CN217547124U - Collagen casing production tunnel system steering mechanism - Google Patents

Collagen casing production tunnel system steering mechanism Download PDF

Info

Publication number
CN217547124U
CN217547124U CN202221714958.3U CN202221714958U CN217547124U CN 217547124 U CN217547124 U CN 217547124U CN 202221714958 U CN202221714958 U CN 202221714958U CN 217547124 U CN217547124 U CN 217547124U
Authority
CN
China
Prior art keywords
bearing roller
support
gas pipeline
tunnel system
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221714958.3U
Other languages
Chinese (zh)
Inventor
张�杰
宋立国
马龙
李玉峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Haios Biotechnology Co ltd
Original Assignee
Shandong Haios Biotechnology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Haios Biotechnology Co ltd filed Critical Shandong Haios Biotechnology Co ltd
Priority to CN202221714958.3U priority Critical patent/CN217547124U/en
Application granted granted Critical
Publication of CN217547124U publication Critical patent/CN217547124U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model belongs to collagen casing production tunnel system structure part field, concretely relates to collagen casing production tunnel system steering mechanism, including semi-cylindrical's support and main gas pipeline, be provided with a plurality of bearing roller groups along the axial on the curved surface of support, each bearing roller group all includes a plurality of arcs of being and rotates the bearing roller that sets up on the support, all be equipped with a plurality of wind grooves on each bearing roller, be fixed with a plurality of leading truck corresponding with bearing roller group on the support, all rotate on each leading truck and be provided with the guide roll, be fixed with on the support through a plurality of splice bars with each bearing roller group one-to-one prop up gas pipeline, all be connected with the jet-propelled pipe with the bearing roller one-to-one on each gas pipeline, all be connected with the connecting pipe between each gas pipeline and the main gas pipeline. The utility model has simpler structure, effectively reduces the maintenance cost of equipment; and the whole volume is reduced to half of the original volume, thereby providing convenience for the artificial pulling process of the collagen casing.

Description

Collagen casing production tunnel system steering mechanism
Technical Field
The utility model relates to a collagen casing production tunnel system steering mechanism belongs to collagen casing production tunnel system structural component field.
Background
In the production of collagen casing, since the casing is long and the length of the plant is limited, it is necessary to provide a steering mechanism at both ends of the collagen casing production tunnel system. The existing steering mechanism mainly comprises a motor and a driving wheel, wherein a plurality of grooves are arranged on the driving wheel to position the sausage casing, and the motor drives the driving wheel to rotate through a chain so as to drive the sausage casing; on the other hand, the volume is large, and the operation is inconvenient in the artificial pulling process of the collagen casing.
SUMMERY OF THE UTILITY MODEL
According to the not enough among the above prior art, the utility model discloses the technical problem who solves is: the steering mechanism of the collagen casing production tunnel system is simple in structure and small in size.
Collagen casing production tunnel system steering mechanism, including semi-cylindrical's support and main gas pipeline, be provided with a plurality of bearing roller groups along the axial on the curved surface of support, each bearing roller group all includes a plurality of arcs of being and rotates the bearing roller of setting on the support, all be equipped with a plurality of wind grooves on each bearing roller, be fixed with a plurality of leading truck corresponding with bearing roller group on the support, all rotate on each leading truck and be provided with the guide roll, be fixed with the branch gas pipeline with each bearing roller group one-to-one through a plurality of splice bars on the support, all be connected with the jet-propelled pipe with the bearing roller one-to-one on each gas pipeline, all be connected with the connecting pipe between each gas pipeline and the main gas pipeline.
The working principle and the process are as follows:
during the use, will the utility model discloses fix the tip at casing tunnel system, main gas piping connection gives the trachea way, support the casing through the bearing roller, through giving the trachea way to main gas piping, the connecting pipe ventilates with a gas piping, thereby for jet-propelled pipe provides the air supply, blow to the bearing roller through jet-propelled pipe, make the bearing roller rotate fast under the effect in bearing roller windward tank, thereby transmit the casing, lead to the casing through the guide roll, thereby guarantee that the casing steadily turns to at casing tunnel system's tip.
Foretell leading truck is connected with lower connecting plate including fixing the locating piece on the support on the locating piece, and the both ends of lower connecting plate all are fixed with the roller, are fixed with the upper junction plate between the top of two rollers, all rotate on two rollers and are connected with the guide roll, make the leading truck of guide roll sharing that two adjacent bearing roller sets correspond, make the structure simple and compact more.
A sleeve is fixed between the middle parts of the upper connecting plate and the lower connecting plate, a screw rod penetrating through the lower connecting plate, the sleeve and the upper connecting plate is fixed on the positioning block, a locking nut is connected to the upper end of the screw rod in a threaded manner, and the deflection angle of the upper connecting plate and the deflection angle of the lower connecting plate can be adjusted as required, so that the transverse positions of the two guide rollers are adjusted, and the sausage casings with different diameters can be conveniently applied.
The main gas pipeline is provided with a main gas valve.
The connecting pipe is provided with a branch air valve.
The gas injection pipe is a copper pipe, is not easy to rust, is easy to bend and is easy to adjust.
Compared with the prior art, the utility model the beneficial effect who has is:
the steering mechanism of the collagen casing production tunnel system adopts the compressed air to blow the carrier roller to transmit the casing, thereby omitting the structures such as a motor, a chain and the like, leading the structure to be simpler and effectively reducing the maintenance cost of equipment; and the semi-cylindrical support is adopted, so that the whole volume is reduced to half of the original volume, an operation space is provided for the manual coating pulling process of the collagen casing, and the manual coating pulling process is more convenient.
Drawings
FIG. 1 is a schematic view of the present invention;
fig. 2 is a partial schematic view of the distribution of the carrier roller and the guide roller of the present invention;
fig. 3 is a cross-sectional view of the guide frame of the present invention.
In the figure: 1. a support; 2. a carrier roller; 3. a guide roller; 4. a guide frame; 5. connecting ribs; 6. a gas ejector tube; 7. a branch gas pipeline; 8. a branch air valve; 9. a connecting pipe; 10. a main gas conduit; 11. a main air valve; 12. an air duct; 13. a casing tunnel system; 14. positioning blocks; 15. a lower connecting plate; 16. a roll shaft; 17. a sleeve; 18. a screw; 19. an upper connecting plate; 20. and locking the nut.
Detailed Description
Embodiments of the present invention are further described below with reference to the accompanying drawings:
example 1:
as shown in fig. 1 and 2, collagen casing production tunnel system steering mechanism, support 1 and main gas pipeline 10 including semi-cylindrical, be provided with a plurality of bearing roller groups along the axial on the curved surface of support 1, each bearing roller group all includes a plurality of arc rotations bearing roller 2 of setting on support 1, all be equipped with a plurality of wind grooves 12 on each bearing roller 2, be fixed with a plurality of leading truck 4 corresponding with bearing roller group on the support 1, all rotate on each leading truck 4 and be provided with guide roll 3, be fixed with a gas pipeline 7 with each bearing roller group one-to-one through a plurality of splice bars 5 on the support 1, all be connected with the jet-propelled pipe 6 with bearing roller 2 one-to-one on each gas pipeline 7, all be connected with connecting pipe 9 between each gas pipeline 7 and the main gas pipeline 10.
During the use, will the utility model discloses fix the tip at casing tunnel system 13, main gas pipeline 10 is connected and is given the trachea way, support the casing through bearing roller 2, to main gas pipeline 10 through giving the trachea way, connecting pipe 9 ventilates with a gas pipeline 7, thereby for jet-propelled pipe 6 provides the air supply, blow to bearing roller 2 through jet-propelled pipe 6, make bearing roller 2 rotate fast under the effect of bearing roller 2 windward way 12, thereby transmit the casing, lead to the casing through guide roll 3, thereby guarantee that the casing steadily turns to at the tip of casing tunnel system 13.
The steering mechanism of the collagen casing production tunnel system adopts the compressed air to blow the carrier roller 2 to drive the casing, thereby omitting the structures such as a motor, a chain and the like, leading the structure to be simpler and effectively reducing the maintenance cost of equipment; and the semi-cylindrical support 1 is adopted, so that the whole volume is reduced to half of the original volume, an operation space is provided for the artificial pulling process of the collagen casing, and the artificial pulling process is more convenient.
Example 2:
as shown in fig. 1 to 3, collagen casing production tunnel system steering mechanism, including semi-cylindrical's support 1 and main gas pipeline 10, be provided with a plurality of bearing roller groups along the axial on the curved surface of support 1, each bearing roller group all includes a plurality of arc rotations bearing roller 2 of setting on support 1, all be equipped with a plurality of wind grooves 12 on each bearing roller 2, be fixed with a plurality of leading truck 4 corresponding with bearing roller group on the support 1, all rotate on each leading truck 4 and be provided with guide roll 3, be fixed with a gas pipeline 7 with each bearing roller group one-to-one through a plurality of splice bars 5 on the support 1, all be connected with the jet-propelled pipe 6 with bearing roller 2 one-to-one on each gas pipeline 7, all be connected with connecting pipe 9 between each gas pipeline 7 and the main gas pipeline 10.
In this embodiment:
the guide frame 4 comprises a positioning block 14 fixed on the support 1, a lower connecting plate 15 is connected to the positioning block 14, roller shafts 16 are fixed at two ends of the lower connecting plate 15, an upper connecting plate 19 is fixed between the tops of the two roller shafts 16, and guide rollers 3 are rotatably connected to the two roller shafts 16, so that the guide rollers 3 corresponding to two adjacent carrier roller sets share one guide frame 4, and the structure is simpler and more compact; a sleeve 17 is fixed between the upper connecting plate 19 and the middle part of the lower connecting plate 15, a screw 18 penetrating through the lower connecting plate 15, the sleeve 17 and the upper connecting plate 19 is fixed on the positioning block 14, and a locking nut 20 is connected to the upper end of the screw 18 in a threaded manner, so that the deflection angle of the upper connecting plate 19 and the lower connecting plate 15 can be adjusted as required, and the transverse positions of the two guide rollers 3 can be adjusted to be suitable for casings with different diameters; a main air valve 11 is arranged on the main air pipeline 10; a branch air valve 8 is arranged on the connecting pipe 9; the gas ejector pipe 6 is a copper pipe, is not easy to rust, is easy to bend and is easy to adjust.
During the use, will the utility model discloses fix the tip at casing tunnel system 13, main gas pipeline 10 is connected and is given the trachea way, support the casing through bearing roller 2, to main gas pipeline 10 through giving the trachea way, connecting pipe 9 ventilates with a gas pipeline 7, thereby for jet-propelled pipe 6 provides the air supply, blow to bearing roller 2 through jet-propelled pipe 6, make bearing roller 2 rotate fast under the effect of 2 last wind grooves 12 of bearing roller, thereby transmit the casing, lead to the casing through guide roll 3, thereby guarantee that the casing steadily turns to at casing tunnel system 13's tip.
The steering mechanism of the collagen casing production tunnel system adopts the compressed air to blow the carrier roller 2 to transmit the casing, thereby omitting the structures such as a motor, a chain and the like, leading the structure to be simpler and effectively reducing the maintenance cost of equipment; and the semi-cylindrical support 1 is adopted, so that the whole volume is reduced to half of the original volume, an operation space is provided for the manual coating pulling process of the collagen casing, and the manual coating pulling process is more convenient.

Claims (6)

1. The utility model provides a collagen casing production tunnel system steering mechanism which characterized in that: support (1) and main gas pipeline (10) including semi-cylindrical, be provided with a plurality of bearing roller groups along the axial on the curved surface of support (1), each bearing roller group all includes a plurality of arc and rotates bearing roller (2) of setting on support (1), all be equipped with a plurality of wind channels (12) on each bearing roller (2), be fixed with a plurality of leading truck (4) corresponding with bearing roller group on support (1), all rotate on each leading truck (4) and be provided with guide roll (3), be fixed with on support (1) through a plurality of splice bar (5) with each bearing roller group one-to-one branch gas pipeline (7), all be connected with on each gas pipeline (7) with bearing roller (2) one-to-one jet-to-jet pipe (6), all be connected with between each gas pipeline (7) and main gas pipeline (10) connecting pipe (9).
2. The collagen casing production tunnel system steering mechanism of claim 1, wherein: the guide frame (4) comprises positioning blocks (14) fixed on the support (1), lower connecting plates (15) are connected to the positioning blocks (14), roller shafts (16) are fixed to two ends of each lower connecting plate (15), an upper connecting plate (19) is fixed between the tops of the two roller shafts (16), and guide rollers (3) are rotatably connected to the two roller shafts (16).
3. The collagen casing production tunnel system steering mechanism of claim 2, wherein: a sleeve (17) is fixed between the middle parts of the upper connecting plate (19) and the lower connecting plate (15), a screw rod (18) penetrating through the lower connecting plate (15), the sleeve (17) and the upper connecting plate (19) is fixed on the positioning block (14), and the upper end of the screw rod (18) is in threaded connection with a locking nut (20).
4. The collagen casing production tunnel system steering mechanism of claim 1, wherein: the main gas pipeline (10) is provided with a main gas valve (11).
5. The collagen casing production tunnel system steering mechanism according to any one of claims 1 to 4, characterized in that: and a branch air valve (8) is arranged on the connecting pipe (9).
6. The collagen casing production tunnel system steering mechanism of claim 5, wherein: the gas injection pipe (6) is a copper pipe.
CN202221714958.3U 2022-06-29 2022-06-29 Collagen casing production tunnel system steering mechanism Active CN217547124U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221714958.3U CN217547124U (en) 2022-06-29 2022-06-29 Collagen casing production tunnel system steering mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221714958.3U CN217547124U (en) 2022-06-29 2022-06-29 Collagen casing production tunnel system steering mechanism

Publications (1)

Publication Number Publication Date
CN217547124U true CN217547124U (en) 2022-10-11

Family

ID=83504823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221714958.3U Active CN217547124U (en) 2022-06-29 2022-06-29 Collagen casing production tunnel system steering mechanism

Country Status (1)

Country Link
CN (1) CN217547124U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115493939A (en) * 2022-11-17 2022-12-20 山东海奥斯生物科技股份有限公司 Collagen casing defect on-line measuring system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115493939A (en) * 2022-11-17 2022-12-20 山东海奥斯生物科技股份有限公司 Collagen casing defect on-line measuring system

Similar Documents

Publication Publication Date Title
CN217547124U (en) Collagen casing production tunnel system steering mechanism
CN211693783U (en) Pipeline support for municipal construction
CN2901844Y (en) Telescopic mechanism of torque transmission of green house rolled film
CN211946057U (en) Ultraviolet light curing pipeline non-excavation prosthetic tractive device
CN111389976B (en) General seamless steel pipe bending machine
CN111071859B (en) Cable penetrating device and penetrating method
CN214467051U (en) Pipeline repair propulsion device
CN112415699A (en) Pipeline pipe penetrating system and optical cable pipe penetrating method using pipeline pipe penetrating system
CN218201872U (en) Pipeline bearing mechanism and pipeline laying device for municipal water supply and drainage engineering
CN111496027A (en) Copper pipe is automatic bending device side by side
CN216030569U (en) Efficient physiosis axle sleeve dismounting device
CN2723061Y (en) Delivery and collecting special car for pipe cleaning device
CN211945588U (en) CIPP composite overturning tower
CN212216677U (en) Universal seamless steel pipe bending machine
CN204685741U (en) A kind of tube straightening device
CN109378770B (en) Corrugated pipe threading device
CN116845762A (en) Pipe embedding repairing robot for underground cable duct
CN221854096U (en) Auxiliary device for installation of heating pipeline network
CN205949544U (en) Straight machine of hank
CN220857455U (en) Circuit laying device for power engineering
CN219968545U (en) Bottle feeding mechanism for gas bottle winding machine
CN212953487U (en) Steel pipe single-wheel traction device
CN221150776U (en) Multi-scene cable laying device
CN221042175U (en) Electrical engineering threading construction device
CN204770047U (en) Metal tubular product bender

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant