CN217518132U - Assembly type scaffold wall connecting piece capable of being circulated - Google Patents

Assembly type scaffold wall connecting piece capable of being circulated Download PDF

Info

Publication number
CN217518132U
CN217518132U CN202221697053.XU CN202221697053U CN217518132U CN 217518132 U CN217518132 U CN 217518132U CN 202221697053 U CN202221697053 U CN 202221697053U CN 217518132 U CN217518132 U CN 217518132U
Authority
CN
China
Prior art keywords
connecting rod
sleeve
scaffold
gasket
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221697053.XU
Other languages
Chinese (zh)
Inventor
李祁东
肖金龙
方庆隆
姜胜利
苏东营
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc
Original Assignee
Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc filed Critical Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc
Priority to CN202221697053.XU priority Critical patent/CN217518132U/en
Application granted granted Critical
Publication of CN217518132U publication Critical patent/CN217518132U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of building components, in particular to a rotatable assembly type scaffold wall connecting piece, which comprises a connecting part and a connecting rod supporting part; the left side of the connecting part is provided with a scaffold connecting cylinder, the right side of the connecting part is provided with a connecting sleeve, and a gasket and a locking nut are connected to the connecting sleeve in a threaded manner; the connecting rod supporting part comprises a first connecting rod, a second connecting rod and a third connecting rod, the right ends of the first connecting rod, the second connecting rod and the third connecting rod are hinged, the left ends of the second connecting rod and the third connecting rod are respectively positioned at the upper side and the lower side of the first connecting rod, a connecting sleeve is slidably sleeved on the first connecting rod and is locked and fixed through a locking part, and the left ends of the second connecting rod and the third connecting rod are respectively connected with the connecting sleeve through a traction rope; the utility model can be operated on one side, which improves the construction efficiency and is simpler and more convenient during construction; the construction method can be suitable for different projects, can be used in different projects in a turnover mode, and saves construction cost.

Description

Assembly type scaffold wall connecting piece capable of being circulated
Technical Field
The utility model relates to a building element technical field especially relates to an assembled scaffold frame that can have enough to meet need links wall spare.
Background
In the building work progress, often can need to use the scaffold, the scaffold is the work platform of setting up in order to guarantee that each work progress goes on smoothly, sets up too high to avoid the scaffold and causes the overturning accident, often adopts even wall spare to make scaffold and main structure carry out the drawknot to guarantee the security that the scaffold used.
In the existing pulling method for the external scaffold at the shear wall with the application number of 201710478829.6, a screw hole reserved on a wall body after the shear wall is poured is used as a through hole of a wall connecting piece when a scaffold steel pipe is pulled and connected, a wall penetrating rod piece is acted by a steel bar, one end of the rod piece is welded with the scaffold steel pipe, and the other end of the rod piece is fixedly pulled and connected with the shear wall through a gasket and a nut; the applicant finds that in the prior art, the rod needs to be welded with a scaffold, can be detached only by cutting and cannot be recycled, so that the construction cost is increased; in addition, when the shear wall is connected with a pulling device, bolts need to be screwed on the inner side of the shear wall, so that the process is complicated and the use is inconvenient.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the above problem to provide one kind can reuse, reduce working cost, can the unilateral operate, easy operation, convenient assembled scaffold frame that can have enough to meet the need even wall spare.
Utility model solves the problem, the technical scheme who adopts is:
a turnover assembly type scaffold wall connecting piece is provided, a structure main body is provided with split bolt holes and pre-buried sleeves pre-buried in the split bolt holes, and the wall connecting piece comprises a connecting part and a connecting rod supporting part; the left side of the connecting part is provided with a scaffold connecting cylinder, the scaffold connecting cylinder is connected with a scaffold through a pipe hoop, the right side of the connecting part is provided with a connecting sleeve, and a gasket and a locking nut are in threaded connection with the connecting sleeve; the connecting rod supporting part comprises a first connecting rod, a second connecting rod and a third connecting rod, the right ends of the first connecting rod, the second connecting rod and the third connecting rod are hinged, the left ends of the second connecting rod and the third connecting rod are respectively positioned at the upper side and the lower side of the first connecting rod, the connecting sleeve is sleeved on the first connecting rod in a sliding mode and is locked and fixed through a locking part, and the left ends of the second connecting rod and the third connecting rod are respectively connected with the connecting sleeve through a traction rope.
Adopt above-mentioned technical scheme the utility model discloses, compare with prior art, its outstanding characteristics are:
the utility model can be operated from the outside and one side, the connecting rod supporting part runs through the pre-buried sleeve, the sliding connecting sleeve jacks up the second connecting rod and the third connecting rod, the second connecting rod and the third connecting rod are unfolded and supported at the inner side of the main body of the structure and are locked and fixed by the locking part; the gasket is abutted against the outer side of the structure main body, and the locking nut is locked, so that the construction efficiency is improved, and the construction is simpler and more convenient; in different construction projects, the interval between main structure body and the scaffold is different to some extent, through the detachable connection structure of scaffold steel pipe and scaffold connecting cylinder, can be applicable to different projects, can have enough to meet the need the use in different projects, has practiced thrift construction cost.
Preferably, the present invention further provides:
the left ends of the second connecting rod and the third connecting rod are of arc structures; the second connecting rod and the third connecting rod are pushed open when the connecting sleeve slides to the right side, so that the second connecting rod and the third connecting rod form a triangular supporting structure which can be abutted against the inner side of the structure main body.
The connecting sleeve is provided with a first through hole, the first connecting rod is provided with a second through hole, the locking part is a screw and a nut, and the screw penetrates through the first through hole and the second through hole and is locked through the nut; the second connecting rod and the third connecting rod are convenient to be ejected and then fixed.
The gasket and the locking nut are welded into a whole and are connected outside the connecting sleeve in a threaded manner; the use is more convenient, and parts are not easy to lose.
The outer diameter of the first connecting rod is 0.3-0.6 times of the inner diameter of the embedded sleeve; the outer diameters of the second connecting rod and the third connecting rod are 0.2-0.4 times of the inner diameter of the embedded sleeve; the connecting rod supporting part is convenient to penetrate through the embedded sleeve.
The gasket is provided with a rubber anti-skid layer; increase the frictional force of gasket and main structure body outer wall, avoid the gasket to damage main structure body.
Drawings
Fig. 1 is a schematic structural view of a fabricated scaffold wall connecting piece in use according to an embodiment of the present invention;
fig. 2 is a schematic structural view of an end portion of a scaffold according to an embodiment of the present invention.
In the figure: 1. a structural body; 101. pre-burying a sleeve; 2. a scaffold; 3. a pipe hoop; 4. a connecting portion; 401. a scaffold connecting cylinder; 402. a connecting sleeve; 5. a connecting rod supporting part; 501. a first link; 502. a second link; 503. a third link; 504. a hauling rope; 6. a locking member; 7. a gasket; 8. and locking the nut.
Detailed Description
The invention will be further described with reference to the following examples, which are intended only for a better understanding of the invention, and therefore, the examples do not limit the scope of the invention.
As shown in fig. 1 to 2, the utility model discloses a rotatable assembled scaffold wall connecting piece, which comprises a split bolt hole on a main structure body 1 and a pre-embedded sleeve 101 pre-embedded in the split bolt hole; the wall connecting piece comprises a connecting part 4 and a connecting rod supporting part 5; a scaffold connecting cylinder 401 is arranged on the left side of the connecting part 4, the scaffold connecting cylinder 401 is connected with the scaffold 2 through a pipe hoop 3, and the end part of the scaffold 2 is propped against the outer side of the structural body; a connecting sleeve 402 is arranged on the right side of the connecting part 4, and a gasket 7 and a locking nut 8 are connected to the connecting sleeve 402 in a threaded manner; the connecting rod supporting part 5 comprises a first connecting rod 501, a second connecting rod 502 and a third connecting rod 503, the right ends of the first connecting rod 501, the second connecting rod 502 and the third connecting rod 503 are hinged through a pin shaft, the left ends of the second connecting rod 502 and the third connecting rod 503 are respectively positioned at the upper side and the lower side of the first connecting rod 501, the connecting sleeve 402 is slidably sleeved on the first connecting rod 501 and is locked and fixed through a locking part 6, the left ends of the second connecting rod 502 and the third connecting rod 503 are respectively connected with the right end of the connecting sleeve 402 through a traction rope 504, and the traction rope 504 can be a steel wire rope; the gasket 7 is made of galvanized steel plates with the thickness of 4mm or 5mm, and the size is 80 x 80 mm; when the gasket is manufactured, a central hole matched with the connecting sleeve 402 is formed in the center of the gasket 7, an inner sleeve screw is processed in the central hole, a locking nut 8 is welded on the outer side (left side) of the central hole on the gasket 7, and the locking nut is connected to the connecting sleeve 402 in a threaded mode; wherein the outer diameter of the first connecting rod 501 is 0.3-0.6 times of the inner diameter of the embedded sleeve 101; the outer diameters of the second connecting rod 502 and the third connecting rod 503 are 0.2-0.4 times of the inner diameter of the embedded sleeve 101; the link supporting portion 5 is easily inserted into the pre-buried sleeve 101.
Further, the left ends of the second connecting rod 502 and the third connecting rod 503 are arc-shaped structures; when the connecting sleeve 402 slides to the right, the second link 502 and the third link 503 are pushed open, so that the second link 502 and the third link 503 form a triangular support structure capable of abutting against the inside of the structure body 1.
Further, a first through hole is formed in the connecting sleeve 402, a second through hole is formed in the first connecting rod 501, the locking member 6 is a screw and a nut, and the screw penetrates through the first through hole and the second through hole and is locked through the nut; the second link 502 and the third link 503 are fixed after being pushed open.
Further, a rubber anti-skid layer is arranged on the gasket 7; the left ends of the second connecting rod 502 and the third connecting rod 503 are abutted to one side of the inner wall of the structural body 1 and provided with a rubber anti-slip layer, so that the friction force between the gasket 7 and the outer wall of the structural body 1 is increased, and the gasket 7 is prevented from damaging the structural body 1.
When the scaffold connecting sleeve is used, the connecting rod supporting part 5 is inserted into an embedded sleeve of the structure body 1 from the outer side of the structure body 1, the second connecting rod 502 and the third connecting rod 503 are located on the inner side of the structure body 1, the connecting sleeve 402 slides along the left side of the first sliding rod to the right side, the connecting sleeve 402 pushes the second connecting rod 502 and the third connecting rod 503 open, the connecting sleeve 402 and the first connecting rod 501 are locked by screws and nuts, then the connecting sleeve 402 is pulled back (leftwards), the left ends of the second connecting rod 502 and the third connecting rod 503 are tightly abutted to a mechanism body outside a counter-pull bolt hole, then the locking nut 8 is rotated rightwards to the gasket 7 to tightly push the outer wall of the structure body 1, and finally the scaffold connecting sleeve 401 and a scaffold 2 steel pipe are connected and fixed by the connecting pipe hoop 3.
The utility model can be operated on one side, the construction efficiency is improved, the construction is simpler and more convenient, and two persons are not needed to be mutually matched at the inner side and the outer side of the main body of the structure; need not the cutting, can dismantle with the scaffold frame and be connected, and can realize that the drawknot of different positions scaffold frame is fixed, can have enough to meet the need the use, practiced thrift construction cost.
The above description is only a preferred and practical embodiment of the present invention, and is not intended to limit the scope of the present invention, which is intended to be encompassed by the present invention, unless otherwise indicated by the appended claims.

Claims (6)

1. The utility model provides an assembled scaffold frame that can have enough to meet need is wall spare even, is equipped with split bolt hole and pre-buried sleeve pipe in split bolt hole on the main structure, its characterized in that: the wall connecting piece comprises a connecting part and a connecting rod supporting part;
the left side of the connecting part is provided with a scaffold connecting cylinder, the scaffold connecting cylinder is connected with a scaffold through a pipe hoop, the right side of the connecting part is provided with a connecting sleeve, and a gasket and a locking nut are in threaded connection with the connecting sleeve;
the connecting rod supporting part comprises a first connecting rod, a second connecting rod and a third connecting rod, the right ends of the first connecting rod, the second connecting rod and the third connecting rod are hinged, the left ends of the second connecting rod and the third connecting rod are respectively positioned on the upper side and the lower side of the first connecting rod, the connecting sleeve is slidably sleeved on the first connecting rod and is locked and fixed through a locking part, and the left ends of the second connecting rod and the third connecting rod are respectively connected with the connecting sleeve through a traction rope.
2. A fabricated recyclable scaffolding wall element as claimed in claim 1, wherein: the left ends of the second connecting rod and the third connecting rod are of arc structures.
3. A fabricated recyclable scaffolding wall element as claimed in claim 1, wherein: the connecting sleeve is provided with a first through hole, the first connecting rod is provided with a second through hole, the locking part is a screw and a nut, and the screw penetrates through the first through hole and the second through hole and is locked through the nut.
4. A fabricated recyclable scaffolding wall element as claimed in claim 1, wherein: the gasket and the locking nut are welded into a whole, and the gasket and the locking nut are connected outside the connecting sleeve through threads.
5. A fabricated recyclable scaffolding wall element as claimed in claim 1, wherein: the outer diameter of the first connecting rod is 0.3-0.6 times of the inner diameter of the embedded sleeve; the outer diameters of the second connecting rod and the third connecting rod are 0.2-0.4 times of the inner diameter of the embedded sleeve.
6. A turnaround assembly scaffold wall connection according to claim 1, wherein: the gasket is provided with a rubber anti-skid layer.
CN202221697053.XU 2022-07-04 2022-07-04 Assembly type scaffold wall connecting piece capable of being circulated Active CN217518132U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221697053.XU CN217518132U (en) 2022-07-04 2022-07-04 Assembly type scaffold wall connecting piece capable of being circulated

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221697053.XU CN217518132U (en) 2022-07-04 2022-07-04 Assembly type scaffold wall connecting piece capable of being circulated

Publications (1)

Publication Number Publication Date
CN217518132U true CN217518132U (en) 2022-09-30

Family

ID=83394168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221697053.XU Active CN217518132U (en) 2022-07-04 2022-07-04 Assembly type scaffold wall connecting piece capable of being circulated

Country Status (1)

Country Link
CN (1) CN217518132U (en)

Similar Documents

Publication Publication Date Title
CN217518132U (en) Assembly type scaffold wall connecting piece capable of being circulated
CN110937496B (en) Lifting lug for hoisting segmented equipment and hoisting method thereof
CN211415024U (en) Water well valve replacing device
CN111546038B (en) Large-scale shaft coupling dismounting device
CN111573402B (en) Slope anchor rope eminence conveyer
KR102022044B1 (en) Overturn preventing device of high place works car
CN114211451B (en) Tube drawing device for adjustable jig frame
CN213054602U (en) Dismantle frock of shafting flange tight fit bolt
CN219807649U (en) Suspension type quick-release shackle
CN214006584U (en) Large-span roof girder bending-proof tool
CN215979252U (en) Safe slips is used in oil drilling convenient to dismantle
CN104929668A (en) Anchor cable disassembly joint and anchor cable disassembly method
CN219341413U (en) Quick assembly frame for hoisting special non-wheeled common equipment
CN219325198U (en) Quick assembly disassembly frock and extracting tool suitable for reinforcing bar portion article hoisting point
DE19721635A1 (en) Hydraulic lifting unit raising large diameter casing tubes from shaft
CN204716269U (en) Anchor cable dismounting joint
CN217783398U (en) Shaft tunnelling safety rope ladder
CN216588482U (en) Workover rig guy rope safety rope telescopic connection device
DE202005003873U1 (en) hoist
CN216328001U (en) Dismounting tool for post insulator of booster station
CN219787228U (en) Bogie side beam overturning device
CN217578055U (en) Tool type combined steel mould hanging device
CN218479831U (en) Manual telescopic type front canopy supporting device
CN220264917U (en) Heavy-calibre reinforced concrete drain pipe section hoist
CN212170226U (en) Belt upper supporting rod dismounting wrench

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant