CN217518219U - Adhere to steel beam formula floor carrier plate and store frame temporarily - Google Patents

Adhere to steel beam formula floor carrier plate and store frame temporarily Download PDF

Info

Publication number
CN217518219U
CN217518219U CN202221090175.2U CN202221090175U CN217518219U CN 217518219 U CN217518219 U CN 217518219U CN 202221090175 U CN202221090175 U CN 202221090175U CN 217518219 U CN217518219 U CN 217518219U
Authority
CN
China
Prior art keywords
sides
steel beam
fixed
connecting rod
storage rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221090175.2U
Other languages
Chinese (zh)
Inventor
董军业
王苗
赵晓娟
刘运成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202221090175.2U priority Critical patent/CN217518219U/en
Application granted granted Critical
Publication of CN217518219U publication Critical patent/CN217518219U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides an adhere to steel beam formula building carrier plate and store frame temporarily belongs to construction machinery equipment field. The technical scheme is as follows: comprises a bottom frame, a clamping mechanism and a supporting leg mechanism; the clamping mechanism comprises two pairs of vertical rods, and the side edges A at two sides are respectively provided with a pair of vertical rods; the supporting leg mechanism comprises four rotary fixing supporting legs, fixing shafts are arranged on the outer side faces of the end portions of the two sides of the side edge A, the two sides of the supporting leg mechanism are provided with the rotary fixing supporting legs in a rotating mode, and the rotary fixing supporting legs are provided with ratchet mechanisms matched with each other. The beneficial effects of the utility model are that: this store a simple structure, convenient to use has realized that the storage frame is at the temporary fixation on girder steel installation layer to through stacking the building carrier plate and effectively having solved the problem that there is not horizontal floor in girder steel installation layer to lead to stacking the difficulty temporarily on storing the frame.

Description

Adhere to steel beam formula floor carrier plate and store frame temporarily
Technical Field
The utility model relates to a construction machinery equipment field especially relates to an adhere to steel beam type building carrier plate temporary storage frame.
Background
The floor bearing plate is a permanent template which is formed by rolling and cold-bending galvanized steel plates, has a V-shaped, U-shaped, trapezoidal or similar wave-shaped cross section, and is widely applied to the construction of horizontal floor slabs of ultra-high floors. The construction process of the super high-rise horizontal structure floor slab mainly comprises the following steps: mounting steel structure columns → mounting horizontal steel beams → laying floor deck → mounting steel bar meshes and studs → pouring concrete. Through above-mentioned construction process can discover, the laying of building carrier plate needs begin gradually after the girder steel installation, and this stage is owing to there is not horizontal structure, often piles up building carrier plate material temporarily on the girder steel during site operation. During installation, operating personnel can loosen the bound floor plate steel wire ropes and convey the used floor support plates to the operation surface to be installed from a stacking place, and the danger that the loose floor support plates falling from the high place easily occur due to the certain distance between the steel beams. Meanwhile, as the construction height of the super high-rise building is increased, the wind power of the working face is increased, and the accident that the single floor bearing plate is blown away by wind and falls from the high altitude can also happen on site, so that the personal safety of the lower working face is directly influenced. Therefore, how to realize the temporary fixation of the floor bearing plate on the steel beam mounting layer is a key link for ensuring the construction safety of the floor bearing plate and avoiding the high-altitude falling object danger.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an attached steel beam formula building carrier plate temporary storage frame of easy operation, effective building carrier plate temporary storage that realizes.
The utility model discloses a realize through following measure:
an attached steel beam type temporary storage rack for floor bearing plates is characterized by comprising a bottom frame, a clamping mechanism and a support leg mechanism, wherein the clamping mechanism and the support leg mechanism are arranged on the bottom frame;
the bottom frame is a rectangular frame, and the rectangular frame comprises two side edges A along the length direction and two side edges B along the width direction;
the clamping mechanism comprises two pairs of vertical rods, and the side edges A at two sides are respectively provided with a pair of vertical rods;
the supporting leg mechanism comprises four rotary fixing supporting legs, fixing shafts are arranged on the outer side faces of the end portions of the two sides of the side edge A, the two sides of the supporting leg mechanism are provided with the rotary fixing supporting legs in a rotating mode, and the rotary fixing supporting legs are provided with ratchet mechanisms matched with each other.
The utility model discloses a concrete characteristics have in addition:
the lower side surfaces of the side edges A at two sides are respectively provided with a first sliding chute, a pair of first sliding blocks are respectively arranged in the first sliding chutes at two sides, and the pair of first sliding blocks at two sides are respectively provided with the corresponding upright rods;
both sides the middle part of first spout all is provided with the fixed block, the orientation is corresponding the both sides side of pole setting and corresponding all be provided with the spring between the first slider, the spring sets up in the first spout, when the spring is in free state, both sides on the side A the interval is less than building carrier plate width between the pole setting, and when the building carrier plate was stored to needs, the manual work will both sides on the side A the pole setting is to keeping away from the direction of fixed block is tensile, works as both sides loosen when interval between the pole setting satisfies building carrier plate width requirement the pole setting, the pole setting is in the inside contraction under the effect of spring realizes that the building carrier plate is in it is fixed on the storage rack.
The periphery of the fixed shaft is rotatably provided with a sleeve, the sleeve is provided with the rotary fixed supporting leg, and the rotary fixed supporting leg is of an L-shaped structure.
The ratchet mechanism comprises a ratchet wheel arranged on the side face of one side of the sleeve, which faces the side edge A, a through hole is formed in the middle of the ratchet wheel, the through hole is formed in the periphery of the fixed shaft, a through second sliding groove is formed in the side edge A, which is close to the ratchet wheel, a second sliding block is arranged in the second sliding groove, a connecting rod A is arranged at one end of the second sliding block, a pawl matched with the ratchet wheel is arranged at the free end of the connecting rod A, a torsion spring is arranged between the periphery of the connecting rod A and the pawl, one end of the torsion spring is fixed on the connecting rod A, and the other end of the torsion spring is fixed on the pawl;
the other end of the second sliding block is provided with a connecting rod B, the connecting rod B is provided with a handle after penetrating out of the second sliding chute, an auxiliary spring is arranged on the periphery of the connecting rod B and between the handle and the side edge A, one end of the auxiliary spring is fixed on the handle, the other end of the auxiliary spring is fixed on the side edge A, the rotary fixed supporting leg is rotated until the free edge of the L-shaped structure is clamped on the steel beam, but can not rotate towards the opposite direction under the action of the ratchet mechanism, so that the rotating fixed supporting leg is ensured to be firmly fixed on the steel beam, and the storage rack can not shake on the steel beam, when the storage rack needs to be detached from the steel beam, the pawl can be disengaged from the ratchet wheel by pulling on the handle, and then rotating the rotating fixed leg until disengaged from the steel beam.
The side edges A on the two sides are provided with limiting blocks matched with the rotary fixed supporting legs, and when the storage rack is not used, the rotary fixed supporting legs are rotated until the rotary fixed supporting legs abut against the limiting blocks.
The working principle is as follows: when the storage rack is used, the rotary fixed supporting legs are rotated until the free edges of the L-shaped structures are clamped on the steel beams, but the free edges cannot rotate in the opposite direction under the action of the ratchet mechanism, so that the rotary fixed supporting legs are firmly fixed on the steel beams, and the storage rack cannot shake on the steel beams;
when the spring is in a free state, the distance between the upright rods on the two sides of the side edge A is smaller than the width of the floor support plate, when the floor support plate needs to be stored, the upright rods on the two sides of the side edge A are manually stretched towards the direction away from the fixed block, when the distance between the upright rods on the two sides meets the width requirement of the floor support plate, the upright rods are loosened, and the upright rods are retracted inwards under the action of the spring, so that the floor support plate is fixed on the storage rack;
when the storage rack needs to be detached from the steel beam, the pawl can be disengaged from the ratchet wheel by pulling the handle, and then the rotary fixing support leg is rotated until the pawl is disengaged from the steel beam.
The utility model has the advantages that: this store a simple structure, convenient to use has realized that the storage frame is at the temporary fixation on girder steel installation layer to through stacking the building carrier plate and effectively having solved the problem that there is not horizontal floor in girder steel installation layer to lead to stacking the difficulty temporarily on storing the frame. In addition, the vertical rod with the telescopic function is arranged on the storage rack, the clamping position of the floor bearing plate on the storage rack can be fixed, and meanwhile, the telescopic arrangement of the vertical rod ensures the adaptability of the storage rack to the floor bearing plates with various sizes.
Drawings
Fig. 1 is a schematic view of an overall structure of a floor deck according to an embodiment of the present invention.
Fig. 2 is a schematic view of the overall structure of the embodiment of the present invention.
Fig. 3 is a schematic structural view of the ratchet mechanism on the rotating fixed leg according to the embodiment of the present invention.
Wherein the reference numerals are: 1. rotating the fixed support leg; 2. 3, steel beam, side B; 4. side edge A; 5. erecting a rod; 6. a floor deck; 7. a handle; 8. a ratchet wheel; 9. a sleeve; 10. a fixed shaft; 11. a first chute; 12. a first slider; 13. a spring; 14. a fixed block; 15. an auxiliary spring; 16. a connecting rod B; 17. a second slider; 18. a torsion spring; 19. a pawl.
Detailed Description
In order to clearly illustrate the technical features of the present solution, the present solution is explained below by way of specific embodiments.
Referring to fig. 1-3, a temporary storage rack for an attached steel beam type floor support plate comprises a bottom frame, a clamping mechanism and a support leg mechanism, wherein the clamping mechanism and the support leg mechanism are arranged on the bottom frame;
the bottom frame is a rectangular frame, and the rectangular frame comprises two side edges A4 along the length direction and two side edges B3 along the width direction;
the clamping mechanism comprises two pairs of upright rods 5, and a pair of upright rods 5 are respectively arranged on the side edges A4 at the two sides;
the landing leg mechanism includes four rotatory fixed landing legs 1, all is provided with fixed axle 10 on the lateral surface that is close to side A4 both sides tip, all rotates on the fixed axle 10 of both sides to be provided with rotatory fixed landing leg 1, is provided with matched with ratchet on the rotatory fixed landing leg 1.
The lower side surfaces of the side edges A4 at two sides are both provided with a first sliding chute 11, a pair of first sliding blocks 12 are both arranged in the first sliding chutes 11 at two sides, and the pair of first sliding blocks 12 at two sides are both provided with corresponding upright rods 5;
the middle part of the first spout 11 in both sides all is provided with fixed block 14, all be provided with spring 13 between the both sides side of corresponding pole setting 5 and corresponding first slider 12 towards, spring 13 sets up in first spout 11, when spring 13 is in free state, the interval is less than building carrier plate 6 width between the both sides pole setting 5 on the side A4, when building carrier plate 6 is stored to needs, the manual work is with both sides pole setting 5 on the side A4 to keeping away from fixed block 14's direction tensile, loosen pole setting 5 when interval between the both sides pole setting 5 satisfies building carrier plate 6 width requirement, pole setting 5 is inwards shrink under spring 13's effect, it is fixed on storing the frame to realize building carrier plate 6.
The periphery of the fixed shaft 10 is rotatably provided with a sleeve 9, the sleeve 9 is provided with a rotary fixed supporting leg 1, and the rotary fixed supporting leg 1 is of an L-shaped structure.
The ratchet mechanism comprises a ratchet wheel 8 arranged on the side face of one side of the sleeve 9 facing the side edge A4, a through hole is formed in the middle of the ratchet wheel 8, the through hole is formed in the periphery of the fixed shaft 10, a through second sliding groove is formed in the side edge A4 close to the ratchet wheel 8, a second sliding block 17 is arranged in the second sliding groove, a connecting rod A is arranged at one end of the second sliding block 17, a pawl 19 matched with the ratchet wheel 8 is arranged at the free end of the connecting rod A, a torsion spring 18 is arranged on the periphery of the connecting rod A and between the connecting rod A and the pawl 19, one end of the torsion spring 18 is fixed on the connecting rod A, and the other end of the torsion spring 18 is fixed on the pawl 19;
the other end of the second sliding block 17 is provided with a connecting rod B16, a handle 7 is arranged after the connecting rod B16 penetrates out of the second sliding groove, the periphery of the connecting rod B16, an auxiliary spring 15 is arranged between the handle 7 and the side A4, one end of the auxiliary spring 15 is fixed on the handle 7, the other end of the auxiliary spring 15 is fixed on the side A4, the supporting leg 1 is rotationally and rotatably fixed until a free edge of an L-shaped structure is clamped on the steel beam 2, but the free edge cannot rotate in the opposite direction under the action of the ratchet mechanism, so that the supporting leg 1 is firmly fixed on the steel beam 2, the storage rack cannot rock on the steel beam 2, when the storage rack needs to be detached from the steel beam 2, the pawl 19 can be separated from the ratchet 8 by pulling the handle 7, and then the supporting leg 1 is rotationally and rotatably fixed until the supporting leg is separated from the steel beam 2.
The side edges A4 on two sides are provided with limit blocks matched with the rotary fixed supporting legs 1, when the storage rack is not used, the rotary fixed supporting legs 1 are rotated until the limit blocks are abutted.
The working principle is as follows: when the rotary fixing support leg is used, the rotary fixing support leg 1 is rotated until the free edge of the L-shaped structure is clamped on the steel beam 2, but the rotary fixing support leg cannot rotate in the opposite direction under the action of the ratchet mechanism, so that the rotary fixing support leg 1 is firmly fixed on the steel beam 2, and the storage frame cannot shake on the steel beam 2;
when the spring 13 is in a free state, the distance between the upright stanchions 5 at the two sides on the side edge A4 is smaller than the width of the floor support plate 6, when the floor support plate 6 needs to be stored, the upright stanchions 5 at the two sides on the side edge A4 are manually stretched towards the direction far away from the fixed block 14, when the distance between the upright stanchions 5 at the two sides meets the width requirement of the floor support plate 6, the upright stanchions 5 are loosened, and the upright stanchions 5 are retracted inwards under the action of the spring 13, so that the floor support plate 6 is fixed on the storage rack;
when it is desired to remove the storage rack from the steel beam 2, the pawl 19 can be disengaged from the ratchet wheel 8 by pulling on the handle 7, and then rotating the swivel mounting leg 1 until it is disengaged from the steel beam 2.
The technical features of the present invention that are not described can be realized through or by the prior art, and are not described herein again, and certainly, the above description is not a limitation of the present invention, the present invention is not limited to the above examples, and the changes, modifications, additions or replacements made by the ordinary skilled person in the art in the essential scope of the present invention should also belong to the protection scope of the present invention.

Claims (5)

1. An attached steel beam type temporary storage rack for floor bearing plates is characterized by comprising a bottom frame, a clamping mechanism and a supporting leg mechanism, wherein the clamping mechanism and the supporting leg mechanism are arranged on the bottom frame;
the bottom frame is a rectangular frame, and the rectangular frame comprises two side edges A (4) along the length direction and two side edges B (3) along the width direction;
the clamping mechanism comprises two pairs of upright rods (5), and the side edges A (4) at two sides are respectively provided with a pair of upright rods (5);
the supporting leg mechanism comprises four rotary fixing supporting legs (1), fixing shafts (10) are arranged on the outer side faces of the end portions of the two sides of the side edge A (4), the fixing shafts (10) on the two sides are all rotatably arranged on the rotary fixing supporting legs (1), and matched ratchet mechanisms are arranged on the rotary fixing supporting legs (1).
2. The temporary storage rack for the attached steel beam floor decks according to claim 1, wherein the lower sides of the side edges A (4) are provided with first sliding grooves (11), a pair of first sliding blocks (12) are arranged in the first sliding grooves (11), and the corresponding upright rods (5) are arranged on the pair of first sliding blocks (12);
both sides the middle part of first spout (11) all is provided with fixed block (14), orientation are corresponding the both sides side of pole setting (5) and corresponding all be provided with spring (13) between first slider (12).
3. The temporary storage rack of the attached steel beam floor deck according to claim 1, wherein a sleeve (9) is rotatably arranged on the periphery of the fixed shaft (10), the sleeve (9) is provided with the rotary fixed leg (1), and the rotary fixed leg (1) is of an L-shaped structure.
4. The temporary storage rack of attached steel beam floor decks according to claim 3, wherein the ratchet mechanism comprises a ratchet wheel (8) arranged on the side of the sleeve (9) facing the side A (4), the ratchet wheel (8) is provided with a through hole in the middle, the through hole is arranged on the periphery of the fixed shaft (10), a through second sliding slot is arranged on the side A (4) close to the ratchet wheel (8), a second sliding block (17) is arranged in the second sliding slot, one end of the second sliding block (17) is provided with a connecting rod A, the free end of the connecting rod A is provided with a pawl (19) matched with the ratchet wheel (8), and a torsion spring (18) is arranged on the periphery of the connecting rod A, between the connecting rod A and the pawl (19);
the other end of second slider (17) is provided with connecting rod B (16), connecting rod B (16) are worn out be provided with handle (7) behind the second spout, connecting rod B (16) are peripheral handle (7) with be provided with between side A (4) assist spring (15), the one end of assist spring (15) is fixed on handle (7), the other end of assist spring (15) is fixed on side A (4).
5. The temporary storage rack of the attached steel beam floor deck according to claim 4, wherein the side edges A (4) at two sides are provided with limit blocks matched with the rotary fixing legs (1).
CN202221090175.2U 2022-05-09 2022-05-09 Adhere to steel beam formula floor carrier plate and store frame temporarily Active CN217518219U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221090175.2U CN217518219U (en) 2022-05-09 2022-05-09 Adhere to steel beam formula floor carrier plate and store frame temporarily

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221090175.2U CN217518219U (en) 2022-05-09 2022-05-09 Adhere to steel beam formula floor carrier plate and store frame temporarily

Publications (1)

Publication Number Publication Date
CN217518219U true CN217518219U (en) 2022-09-30

Family

ID=83373207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221090175.2U Active CN217518219U (en) 2022-05-09 2022-05-09 Adhere to steel beam formula floor carrier plate and store frame temporarily

Country Status (1)

Country Link
CN (1) CN217518219U (en)

Similar Documents

Publication Publication Date Title
CN105781099A (en) Movable combined type one-sided large template structure and construction method thereof
WO2015184476A1 (en) Precast concrete falsework bubbledeck element and process of manufacturing thereof
CN106703407A (en) Construction method of double-layered shape steel supporting rack of cantilever beam plate
CN217518219U (en) Adhere to steel beam formula floor carrier plate and store frame temporarily
CN211498507U (en) Whole reassembling type protection rack
CN109736591A (en) A kind of ruggedized construction and reinforcement means suitable for building hoist basement roof
CN107587711A (en) A kind of regularization assembled overhanging protection canopy and its assembly method
CN210420894U (en) T-beam traversing device for highway and railway bridge construction
CN218758864U (en) No anchor platform of unloading of encorbelmenting
CN110656723B (en) Rail support for sliding construction of cylindrical arch shell roof
CN217559183U (en) Gas pipeline protection structure next to underground continuous wall
CN214456325U (en) Gantry crane beam lifting machine with high legs and low legs
CN214783310U (en) Prefabricated case roof beam vertically and horizontally sloping adjusting device
CN211142816U (en) Construction platform
CN214996135U (en) Overhanging type discharging platform with reinforcing protection device
CN102454298B (en) Large-sized reinforced concrete construction of frame beam method
CN112609966B (en) Construction method for constructing super-thick concrete top plate by utilizing simple latticed column laminated slab system
CN110282536B (en) Prestressed hollow slab hoisting point limiter
CN207794600U (en) A kind of oblique bracing means of building form
Andresen Investigation of a collapsed scaffold structure
CN206053310U (en) A kind of adjustable falsework
CN207109599U (en) A kind of form removable of support cast-in-place concrete continuous beam and erecting device
CN210260842U (en) Prestressed hollow slab hoisting point limiter
CN214497165U (en) Bridge embedded rib type deformed steel expansion device
CN220247736U (en) Remove reinforcing bar processing canopy

Legal Events

Date Code Title Description
GR01 Patent grant