CN217522494U - Interim electric pipe stores pylon below floor - Google Patents

Interim electric pipe stores pylon below floor Download PDF

Info

Publication number
CN217522494U
CN217522494U CN202123391968.6U CN202123391968U CN217522494U CN 217522494 U CN217522494 U CN 217522494U CN 202123391968 U CN202123391968 U CN 202123391968U CN 217522494 U CN217522494 U CN 217522494U
Authority
CN
China
Prior art keywords
nut
sleeve
screw rod
anchor plate
electric pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123391968.6U
Other languages
Chinese (zh)
Inventor
姜兆双
肖俊才
王放
毛云飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN202123391968.6U priority Critical patent/CN217522494U/en
Application granted granted Critical
Publication of CN217522494U publication Critical patent/CN217522494U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model provides a interim electric pipe stores pylon below floor, belongs to concrete frame structure construction technical field. Comprises an anchor plate (1), an anchor bolt (2), an upper nut (3), a screw rod (4), a lower nut (5) and a sleeve (6); the anchor bolt (2) penetrates through the anchor plate (1); the upper nut (3) is welded in the middle of the anchor plate (1); the lower nut (5) is welded in the middle of the upper part of the sleeve (6); the upper end of the screw rod (4) is screwed into the upper nut (3), and the lower end of the screw rod (4) is screwed into the lower nut (5) and penetrates through the sleeve (6). The advantage lies in, the equipment is simple, convenient operation, and simple and practical has both avoided setting up the support, has saved the construction site again, makes the construction more convenient, greatly reduced construction cost.

Description

Interim electric pipe stores pylon below floor
Technical Field
The utility model belongs to concrete frame structure construction field especially provides a interim electric pipe stores pylon below floor.
Background
When the concrete frame structure is constructed, a mode of erecting a support for supporting is generally adopted for fixing a temporary cable and an electric pipe, and the mode has the defects that firstly, the erection of the support consumes a large amount of manpower and material resources, and the construction cost is high; secondly, the erected support needs to occupy a plurality of construction sites, which brings inconvenience to construction operation.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a interim electric pipe stores pylon below floor has solved and has consumeed a large amount of manpowers, material resources, the big scheduling problem of construction cost.
The utility model discloses it is fixed with the concrete floor with the crab-bolt on the stores pylon anchor plate, every 3m sets up stores pylon one on a straight line, then passes the sleeve pipe on the stores pylon with interim electric pipe, later twists and moves the screw rod, makes screw rod and interim electric pipe top tight, and interim electric pipe can normal use.
The utility model comprises an anchor plate 1, an anchor bolt 2, an upper nut 3, a screw rod 4, a lower nut 5 and a sleeve 6, which are combined for use, and the anchor bolt 2 passes through the anchor plate 1; the upper nut 3 is welded in the middle of the anchor plate 1; the lower nut 5 is welded in the middle of the upper part of the sleeve 6; the upper end of the screw rod 4 is screwed into the upper nut 3, and the lower end of the screw rod 4 is screwed into the lower nut 5 and passes through the sleeve 6 (see fig. 1 and 2).
Wherein the anchor plate 1 is processed by a 12mm thick steel plate, and the size is 100 x 100 mm; the diameter of the anchor bolt 2 is 10mm, and the length is 50 mm; the inner diameter of the upper nut 3 is 14 mm; the diameter of the screw rod 4 is 14mm, and the length of the screw rod is 600 mm; the inner diameter of the lower nut 5 is 14 mm; the sleeve 6 was machined from a square tube having a cross-sectional dimension (length by width) of 80 by 80mm and a length of 100mm (fig. 1 and 2).
During the use, 2 anchor bolts and 7 concrete floor on the rack anchor plate 1 are fixed, every 3m sets up one rack on a straight line, then pass sleeve pipe 6 on the rack with interim electric pipe 8, later twist and move screw rod 4, make screw rod 4 and interim electric pipe 8 top tight, interim electric pipe 8 can normal use (fig. 3, fig. 4).
The hanger is simple to assemble, convenient to operate, simple and practical, the support is prevented from being erected, the construction site is saved, construction is more convenient, construction cost is greatly reduced, and good economic benefits are obtained for companies.
Drawings
Fig. 1 is a front view of the present invention.
Fig. 2 is a side view of the present invention.
Fig. 3 is a front view of the present invention.
Fig. 4 is a side view of the present invention.
In the figure, an anchor plate 1, an anchor bolt 2, an upper nut 3, a screw rod 4, a lower nut 5, a sleeve 6, a concrete floor 7 and a temporary electric pipe 8.
Detailed Description
Fig. 1-4 show a specific embodiment of the present invention. The present invention will be further explained with reference to the accompanying drawings.
The utility model comprises an anchor plate 1, an anchor bolt 2, an upper nut 3, a screw rod 4, a lower nut 5 and a sleeve 6, which are combined for use, and the anchor bolt 2 passes through the anchor plate 1; the upper nut 3 is welded in the middle of the anchor plate 1; the lower nut 5 is welded in the middle of the upper part of the sleeve 6; the upper end of the screw rod 4 is screwed into the upper nut 3, and the lower end of the screw rod 4 is screwed into the lower nut 5 and passes through the sleeve 6. Wherein the anchor plate 1 is processed by a 12mm thick steel plate, and the size is 100 x 100 mm; the diameter of the anchor bolt 2 is 10mm, and the length is 50 mm; the inner diameter of the upper nut 3 is 14 mm; the diameter of the screw rod 4 is 14mm, and the length of the screw rod is 600 mm; the inner diameter of the lower nut 5 is 14 mm; the sleeve 6 was machined from a square tube of 80 x 80mm cross-sectional dimension (length x width) and 100mm length.
During the use, 2 anchor bolts and concrete floor 7 on the hanger anchor plate 1 are fixed, and every 3m sets up one hanger bracket on a straight line, then passes sleeve pipe 6 on the hanger bracket with interim electric pipe 8, later twists screw rod 4, makes screw rod 4 and 8 tops of interim electric pipe tight, and interim electric pipe 8 can normal use.
When the concrete frame structure of the electric control plant is constructed, a hanging frame is adopted for fixing the temporary cable and electric pipe, and a good effect is obtained. The hanging rack comprises an anchor plate, an anchor bolt, an upper nut, a screw rod, a lower nut and a sleeve 6 which are combined for use, wherein the anchor bolt penetrates through the anchor plate; the upper nut is welded in the middle of the anchor plate; the lower nut is welded in the middle of the upper part of the sleeve; the upper end of the screw is screwed in the upper nut, and the lower end of the screw is screwed in the lower nut and penetrates through the sleeve. During the use, it is fixed with the concrete floor with the crab-bolt on the stores pylon anchor plate, set up one stores pylon per 3m on a straight line, then pass the sleeve pipe on the stores pylon with interim electric pipe, later twist and move the screw rod, make screw rod and interim electric pipe top tight, interim electric pipe can normal use. The hanger is simple to assemble, convenient to operate, simple and practical, the support is prevented from being erected, the construction site is saved, construction is more convenient, and construction cost is greatly reduced.

Claims (2)

1. A temporary electric pipe hanging rack under a floor slab is characterized by comprising an anchor plate (1), anchor bolts (2), an upper nut (3), a screw rod (4), a lower nut (5) and a sleeve (6); the anchor bolt (2) penetrates through the anchor plate (1); the upper nut (3) is welded in the middle of the anchor plate (1); the lower nut (5) is welded in the middle of the upper part of the sleeve (6); the upper end of the screw rod (4) is screwed into the upper nut (3), and the lower end of the screw rod (4) is screwed into the lower nut (5) and penetrates through the sleeve (6).
2. The temporary electric pipe hanger under floor according to claim 1, wherein the anchor plate (1) is machined from 12mm thick steel plate with a size of 100 x 100 mm; the diameter of the anchor bolt (2) is 10mm, and the length is 50 mm; the inner diameter of the upper nut (3) is 14 mm; the diameter of the screw (4) is 14mm, and the length of the screw is 600 mm; the inner diameter of the lower nut (5) is 14 mm; the sleeve (6) is formed by processing a square tube with the cross section size of 80mm by 80mm, and the length of the square tube is 100 mm.
CN202123391968.6U 2021-12-29 2021-12-29 Interim electric pipe stores pylon below floor Active CN217522494U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123391968.6U CN217522494U (en) 2021-12-29 2021-12-29 Interim electric pipe stores pylon below floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123391968.6U CN217522494U (en) 2021-12-29 2021-12-29 Interim electric pipe stores pylon below floor

Publications (1)

Publication Number Publication Date
CN217522494U true CN217522494U (en) 2022-09-30

Family

ID=83367369

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123391968.6U Active CN217522494U (en) 2021-12-29 2021-12-29 Interim electric pipe stores pylon below floor

Country Status (1)

Country Link
CN (1) CN217522494U (en)

Similar Documents

Publication Publication Date Title
CN217522494U (en) Interim electric pipe stores pylon below floor
CN212376021U (en) Steel corbel and support-free installation connecting node comprising same
CN112523604A (en) Recyclable enclosure suitable for building construction and installation method thereof
CN214995260U (en) Positioning steel bar position controller
CN217205526U (en) Industrial and civil building wall reinforcing device
CN203603253U (en) Detachable steel corbel structure on reinforced concrete column
CN113719153A (en) Temporary support and mounting method thereof
CN212317536U (en) Simply set up design and face limit safety protection support
CN209369334U (en) A kind of large-span concrete stay in place form support device
CN211596427U (en) Pier top assembly type triangular bracket
CN110805141B (en) Connecting device and method for steel pipe column and shock insulation support after jacking of building
CN209924121U (en) Independent supporting structure for assembly type building construction
CN217153297U (en) Temporary fixing hanger for smoke exhaust pipe
CN216587615U (en) Installation operation support of wall body top decorative cover layer
CN216583916U (en) Installation gallows of wall skin purlin
CN211541661U (en) Concrete internal mold supporting device
CN216587631U (en) Fixing support of platform edge horizontal safety net
CN211920756U (en) Lifting device convenient for binding steel bars at bottom of cast-in-place beam
CN215516468U (en) Hoisting support on frame beam
CN221380291U (en) Horizontal fixing support for construction cable
CN214790961U (en) Large-scale lamps and lanterns fixing support on riser
CN211597651U (en) Structure system of I-steel encorbelments
CN215528499U (en) Cable bracket on H-shaped steel frame steel column
CN204326658U (en) LNG storage tank reinforced mesh wind-resistant column bracing means
CN217234639U (en) Comprehensive pipeline anti-seismic support suitable for different pipeline shapes