CN217537429U - Steel construction wall body based on energy-conserving assembled - Google Patents

Steel construction wall body based on energy-conserving assembled Download PDF

Info

Publication number
CN217537429U
CN217537429U CN202221410659.0U CN202221410659U CN217537429U CN 217537429 U CN217537429 U CN 217537429U CN 202221410659 U CN202221410659 U CN 202221410659U CN 217537429 U CN217537429 U CN 217537429U
Authority
CN
China
Prior art keywords
wall body
block
fixedly connected
energy
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221410659.0U
Other languages
Chinese (zh)
Inventor
张春波
陈笑亮
李平
李丹丹
金荣卫
储小龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Junshun Construction Co ltd
Original Assignee
Hangzhou Junshun Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Junshun Construction Co ltd filed Critical Hangzhou Junshun Construction Co ltd
Priority to CN202221410659.0U priority Critical patent/CN217537429U/en
Application granted granted Critical
Publication of CN217537429U publication Critical patent/CN217537429U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model relates to a steel construction wall technical field specifically is a steel construction wall based on energy-conserving assembled, including wall body, the last installation mechanism that is provided with of wall body, installation mechanism includes the positive installation piece of fixed mounting at wall body, the first fixture block of positive fixedly connected with of wall body, the top sliding connection of installation piece has the pull rod, the spring has been cup jointed in the outside of pull rod, the bottom fixedly connected with second fixture block of pull rod. This steel construction wall based on energy-conserving assembled, through setting up installation mechanism, can demolish fast between two wall body, solved traditional assembled building wall and passed through the problem that bolt fastening dismantles wastes time and energy, the effectual efficiency of construction that has improved does benefit to assembled building wall's popularization and use, restricts through the pull rod simultaneously for connection between the wall body is more firm, increases the holistic stability of wall body.

Description

Steel construction wall body based on energy-conserving assembled
Technical Field
The utility model relates to a steel construction wall technical field specifically is a steel construction wall based on energy-conserving assembled.
Background
The steel material features high strength, light dead weight, good integral rigidity and strong deformation capacity, so it is especially suitable for building large-span super-high and super-heavy buildings, the structure is mainly composed of steel beams, steel columns and steel trusses, all the components are usually connected by welding seams, bolts or rivets, because of its light dead weight, and the construction is simple, it can be widely used in the fields of large-scale factory buildings, venues and super-high buildings.
The structure that gives first place to with steel preparation is one of main building structure type, and current steel construction wall body is inconvenient to be installed fast and dismantles, and traditional assembled building wall body all carries out fixed mounting through a plurality of bolts, wastes time and energy during the dismantlement, and the dismantlement of giving the operating personnel brings very big inconvenience to installation effectiveness has been reduced, so proposed a steel construction wall body based on energy-conserving assembled.
SUMMERY OF THE UTILITY MODEL
The not enough to prior art, the utility model provides a steel construction wall based on energy-conserving assembled possesses advantages such as easy to assemble dismantlement, has solved the inconvenient problem of installing the dismantlement fast of current steel construction wall.
In order to achieve the above purpose, the utility model provides a following technical scheme: a steel structure wall based on an energy-saving assembly type comprises a wall body, wherein an installation mechanism is arranged on the wall body;
the installation mechanism includes the positive installation piece of fixed mounting at the wall body, the first fixture block of positive fixedly connected with of wall body, the top sliding connection of installation piece has the pull rod, the spring has been cup jointed in the outside of pull rod, the bottom fixedly connected with second fixture block of pull rod, the mounting groove has been seted up in the left side of installation piece, the top fixedly connected with of installation piece connects the storehouse, the top of connecting the storehouse is rotated and is connected with the threaded rod, the outside threaded connection of threaded rod has the movable block, the front of movable block articulates there is the connecting rod, connect the inside fixedly connected with slide bar in storehouse, the outside sliding connection of slide bar has the sliding block, the right side fixedly connected with U type frame of sliding block, the bottom fixedly connected with gag lever post of sliding block, the positive fixedly connected with fixed block of wall body, the positive fixedly connected with connecting block of wall body, pull rod one end runs through and extends to the inside of installation piece, the one end of connecting rod is articulated with the inside of U type frame.
Through adopting above-mentioned technical scheme, the convenience is realized splicing between two wall body bodies when using to install fast, thereby improved staff's installation effectiveness, the connecting rod is convenient to rotate around U type frame when using.
Further, one end of the spring is fixedly connected with the inner top of the mounting groove, and the other end of the spring is fixedly connected with the top of the second clamping block.
Through adopting above-mentioned technical scheme, the convenience drives the removal of second fixture block through the tension of spring when using.
Further, the spout has been seted up to the right side inner wall of mounting groove, the right side fixedly connected with of second fixture block and spout sliding connection's slider.
Through adopting above-mentioned technical scheme, the second fixture block passes through the slider and removes in the spout when the convenience is used.
Furthermore, the left side of the fixed block is provided with a clamping groove matched with the width of the connecting block, and the right side of the pull rod is provided with a limiting groove matched with the size of the limiting rod.
Through adopting above-mentioned technical scheme, the convenience is restricted the pull rod by the spacing pole when using.
Furthermore, the inside of sliding block is seted up with the slip through-hole of slide bar size looks adaptation, gag lever post one end runs through and extends to the outside of connecting the storehouse.
Through adopting above-mentioned technical scheme, the sliding block moves on the slide bar when the convenience is used.
Further, threaded rod one end through connection storehouse and with be connected the interior diapire rotation connection in storehouse, the threaded rod is located the front of slide bar.
Through adopting above-mentioned technical scheme, the threaded rod remains stable when the convenience is used.
Furthermore, the inside of movable block is seted up with threaded rod threaded connection's screw through-hole.
Through adopting above-mentioned technical scheme, the convenience is when using the movable block to remove on the threaded rod.
Compared with the prior art, the technical scheme of the application has the following beneficial effects:
this steel construction wall based on energy-conserving assembled, through setting up installation mechanism, can demolish fast between two wall body, solved traditional assembled building wall and passed through the problem that bolt fastening dismantles wastes time and energy, the effectual efficiency of construction that has improved does benefit to assembled building wall's popularization and use, restricts through the pull rod simultaneously for connection between the wall body is more firm, increases the holistic stability of wall body.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of the structure A of FIG. 1;
fig. 3 is a sectional view of the connection structure of the first fixture block and the second fixture block of the present invention.
In the figure: 1. a wall body; 2. mounting blocks; 3. a first clamping block; 4. a pull rod; 5. a spring; 6. a second fixture block; 7. mounting grooves; 8. a connecting bin; 9. a threaded rod; 10. a movable block; 11. a connecting rod; 12. a slide bar; 13. a slider; 14. a U-shaped frame; 15. a limiting rod; 16. a fixed block; 17. and (4) connecting the blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the energy-saving assembly-based steel structural wall in the embodiment includes a wall body 1, and a mounting mechanism is disposed on the wall body 1.
The installation mechanism comprises an installation block 2 fixedly installed on the front face of the wall body 1, a first clamping block 3 is fixedly connected to the front face of the wall body 1, a pull rod 4 is slidably connected to the top of the installation block 2, and a pull head is fixed to the top end of the pull rod 4 to facilitate moving of the pull rod 4. 4 one ends of pull rod run through and extend to the inside of installation piece 2, spring 5 has been cup jointed in the outside of pull rod 4, the bottom fixedly connected with second fixture block 6 of pull rod 4, mounting groove 7 has been seted up in the left side of installation piece 2, the spout has been seted up to the right side inner wall of mounting groove 7, the right side fixedly connected with and spout sliding connection's slider of second fixture block 6, the one end of spring 5 and the interior top fixed connection of mounting groove 7, the other end of spring 5 and the top fixed connection of second fixture block 6, the top fixedly connected with of installation piece 2 connects storehouse 8, the top of connecting storehouse 8 is rotated and is connected with threaded rod 9, the outside threaded connection of threaded rod 9 has movable block 10, the threaded hole with threaded rod 9 threaded connection is seted up to the inside of movable block 10, the front of movable block 10 articulates there is connecting rod 11, the inside fixedly connected with slide bar 12 of connecting storehouse 8, slide bar 12 and threaded rod 9 mutually perpendicular. Threaded rod 9 one end through connection storehouse 8 and with be connected the interior diapire rotation of storehouse 8 and be connected, threaded rod 9 is located the front of slide bar 12, the outside sliding connection of slide bar 12 has sliding block 13, the right side fixedly connected with U type frame 14 of sliding block 13, the one end of connecting rod 11 is articulated with the inside of U type frame 14, the bottom fixedly connected with gag lever post 15 of sliding block 13, gag lever post 15 can restrict pull rod 4, avoid breaking away from because of not hard up first fixture block 3 and second fixture block 6 of pull rod 4 messenger, make the connection between two wall body 1 more stable, the sliding through-hole with the adaptation of slide bar 12 size is seted up to the inside of sliding block 13, gag lever post 15 one end runs through and extends to the outside of connecting storehouse 8, the front fixedly connected with fixed block 16 of wall body 1, the front fixedly connected with connecting block 17 of wall body 1, the draw-in groove with the width looks adaptation of connecting block 17 is seted up in the left side of fixed block 16, the spacing groove with the adaptation of gag lever post 15 size is seted up on the right side of pull rod 4, be connected with fixed block 16 earlier through connecting block 17, improve the accuracy during installation, make the accuracy of inserting in the mounting groove 7.
The working principle of the above embodiment is as follows:
this steel construction wall based on energy-conserving assembled, through setting up installation mechanism, when using, according to the work demand, splice two or polylith wall body 1, connecting block 17 stretches into in the draw-in groove on the fixed block 16, rotating threaded rod 9, threaded rod 9 drives movable block 10 downstream, connecting rod 11 is along with removing, connecting rod 11 one end rotates around U type frame 14, connecting rod 11 pulling sliding block 13 moves on slide bar 12, make gag lever post 15 break away from the spacing groove on pull rod 4, insert first fixture block 3 in the mounting groove 7 of installation piece 2 on the adjacent wall body 1 simultaneously, pulling pull rod 4, second fixture block 6 passes through the slider and moves on the spout, extrude spring 5, second fixture block 6 stretches into behind the mounting groove 7, through the tension of spring 5, drive second fixture block 6 downstream, first fixture block 3 and second fixture block 6 block, thereby accomplish the installation, reverse rotation 9, movable block 10 drives connecting rod 11 and upwards moves, connecting rod 11 extrudes sliding block 13, make gag lever post 15 stretch into the spacing inslot, make the installation more firm.

Claims (7)

1. The utility model provides a steel construction wall based on energy-conserving assembled, includes wall body (1), its characterized in that: an installation mechanism is arranged on the wall body (1);
the installation mechanism comprises an installation block (2) fixedly installed on the front of a wall body (1), a first fixture block (3) is fixedly connected to the front of the wall body (1), a pull rod (4) is slidably connected to the top of the installation block (2), a spring (5) is sleeved on the outer side of the pull rod (4), a second fixture block (6) is fixedly connected to the bottom of the pull rod (4), an installation groove (7) is formed in the left side of the installation block (2), a connection bin (8) is fixedly connected to the top of the installation block (2), a threaded rod (9) is rotatably connected to the top of the connection bin (8), a movable block (10) is in threaded connection with the outer side of the threaded rod (9), a connecting rod (11) is hinged to the front of the movable block (10), a sliding rod (12) is fixedly connected to the inside of the connection bin (8), a sliding block (13) is slidably connected to the outer side of the sliding rod (12), a U-shaped frame (14) is fixedly connected to the right side of the sliding block (13), a limiting rod (15) is fixedly connected to the bottom of the sliding block (13), a fixed block (16) is fixedly connected to the front of the wall body (1), and one end of the pull rod (17) extends through the wall body (17), one end of the connecting rod (11) is hinged with the inside of the U-shaped frame (14).
2. The energy-saving assembly type-based steel structure wall body as claimed in claim 1, wherein: one end of the spring (5) is fixedly connected with the inner top of the mounting groove (7), and the other end of the spring (5) is fixedly connected with the top of the second clamping block (6).
3. The energy-saving assembled steel structure wall body according to claim 1, wherein: the right side inner wall of mounting groove (7) has seted up the spout, the right side fixedly connected with of second fixture block (6) and spout sliding connection's slider.
4. The energy-saving assembled steel structure wall body according to claim 1, wherein: the left side of the fixing block (16) is provided with a clamping groove matched with the width of the connecting block (17), and the right side of the pull rod (4) is provided with a limiting groove matched with the size of the limiting rod (15).
5. The energy-saving assembled steel structure wall body according to claim 1, wherein: the inside of sliding block (13) is seted up with the slip through-hole of slide bar (12) size looks adaptation, gag lever post (15) one end is run through and is extended to the outside of connecting storehouse (8).
6. The energy-saving assembly type-based steel structure wall body as claimed in claim 1, wherein: threaded rod (9) one end through connection storehouse (8) and with be connected the interior diapire rotation connection in storehouse (8), threaded rod (9) are located the front of slide bar (12).
7. The energy-saving assembly type-based steel structure wall body as claimed in claim 1, wherein: the movable block (10) is internally provided with a threaded through hole in threaded connection with the threaded rod (9).
CN202221410659.0U 2022-06-06 2022-06-06 Steel construction wall body based on energy-conserving assembled Active CN217537429U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221410659.0U CN217537429U (en) 2022-06-06 2022-06-06 Steel construction wall body based on energy-conserving assembled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221410659.0U CN217537429U (en) 2022-06-06 2022-06-06 Steel construction wall body based on energy-conserving assembled

Publications (1)

Publication Number Publication Date
CN217537429U true CN217537429U (en) 2022-10-04

Family

ID=83444040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221410659.0U Active CN217537429U (en) 2022-06-06 2022-06-06 Steel construction wall body based on energy-conserving assembled

Country Status (1)

Country Link
CN (1) CN217537429U (en)

Similar Documents

Publication Publication Date Title
CN210685116U (en) Novel fast mode steel construction building ridge
CN217537429U (en) Steel construction wall body based on energy-conserving assembled
CN217978639U (en) LED street lamp easy to install and maintain
CN218437503U (en) Buckling-restrained replaceable boom truss chord member
CN217537301U (en) Building steel structure convenient to installation
CN113914469B (en) Steel construction system convenient to dismantle
CN115637839A (en) Quick assembly disassembly structure for building scaffold
CN215253443U (en) Steel construction architectural design trunk form pillar structure
CN111648473B (en) High-strength steel structure
CN203673787U (en) Spread cloth lamp box structure
CN113175147A (en) Hyperbolic arc-shaped metal roof produced based on BIM technology and construction method
CN219101026U (en) Hinge structure of fireproof door
CN216215643U (en) Steel cable bridge with rain-proof fire prevention function
CN210118107U (en) Hydraulic auxiliary device for dismounting oil production well head
CN218509304U (en) Heat-insulating bridge-cut-off aluminum window
CN213775631U (en) Liquid-driven air pump for multiphase mixed-production supercharging device
CN217299514U (en) Fixing device for curtain of overhead curtain
CN215519204U (en) Connect adjustable length's H shaped steel
CN217175982U (en) Factory building convenient to daylighting
CN219034715U (en) Novel underground coal mining equipment
CN216016322U (en) Combined cable bridge with remote real-time fault alarm function
CN214284735U (en) Environment-friendly high-rise building's window belt cleaning device
CN214939329U (en) Temporary supporting system for quick mounting and dismounting in steel box girder bridge deck construction box
CN220434206U (en) Outer side template supporting structure of basement outer wall
CN212648992U (en) But angle regulation's cable testing bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant