CN217522557U - Electric power engineering construction pipeline - Google Patents
Electric power engineering construction pipeline Download PDFInfo
- Publication number
- CN217522557U CN217522557U CN202221033244.6U CN202221033244U CN217522557U CN 217522557 U CN217522557 U CN 217522557U CN 202221033244 U CN202221033244 U CN 202221033244U CN 217522557 U CN217522557 U CN 217522557U
- Authority
- CN
- China
- Prior art keywords
- power engineering
- engineering construction
- electric power
- boss
- construction pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model discloses an electric power engineering construction pipeline, including being responsible for the body and coupling, still include a plurality of blind holes of circumference evenly distributed, be responsible for internal wall evenly distributed of body and have a plurality of bosss, the boss top surface is provided with the cambered surface, the boss with be responsible for body axial direction parallel. The utility model discloses a power engineering construction pipeline, through the setting of boss, improved the cable height, reduced the influence of infiltration or moisture to the cable; the arrangement of the cambered surface avoids the cable from falling off the boss; through the setting of blind hole, increased the convenience of construction.
Description
Technical Field
The utility model belongs to electric power engineering construction field especially relates to an electric power engineering construction pipeline.
Background
The municipal works weak current cable duct bank refers to that the broadcasting and TV system, the communication system, the closed circuit TV, the monitoring system, the fire-fighting linkage system, the video intercommunication system and the like are wired and the pipeline is buried. However, in the prior art, the construction pipeline of the electric power engineering is as follows: 1. the arrangement of the lug boss is avoided, the cable is tightly attached to the bottom of the pipeline, and the influence of water seepage or moisture on the cable is large; 2. the arrangement of the cambered surface is avoided, so that the cable is easy to fall off the boss; 3. the blind holes are not arranged, so that the pipeline connection is not convenient to rotate and adjust.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electric power engineering construction pipeline to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme:
the utility model provides an electric power engineering construction pipeline, includes and is responsible for the body and the coupling, still includes a plurality of blind holes of circumference evenly distributed, be responsible for body inner wall evenly distributed and have a plurality of bosss, the boss top surface is provided with the cambered surface, the boss with be responsible for body axial direction parallel.
Further, the method comprises the following steps: the blind hole is provided with three groups, and each group of blind holes is provided with four.
Further: the pipe joint, the boss and the main pipe body are integrally formed.
Further: the boss is provided with four, the height of boss is 30 millimeters.
Further, the method comprises the following steps: the diameter of the blind hole is 10 millimeters.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the arrangement of the lug boss improves the height of the cable and reduces the influence of water seepage or moisture on the cable;
2. the arrangement of the cambered surface avoids the cable from falling off the boss;
3. through the setting of blind hole, the convenience of construction has been increased.
Drawings
Fig. 1 is a schematic structural view of an electric power engineering construction pipeline according to the present invention;
fig. 2 is a right side view of the electric power engineering construction pipeline according to the present invention;
fig. 3 is a front view of an electric power engineering construction pipeline according to the present invention;
fig. 4 is a front cross-sectional view of an electric power engineering construction pipeline.
In the reference symbols: 1. a primary tube body; 2. a pipe joint; 3. blind holes; 4. a boss; 5. and (4) cambered surface.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, an electric power engineering construction pipeline includes a main pipe body 1, a pipe joint 2, and a plurality of blind holes 3 uniformly distributed on the circumference, wherein a plurality of bosses 4 are uniformly distributed on the inner wall of the main pipe body 1, the top surfaces of the bosses 4 are provided with arc surfaces 5, and the bosses 4 are axially parallel to the main pipe body 1.
In this embodiment: three groups of blind holes 3 are arranged, and four blind holes 3 are arranged in each group;
in this embodiment: the pipe joint 2, the boss 4 and the main pipe body 1 are integrally formed;
in this embodiment: four bosses 4 are arranged, and the height of each boss 4 is 30 mm;
in this embodiment: the diameter of the blind hole 3 is 10 mm.
The working principle is as follows: hang into the pre-buried hole earlier in being responsible for the body 1 to insert in the previous joint of being responsible for the body 1, insert the drill rod in 3 rotations of blind hole and be responsible for the body 1 again, make in being responsible for the body 1 a boss 4 rotate to bottom intermediate position, when laying the circuit, lay the cable conductor in the cambered surface 5 of 4 top surfaces of boss can, reduced the influence of infiltration or moisture to the cable.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides an electric power engineering construction pipeline, includes main pipe body (1) and coupling (2), its characterized in that: the novel multi-cavity hydraulic cylinder is characterized by further comprising a plurality of blind holes (3) which are evenly distributed on the circumference, a plurality of bosses (4) are evenly distributed on the inner wall of the main pipe body (1), arc surfaces (5) are arranged on the top surfaces of the bosses (4), and the bosses (4) are axially parallel to the main pipe body (1).
2. The electric power engineering construction pipeline according to claim 1, characterized in that: the blind holes (3) are provided with three groups, and each group of blind holes (3) is provided with four blind holes.
3. The electric power engineering construction pipeline of claim 1, characterized in that: the pipe joint (2), the boss (4) and the main pipe body (1) are integrally formed.
4. The electric power engineering construction pipeline of claim 1, characterized in that: the number of the bosses (4) is four, and the height of each boss (4) is 30 millimeters.
5. The electric power engineering construction pipeline according to claim 1, characterized in that: the diameter of the blind hole (3) is 10 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221033244.6U CN217522557U (en) | 2022-04-29 | 2022-04-29 | Electric power engineering construction pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221033244.6U CN217522557U (en) | 2022-04-29 | 2022-04-29 | Electric power engineering construction pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217522557U true CN217522557U (en) | 2022-09-30 |
Family
ID=83388836
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221033244.6U Active CN217522557U (en) | 2022-04-29 | 2022-04-29 | Electric power engineering construction pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217522557U (en) |
-
2022
- 2022-04-29 CN CN202221033244.6U patent/CN217522557U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204271566U (en) | A kind of JDG pipe joint place hermetically-sealed construction | |
CN204156473U (en) | Frp cable protective pipe pipe is rested the head on | |
CN217522557U (en) | Electric power engineering construction pipeline | |
CN204481450U (en) | Underground pipe gallery wire rod water repellent component | |
CN204785253U (en) | FRP pipe says and pipe connection sleeve | |
CN210517702U (en) | Wall-mounted optical cable fixing device | |
CN220040833U (en) | Optical cable distributing box with adjustable base | |
CN204578013U (en) | There is the duct plug of draught line fixed structure | |
CN208284930U (en) | Photoelectric composite power cable for smart grid fixed structure | |
CN108599034B (en) | Full-house live wire tube arrangement system | |
CN206922361U (en) | A kind of multi-cavity circuit and its connector | |
CN211089088U (en) | Interior sepiolite cement cable pipe that sprays paint that thermal resistivity is low | |
CN201185101Y (en) | Ribbon safety-proof combined cable | |
CN204420361U (en) | A kind of PE double-wall corrugated pipe | |
CN204205540U (en) | Voltage Cable Lines Construction Integral earthing case | |
CN202691298U (en) | Flap-type pipe clamp | |
CN207166066U (en) | A kind of novel multi-layer power pipe | |
CN2439132Y (en) | Cable protection tube and its connection joint | |
CN202758630U (en) | Optical and electric integrated cable used for reservoir | |
CN207603168U (en) | A kind of wear-resisting PE power pipes | |
CN219351167U (en) | Special-shaped cable protection tube | |
CN211719878U (en) | High-performance shielded mineral cable | |
CN217824038U (en) | Laying pipeline structure of building cable | |
CN218569801U (en) | Prefabricated cable spool | |
CN216489553U (en) | PVC-0 cable protection pipe for industrial pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |