CN217517645U - Assembled piping lane - Google Patents

Assembled piping lane Download PDF

Info

Publication number
CN217517645U
CN217517645U CN202220957999.9U CN202220957999U CN217517645U CN 217517645 U CN217517645 U CN 217517645U CN 202220957999 U CN202220957999 U CN 202220957999U CN 217517645 U CN217517645 U CN 217517645U
Authority
CN
China
Prior art keywords
piping lane
base
pipe
worm
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220957999.9U
Other languages
Chinese (zh)
Inventor
马玉成
肖斯娜
郭力嫦
陈正飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Construction Engineering Corp Guangzhou
Original Assignee
Guangzhou Construction Engineering Corp Guangzhou
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Construction Engineering Corp Guangzhou filed Critical Guangzhou Construction Engineering Corp Guangzhou
Priority to CN202220957999.9U priority Critical patent/CN217517645U/en
Application granted granted Critical
Publication of CN217517645U publication Critical patent/CN217517645U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a piping lane technical field specifically is an assembled piping lane, including the piping lane base, the top of piping lane base is provided with the piping lane support body, the bottom fixed mounting of piping lane support body has quantity to be two picture pegs, two the inside of piping lane base is all extended to the bottom of picture peg, the bottom of piping lane support body and the equal fixed mounting in outside that is located two picture pegs have the sealing washer that contacts with the piping lane base, the inner wall left and right sides of piping lane base all is provided with positioning mechanism, positioning mechanism includes the storehouse body, one side that the storehouse body was carried on the back mutually all with piping lane base fixed connection, the roof movable mounting in the storehouse body has one end to run through and extend to the worm of storehouse body below. This assembled piping lane not only is convenient for connect piping lane base and piping lane support body, makes piping lane base and piping lane support body connect more firmly moreover, has reduced not hard up condition and has taken place, has improved assembly stability to possess the good advantage of stability, made things convenient for the use.

