CN217522494U - Interim electric pipe stores pylon below floor - Google Patents
Interim electric pipe stores pylon below floor Download PDFInfo
- Publication number
- CN217522494U CN217522494U CN202123391968.6U CN202123391968U CN217522494U CN 217522494 U CN217522494 U CN 217522494U CN 202123391968 U CN202123391968 U CN 202123391968U CN 217522494 U CN217522494 U CN 217522494U
- Authority
- CN
- China
- Prior art keywords
- nut
- sleeve
- screw rod
- anchor plate
- electric pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The utility model provides a interim electric pipe stores pylon below floor, belongs to concrete frame structure construction technical field. Comprises an anchor plate (1), an anchor bolt (2), an upper nut (3), a screw rod (4), a lower nut (5) and a sleeve (6); the anchor bolt (2) penetrates through the anchor plate (1); the upper nut (3) is welded in the middle of the anchor plate (1); the lower nut (5) is welded in the middle of the upper part of the sleeve (6); the upper end of the screw rod (4) is screwed into the upper nut (3), and the lower end of the screw rod (4) is screwed into the lower nut (5) and penetrates through the sleeve (6). The advantage lies in, the equipment is simple, convenient operation, and simple and practical has both avoided setting up the support, has saved the construction site again, makes the construction more convenient, greatly reduced construction cost.
Description
Technical Field
The utility model belongs to concrete frame structure construction field especially provides a interim electric pipe stores pylon below floor.
Background
When the concrete frame structure is constructed, a mode of erecting a support for supporting is generally adopted for fixing a temporary cable and an electric pipe, and the mode has the defects that firstly, the erection of the support consumes a large amount of manpower and material resources, and the construction cost is high; secondly, the erected support needs to occupy a plurality of construction sites, which brings inconvenience to construction operation.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a interim electric pipe stores pylon below floor has solved and has consumeed a large amount of manpowers, material resources, the big scheduling problem of construction cost.
The utility model discloses it is fixed with the concrete floor with the crab-bolt on the stores pylon anchor plate, every 3m sets up stores pylon one on a straight line, then passes the sleeve pipe on the stores pylon with interim electric pipe, later twists and moves the screw rod, makes screw rod and interim electric pipe top tight, and interim electric pipe can normal use.
The utility model comprises an anchor plate 1, an anchor bolt 2, an upper nut 3, a screw rod 4, a lower nut 5 and a sleeve 6, which are combined for use, and the anchor bolt 2 passes through the anchor plate 1; the upper nut 3 is welded in the middle of the anchor plate 1; the lower nut 5 is welded in the middle of the upper part of the sleeve 6; the upper end of the screw rod 4 is screwed into the upper nut 3, and the lower end of the screw rod 4 is screwed into the lower nut 5 and passes through the sleeve 6 (see fig. 1 and 2).
Wherein the anchor plate 1 is processed by a 12mm thick steel plate, and the size is 100 x 100 mm; the diameter of the anchor bolt 2 is 10mm, and the length is 50 mm; the inner diameter of the upper nut 3 is 14 mm; the diameter of the screw rod 4 is 14mm, and the length of the screw rod is 600 mm; the inner diameter of the lower nut 5 is 14 mm; the sleeve 6 was machined from a square tube having a cross-sectional dimension (length by width) of 80 by 80mm and a length of 100mm (fig. 1 and 2).
During the use, 2 anchor bolts and 7 concrete floor on the rack anchor plate 1 are fixed, every 3m sets up one rack on a straight line, then pass sleeve pipe 6 on the rack with interim electric pipe 8, later twist and move screw rod 4, make screw rod 4 and interim electric pipe 8 top tight, interim electric pipe 8 can normal use (fig. 3, fig. 4).
The hanger is simple to assemble, convenient to operate, simple and practical, the support is prevented from being erected, the construction site is saved, construction is more convenient, construction cost is greatly reduced, and good economic benefits are obtained for companies.
Drawings
Fig. 1 is a front view of the present invention.
Fig. 2 is a side view of the present invention.
Fig. 3 is a front view of the present invention.
Fig. 4 is a side view of the present invention.
In the figure, an anchor plate 1, an anchor bolt 2, an upper nut 3, a screw rod 4, a lower nut 5, a sleeve 6, a concrete floor 7 and a temporary electric pipe 8.
Detailed Description
Fig. 1-4 show a specific embodiment of the present invention. The present invention will be further explained with reference to the accompanying drawings.
The utility model comprises an anchor plate 1, an anchor bolt 2, an upper nut 3, a screw rod 4, a lower nut 5 and a sleeve 6, which are combined for use, and the anchor bolt 2 passes through the anchor plate 1; the upper nut 3 is welded in the middle of the anchor plate 1; the lower nut 5 is welded in the middle of the upper part of the sleeve 6; the upper end of the screw rod 4 is screwed into the upper nut 3, and the lower end of the screw rod 4 is screwed into the lower nut 5 and passes through the sleeve 6. Wherein the anchor plate 1 is processed by a 12mm thick steel plate, and the size is 100 x 100 mm; the diameter of the anchor bolt 2 is 10mm, and the length is 50 mm; the inner diameter of the upper nut 3 is 14 mm; the diameter of the screw rod 4 is 14mm, and the length of the screw rod is 600 mm; the inner diameter of the lower nut 5 is 14 mm; the sleeve 6 was machined from a square tube of 80 x 80mm cross-sectional dimension (length x width) and 100mm length.
During the use, 2 anchor bolts and concrete floor 7 on the hanger anchor plate 1 are fixed, and every 3m sets up one hanger bracket on a straight line, then passes sleeve pipe 6 on the hanger bracket with interim electric pipe 8, later twists screw rod 4, makes screw rod 4 and 8 tops of interim electric pipe tight, and interim electric pipe 8 can normal use.
When the concrete frame structure of the electric control plant is constructed, a hanging frame is adopted for fixing the temporary cable and electric pipe, and a good effect is obtained. The hanging rack comprises an anchor plate, an anchor bolt, an upper nut, a screw rod, a lower nut and a sleeve 6 which are combined for use, wherein the anchor bolt penetrates through the anchor plate; the upper nut is welded in the middle of the anchor plate; the lower nut is welded in the middle of the upper part of the sleeve; the upper end of the screw is screwed in the upper nut, and the lower end of the screw is screwed in the lower nut and penetrates through the sleeve. During the use, it is fixed with the concrete floor with the crab-bolt on the stores pylon anchor plate, set up one stores pylon per 3m on a straight line, then pass the sleeve pipe on the stores pylon with interim electric pipe, later twist and move the screw rod, make screw rod and interim electric pipe top tight, interim electric pipe can normal use. The hanger is simple to assemble, convenient to operate, simple and practical, the support is prevented from being erected, the construction site is saved, construction is more convenient, and construction cost is greatly reduced.
Claims (2)
1. A temporary electric pipe hanging rack under a floor slab is characterized by comprising an anchor plate (1), anchor bolts (2), an upper nut (3), a screw rod (4), a lower nut (5) and a sleeve (6); the anchor bolt (2) penetrates through the anchor plate (1); the upper nut (3) is welded in the middle of the anchor plate (1); the lower nut (5) is welded in the middle of the upper part of the sleeve (6); the upper end of the screw rod (4) is screwed into the upper nut (3), and the lower end of the screw rod (4) is screwed into the lower nut (5) and penetrates through the sleeve (6).
2. The temporary electric pipe hanger under floor according to claim 1, wherein the anchor plate (1) is machined from 12mm thick steel plate with a size of 100 x 100 mm; the diameter of the anchor bolt (2) is 10mm, and the length is 50 mm; the inner diameter of the upper nut (3) is 14 mm; the diameter of the screw (4) is 14mm, and the length of the screw is 600 mm; the inner diameter of the lower nut (5) is 14 mm; the sleeve (6) is formed by processing a square tube with the cross section size of 80mm by 80mm, and the length of the square tube is 100 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123391968.6U CN217522494U (en) | 2021-12-29 | 2021-12-29 | Interim electric pipe stores pylon below floor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123391968.6U CN217522494U (en) | 2021-12-29 | 2021-12-29 | Interim electric pipe stores pylon below floor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217522494U true CN217522494U (en) | 2022-09-30 |
Family
ID=83367369
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202123391968.6U Active CN217522494U (en) | 2021-12-29 | 2021-12-29 | Interim electric pipe stores pylon below floor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217522494U (en) |
-
2021
- 2021-12-29 CN CN202123391968.6U patent/CN217522494U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN217522494U (en) | Interim electric pipe stores pylon below floor | |
CN212376021U (en) | Steel corbel and support-free installation connecting node comprising same | |
CN112523604A (en) | Recyclable enclosure suitable for building construction and installation method thereof | |
CN214995260U (en) | Positioning steel bar position controller | |
CN217205526U (en) | Industrial and civil building wall reinforcing device | |
CN203603253U (en) | Detachable steel corbel structure on reinforced concrete column | |
CN113719153A (en) | Temporary support and mounting method thereof | |
CN212317536U (en) | Simply set up design and face limit safety protection support | |
CN209369334U (en) | A kind of large-span concrete stay in place form support device | |
CN211596427U (en) | Pier top assembly type triangular bracket | |
CN110805141B (en) | Connecting device and method for steel pipe column and shock insulation support after jacking of building | |
CN209924121U (en) | Independent supporting structure for assembly type building construction | |
CN217153297U (en) | Temporary fixing hanger for smoke exhaust pipe | |
CN216587615U (en) | Installation operation support of wall body top decorative cover layer | |
CN216583916U (en) | Installation gallows of wall skin purlin | |
CN211541661U (en) | Concrete internal mold supporting device | |
CN216587631U (en) | Fixing support of platform edge horizontal safety net | |
CN211920756U (en) | Lifting device convenient for binding steel bars at bottom of cast-in-place beam | |
CN215516468U (en) | Hoisting support on frame beam | |
CN221380291U (en) | Horizontal fixing support for construction cable | |
CN214790961U (en) | Large-scale lamps and lanterns fixing support on riser | |
CN211597651U (en) | Structure system of I-steel encorbelments | |
CN215528499U (en) | Cable bracket on H-shaped steel frame steel column | |
CN204326658U (en) | LNG storage tank reinforced mesh wind-resistant column bracing means | |
CN217234639U (en) | Comprehensive pipeline anti-seismic support suitable for different pipeline shapes |