral wall fixedly connected with of adjustment festival, second chain ring 9 is hung and is established on the second couple 8 that corresponds.
When the device is used, the length of the adjusting section 3 is selected firstly, the adjusting section is connected with the hopper 1 through the pipe opening in the guide pipe 2, during specific operation, the adjusting section is lifted to a pouring position through lifting equipment firstly, the first chain ring 7 is hung on the first hook 6 to realize the connection of the guide pipe 2 and the hopper 1, and the second chain ring 9 is hung on the second hook 8 to realize the connection between the adjusting section 3 and the guide pipe 2.
The hopper 1 is characterized in that the side wall of the hopper 1 is fixedly connected with four symmetrically arranged hanging rings 5, every two hanging rings 5 are arranged on one side, and a support rod member 4 is inserted between every two corresponding hanging rings 5.
In order to facilitate connection, the inner diameters of the guide pipe 2 and the adjusting section 3 are designed to be reduced from top to bottom in sequence, so that the top of the guide pipe 2 can be sleeved outside a discharge port of the hopper 1, and the top of the adjusting section 3 can be sleeved outside the guide pipe 2.
In order to avoid concrete blockage at the discharge hole of the hopper 1 and ensure smooth and quick pouring, the anti-blockage assembly 10 is arranged on the hopper 1, and the anti-blockage assembly 10 comprises a driving mechanism and a dredging rod piece 107 arranged on the driving mechanism.
Actuating mechanism is including being fixed in the mounting bracket 101 at 1 top of hopper, fixed mounting has motor 102 on mounting bracket 101, motor 102 output fixedly connected with driving piece 106, fixedly connected with gib block 103 on the mounting bracket 101, dredge rod piece 107 one side fixedly connected with level sets up annular frame 105, driving piece 106 one end is inserted and is located in annular frame 105, driving piece 106 realizes the drive purpose to this annular frame 105, driving piece 106 wholly is L shape, can use the motor 102 output to carry out circular motion as the center, annular frame 105 top fixedly connected with guide arm 104, the gib block 103 setting is run through in the activity of guide arm 104 upper end, this gib block 103 realizes the direction purpose to this guide arm 104, guarantee that guide arm 104 can move along vertical direction in gib block 103.
During the specific use, starter motor 102 drives driving piece 106 and rotates, and driving piece 106 drives annular frame 105 up-and-down motion to make mediation member 107 up-and-down motion, dredge the discharge gate of hopper 1, prevent that the concrete from piling up, guarantee ejection of compact speed, improved the efficiency of pouring.
The foregoing shows and describes the basic principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (6)
1. The utility model provides a device is pour to simple and easy high pier stud, its characterized in that: including hopper (1), be located pipe (2) of hopper (1) downside, be located adjustment festival (3) of pipe (2) downside, four first couples (6) of hopper (1) lateral wall fixedly connected with, first chain ring (7) of four correspondences of pipe (2) lateral wall fixedly connected with, first chain ring (7) are hung and are established on corresponding first couple (6), four second couples (8) of pipe (2) lateral wall fixedly connected with, four second chain rings (9) of adjustment festival (3) lateral wall fixedly connected with, second chain ring (9) are hung and are established on corresponding second couple (8).
2. The simple high pier column pouring device according to claim 1, characterized in that: hopper (1) lateral wall fixedly connected with four rings (5) that the symmetry set up, per two rings (5) set up in one side, two correspond it is equipped with support member (4) to insert between rings (5).
3. The simple high pier column pouring device according to claim 1, characterized in that: the inner diameters of the guide pipe (2) and the adjusting joint (3) are sequentially reduced from top to bottom.
4. The simple high pier column pouring device according to claim 1, wherein: the anti-blocking device is characterized in that an anti-blocking assembly (10) is arranged on the hopper (1), and the anti-blocking assembly (10) comprises a driving mechanism and a dredging rod piece (107) arranged on the driving mechanism.
5. The simple high pier column pouring device according to claim 4, wherein: actuating mechanism is including being fixed in mounting bracket (101) at hopper (1) top, fixed mounting has motor (102) on mounting bracket (101), motor (102) output end fixedly connected with driving piece (106), fixedly connected with gib block (103) on mounting bracket (101), annular frame (105) that mediation member bar (107) one side fixed connection set up have the level, driving piece (106) one end is inserted and is located annular frame (105), annular frame (105) top fixedly connected with guide arm (104), gib block (103) setting is run through in guide arm (104) upper end activity.
6. The simple high pier column pouring device according to claim 1, wherein: the cross-sectional area of the interior of the hopper (1) decreases from top to bottom.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221334546.7U CN217556706U (en) | 2022-05-31 | 2022-05-31 | Simple high pier column pouring device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221334546.7U CN217556706U (en) | 2022-05-31 | 2022-05-31 | Simple high pier column pouring device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217556706U true CN217556706U (en) | 2022-10-11 |
Family
ID=83499788
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221334546.7U Active CN217556706U (en) | 2022-05-31 | 2022-05-31 | Simple high pier column pouring device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217556706U (en) |
-
2022
- 2022-05-31 CN CN202221334546.7U patent/CN217556706U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210263053U (en) | Underwater concrete pouring control device | |
CN209957260U (en) | Hoisting frame for mechanical equipment | |
CN212002323U (en) | Telescopic string cylinder for pouring super-thick concrete | |
CN210705927U (en) | Automatic feeding production system | |
CN217556706U (en) | Simple high pier column pouring device | |
CN102102365A (en) | Slurry protection wall bored pile concrete casting device | |
CN110963419A (en) | Double-beam crane and vinasse conveying system adopting same | |
CN211444786U (en) | Vinasse conveying system adopting double-beam crane | |
CN210172518U (en) | Steel ladle casting equipment | |
CN210702517U (en) | Molten iron pouring device for casting production line | |
CN210505223U (en) | Bored concrete pile steel reinforcement cage hangs puts device | |
CN208932786U (en) | Cover plate for side ditch demoulds component | |
CN219823397U (en) | Mountain river roof block hoisting structure | |
CN217142313U (en) | Casting ladle height adjusting device | |
CN211333852U (en) | Pouring device of self-compaction concrete | |
CN218948031U (en) | Hopper for pouring large-diameter concrete pipe | |
CN211769713U (en) | Multi-functional concrete overhead tank for water conservancy construction | |
CN218174369U (en) | Novel ladle cover taking and placing mechanism | |
CN219603080U (en) | Anti-swing lifting appliance for surface treatment of pipe | |
CN210918259U (en) | Flow-adjustable steel plate perfusion apparatus | |
CN218403350U (en) | A grab bucket car for construction waste feeding | |
CN214920466U (en) | Anti-splashing molten iron casting ladle | |
CN209922696U (en) | Waste hoisting device for production of fused zirconia-corundum bricks | |
CN212671211U (en) | Roof, roof beam concrete pouring device | |
CN216379706U (en) | Hydraulic backfiller of full-automatic heavy hammer device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |