CN217519367U - HDPE pipeline laying structure - Google Patents
HDPE pipeline laying structure Download PDFInfo
- Publication number
- CN217519367U CN217519367U CN202221031136.5U CN202221031136U CN217519367U CN 217519367 U CN217519367 U CN 217519367U CN 202221031136 U CN202221031136 U CN 202221031136U CN 217519367 U CN217519367 U CN 217519367U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- under casing
- guide bar
- laying structure
- movable block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a HDPE pipeline laying structure, including bottom plate and fly leaf, the top fixedly connected with under casing of bottom plate, the middle-end fixedly connected with cassette of under casing inner wall bottom, the equal fixedly connected with guide bar in the left and right sides of cassette, the outside cover on guide bar surface is equipped with the spring, the surface of guide bar and the inboard sliding connection who is located the spring have the movable block, the bottom fixedly connected with slider of movable block, the outside fixedly connected with inserted bar of slider, the middle-end fixedly connected with dead lever at fly leaf top. The utility model discloses set up the hand wheel, placed ring, slipmat, threaded rod, screw, splint, spring, guide bar, cassette, fixture block, connecting rod, movable block, fly leaf, slider, slot and inserted bar, it is inconvenient at the laying process to have solved current HDPE pipeline, leads to the fixed effect of pipeline not ideal, reduces holistic practicality to the problem that people of being not convenient for used.
Description
Technical Field
The utility model relates to a pipeline laying technical field specifically is a HDPE pipeline laying structure.
Background
The pipe is a device for conveying gas, liquid or fluid with solid particles, which is formed by connecting pipes, pipe connectors, valves and the like, generally, the fluid flows from a high-pressure part to a low-pressure part of the pipe after being pressurized by a blower, a compressor, a pump, a boiler and the like, and can also be conveyed by utilizing the pressure or gravity of the fluid, the pipe is widely used and mainly used in water supply, drainage, heat supply, gas supply, long-distance petroleum and natural gas conveying, agricultural irrigation, hydraulic engineering and various industrial devices, but the existing HDPE pipe is inconvenient in the laying process, so that the fixing effect on the pipe is not ideal, the whole practicability is reduced, and the HDPE pipe is inconvenient to use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a HDPE pipeline laying structure possesses the convenient advantage of laying, has solved current HDPE pipeline and is inconvenient laying the in-process, leads to the fixed effect of pipeline not ideal, reduces holistic practicality to the problem that people used not convenient for.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a HDPE pipe laying structure, includes bottom plate and fly leaf, the top fixedly connected with under casing of bottom plate, the middle-end fixedly connected with cassette of under casing inner wall bottom, the equal fixedly connected with guide bar in the left and right sides of cassette, the outside cover on guide bar surface is equipped with the spring, the surface of guide bar and the inboard sliding connection who is located the spring have the movable block, the bottom fixedly connected with slider of movable block, the outside fixedly connected with inserted bar of slider, the middle-end fixedly connected with dead lever at fly leaf top, the ring is placed to the top fixedly connected with of dead lever.
Preferably, the top of the movable block is movably connected with a connecting rod through a rotating shaft, the top of the connecting rod is movably connected to the bottom of the movable plate through the rotating shaft, a clamping block is fixedly connected to the middle end of the bottom of the movable plate, and the bottom of the clamping block is clamped in the inner cavity of the clamping seat.
Preferably, horizontal chutes are formed in the left side and the right side of the bottom of the inner wall of the bottom box, the bottom of the sliding block is connected to the inner cavity of the horizontal chute in a sliding mode, slots are formed in the inner surface of the bottom box and located on the outer side of the horizontal chutes, and the inserting rods are inserted into the inner cavities of the slots in an inserting mode.
Preferably, the screw has all been seted up to the left and right sides of placing the ring, the inner chamber threaded connection of screw has the threaded rod, the outside fixedly connected with hand wheel of threaded rod, the inboard fixedly connected with splint of threaded rod, the inboard bonding of splint has the slipmat.
Preferably, the left side fixedly connected with connecting seat of under casing, the right side fixedly connected with installation piece of under casing, vertical spout has all been seted up to the left and right sides of under casing inner wall, the outside sliding connection of fly leaf is in the inner chamber of vertical spout.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model is provided with a hand wheel, a placing ring, a non-slip mat, a threaded rod, a screw hole and a clamp plate, the hand wheel is rotated after the pipeline is placed on the inner side of the placing ring, the hand wheel drives the threaded rod to rotate, the threaded rod moves inwards along the inner cavity of the screw hole under the action of the thread and drives the clamp plate to move inwards, so that the inner side of the non-slip mat is contacted with the outer side of the pipeline, the pipeline is preliminarily fixed, a spring, a guide rod, a clamping seat, a clamping block, a connecting rod, a movable block, a movable plate, a sliding block, a slot and an inserting rod are arranged, the placing ring drives the movable plate to move downwards through a fixed rod, the movable plate drives the clamping block to move downwards, the bottom of the clamping block is clamped in the inner cavity of the clamping seat, meanwhile, the movable plate drives the connecting rod to move outwards, the connecting rod drives the movable block to slide outwards, the movable block drives the inserting rod to move outwards through the sliding block, make the inserted bar peg graft in the inner chamber of slot, carry on spacingly to placing the ring, further improve the fixed effect to the pipeline, use through the cooperation of above structure, it is inconvenient at the laying in-process to have solved current HDPE pipeline, leads to the fixed effect of pipeline not ideal, reduces holistic practicality to the problem that people used not convenient for.
2. The utility model discloses a set up vertical spout, effectively improve the fly leaf and reciprocating the smoothness nature of in-process, through setting up horizontal spout, effectively improve slider and movable block and remove the stability of in-process about, through setting up connecting seat and installation piece, conveniently connect a plurality of laying device.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic sectional view of the present invention;
fig. 3 is an enlarged schematic view of the a position of the present invention.
In the figure: 1. a base plate; 2. a bottom case; 3. a connecting seat; 4. a hand wheel; 5. placing a ring; 6. a non-slip mat; 7. a threaded rod; 8. a screw hole; 9. a splint; 10. a spring; 11. a guide rod; 12. a card holder; 13. a clamping block; 14. a connecting rod; 15. a movable block; 16. a movable plate; 17. fixing the rod; 18. a longitudinal chute; 19. inserting a rod; 20. a slot; 21. a slider; 22. a transverse chute; 23. and (7) installing the block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a HDPE pipeline laying structure comprises a bottom plate 1 and a movable plate 16, wherein a connecting seat 3 is fixedly connected to the left side of a bottom box 2, a mounting block 23 is fixedly connected to the right side of the bottom box 2, and a plurality of laying devices are conveniently connected by arranging the connecting seat 3 and the mounting block 23, longitudinal sliding grooves 18 are respectively formed in the left side and the right side of the inner wall of the bottom box 2, the outer side of the movable plate 16 is slidably connected to the inner cavity of the longitudinal sliding groove 18, and the smoothness of the movable plate 16 in the up-and-down moving process is effectively improved by arranging the longitudinal sliding grooves 18, the top of the bottom plate 1 is fixedly connected to the bottom box 2, a clamping seat 12 is fixedly connected to the middle end of the bottom of the inner wall of the bottom box 2, guide rods 11 are fixedly connected to the left side and the right side of the clamping seat 12, springs 10 are sleeved on the outer side of the surfaces of the guide rods 11, and movable blocks 15 are slidably connected to the inner sides of the guide rods 11, the top of the movable block 15 is movably connected with a connecting rod 14 through a rotating shaft, the top of the connecting rod 14 is movably connected with the bottom of the movable plate 16 through a rotating shaft, the middle end of the bottom of the movable plate 16 is fixedly connected with a clamping block 13, the bottom of the clamping block 13 is clamped in the inner cavity of the clamping seat 12, the bottom of the movable block 15 is fixedly connected with a sliding block 21, the left side and the right side of the bottom of the inner wall of the bottom box 2 are both provided with a transverse sliding groove 22, the bottom of the sliding block 21 is slidably connected in the inner cavity of the transverse sliding groove 22, the stability of the sliding block 21 and the movable block 15 in the left-right moving process is effectively improved through the arrangement of the transverse sliding groove 22, the inner surface of the bottom box 2 and the outer side of the transverse sliding groove 22 are provided with a slot 20, an inserting rod 19 is inserted in the inner cavity of the slot 20, the outer side of the sliding block 21 is fixedly connected with an inserting rod 19, the middle end of the top of the movable plate 16 is fixedly connected with a fixing rod 17, and the top of the fixing rod 17 is fixedly connected with a placing ring 5, the left side and the right side of placing ring 5 have all been seted up screw 8, and the inner chamber threaded connection of screw 8 has threaded rod 7, the outside fixedly connected with hand wheel 4 of threaded rod 7, the inboard fixedly connected with splint 9 of threaded rod 7, and the inboard bonding of splint 9 has slipmat 6.
When the pipeline fixing device is used, after a pipeline is placed on the inner side of the placing ring 5, the hand wheel 4 is rotated, the hand wheel 4 drives the threaded rod 7 to rotate, the threaded rod 7 moves inwards along the inner cavity of the screw hole 8 under the action of threads and drives the clamping plate 9 to move inwards, so that the inner side of the anti-skid pad 6 is contacted with the outer side of the pipeline to preliminarily fix the pipeline, by moving the placing ring 5 downwards, the placing ring 5 drives the movable plate 16 to move downwards through the fixed rod 17, the movable plate 16 drives the clamping block 13 to move downwards, so that the bottom of the clamping block 13 is clamped in the inner cavity of the clamping seat 12, meanwhile, the movable plate 16 drives the connecting rod 14 to move outwards, the connecting rod 14 drives the movable block 15 to slide outwards, the movable block 15 drives the inserting rod 19 to move outwards through the sliding block 21, so that the inserting rod 19 is inserted in the inner cavity of the inserting groove 20, the placing ring 5 is limited, and the fixing effect on the pipeline is further improved, the HDPE pipeline laying device has the advantages that the problem that an existing HDPE pipeline is inconvenient to lay in the laying process, the fixing effect of the pipeline is not ideal, the overall practicability is reduced, and people are not convenient to use is solved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. An HDPE pipe laying structure, includes bottom plate (1) and fly leaf (16), its characterized in that: the top fixedly connected with under casing (2) of bottom plate (1), middle-end fixedly connected with cassette (12) of under casing (2) inner wall bottom, equal fixedly connected with guide bar (11) in the left and right sides of cassette (12), the outside cover on guide bar (11) surface is equipped with spring (10), the surface of guide bar (11) and the inboard sliding connection who is located spring (10) have movable block (15), the bottom fixedly connected with slider (21) of movable block (15), the outside fixedly connected with inserted bar (19) of slider (21), the middle-end fixedly connected with dead lever (17) at fly leaf (16) top, ring (5) are placed to the top fixedly connected with of dead lever (17).
2. An HDPE pipe-laying structure as claimed in claim 1, characterized in that: the top of the movable block (15) is movably connected with a connecting rod (14) through a rotating shaft, the top of the connecting rod (14) is movably connected with the bottom of the movable plate (16) through the rotating shaft, a clamping block (13) is fixedly connected to the middle end of the bottom of the movable plate (16), and the bottom of the clamping block (13) is clamped in an inner cavity of the clamping seat (12).
3. An HDPE pipe-laying structure as claimed in claim 1, characterized in that: horizontal sliding grooves (22) are formed in the left side and the right side of the bottom of the inner wall of the bottom box (2), the bottom of the sliding block (21) is connected to the inner cavity of the horizontal sliding grooves (22) in a sliding mode, slots (20) are formed in the inner surface of the bottom box (2) and located on the outer side of the horizontal sliding grooves (22), and the inserting rods (19) are inserted into the inner cavities of the slots (20).
4. An HDPE pipe-laying structure as claimed in claim 1, characterized in that: screw (8) have all been seted up to the left and right sides of placing ring (5), the inner chamber threaded connection of screw (8) has threaded rod (7), the outside fixedly connected with hand wheel (4) of threaded rod (7), inboard fixedly connected with splint (9) of threaded rod (7), the inboard bonding of splint (9) has slipmat (6).
5. An HDPE pipe-laying structure as claimed in claim 1, characterized in that: the left side fixedly connected with connecting seat (3) of under casing (2), the right side fixedly connected with installation piece (23) of under casing (2), vertical spout (18) have all been seted up to the left and right sides of under casing (2) inner wall, the outside sliding connection of fly leaf (16) is in the inner chamber of vertical spout (18).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221031136.5U CN217519367U (en) | 2022-04-29 | 2022-04-29 | HDPE pipeline laying structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221031136.5U CN217519367U (en) | 2022-04-29 | 2022-04-29 | HDPE pipeline laying structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217519367U true CN217519367U (en) | 2022-09-30 |
Family
ID=83388900
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221031136.5U Active CN217519367U (en) | 2022-04-29 | 2022-04-29 | HDPE pipeline laying structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217519367U (en) |
-
2022
- 2022-04-29 CN CN202221031136.5U patent/CN217519367U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210233212U (en) | Clamping device for pipeline cutting | |
CN109099209B (en) | Pipeline butt joint inner wall aligning device | |
CN215357064U (en) | Supporting and positioning clamp for pipeline welding | |
CN217519367U (en) | HDPE pipeline laying structure | |
CN218031992U (en) | Pipeline installation auxiliary device | |
CN214248720U (en) | Protection device of pipeline for water conservancy construction | |
CN111036731A (en) | Double-side pipe bending device for metal pipeline | |
CN215334853U (en) | Auxiliary connecting device for erecting petroleum long-distance pipeline | |
CN213728315U (en) | Civil engineering pipeline outer wall cleaning equipment | |
CN217832699U (en) | Pipeline grinding and cutting integrated equipment for indoor and outdoor decoration engineering | |
CN217899062U (en) | Novel building engineering drainage pipe that crashproof is able to bear or endure extrusion performance height | |
CN216029430U (en) | Numerical control drilling equipment for pipeline | |
CN210266079U (en) | Pipeline with ball valve function | |
CN219506538U (en) | Refrigeration pipeline transportation device for refrigeration house | |
CN217482126U (en) | Smart city foundation pit construction is with burying pipeline support device | |
CN214109419U (en) | Fixing device for pipeline welding | |
CN211976104U (en) | Green's novel municipal pipeline lays fixedly device | |
CN213022665U (en) | Bending and bending angle test equipment for clamping and pressing pipe fitting | |
CN213479378U (en) | Adjustable supporting device for splicing pipelines | |
CN210566697U (en) | Wheel type heat supply pipe network support device | |
CN213206782U (en) | Fixing device for pipeline engineering | |
CN212192846U (en) | Pipeline fixing tool | |
CN211259857U (en) | Fixing device for preventing gas pipeline from shifting | |
CN217132819U (en) | Heat supply pipeline pressure testing device | |
CN212552526U (en) | Pipeline welding clamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |