CN217536728U - Simple hanging basket - Google Patents

Simple hanging basket Download PDF

Info

Publication number
CN217536728U
CN217536728U CN202220730115.6U CN202220730115U CN217536728U CN 217536728 U CN217536728 U CN 217536728U CN 202220730115 U CN202220730115 U CN 202220730115U CN 217536728 U CN217536728 U CN 217536728U
Authority
CN
China
Prior art keywords
bearing beam
hanging basket
round steel
bearing
lifting rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220730115.6U
Other languages
Chinese (zh)
Inventor
陈尚晓
张磊
徐志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Hi Speed Maintenance Group Co Ltd
Original Assignee
Shandong Hi Speed Maintenance Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Hi Speed Maintenance Group Co Ltd filed Critical Shandong Hi Speed Maintenance Group Co Ltd
Priority to CN202220730115.6U priority Critical patent/CN217536728U/en
Application granted granted Critical
Publication of CN217536728U publication Critical patent/CN217536728U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a simple hanging basket to solve current hanging flower basket structure comparatively complicated under the prerequisite of guaranteeing construction safety, and the problem that the subassembly reusability is low, this simple hanging flower basket includes: the bearing frame is provided with a first bearing beam and a second bearing beam, first stop columns are arranged at two ends of the first bearing beam, and second stop columns are arranged at two ends of the second bearing beam; the construction platform is provided with a working surface for connecting the bearing frame, a plurality of stop columns are arranged on the working surface, and every two stop columns are arranged at intervals and are positioned on two axial sides of the first bearing beam or the second bearing beam; the tip of round steel lifting rope, 4 at least round steel lifting ropes is connected with first bumping post, second bumping post respectively, and the free end of round steel lifting rope is constructed into the hook-like with bridge side fence adaptation, and this free end still is connected with the extension. The utility model has the advantages of simple structure, simple and convenient construction and high component reusability.

Description

Simple hanging basket
Technical Field
The utility model relates to a bridge construction technical field particularly, relates to a simple and easy hanging flower basket.
Background
In the maintenance engineering of roads and bridges, temporary maintenance of viaducts or highways, such as external prestress reinforcement or basalt stainless steel wire mesh reinforcement, is not performed. Because the clearance below the viaduct or the highway to be maintained is large, a construction method for building a full hall scaffold is generally adopted to provide a maintenance platform. However, in some special construction environments, greening vegetation is located below the viaduct or the expressway, and another expressway may be located below the viaduct or the expressway. The prior art provides a hanging basket, which is mainly characterized in that a plurality of trusses are welded together and connected to a side fence of a viaduct, and a construction platform is built below a part to be maintained, so that the problems of protecting greening vegetation or ensuring the smoothness of a highway are solved. However, the existing hanging basket is complex in structure and large in self-weight, so that the strength requirement on the part, connected with the side rail of the viaduct, of the hanging basket is higher, the manufacturing difficulty is high, the existing hanging basket is manufactured by adopting a process of fixedly connecting components, and the reusability of the components is low after the hanging basket is used.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that how simplify the structure of hanging flower basket and improve the reusability of hanging flower basket subassembly under the prerequisite of guaranteeing construction safety, aim at provides a simple and easy hanging flower basket.
The utility model discloses a following technical scheme realizes:
a simple hanging basket, comprising:
the bearing frame is provided with a first bearing beam and a second bearing beam, first stop posts are arranged at two ends of the first bearing beam, and second stop posts are arranged at two ends of the second bearing beam;
the construction platform is provided with a working surface for connecting the bearing frame, a plurality of stop columns are arranged on the working surface, and every two stop columns are arranged at intervals and are positioned on two axial sides of the first bearing beam or the second bearing beam;
the tip of round steel lifting rope, 4 at least round steel lifting ropes is connected with first bumping post, second bumping post respectively, and the free end of round steel lifting rope is constructed into the hook-like with bridge side fence adaptation, and this free end still is connected with the extension.
In some possible embodiments, the construction platform comprises an underframe and a sideframe; the stop columns are arranged on the underframe, the side frames are connected with the underframe to enclose a working space for workers to move, and the underframe is provided with a bamboo plywood.
In some possible embodiments, the chassis includes square pipes and diagonal ribs, four square pipes are surrounded into a rectangle, and the diagonal ribs are connected between two opposite square pipes.
In some possible embodiments, the square tube has a size of 3 × 3 and a wall thickness of 1.2mm.
In some possible embodiments, the thickness of the bamboo veneer is 1.8cm.
In some possible embodiments, the first retaining column and the second retaining column are respectively provided with an avoiding through hole, and a hanging ring is arranged in the avoiding through hole in a penetrating manner, and the hanging ring is connected with one end of the round steel lifting rope.
In some possible embodiments, the lifting ring is a 5t lifting ring.
In some possible embodiments, the first and second load-bearing beams are each configured as an i-steel.
In some possible embodiments, the i-steel is 22a in size.
In some possible embodiments, the extension is constructed as a threaded steel.
Compared with the prior art, the utility model, following advantage and beneficial effect have:
the simple hanging basket provided by the utility model has the advantages that the bearing beam is connected with the viaduct by the lifting rope, and the connection is convenient; the two support beams are used as main supports of the construction platform, and the stop columns are arranged on the construction platform and matched with the support beams, so that the construction platform can be prevented from moving left and right and overturning left and right; the end part of the supporting beam is provided with the retaining column, so that the construction platform can be prevented from sliding out of the supporting beam. Therefore, the construction platform is in a relatively stable and safe state, and the construction safety of construction workers is further ensured; and the assemblies are in non-permanent connection, and after the hanging basket is used, the assemblies can be disassembled to reuse the assemblies.
Drawings
In order to more clearly illustrate the technical solutions of the exemplary embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and that for those skilled in the art, other related drawings can be obtained from these drawings without inventive effort.
Fig. 1 is a schematic view of a partial structure of a simple hanging basket provided in an embodiment of the present invention;
fig. 2 is a schematic structural view of a bearing frame according to an embodiment of the present invention;
fig. 3 is a schematic structural view of a construction platform provided in an embodiment of the present invention;
fig. 4 is the schematic view of the round steel lifting rope structure provided by the embodiment of the utility model.
Reference numbers and corresponding part names in the drawings:
1-a bearing frame, 11-a first bearing beam, 12-a second bearing beam, 13-a first bumping post, 14-a second bumping post, 2-a construction platform, 21-a bottom frame, 22-a bumping post, 23-a side frame, 3-a lifting ring, 4-a round steel lifting rope and 5-an extension section.
Detailed Description
To make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail below with reference to the following examples and drawings, and the exemplary embodiments and descriptions thereof of the present invention are only used for explaining the present invention, and are not intended as limitations of the present invention.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. However, it will be apparent to those of ordinary skill in the art that: it is not necessary to employ these specific details to practice the invention. In other instances, well-known structures, circuits, materials, or methods have not been described in detail so as not to obscure the present invention.
Throughout the specification, reference to "one embodiment," "an embodiment," "one example," or "an example" means: the particular features, structures, or characteristics described in connection with the embodiment or example are included in at least one embodiment of the present invention. Thus, the appearances of the phrases "one embodiment," "an embodiment," "one example" or "an example" in various places throughout this specification are not necessarily all referring to the same embodiment or example. Furthermore, the particular features, structures, or characteristics may be combined in any suitable combination and/or sub-combination in one or more embodiments or examples. Further, those of ordinary skill in the art will appreciate that the illustrations provided herein are for illustrative purposes and are not necessarily drawn to scale. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
In the description of the present invention, the terms "front", "rear", "left", "right", "upper", "lower", "vertical", "horizontal", "high", "low", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the scope of the present invention.
Examples
As shown in fig. 1 to 4, in an embodiment of the simple hanging basket provided by the present invention, the simple hanging basket includes a bearing frame 1, a construction platform 2 and a round steel lifting rope 4; the bearing frame 1 is provided with a first bearing beam 11 and a second bearing beam 12, wherein two ends of the first bearing beam 11 are provided with first stop posts 13, and two ends of the second bearing beam 12 are provided with second stop posts 14; the construction platform 2 is provided with a working surface for connecting the bearing frame 1, a plurality of stop columns 22 are arranged on the working surface, and every two stop columns 22 are arranged at intervals and are positioned at two axial sides of the first bearing beam 11 or the second bearing beam 12; the tip of 4 at least round steel lifting ropes 4 is connected with first bumping post 13, second bumping post 14 respectively, and the free end of round steel lifting rope 4 is constructed into the hook-like with the adaptation of bridge side fence, and this free end still is connected with extension 5.
Specifically, the first carrier beam 11 and the second carrier beam 12 are respectively configured as two i-beams, the type of the i-beams is 22a, the length of the i-beams is set to 11 meters, a plurality of diagonal ribs can be welded between the first carrier beam 11 and the second carrier beam 12 to prevent the change of the distance between the first carrier beam 11 and the second carrier beam 12, two steel plates are respectively and vertically welded at two ends of the first carrier beam 11 and the second carrier beam 12 to serve as a first fender post 13 and a second fender post 14, and avoidance through holes are respectively formed in the first fender post 13 and the second fender post 14; the construction platform 2 comprises an underframe 21 and side frames 23, wherein the underframe 21 is a rectangular profile formed by four square pipes, the specification and model of the square pipes are 4 x 6, the wall thickness is 3mm, the length of each long square pipe is 4 meters, and the length of each wide square pipe is 1 meter; the side frame 23 comprises a plurality of square pipes, the square pipes are vertically connected with the underframe 21, the interval between adjacent square pipes is set to be 1m, the specification model of each square pipe is 3 x 3, the height is set to be 1.1m, the wall thickness is set to be 1.2mm, adjacent square pipes are connected through an inclined strut, the inclined strut can be angle steel or a square pipe, when the square pipes are selected, the specification model is 3 x 3, the length is 1.49m, the wall thickness is 1.2mm, the connection mode adopts welding, 8 stop columns 22 are further welded on the underframe 21, every two stop columns 22 are distributed on the corners of the underframe 21, the axes of the two stop columns 22 are parallel, the interval between the two stop columns 22 is equivalent to that of the first carrier beam 11 or the second carrier beam 12, and the first carrier beam 11 or the second carrier beam 12 can be clamped between the two stop columns 22, so that the underframe 21 of the construction platform 2 is limited; round steel lifting rope 4 chooses for use 20 # round steel, length is configured to 4m, 4 one end of round steel lifting rope is passed through rings 3 respectively with first carrier bar 11, the bumping post at 12 both ends of second carrier bar is connected, 5t rings are chooseed for use to rings 3's specification, rings 3 pass dodge on the bumping post and form through the sky and can dismantle the connection, the other end of round steel lifting rope 4 is constructed into hook-like, the shape adaptation of the side guardrail of this hooked space shape that forms and overpass, and it has extension 5 still to weld on this tip to become hook-like, screw-thread steel is chooseed for use to extension 5, 16mm is chooseed for use to extension 5's diameter, extension 5's length is configured to 50cm.
In the embodiment, the end part of the round steel lifting rope 4 is designed into a hook shape, and the extension section 5 is welded and then directly matched with a side guardrail of a viaduct or other highways, so that the construction is simple and convenient, the disassembly and the assembly are easy, and a temporary building or manufacturing of a connecting structure is not needed; the other end of the round steel lifting rope 4 is connected with the first bearing beam 11 and the second bearing beam 12 through the lifting ring 3, so that the detachable connection is realized on the basis of ensuring the tensile strength, and after the bearing beams with different lengths are replaced, the viaducts or highways with the same type and different spans can be maintained, of course, the weight of the first bearing beam 11 and the weight of the second bearing beam 12 are within the bearing range of the round steel lifting rope 4, and compared with the conventional welding, the construction of connecting the round steel lifting rope 4 with the bearing frame 1 by adopting the lifting ring 3 is easier; bear first carrier bar 11 on the frame 1, just can realize bearing frame 1 and construction platform 2 relative spacing between two backstop posts 22 on the second carrier bar 12 card advances construction platform 2, set up the length of backstop post 22 and can avoid construction platform 2 to overturn for bearing frame 1 for long time promptly, simultaneously first carrier bar 11, the fender post at second carrier bar 12 both ends can prevent the first carrier bar 11 of 2 roll-outs of construction platform, second carrier bar 12, thereby can guarantee constructor's construction safety among the construction platform 2. Construction platform 2 and bear the mode that the frame 1 adopted the joint to be connected, the construction is simple to construction 2 and bear and to dismantle between the frame 1, both can multiplex.
In some possible embodiments, in order to prevent some tools on the construction platform 2 from falling, bamboo plywood is laid on the bottom of the construction platform 2, and the thickness of the bamboo plywood is selected to be 1.8cm. The bamboo plywood has better bearing capacity, and compares with steel sheet commonly used, and the weight of bamboo plywood is lighter, can avoid round steel lifting rope 4 to be in the environment of heavily loaded.
In this embodiment, when installing, holes are drilled below the first carrier bar 11 and the second carrier bar 12 corresponding to the bridge span, and the holes are connected by oil ropes, wherein the specification and model of the oil ropes are 304L, and the diameter of the oil ropes is 8mm; installing a 5t winch on a bridge, wherein the rated power of the winch is 11kw, connecting a wire rope with the winch, hoisting a first carrier beam 11 and a second carrier beam 12 by the winch, when the first carrier beam 11 and the second carrier beam 12 are hoisted to a preset height, enabling a constructor to use a hanging ladder to enable a 5t hoisting ring 3 to penetrate through avoiding through holes in a first blocking column 13 and a second blocking column 14, connecting the hoisting ring 3 with the end part of a round steel hoisting rope 4 with the diameter of 20mm, and enabling the other end of the round steel hoisting rope 4 to be in a hook shape and fully welded with a screw steel with the diameter of 16; after the construction platform 2 is prefabricated on site, the construction platform 2 is lifted to the first bearing beam 11 and the second bearing beam 12 by the same method and the construction platform 2 is clamped on the first bearing beam 11 and the second bearing beam 12 through the stop posts 22 on the construction platform 2, the construction platform 2 and the first bearing beam 11 and the second bearing beam 12 can be drilled through large-sized drill bits for bolt connection, so that the relative stability of the first bearing beam 11 and the second bearing beam 12 and the construction platform 2 is enhanced, and the shaking of the construction platform 2 is reduced; lay the bamboo plywood that the thickness is 1.8cm on the construction platform 2 so that constructor tramples, is convenient for simultaneously the placing of instrument.
The above-mentioned embodiments, further detailed description of the objects, technical solutions and advantages of the present invention, it should be understood that the above description is only the embodiments of the present invention, and is not intended to limit the scope of the present invention, and any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the scope of the present invention.

Claims (10)

1. A simple hanging basket is characterized by comprising:
the bearing frame (1) is provided with a first bearing beam (11) and a second bearing beam (12), first stop columns (13) are arranged at two ends of the first bearing beam (11), and second stop columns (14) are arranged at two ends of the second bearing beam (12);
the construction platform (2) is provided with a working surface for connecting the bearing frame (1), a plurality of stop columns (22) are arranged on the working surface, and every two stop columns (22) are arranged at intervals and are positioned on two axial sides of the first bearing beam (11) or the second bearing beam (12);
round steel lifting rope (4), the tip of 4 piece at least round steel lifting rope (4) is connected with first bumping post (13), second bumping post (14) respectively, and the free end of round steel lifting rope (4) is constructed into with the hook-like of bridge side fence adaptation, this free end still is connected with extension section (5).
2. Simple gondola as claimed in claim 1, characterized in that the construction platform (2) comprises an underframe (21) and side frames (23); the stop columns (22) are arranged on the bottom frame (21), the side frames (23) are connected with the bottom frame (21) to form a working space for workers to move, and bamboo rubber plates are arranged on the bottom frame (21).
3. The simple hanging basket according to claim 2, characterized in that the bottom frame (21) comprises square pipes and oblique ribs, wherein the four square pipes are enclosed into a rectangle, and the oblique ribs are connected between two opposite square pipes.
4. The simple hanging basket according to claim 3, wherein the square pipe has a size of 3 x 3 and a wall thickness of 1.2mm.
5. The simple hanging basket according to claim 2, wherein the thickness of the bamboo plywood is 1.8cm.
6. The simple hanging basket according to claim 1, wherein the first retaining column (13) and the second retaining column (14) are respectively provided with an avoiding through hole, a hanging ring (3) is arranged in the avoiding through hole in a penetrating manner, and the hanging ring (3) is connected with one end of the round steel lifting rope (4).
7. Simple hanging basket according to claim 6, characterized in that the hanging ring (3) is a 5t hanging ring.
8. Simple gondola according to claim 1, characterized in that the first (11) and second (12) carrying beams are each configured as i-steel.
9. The simple hanging basket according to claim 8, wherein the I-shaped steel is 22a in size.
10. Simple hanging basket according to claim 1, characterized in that the extension (5) is constructed as a screw steel.
CN202220730115.6U 2022-03-31 2022-03-31 Simple hanging basket Active CN217536728U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220730115.6U CN217536728U (en) 2022-03-31 2022-03-31 Simple hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220730115.6U CN217536728U (en) 2022-03-31 2022-03-31 Simple hanging basket

Publications (1)

Publication Number Publication Date
CN217536728U true CN217536728U (en) 2022-10-04

Family

ID=83429075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220730115.6U Active CN217536728U (en) 2022-03-31 2022-03-31 Simple hanging basket

Country Status (1)

Country Link
CN (1) CN217536728U (en)

Similar Documents

Publication Publication Date Title
CN102535845A (en) Construction method of bearing frame of corridor structure
CN213234203U (en) Disc buckle type upright column ladder cage scaffold
CN205775852U (en) Acting force conversion support for top of steel structure supporting jig frame
CN111663698A (en) Assembled steel structure roof and assembling construction method thereof
CN102261043A (en) Assembled steel pipe upright post system
CN213268605U (en) Steel bar support and raft foundation steel bar structure comprising same
CN217536728U (en) Simple hanging basket
CN112962664A (en) Overhead cable corridor with steel pipe truss structure
CN202152442U (en) Assembling type steel tube-vertical post system
CN211171623U (en) Steel pipe concrete combined main tower
CN210369895U (en) Indoor super-high and large template Bailey beam supporting system for building
CN211113196U (en) Multifunctional folding assembly type operating platform
CN113404278A (en) Self-climbing type protection frame and climbing method thereof
CN220247541U (en) Suspension type supporting system for silo construction
CN214302864U (en) Well operation combination steel platform
CN210216127U (en) Assembled concrete-filled steel tube super-high lattice pier
CN216999353U (en) Assembled pier stud protection platform
CN219156362U (en) Ladder type adduction building tower crane attachment device
CN217869992U (en) Steel truss girder lower chord member connecting operation platform
CN217269083U (en) Suspension type safety ladder cage
CN219863968U (en) Construction platform of prestressing force structure
CN216973126U (en) Bridge construction device
RU208859U1 (en) CABLE RATE COLUMN
CN218621848U (en) Interim cable wind device of high mound construction ladder cage of finite construction area double-column type
CN213143552U (en) Assembled steel construction roofing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant