CN217545461U - Communication pipeline construction clamping device - Google Patents

Communication pipeline construction clamping device Download PDF

Info

Publication number
CN217545461U
CN217545461U CN202220580331.7U CN202220580331U CN217545461U CN 217545461 U CN217545461 U CN 217545461U CN 202220580331 U CN202220580331 U CN 202220580331U CN 217545461 U CN217545461 U CN 217545461U
Authority
CN
China
Prior art keywords
sleeve
motor
rod
montant
clamping device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220580331.7U
Other languages
Chinese (zh)
Inventor
叶礼斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jinyi Communication Engineering Co ltd
Original Assignee
Shanghai Jinyi Communication Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jinyi Communication Engineering Co ltd filed Critical Shanghai Jinyi Communication Engineering Co ltd
Priority to CN202220580331.7U priority Critical patent/CN217545461U/en
Application granted granted Critical
Publication of CN217545461U publication Critical patent/CN217545461U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model relates to a communication pipeline construction technical field, concretely relates to communication pipeline construction clamping device, the on-line screen storage device comprises a base, two actuating mechanism and two adjustment mechanism, adjustment mechanism includes two montants, two first motors, two threaded rods, first sleeve and anchor clamps subassembly, when the level of anchor clamps subassembly is adjusted to needs, two threaded rods of two first motor work drives rotate, two threaded rods drive two sleeves and rotate to one side of keeping away from first motor on two threaded rods, two first sleeves drive two anchor clamps subassemblies and remove to one side of keeping away from first motor, adjust the level of two anchor clamps subassemblies according to actual demand, starting actuating mechanism, two montants of actuating mechanism work drive are close to each other the anchor clamps subassembly on two first sleeves, and carry out the centre gripping to communication pipeline and fix, thereby solved current clamping device and did not possess regulatory function's problem.

Description

Communication pipeline construction clamping device
Technical Field
The utility model relates to a communication pipeline construction technical field especially relates to a communication pipeline construction clamping device.
Background
The existing cables or receivers and the like are generally installed at high places or underground, and when some cables are installed underground, the cables need to be wrapped in pipelines, namely, pipelines for communication engineering, which are called communication pipelines for short. The arrangement can well protect the cable from the underground environment.
At present, prior art (CN 212011945U) discloses a pipeline positioner for communication construction, including the installation base, the top fixed mounting of installation base has two support frames, two the equal sliding connection in the left and right sides of support frame has integrated into one piece's sliding block, the right side fixed mounting at installation base top has servo motor, two the equal fixed mounting in bottom of sliding block has two holding rings. The utility model discloses a, can drive two-way lead screw when moving through servo motor for two holding rings can be close to each other or keep away from each other when rotating two-way lead screw, and then can drive solid fixed ring and be close to each other or keep away from, behind grip block centre gripping pipeline, through operation servo motor, make two pipelines be close to the butt joint each other, and then make the device reach the pipeline butt joint simple and convenient relatively, and the butt joint accuracy is higher relatively, has increased the convenience and the practicality of pipeline butt joint.
By adopting the mode, the clamp does not have an adjusting function, and when the pipeline is clamped, the height of the clamp cannot be adjusted according to the height in field construction, so that the practicability is reduced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a communication pipeline construction clamping device aims at solving the problem that current clamping device does not possess regulatory function.
In order to achieve the purpose, the utility model provides a communication pipeline construction clamping device, which comprises a base, two driving mechanisms and two adjusting mechanisms, wherein the two driving mechanisms are respectively arranged at the top of the base, and the two adjusting mechanisms are respectively arranged on the outer side walls of the two driving mechanisms;
adjustment mechanism includes two montants, two first motors, two threaded rods, first sleeve and two anchor clamps subassemblies, two the montant respectively with two actuating mechanism fixed connection to be located two respectively actuating mechanism's lateral wall, two first motor respectively with two montant fixed connection, and be located two respectively the inside wall of montant, two one side of threaded rod respectively with two the output fixed connection of first motor, two the opposite side of threaded rod respectively with two the montant rotates to be connected, and is located two respectively first motor and two between the montant, first sleeve with threaded rod threaded connection, and be located around the threaded rod, two the anchor clamps subassembly sets up respectively in two first telescopic lateral wall.
The clamp assembly comprises a first connecting rod and a clamping plate, the first connecting rod is fixedly connected with the first sleeve and is positioned on the outer side wall of the first sleeve, and the clamping plate is fixedly connected with the first connecting rod and is positioned on one side, far away from the first sleeve, of the first connecting rod.
Wherein, actuating mechanism includes horizontal pole, second motor, two-way screw rod, two transmission assembly and slip subassembly, the horizontal pole with base fixed connection, and be located the top of base, the second motor with horizontal pole fixed connection, and be located the inside wall of horizontal pole, one side of two-way screw rod with the output fixed connection of second motor, the opposite side of two-way screw rod with the horizontal pole rotates to be connected, and is located the second motor with between the horizontal pole, two transmission assembly sets up respectively in two-way screw rod and two between the montant, the slip subassembly set up in the base with between the montant.
The transmission assembly comprises a second sleeve and a second connecting rod, the second sleeve is in threaded connection with the two-way screw rod and located around the two-way screw rod, one side of the second connecting rod is fixedly connected with the second sleeve, and the other side of the second connecting rod is fixedly connected with the vertical rod and located between the second sleeve and the vertical rod.
The sliding assembly comprises a bottom plate and two sliding blocks, the bottom plate is provided with a sliding groove, the bottom plate is fixedly connected with the base and is positioned on one side, away from the transverse rod, of the base, the sliding blocks are respectively connected with one side of the bottom plate in a sliding mode, the sliding blocks are respectively connected with one side of the vertical rod in a fixed mode, and the sliding blocks are respectively connected with one side of the vertical rod in a fixed mode and are positioned in the sliding groove.
The utility model discloses a communication pipeline construction clamping device, the base is two actuating mechanism and two adjustment mechanism provides the installation condition, two the montant is two first motor and two the threaded rod provides the installation condition, adjusts as required during the level of anchor clamps subassembly, start two first motor, two first motor work drive is two the threaded rod rotates, two the threaded rod drives two the sleeve is two to keeping away from on the threaded rod one side of first motor is rotated, two first sleeve drives two the anchor clamps subassembly is to keeping away from one side of first motor removes, adjusts the level of two anchor clamps subassemblies according to actual demand, starts actuating mechanism, actuating mechanism work drive two the montant drives two anchor clamps subassemblies on the first sleeve are close to each other to fix communication pipeline, thereby solved current clamping device and did not possess regulatory function's problem.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is the utility model provides a pair of communication pipeline construction clamping device's schematic structure drawing.
Fig. 2 is a side view of the utility model provides a communication pipe construction clamping device.
Fig. 3 is a cross-sectional view of fig. 2.
1-base, 2-driving mechanism, 3-adjusting mechanism, 4-vertical rod, 5-first motor, 6-threaded rod, 7-first sleeve, 8-clamp component, 9-first connecting rod, 10-clamping plate, 11-cross rod, 12-second motor, 13-bidirectional screw, 14-transmission component, 15-sliding component, 16-second sleeve, 17-second connecting rod, 18-bottom plate, 19-sliding block and 20-sliding chute.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary and intended to be used for explaining the present invention, and should not be construed as limiting the present invention.
Referring to fig. 1 to 3, the present invention provides a communication pipe construction clamping device, which includes a base 1, two driving mechanisms 2 and two adjusting mechanisms 3, wherein the two driving mechanisms 2 are respectively disposed on the top of the base 1, and the two adjusting mechanisms 3 are respectively disposed on the outer sidewalls of the two driving mechanisms 2;
adjusting mechanism 3 includes two montants 4, two first motors 5, two threaded rods 6, first sleeve 7 and two anchor clamps subassemblies 8, two montant 4 respectively with two actuating mechanism 2 fixed connection, and be located two respectively actuating mechanism 2's lateral wall, two first motor 5 respectively with two montant 4 fixed connection, and be located two respectively the inside wall of montant 4, two one side of threaded rod 6 respectively with two the output fixed connection of first motor 5, two the opposite side of threaded rod 6 respectively with two montant 4 rotates to be connected, and is located two respectively first motor 5 with two between the montant 4, first sleeve 7 with threaded rod 6 threaded connection, and be located around threaded rod 6, two anchor clamps subassemblies 8 set up respectively in two the lateral wall of first sleeve 7.
In this embodiment, the base 1 is two actuating mechanism 2 and two adjustment mechanism 3 provides the installation condition, two montant 4 is two first motor 5 and two threaded rod 6 provides the installation condition, adjusts as required when the level of anchor clamps subassembly 8, starts two first motor 5, two first motor 5 work drive is two threaded rod 6 rotates, two threaded rod 6 drives two the sleeve is two to keeping away from on the threaded rod 6 one side of first motor 5 is rotated, two first sleeve 7 drives two anchor clamps subassembly 8 is to keeping away from one side of first motor 5 removes, adjusts the level of two anchor clamps subassemblies 8 according to actual demand, starts actuating mechanism 2, actuating mechanism 2 work drive two montant 4 drives two anchor clamps subassemblies 8 on the first sleeve 7 are close to each other to fix the communication pipeline, thereby solved the problem that current clamping device does not possess the regulatory function.
Further, the clamp assembly 8 includes a first connecting rod 9 and a clamping plate 10, the first connecting rod 9 is fixedly connected with the first sleeve 7 and is located on the outer side wall of the first sleeve 7, and the clamping plate 10 is fixedly connected with the first connecting rod 9 and is located on one side of the first connecting rod 9 away from the first sleeve 7.
In this embodiment, when the first sleeve 7 moves on the threaded rod 6, the first connecting rod 9 drives the clamping plate 10 to move, so as to adjust the horizontal height of the clamping plate 10, and the communication pipeline during construction can be clamped and fixed by the clamping plate 10.
Further, actuating mechanism 2 includes horizontal pole 11, second motor 12, two-way screw rod 13, two drive assembly 14 and slip subassembly 15, horizontal pole 11 with base 1 fixed connection, and be located base 1's top, second motor 12 with horizontal pole 11 fixed connection, and be located the inside wall of horizontal pole 11, one side of two-way screw rod 13 with the output fixed connection of second motor 12, the opposite side of two-way screw rod 13 with horizontal pole 11 rotates to be connected, and is located second motor 12 with between the horizontal pole 11, two drive assembly 14 sets up respectively in two-way screw rod 13 and two between the montant 4, slip subassembly 15 set up in base 1 with between the montant 4, drive assembly 14 includes second sleeve 16 and second connecting rod 17, second sleeve 16 with two-way screw rod 13 threaded connection, and be located around two-way screw rod 13, one side of second connecting rod 17 with second sleeve 16 fixed connection, the opposite side of second connecting rod 17 with montant 4 fixed connection, and be located second sleeve 16 with the second sleeve 4, and be located between the slider 18 and the bottom plate 19, the bottom plate 19 is connected with the slider 18, the bottom plate 19 is located the slider is connected with two fixed connection of the bottom plate 18, the bottom plate 20 respectively, the bottom plate 20, the slider is connected with two opposite side of the bottom plate 18, the slider is located the bottom plate 18, the slider is connected with the bottom plate 19, the bottom plate 19 is connected with two fixed connection of base 1, the bottom plate 19 is connected with the slider 18, the bottom plate 19, the slider is connected with the bottom plate 19, the bottom plate 19 is connected with the bottom plate 19, the opposite side of the slider 18, the slider 18 is connected with the bottom plate 19, the slider is connected with the bottom plate 20 is connected with the bottom plate 19, the bottom plate 19 is connected with the bottom plate, the bottom plate 20.
In this embodiment, the bottom plate 18 is two the slider 19 provides the installation condition, the horizontal pole 11 does the second motor 12 with the two-way screw 13 provides the installation condition, starts the second motor 12, the second motor 12 drives in work the two-way screw 13 rotates, the two-way screw 13 drives the second sleeve 16 moves to the one side of keeping away from the second motor 12, the second sleeve 16 passes through the second connecting rod 17 drives the montant 4 moves to the one side of keeping away from the second motor 12, drives the slider 19 is in the spout 20 internal slipping, the slider 19 is right the montant 4 leads, drives simultaneously the splint 10 moves to the one side that is close to the communication pipeline, until splint 10 and communication pipeline contact to it is fixed to carry out the centre gripping to the communication pipeline.
The above disclosure is only a preferred embodiment of the clamping device for communication pipe construction, and certainly, the scope of the present invention should not be limited thereto, and one skilled in the art can understand that all or part of the procedures of the above embodiment can be implemented, and the equivalent changes made according to the claims of the present invention still belong to the scope covered by the present invention.

Claims (5)

1. A communication pipeline construction clamping device comprises a base, two driving mechanisms and two adjusting mechanisms, wherein the two driving mechanisms are respectively arranged at the top of the base, the two adjusting mechanisms are respectively arranged at the outer side walls of the two driving mechanisms,
adjustment mechanism includes two montants, two first motors, two threaded rods, first sleeve and two anchor clamps subassemblies, two the montant respectively with two actuating mechanism fixed connection to be located two respectively actuating mechanism's lateral wall, two first motor respectively with two montant fixed connection, and be located two respectively the inside wall of montant, two one side of threaded rod respectively with two the output fixed connection of first motor, two the opposite side of threaded rod respectively with two the montant rotates to be connected, and is located two respectively first motor and two between the montant, first sleeve with threaded rod threaded connection, and be located around the threaded rod, two the anchor clamps subassembly sets up respectively in two first telescopic lateral wall.
2. The communication pipe construction clamping device of claim 1,
the clamp assembly comprises a first connecting rod and a clamping plate, the first connecting rod is fixedly connected with the first sleeve and is positioned on the outer side wall of the first sleeve, and the clamping plate is fixedly connected with the first connecting rod and is positioned on one side, far away from the first sleeve, of the first connecting rod.
3. The communication pipe construction clamping device of claim 1,
actuating mechanism includes horizontal pole, second motor, two-way screw rod, two drive assembly and slip subassembly, the horizontal pole with base fixed connection, and be located the top of base, the second motor with horizontal pole fixed connection, and be located the inside wall of horizontal pole, one side of two-way screw rod with the output fixed connection of second motor, the opposite side of two-way screw rod with the horizontal pole rotates to be connected, and is located the second motor with between the horizontal pole, two drive assembly sets up respectively in two-way screw rod and two between the montant, the slip subassembly set up in the base with between the montant.
4. The communication pipe construction clamping device of claim 3,
the transmission assembly comprises a second sleeve and a second connecting rod, the second sleeve is in threaded connection with the two-way screw rod and located around the two-way screw rod, one side of the second connecting rod is fixedly connected with the second sleeve, and the other side of the second connecting rod is fixedly connected with the vertical rod and located between the second sleeve and the vertical rod.
5. The communication pipe construction clamping device of claim 3,
the sliding assembly comprises a bottom plate and two sliding blocks, the bottom plate is provided with a sliding groove, the bottom plate is fixedly connected with the base and is positioned on one side of the transverse rod, two sliding blocks are arranged on one sides of the sliding blocks respectively and are in sliding connection with the bottom plate, and two sliding blocks are arranged on the other sides of the sliding blocks respectively and are fixedly connected with the vertical rods and are positioned in the sliding groove.
CN202220580331.7U 2022-03-16 2022-03-16 Communication pipeline construction clamping device Active CN217545461U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220580331.7U CN217545461U (en) 2022-03-16 2022-03-16 Communication pipeline construction clamping device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220580331.7U CN217545461U (en) 2022-03-16 2022-03-16 Communication pipeline construction clamping device

Publications (1)

Publication Number Publication Date
CN217545461U true CN217545461U (en) 2022-10-04

Family

ID=83427696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220580331.7U Active CN217545461U (en) 2022-03-16 2022-03-16 Communication pipeline construction clamping device

Country Status (1)

Country Link
CN (1) CN217545461U (en)

Similar Documents

Publication Publication Date Title
CN209773856U (en) Fixing tool for double-side welding of pipe flange
CN210326928U (en) Adjustable soft bus spacing hardware fitting
CN216903701U (en) Butt joint device for special cable production
CN217545461U (en) Communication pipeline construction clamping device
CN113369751A (en) Welding set is used in stainless steel pipe fitting production with detect function
CN219113304U (en) Welding jig of variable angle
CN209805259U (en) conveying device for cable laying
CN218081217U (en) Fixing and aligning machine for water pipeline construction
CN214850415U (en) High-efficient damper is used to cable termination joint
CN212012109U (en) Quick connection structure of communication cable intermediate head
CN220775303U (en) Wiring device for power distribution engineering
CN215148507U (en) Pipeline butt joint auxiliary device for communication engineering
CN217507883U (en) RPS pencil connector is fixed and is used anchor clamps with adjust structure
CN215848490U (en) Clamping tool for ultrahigh-speed steel belt reinforced corrugated drain pipe production line
CN218956871U (en) Optical cable holder
CN217669680U (en) Pipe clamping device
CN219310665U (en) Panel fluting device is used in panel processing
CN217967095U (en) Guide rail for industrial robot
CN220754226U (en) Communication cable fixing mechanism
CN221696692U (en) Automatic splicing structure of catheter and connector
CN221755391U (en) Clamp for producing automobile chassis parts
CN217984432U (en) Cable bracket arm combined system of fast-assembling installation
CN217968438U (en) A butt fusion device for PVC pipeline processing
CN211981364U (en) Pre-buried equipment for construction and laying of power cable wall surface
CN221791544U (en) Auxiliary fixture for sensor welding

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant