CN217541991U - Novel test of reserve wind gap snare device - Google Patents

Novel test of reserve wind gap snare device Download PDF

Info

Publication number
CN217541991U
CN217541991U CN202221415825.6U CN202221415825U CN217541991U CN 217541991 U CN217541991 U CN 217541991U CN 202221415825 U CN202221415825 U CN 202221415825U CN 217541991 U CN217541991 U CN 217541991U
Authority
CN
China
Prior art keywords
water
outlet pipe
small sleeve
backup pad
tuyere small
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221415825.6U
Other languages
Chinese (zh)
Inventor
候兵
刘刚
魏德江
明阳
李宗江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Laigang Yongfeng Steel and Iron Co Ltd
Original Assignee
Shandong Laigang Yongfeng Steel and Iron Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Laigang Yongfeng Steel and Iron Co Ltd filed Critical Shandong Laigang Yongfeng Steel and Iron Co Ltd
Priority to CN202221415825.6U priority Critical patent/CN217541991U/en
Application granted granted Critical
Publication of CN217541991U publication Critical patent/CN217541991U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model discloses a novel reserve tuyere small sleeve testing device, comprising a base plate, top one side of bottom plate is equipped with the backup pad, one side of backup pad is equipped with the water tank, the inside of water tank is equipped with the water pump, the play water outlet end of water pump is connected with the outlet pipe, be equipped with manometer and flowmeter on the outlet pipe, the one end that the water pump was kept away from to the outlet pipe is connected with flexible pipe, the bottom of flexible pipe is equipped with the bayonet joint, one side of bayonet joint is equipped with lifting unit, lifting unit's below is equipped with the rack with backup pad fixed connection, be equipped with the tuyere small sleeve that awaits measuring on the rack. The utility model discloses a manometer and flowmeter detect tuyere small sleeve operating condition as the test subject, open the flow of high pressure water under through testing different pressure, effective measurement pressure and flow data simultaneously to the test is convenient, and is consuming time shorter, has the reliability, and the security is good, and measurement numerical value is accurate, guarantees blast furnace production.

Description

Novel test of reserve wind gap snare device
Technical Field
The utility model relates to an iron-making blast furnace cooling technical field, more specifically say, in particular to novel test of reserve tuyere cover device.
Background
The working environment of the tuyere small sleeve is extremely severe. Generally made of copper, the cooling water is introduced into the furnace for cooling, and the hot air and the coal powder are prevented from directly scouring the wall of the furnace when the furnace is protruded into the furnace. The blast furnace tuyere small sleeve consists of a body and a front cap and is characterized in that the body of the tuyere small sleeve consists of a front body, a rear body, a steel frame and a rear cap, the front cap and the front body are formed by pure copper extrusion casting, the rear body is provided with a water inlet and a water outlet, the rear body and the rear cap are formed by boiler steel casting, and the steel frame is formed by common steel plates in a welding mode. After the tuyere sleeve is designed to be produced, a workshop must carry out multiple tests on the flow, the pressure maintaining parameters and the like to obtain a numerical value so as to determine the flow parameter and the pressure maintaining numerical value of the tuyere sleeve; the test system has multiple problems in the prior art, such as inaccurate test results, inaccurate pressure of the flow velocity of water, low flow velocity of water, poor cooling effect and easy burning loss, influences the normal use of a blast furnace cooling system, and can not collect water flow during testing, so that a novel standby tuyere small sleeve test device is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel reserve wind gap snare test device.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a novel reserve wind gap snare test device, comprising a base plate, top one side of bottom plate is equipped with the backup pad, one side of backup pad is equipped with the water tank, the inside of water tank is equipped with the water pump, the play water end of water pump is connected with the outlet pipe, be equipped with manometer and flowmeter on the outlet pipe, the one end that the water pump was kept away from to the outlet pipe is connected with flexible pipe, the bottom of flexible pipe is equipped with the bayonet joint, one side of bayonet joint is equipped with lifting unit, lifting unit's below is equipped with the rack with backup pad fixed connection, be equipped with the wind gap snare that awaits measuring on the rack, the top of wind gap snare is equipped with inlet tube and drain pipe, and the bayonet joint inserts in the inlet tube.
Preferably, the lifting assembly comprises a push rod motor fixedly connected to the top of the placing frame, an output shaft of the push rod motor is fixedly connected with a lifting plate, and one side of the lifting plate is fixedly connected with the plug connector.
Preferably, one side of the supporting plate is provided with a supporting frame, and the water tank is arranged on the supporting frame.
Preferably, a baffle is arranged on one side, away from the support plate, of the plug connector, and a top plate is arranged at the top of the support plate.
Preferably, a water receiving box is arranged below the placing frame, and the cross section of the placing frame is of a U-shaped structure.
Preferably, the supporting plate is provided with a fixing hole, the water outlet pipe is fixedly sleeved in the fixing hole, the top of the water tank is provided with an opening, and the water outlet pipe penetrates through the opening.
Compared with the prior art, the utility model has the advantages of:
through setting up the backup pad, the water tank, the outlet pipe, the manometer, the flowmeter, flexible pipe, the bayonet joint, lifting unit, the rack, the tuyere small sleeve, the inlet tube, drain pipe and water receiving tank isotructure, wherein lifting unit conveniently controls in the inlet tube that the bayonet joint inserted the tuyere small sleeve, water pump in the water tank can send water into the inlet tube through outlet pipe and flexible pipe like this, water gets into behind the tuyere small sleeve, from the outlet pipe outflow completion test again, through manometer and flowmeter, can show these parameter display directly perceivedly, be convenient for staff's observation and processing, this scheme simple structure, and novel design, adopt manometer and flowmeter as the test subject, open the high pressure water and detect tuyere small sleeve operating condition through the flow that tests under the different pressures, effective measurement pressure and flow data simultaneously, and the test is convenient, consuming time is shorter, reliability has, the security is good, measure numerical value accuracy, guarantee blast furnace production.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a front view of the structure of the present invention;
FIG. 2 is a side view of the structure of the present invention;
fig. 3 is a perspective view of the present invention.
In the figure: the water-saving water dispenser comprises a base plate 1, a support plate 2, a support frame 3, a water tank 4, a water outlet pipe 5, a pressure gauge 6, a flow meter 7, an extension pipe 8, a plug 9, a lifting plate 10, a push rod motor 11, a placing frame 12, a tuyere small sleeve 13, a water inlet pipe 14, a water outlet pipe 15, a baffle 16, a top plate 17 and a water receiving tank 18.
Detailed Description
The preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings, so that the advantages and features of the present invention can be more easily understood by those skilled in the art, and the scope of the present invention can be more clearly and clearly defined.
Referring to fig. 1-3, the utility model provides a novel reserve tuyere small sleeve testing arrangement, comprising a base plate 1, top one side of bottom plate 1 is equipped with backup pad 2, one side of backup pad 2 is equipped with water tank 4, the inside of water tank 4 is equipped with the water pump, the delivery end of water pump is connected with outlet pipe 5, be equipped with manometer 6 and flowmeter 7 on the outlet pipe 5, the one end that the water pump was kept away from to outlet pipe 5 is connected with flexible pipe 8, the bottom of flexible pipe 8 is equipped with bayonet joint 9, one side of bayonet joint 9 is equipped with lifting unit, lifting unit's below is equipped with rack 12 with backup pad 2 fixed connection, be equipped with the tuyere small sleeve 13 that awaits measuring on the rack 12, the top of tuyere small sleeve 13 is equipped with inlet tube 14 and drain pipe 15, and bayonet joint 9 inserts in the inlet tube 14, lifting unit drives bayonet joint 9 and pegs graft on inlet tube 14, like this water in the water tank 4 passes through outlet pipe 5 and flexible pipe 8 gets into inlet tube 14, water gets into the tuyere small sleeve 13 after water gets into, accomplish the test from drain pipe 15 discharge again, manometer 6 and flowmeter 7 are used for the pressure and the flow of test.
As shown in fig. 1, the lifting assembly includes a push rod motor 11 fixedly connected to the top of the placing rack 12, an output shaft of the push rod motor 11 is fixedly connected to a lifting plate 10, and one side of the lifting plate 10 is fixedly connected to the plug 9, the push rod motor 11 drives the lifting plate 10 to move up and down, the lifting plate 10 drives the plug 9 to move, and the plug 9 is plugged into and separated from the water inlet pipe 14.
As shown in fig. 1, a support frame 3 is provided at one side of the support plate 2, and a water tank 4 is provided on the support frame 3.
As shown in fig. 1, a baffle 16 is arranged on one side of the plug 9 away from the support plate 2, a top plate 17 is arranged on the top of the support plate 2, and the baffle 16 protects the water discharged from the water discharge pipe 15 to prevent the water from splashing.
As shown in fig. 3, a water receiving tank 18 is arranged below the placing rack 12, and the cross section of the placing rack 12 is of a U-shaped structure.
Furthermore, a fixing hole is formed in the supporting plate 2, the water outlet pipe 5 is fixedly sleeved in the fixing hole, an opening is formed in the top of the water tank 4, and the water outlet pipe 5 penetrates through the opening.
The detailed working principle is as follows: the tuyere small sleeve 13 to be tested is placed on the placing frame 12, the push rod motor 11 drives the lifting plate 10 to move downwards, the lifting plate 10 drives the plug-in connector 9 to be inserted into the water inlet pipe 14 on the tuyere small sleeve 13, at the moment, a water pump in the water tank 4 sends water into the tuyere small sleeve 13 through the water outlet pipe 5 and the telescopic pipe 8, the pressure gauge 6 and the flowmeter 7 can visually and digitally monitor the test process for detection, parameters such as pressure, flow and the like of equipment to be tested can be accurately tested, the parameters can be visually displayed, observation and treatment of workers are facilitated, after the water is discharged from the water discharge pipe 15 on the tuyere small sleeve 13, the water can flow back into the water receiving tank 18 to be collected, and after the test is completed, the push rod motor 11 drives the lifting plate 10 and the plug-in connector 9 to move upwards to be separated from the water inlet pipe 14.
Although the embodiments of the present invention have been described with reference to the accompanying drawings, various changes and modifications can be made by the owner within the scope of the appended claims, and the protection scope of the present invention should not be exceeded by the claims.

Claims (6)

1. The utility model provides a novel reserve wind gap tegillum testing arrangement, includes the bottom plate, its characterized in that, top one side of bottom plate is equipped with the backup pad, one side of backup pad is equipped with the water tank, the inside of water tank is equipped with the water pump, the play water outlet end of water pump is connected with the outlet pipe, be equipped with manometer and flowmeter on the outlet pipe, the one end that the water pump was kept away from to the outlet pipe is connected with flexible pipe, flexible pipe's bottom is equipped with the bayonet joint, one side of bayonet joint is equipped with lifting unit, lifting unit's below is equipped with the rack with backup pad fixed connection, be equipped with the wind gap tegillum that awaits measuring on the rack, the top of wind gap tegillum is equipped with inlet tube and drain pipe, and the bayonet joint inserts in the inlet tube.
2. The novel spare tuyere small sleeve testing device of claim 1, wherein: the lifting assembly comprises a push rod motor fixedly connected to the top of the placing frame, an output shaft of the push rod motor is fixedly connected with a lifting plate, and one side of the lifting plate is fixedly connected with the plug connector.
3. The novel spare tuyere small sleeve testing device of claim 1, wherein: one side of backup pad is equipped with the support frame, and the water tank setting is on the support frame.
4. The novel spare tuyere small sleeve testing device of claim 1, wherein: a baffle is arranged on one side, away from the supporting plate, of the plug connector, and a top plate is arranged at the top of the supporting plate.
5. The novel spare tuyere small sleeve testing device of claim 1, wherein: the water receiving box is arranged below the placing rack, and the cross section of the placing rack is of a U-shaped structure.
6. The novel spare tuyere small sleeve testing device of claim 1, wherein: the fixed orifices have been seted up in the backup pad, and the fixed cover of outlet pipe is established in the fixed orifices, the top of water tank is equipped with the opening, and the outlet pipe runs through the opening.
CN202221415825.6U 2022-06-08 2022-06-08 Novel test of reserve wind gap snare device Expired - Fee Related CN217541991U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221415825.6U CN217541991U (en) 2022-06-08 2022-06-08 Novel test of reserve wind gap snare device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221415825.6U CN217541991U (en) 2022-06-08 2022-06-08 Novel test of reserve wind gap snare device

Publications (1)

Publication Number Publication Date
CN217541991U true CN217541991U (en) 2022-10-04

Family

ID=83444429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221415825.6U Expired - Fee Related CN217541991U (en) 2022-06-08 2022-06-08 Novel test of reserve wind gap snare device

Country Status (1)

Country Link
CN (1) CN217541991U (en)

Similar Documents

Publication Publication Date Title
CN217541991U (en) Novel test of reserve wind gap snare device
CN106990014B (en) Foaming multiple measuring system and method for foam extinguishing agent
CN208109335U (en) A kind of gauge stand for exempting to tear safety check pressure open
CN214550431U (en) Multifunctional urine flow device for ICU department
CN110274668A (en) A kind of tank fill level scaling method and liquid level calibration tool
CN213657983U (en) Flow aperture test device
CN208736490U (en) A kind of precession vortex gas flowmeter
CN216815688U (en) Float level meter based on Internet of things
CN221103172U (en) Single bar foreign matter detection blowing device of steam turbine generator
CN215178020U (en) Automatic change triangle weir measuring apparatu
CN218121317U (en) Air leakage detection device
CN209645736U (en) A kind of novel fire hydrant pressure measuring tie-in
CN221038958U (en) Sampling detection mechanism is used in diluent production
CN211576497U (en) Intelligent detector for safety valve sealing test
CN214951959U (en) Pressure instrument for fluid measurement
CN214907221U (en) Hysteroscope operation uterus expanding liquid discharge amount accurate metering device
CN210834415U (en) Measurement detection device
CN215262300U (en) Pipeline water pressure detection equipment
CN217059004U (en) Device for detecting water meter production
CN219531944U (en) Shell flatness detection equipment
CN2188199Y (en) Water meter tester
CN216116192U (en) Intelligent water meter capable of detecting pressure
CN221173557U (en) Detachable liquid level meter
CN221006514U (en) Automatic metering and calibrating device for liquid level meter
CN214277110U (en) Stable mounting structure of liquid level monitoring equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221004