Description

Assembled piping lane
Technical Field
The application relates to a piping lane technical field specifically is an assembled piping lane.
Background
The utility tunnel is an underground urban pipeline utility tunnel, namely, a tunnel space is built underground in a city, various engineering pipelines such as electric power, communication, gas, heat supply, water supply and drainage and the like are integrated, a special overhaul port, a lifting port and a monitoring system are arranged, unified planning, unified design, unified construction and management are implemented, and the utility tunnel is an important infrastructure and a 'lifeline' for guaranteeing urban operation.
The construction mode of present piping lane divide into cast-in-place and prefabricated assembly, because site operation water power consumption is many, wet operation work load is big, and the condition at the site of building site is limited, consequently, lead to the construction process slow, in addition, the difficult assurance of site operation concrete construction quality, still produce the seepage problem easily, consequently, begin to adopt prefabricated piping lane to replace cast-in-place piping lane on the market at present, current piping lane assembles through the bolt usually, the bolt can produce not hard up after the assembly is accomplished, the assembly stability has been influenced, need improve.
SUMMERY OF THE UTILITY MODEL
To prior art's not enough, this application provides an assembled piping lane, possesses advantages such as stability is good, has solved current piping lane and has assembled through the bolt usually, and the bolt may produce not hard up after the assembly is accomplished, has influenced assembly stability's problem.
In order to achieve the above purpose, the present application provides the following technical solutions: an assembled pipe gallery comprises a pipe gallery base, wherein a pipe gallery frame body is arranged at the top of the pipe gallery base, two inserting plates are fixedly arranged at the bottom of the pipe gallery frame body, the bottoms of the two inserting plates extend into the pipe gallery base, sealing rings which are in contact with the pipe gallery base are fixedly arranged at the bottom of the pipe gallery frame body and outside the two inserting plates, and positioning mechanisms are arranged on the left side and the right side of the inner wall of the pipe gallery base;
the positioning mechanism comprises a bin body, one side of the bin body, which is opposite to the other side, is fixedly connected with the pipe rack base, the inner top wall of the bin body is movably provided with a worm, one end of the worm penetrates through and extends to the lower part of the bin body, one side, which is opposite to the other side, of the inner wall of the bin body is movably provided with a threaded rod, the outer part of the threaded rod is fixedly provided with a worm wheel meshed with the worm, one side, which is opposite to the other side, of the threaded rod is movably provided with a threaded pipe extending to the inner part of the pipe rack base, one side, which is opposite to the other side, of the threaded pipe is fixedly provided with a positioning block extending to the inner part of the inserting plate, the pipe rack body is firstly moved downwards, the pipe rack body drives the two inserting plates to move downwards, the two inserting plates are inserted into the pipe rack base, then the worm on one side is rotated, the worm drives the worm wheel and the threaded rod to rotate, and the threaded pipe and the positioning block are driven to move towards the direction of the inserting plates, make the locating piece insert the inside of picture peg, the worm of rotatory opposite side again makes the inside that two locating pieces inserted two picture pegs, is not only convenient for connect piping lane base and piping lane support body, makes piping lane base and piping lane support body connect more firmly moreover, has reduced not hard up condition and has taken place, has improved assembly stability.
Further, the top of piping lane base is seted up quantity and is two slots, slot and picture peg phase-match.
Through adopting above-mentioned technical scheme, two picture pegs can insert the inside of piping lane base through two slots.
Further, the worm is rotationally connected with the bin body through a first bearing, the worm is rotationally connected with the bin body through a second bearing, and a knob is fixedly mounted at the bottom of the worm.
Through adopting above-mentioned technical scheme, it can drive the worm and rotate to rotate the knob.
Further, a thread groove is formed in one side, opposite to the thread pipe, and the thread groove is matched with the threaded rod.
Through adopting above-mentioned technical scheme, can drive the screwed pipe when the threaded rod is rotatory and move left or move right.
Furthermore, the inner top wall and the inner bottom wall of the bin body are both provided with a limiting groove, the top and the bottom of the screwed pipe are both fixedly provided with a limiting rod, one end of the limiting rod extends to the inside of the limiting groove, and the limiting groove is matched with the moving range of the limiting rod.
Through adopting above-mentioned technical scheme, the screwed pipe drives two gag lever posts and removes in the inside of two spacing grooves when removing, can make the screwed pipe remove more steadily.
Furthermore, the left side and the right side of the inner wall of the pipe gallery base are provided with positioning holes communicated with the slots, and the positioning holes are matched with the positioning blocks.
Through adopting above-mentioned technical scheme, two locating pieces can remove in the inside of piping lane base through two locating holes.
Furthermore, a positioning groove is formed in one side, opposite to the inserting plate, and the positioning groove is matched with the positioning block.
Through adopting above-mentioned technical scheme, the locating piece can insert the inside of picture peg through the constant head tank.
Compared with the prior art, the technical scheme of the application has the following beneficial effects:
1. this assembled piping lane through setting up positioning mechanism, is not only convenient for connect piping lane base and piping lane support body, makes piping lane base and piping lane support body connect more firmly moreover, has reduced not hard up condition and has taken place, has improved assembly stability to possess the good advantage of stability, made things convenient for the use.
2. This assembled piping lane through setting up the sealing washer, has strengthened the leakproofness that piping lane base and piping lane support body increase, has reduced the condition emergence of seeping water to possess the good advantage of leakproofness, made things convenient for the use.
Drawings
FIG. 1 is a schematic structural diagram of the present application;
FIG. 2 is an enlarged view taken at A in FIG. 1 of the present application;
fig. 3 is a front view of the present application.
In the figure: 1 pipe rack base, 2 pipe rack support bodies, 3 insertion plates, 4 sealing rings, 5 positioning mechanisms, 51 cabin bodies, 52 worms, 521 knobs, 53 threaded rods, 54 worm wheels, 55 threaded pipes, 551 limiting grooves, 552 limiting rods and 56 positioning blocks.
Detailed Description
The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
Referring to fig. 1-3, the assembly type pipe rack in the embodiment includes a pipe rack base 1, a pipe rack frame body 2 is arranged at the top of the pipe rack base 1, two insertion plates 3 are fixedly installed at the bottom of the pipe rack frame body 2, the bottoms of the two insertion plates 3 extend into the pipe rack base 1, sealing rings 4 contacting with the pipe rack base 1 are fixedly installed at the bottom of the pipe rack frame body 2 and outside the two insertion plates 3, and positioning mechanisms 5 are arranged on the left side and the right side of the inner wall of the pipe rack base 1;
positioning mechanism 5 includes the storehouse body 51, one side that storehouse body 51 carried on the back all with piping lane base 1 fixed connection, the interior roof of storehouse body 51 rotates and installs one end and run through and extend to the worm 52 of storehouse body 51 below, one side that storehouse body 51 inner wall carried on the back mutually all rotates installs threaded rod 53, the equal fixed mounting in outside of threaded rod 53 has the worm wheel 54 who meshes mutually with worm 52, threaded rod 53's outside and be located one side screw thread that worm 52 carried on the back mutually install and extend to the inside screwed pipe 55 of piping lane base 1, the equal fixed mounting in one side that screwed pipe 55 carried on the back mutually has the locating piece 56 that extends to 3 inside picture pegs.
It is specific, earlier remove pipe rack support body 2 downwards, pipe rack support body 2 drives two picture peg 3 and removes downwards, make two picture peg 3 insert the inside of pipe rack base 1, then the worm 52 of rotatory one side, worm 52 drives worm wheel 54 and threaded rod 53 and rotates, threaded rod 53 drives screwed pipe 55 and locating piece 56 and removes towards the direction of picture peg 3, make locating piece 56 insert the inside of picture peg 3, the worm 52 of rotatory opposite side again, make two locating pieces 56 insert the inside of two picture peg 3, not only be convenient for connect pipe rack base 1 and pipe rack support body 2, and make pipe rack base 1 and pipe rack support body 2 connect more firmly, the condition that has reduced not hard up takes place, assembly stability has been improved.
Referring to fig. 1-3, in the present embodiment, two slots are formed at the top of the pipe rack base 1, the slots are matched with the insertion plates 3, and the two insertion plates 3 can be inserted into the pipe rack base 1 through the two slots.
Referring to fig. 1-3, in the present embodiment, the worm 52 is rotatably connected to the bin body 51 through a first bearing, the worm 52 is rotatably connected to the bin body 51 through a second bearing, a knob 521 is fixedly mounted at the bottom of the worm 52, the worm 52 can be driven to rotate by rotating the knob 521, thread grooves are formed on the opposite sides of the threaded pipe 55, the thread grooves are matched with the threaded rod 53, and the threaded rod 53 can drive the threaded pipe 55 to move leftward or rightward when rotating.
Referring to fig. 1-3, in the present embodiment, the inner top wall and the inner bottom wall of the bin body 51 are both provided with a limiting groove 551, the top and the bottom of the threaded pipe 55 are both fixedly provided with a limiting rod 552, one end of the limiting rod 552 extends into the limiting groove 551, the moving range of the limiting groove 551 is matched with that of the limiting rod 552, and the threaded pipe 55 moves by driving the two limiting rods 552 to move inside the two limiting grooves 551, so that the threaded pipe 55 can move more stably.
Referring to fig. 1-3, in the embodiment, the left and right sides of the inner wall of the pipe rack base 1 are respectively provided with positioning holes communicated with the slots, the positioning holes are matched with the positioning blocks 56, the two positioning blocks 56 can move inside the pipe rack base 1 through the two positioning holes, one side of the inserting plate 3 opposite to each other is provided with positioning grooves, the positioning grooves are matched with the positioning blocks 56, and the positioning blocks 56 can be inserted into the inserting plate 3 through the positioning grooves.
The working principle of the above embodiment is as follows:
the staff firstly moves the pipe rack body 2 downwards, the pipe rack body 2 drives the two insert plates 3 to move downwards, so that the two insert plates 3 are inserted into the pipe rack base 1, then the knob 521 on one side is rotated to drive the worm 52 to rotate, the worm 52 drives the worm wheel 54 and the threaded rod 53 to rotate, the threaded rod 53 drives the threaded pipe 55 and the positioning block 56 to move towards the direction of the insert plate 3, the threaded pipe 55 drives the two limiting rods 552 to move inside the two limiting grooves 551, so that the threaded pipe 55 can move more stably, the positioning block 56 can be inserted into the insert plate 3, then the knob 521 on the other side is rotated, so that the two positioning blocks 56 are inserted into the two insert plates 3, thereby not only being convenient for connecting the pipe rack base 1 and the pipe rack body 2, but also enabling the pipe rack base 1 and the pipe rack body 2 to be connected more firmly, and reducing the loosening condition, the assembly stability is improved, so that the device has the advantage of good stability and is convenient to use.
Two sealing washer 4 are located between piping lane base 1 and piping lane support body 2, have strengthened the leakproofness that piping lane base 1 and piping lane support body 2 increase, have reduced the condition of infiltration and have taken place to possess the good advantage of leakproofness, made things convenient for the use.
It should be noted that, in this document, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present application have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the application, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides an assembled piping lane, includes piping lane base (1), its characterized in that: the pipe rack is characterized in that a pipe rack frame body (2) is arranged at the top of the pipe rack base (1), two inserting plates (3) are fixedly arranged at the bottom of the pipe rack frame body (2), the bottoms of the two inserting plates (3) extend into the pipe rack base (1), sealing rings (4) which are in contact with the pipe rack base (1) are fixedly arranged at the bottom of the pipe rack frame body (2) and positioned outside the two inserting plates (3), and positioning mechanisms (5) are arranged on the left side and the right side of the inner wall of the pipe rack base (1);
positioning mechanism (5) are including the storehouse body (51), one side that the storehouse body (51) carried on the back all with piping lane base (1) fixed connection, the interior roof movable mounting of the storehouse body (51) has one end to run through and extends to worm (52) of the storehouse body (51) below, the equal movable mounting in one side that the storehouse body (51) inner wall carried on the back has threaded rod (53), the equal fixed mounting in outside of threaded rod (53) has worm wheel (54) with worm (52) engaged with mutually, the outside of threaded rod (53) and be located one side movable mounting that worm (52) carried on the back mutually have extend to inside screwed pipe (55) of piping lane base (1), the equal fixed mounting in one side that screwed pipe (55) carried on the back mutually has locating piece (56) that extend to picture peg (3) inside.
2. A fabricated pipe gallery according to claim 1, wherein: the top of piping lane base (1) is seted up quantity and is two slots, slot and picture peg (3) phase-match.
3. The fabricated pipe gallery according to claim 1, wherein: the worm (52) is rotationally connected with the bin body (51) through a first bearing, the worm (52) is rotationally connected with the bin body (51) through a second bearing, and a knob (521) is fixedly mounted at the bottom of the worm (52).
4. A fabricated pipe gallery according to claim 1, wherein: thread grooves are formed in the opposite side of the threaded pipe (55), and the thread grooves are matched with the threaded rod (53).
5. The fabricated pipe gallery according to claim 1, wherein: the inner top wall and the inner bottom wall of the bin body (51) are both provided with a limiting groove (551), the top and the bottom of the threaded pipe (55) are both fixedly provided with a limiting rod (552) with one end extending into the limiting groove (551), and the limiting groove (551) is matched with the moving range of the limiting rod (552).
6. A fabricated pipe gallery according to claim 2, wherein: the left side and the right side of the inner wall of the pipe gallery base (1) are provided with positioning holes communicated with the slots, and the positioning holes are matched with the positioning blocks (56).
7. A fabricated pipe gallery according to claim 1, wherein: and one side of the inserting plate (3) opposite to the inserting plate is provided with a positioning groove, and the positioning grooves are matched with the positioning blocks (56).
CN202220957999.9U 2022-04-23 2022-04-23 Assembled piping lane Active CN217517645U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220957999.9U CN217517645U (en) 2022-04-23 2022-04-23 Assembled piping lane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220957999.9U CN217517645U (en) 2022-04-23 2022-04-23 Assembled piping lane

Publications (1)

Publication Number Publication Date
CN217517645U true CN217517645U (en) 2022-09-30

Family

ID=83371268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220957999.9U Active CN217517645U (en) 2022-04-23 2022-04-23 Assembled piping lane

Country Status (1)

Country Link
CN (1) CN217517645U (en)

Similar Documents

Publication Publication Date Title
CN207063022U (en) A kind of hydraulic engineering Accrete clearing device
CN217517645U (en) Assembled piping lane
CN210088169U (en) Soft foundation reinforcing structure for pipeline laying
CN215442337U (en) Drainage pipeline dredging device
CN207913344U (en) A kind of foundation pit recycling equipment
CN214551413U (en) Energy-saving peripheral transmission mud scraping equipment
CN213202640U (en) Building wastewater recycling energy-saving device
CN214766114U (en) Civil engineering construction waste treatment device
CN215891563U (en) Rigid sleeve plugging device for sewage pool
CN218774358U (en) Mud scraper for sedimentation tank
CN215166610U (en) Reinforced steel structure at joint of steel structure
CN215562924U (en) River channel dredging device
CN213268024U (en) Foundation ditch excavation braced system monitoring structure
CN220435038U (en) Drainage device for farmland water conservancy
CN217997985U (en) Ecological landscape ditch
CN213707857U (en) Mobile groundwater bioremediation device
CN220117611U (en) Waterproof support structure of photovoltaic roof
CN216618778U (en) A water conservancy pipeline supports connection structure for hydraulic engineering
CN215442335U (en) Drainage pipeline dredging device
CN217079076U (en) Drainage device with rainwater treatment system
CN220705377U (en) Municipal construction encloses fender
CN220544904U (en) Roof distributed photovoltaic power generation device convenient to install
CN220426290U (en) Processing draining device for waste resource recovery
CN211935711U (en) Mud scraping device for environment-friendly sewage treatment tank
CN211285791U (en) Building rainwater collection and cyclic utilization device

Legal Events

Date Code Title Description
GR01 Patent grant