CN217503007U - Broken pipe repairing device for internally inserting ground pipeline - Google Patents

Broken pipe repairing device for internally inserting ground pipeline Download PDF

Info

Publication number
CN217503007U
CN217503007U CN202221438178.0U CN202221438178U CN217503007U CN 217503007 U CN217503007 U CN 217503007U CN 202221438178 U CN202221438178 U CN 202221438178U CN 217503007 U CN217503007 U CN 217503007U
Authority
CN
China
Prior art keywords
pipe
holding piece
broken pipe
pipeline
ground pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221438178.0U
Other languages
Chinese (zh)
Inventor
许文忠
张恒涛
朱增强
燕自峰
付冰
熊强
熊武
胡珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Defeng Yisheng Petroleum Anticorrosion Engineering Co ltd
Original Assignee
Xinjiang Defeng Yisheng Petroleum Anticorrosion Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Defeng Yisheng Petroleum Anticorrosion Engineering Co ltd filed Critical Xinjiang Defeng Yisheng Petroleum Anticorrosion Engineering Co ltd
Priority to CN202221438178.0U priority Critical patent/CN217503007U/en
Application granted granted Critical
Publication of CN217503007U publication Critical patent/CN217503007U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/10Geothermal energy

Landscapes

  • Pipe Accessories (AREA)

Abstract

The utility model discloses a disconnected tub of prosthetic devices that is used for interior interlude ground pipeline, include: the interpenetration PE pipe is arranged in the broken pipe of the ground pipeline medium pipeline after hot-pressing diameter reduction and is tightly attached to the medium pipeline at normal temperature; the hoop unit is arranged in a split mode, and the split hoop unit is wrapped at the position of a broken pipe of the medium pipeline through a fastening bolt after being installed. The utility model discloses can effectively solve the complicated loaded down with trivial details problem of construction process, easy operation is swift, does not receive the restriction in operation space, practices thrift the cost, reduces construction cycle.

Description

Broken pipe repairing device for internally inserting ground pipeline
Technical Field
The utility model relates to a crude oil gathering pipeline engineering technical field, in particular to disconnected tub of prosthetic devices that is used for interior interlude ground pipeline.
Background
In the process of crude oil exploitation, crude oil is conveyed through a metal pipeline after reaching the ground, because the crude oil extracted underground has complex components and contains corrosive substances, and the metal characteristics of the gathering and conveying pipeline inevitably cause corrosion of the gathering and conveying pipeline in different degrees, the corrosion problem causes serious harm to production, pipeline perforation causes interruption of production, and environmental pollution in different degrees and serious waste of social resources.
In order to avoid metal corrosion, glass reinforced plastic pipes are adopted to replace metal ground pipelines in some areas, although the corrosion problem is effectively solved, the glass reinforced plastic pipes do not have the strength of metal pipes, are easy to damage in the ground laying process and cannot be effectively used for a long time, and along with the implementation of the interpenetration process in the ground pipelines, PE pipes are adopted to directly penetrate through the gathering pipelines to be repaired, so that the problems of damage and the like in the construction process are solved. In the construction process, the construction pipeline is long, the PE pipe cannot directly penetrate through the whole pipeline, so that the pipe needs to be dug and broken, reducing diameters are respectively welded at two ends of the broken pipe after the pipe is broken, the PE pipe can smoothly penetrate out, then a steel wrapping sleeve with the diameter larger than that of the construction pipeline is sleeved on the construction pipeline, the PE pipe is welded through hot melting welding or a hot melting sleeve, but in the subsequent steel wrapping construction process, the welding is limited by the operation space and is slow; before and after welding, water needs to be injected and drained in steel ladle wrapping; after welding, mortar needs to be poured in the steel wrapping reserved hole, construction is complicated, construction progress is greatly prolonged, and production can not be recovered efficiently.
Aiming at repairing broken pipes, in the prior art, steel-wrapped lap welding is mainly adopted, the welding is limited by an operation space, the construction difficulty is high, the consumed time is long, in order to prevent the PE pipe and the original steel pipe from being penetrated and inserted into the space between the PE pipe and the original steel pipe to form collapse, a mortar grouting hole is reserved on the wall of the steel-wrapped pipe after welding, and the steel-wrapped pipe can be pressurized after the mortar is completely solidified (the solidification time is long according to the weather condition); during pressing, all the holes are cut if leakage exists, welding assembly is carried out again, and when error work occurs, the grouting preformed hole can be welded after pressing is qualified, so that the whole construction process is complex and tedious.
Therefore, a broken pipe repairing device which can effectively improve the construction efficiency, liberate the manpower and reduce the comprehensive construction cost is needed.
The information disclosed in this background section is only for enhancement of understanding of the general background of the invention and should not be taken as an acknowledgement or any form of suggestion that this information constitutes prior art already known to a person skilled in the art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a disconnected tub of prosthetic devices for interior interlude ground pipeline can effectively solve the complicated loaded down with trivial details problem of construction process, and easy operation is swift, does not receive the restriction in operation space, practices thrift the cost, reduces construction cycle.
In order to achieve the above object, according to the utility model discloses an aspect, the utility model provides a disconnected tub of prosthetic devices for interior interlude ground pipeline, include: the interpenetration PE pipe is arranged in the broken pipe of the ground pipeline medium pipeline after hot-pressing diameter reduction and is tightly attached to the medium pipeline at normal temperature; the hoop unit is arranged in a split mode, and the split hoop unit is wrapped at the position of a broken pipe of the medium pipeline through a fastening bolt after being installed.
Further, in the above technical solution, the hoop unit may include: the main structure of the first holding piece is semi-cylindrical and is made of steel materials; the main structure of the second holding piece is semi-cylindrical and is matched with the shape and the size of the first holding piece, and the second holding piece is made of steel materials.
Furthermore, among the above technical scheme, all be equipped with staple bolt limit clamp plate on first armful piece and the second armful piece, first armful piece after the installation and second armful piece carry out fastening connection through this staple bolt limit clamp plate.
Further, among the above-mentioned technical scheme, the inboard of staple bolt limit clamp plate can be equipped with the seal groove, and packing rubber gasket or filler are filled in the seal groove.
Furthermore, among the above technical scheme, can evenly set up the bolt hole at an interval on the staple bolt limit clamp plate for wear to establish the fastening bolt of assembling first armful piece and second armful piece.
Furthermore, in the above technical scheme, the interpenetration PE pipe installed at the pipe breakage can be two or more sections, and the outer part of the interface of two adjacent sections is provided with an electrothermal melting sleeve.
Further, in the above technical scheme, the outer diameter of the electric hot melting sleeve is equal to the outer diameter of the medium pipeline.
Furthermore, in the above technical scheme, the interpenetration PE pipe installed at the pipe breakage position can be two or more sections, and the hot melting connection of the interfaces can be performed by adopting a hot melting welder at the interfaces of two adjacent sections.
Compared with the prior art, the utility model discloses following beneficial effect has:
1) the steel hoop unit of the utility model is detachably connected, thereby avoiding the welding process of repairing the broken pipe in the prior art, and if the problem is found in the subsequent pressing process, the disassembly and rework are more convenient and faster;
2) the utility model discloses can effectively solve the complicated loaded down with trivial details problem of current construction process, easy operation is swift, can not receive the restriction in operation space, practices thrift cost, reduces construction cycle.
The foregoing description is only an overview of the technical solutions of the present invention, and in order to make the technical means of the present invention more clearly understood and to make the technical means more comprehensible, and to make the above and other objects, technical features, and advantages of the present invention easier to understand, one or more preferred embodiments are listed below, and the following detailed description is given with reference to the accompanying drawings.
Drawings
Fig. 1 is a schematic structural diagram of the utility model used for interior alternate ground pipeline's disconnected pipe prosthetic devices after installation.
Fig. 2 is an exploded schematic view of the broken pipe repairing device for internally inserting the ground pipeline.
Description of the main reference numerals:
the pipe fitting comprises a medium pipeline 1, an electric hot-melt sleeve 2, an anchor ear unit 3, a first holding piece 31, a second holding piece 32, a sealing groove, an anchor ear edge pressing plate 5 and a PE pipe 6 inserted in the groove.
Detailed Description
The following detailed description of the present invention is provided in conjunction with the accompanying drawings, but it should be understood that the scope of the present invention is not limited by the following detailed description.
Throughout the specification and claims, unless explicitly stated otherwise, the word "comprise", or variations such as "comprises" or "comprising", will be understood to imply the inclusion of a stated element or component but not the exclusion of any other element or component.
Spatially relative terms, such as "below," "lower," "upper," "above," "upper," and the like, may be used herein for ease of description to describe one element or feature's relationship to another element or feature in the figures. It will be understood that the spatially relative terms are intended to encompass different orientations of the object in use or operation in addition to the orientation depicted in the figures. For example, if the article in the drawings is turned over, elements described as "below" or "beneath" other elements or features would then be oriented "above" the element or feature. Thus, the exemplary term "below" can encompass both an orientation of below and above. The article may be otherwise oriented (rotated 90 degrees or at other orientations) and the spatially relative terms used herein should be interpreted accordingly.
In this document, the terms "first", "second", etc. are used to distinguish two different elements or portions, and are not used to define a particular position or relative relationship. In other words, the terms "first," "second," and the like may also be interchanged with one another in some embodiments.
The inventor finds out through research that: in the prior art, when a broken pipe of a crude oil steel pipeline is repaired, a steel wrapping lap welding mode is mainly adopted, the welding is limited by an operation space, the construction difficulty is high, and the consumed time is long.
In view of this, as shown in fig. 1 and 2, the utility model provides a broken pipe prosthetic devices for interior interpenetration ground pipeline, includes: the PE pipe 6 and the hoop unit 3 are inserted. The interpenetration PE pipe 6 is arranged in a broken pipe of the ground pipeline medium pipeline 1 after being reduced by the reducing machine, and the interpenetration PE pipe 6 can be tightly attached to the inner wall of the medium pipeline at normal temperature, so that fastening is realized. The hoop unit 3 adopts a split type design, namely a two-part detachable assembly design, and the split type hoop unit 3 is wrapped at the pipe breaking position of the medium pipeline 1 through a fastening bolt after being installed (refer to fig. 1).
As further shown in fig. 1 and 2, preferably, but not limitatively, the hoop unit 3 may include a first hoop sheet 31 and a second hoop sheet 32. The main structure of the first holding piece 31 is a semi-cylindrical shape, and is made of steel, preferably, the same material as the medium pipeline. The main structure of the second holding piece 32 is also semi-cylindrical and is matched with the shape and size of the first holding piece 31, and the second holding piece is made of the same steel material as the first holding piece 31.
As further shown in fig. 1 and 2, in order to connect and fasten the first holding piece 31 and the second holding piece 32, the first holding piece 31 and the second holding piece 32 are both provided with a hoop edge pressing plate 5, and the installed first holding piece 31 and the installed second holding piece 32 are assembled and fastened by the hoop edge pressing plate 5. Preferably, but not limitatively, the inside of staple bolt limit clamp 5 is equipped with seal groove 4, and packing rubber gasket (not shown in the figure) in seal groove 4. Further, bolt holes are evenly arranged on the hoop edge pressing plate 5 at intervals and used for penetrating and assembling fastening bolts of the first holding piece and the second holding piece.
In order to facilitate installation and to ensure that the pipe breaking distance is long, the length required for inserting the PE pipe 6 is long, and two or more sections of PE pipes need to be connected at the moment. When the interpenetration PE pipe installed at the broken pipe is two or more sections, the external part of each two section of interface can be provided with an electric hot melting sleeve 2. Considering the installation problem of the hoop unit 3 (needing to be held tightly and tightly against the medium pipeline), the outer diameter of the electric hot melting sleeve 2 is equal to or slightly larger than that of the medium pipeline 1. In addition, a thermal welding machine can be used for interface thermal welding.
The utility model discloses a disconnected pipe prosthetic devices of interior interlude ground pipeline is fastened the staple bolt unit in the disconnected pipe department of medium pipeline by high strength fastening bolt to seal through the rubber gasket. Specifically, at the pipe breakage of the pipeline, the PE pipes at the pipe breakage are connected in a hot melting mode through an electric hot melting sleeve or a hot melting welding machine, excess materials turned over during hot melting are removed, then a first holding piece and a second holding piece in the hoop unit are clamped at the connection position of the broken PE pipes, an axial rubber sealing gasket is added on the holding pieces, the PE pipes at the pipe breakage are wrapped by the hoop unit in a whole mode, and then the PE pipes are tightened by fastening bolts and then pressed.
The utility model discloses a disconnected tub prosthetic devices of interior interlude ground pipeline adopts the staple bolt unit of pressure-bearing steel construction, can effectively solve the complicated loaded down with trivial details problem of current construction process, and easy operation is swift, can not receive the restriction in operation space, practices thrift cost, reduces construction cycle.
The foregoing descriptions of specific exemplary embodiments of the present invention have been presented for purposes of illustration and description. It is not intended to limit the invention to the precise form disclosed, and obviously many modifications and variations are possible in light of the above teaching. The exemplary embodiments were chosen and described in order to explain certain principles of the invention and its practical application to enable one skilled in the art to make and use various exemplary embodiments of the invention and various alternatives and modifications as are suited to the particular use contemplated. Any simple modifications, equivalent changes and modifications made to the above exemplary embodiments shall fall within the scope of the present invention.

Claims (8)

1. A broken pipe repair device for interlooping a ground pipeline, comprising:
the interpenetration PE pipe is arranged in the broken pipe of the ground pipeline medium pipe after being reduced by a reducing machine and is tightly attached to the medium pipe at normal temperature;
the hoop unit is arranged in a split mode, and the hoop unit is wrapped at the position of a broken pipe of the medium pipeline through a fastening bolt after being installed in the split mode.
2. The broken pipe repair device for internally inserting a ground pipeline according to claim 1, wherein the hoop unit comprises:
the main structure of the first holding piece is semi-cylindrical and is made of steel materials;
and the main body structure of the second holding piece is semi-cylindrical and is matched with the shape and the size of the first holding piece, and the second holding piece is made of steel materials.
3. The broken pipe repairing device for the internal insertion ground pipeline as claimed in claim 2, wherein the first holding piece and the second holding piece are both provided with a hoop edge pressing plate, and the installed first holding piece and second holding piece are fastened and connected through the hoop edge pressing plate.
4. The broken pipe repairing device for the internal insertion ground pipeline as claimed in claim 3, wherein a sealing groove is formed in the inner side of the anchor ear edge pressing plate, and a rubber gasket is filled in the sealing groove.
5. The broken pipe repairing device for the internal insertion ground pipeline according to claim 3, wherein bolt holes are uniformly arranged on the hoop edge pressing plate at intervals, and are used for penetrating and assembling fastening bolts of the first holding piece and the second holding piece.
6. The broken pipe repairing device for the internal insertion ground pipeline according to claim 1, wherein the inserted PE pipe installed at the broken pipe is provided with two or more sections, and an electric melting sleeve is arranged outside the interface of two adjacent sections.
7. The pipe breakage repairing apparatus for internally inserting ground pipelines according to claim 6, wherein the outer diameter of the electro-thermal fuse sleeve is equal to the outer diameter of the medium pipeline.
8. The broken pipe repairing device for the internal insertion ground pipeline according to claim 1, wherein the inserted PE pipe installed at the broken pipe is divided into two or more sections, and the interfaces of the two adjacent sections are connected by hot melting through a hot melting welder.
CN202221438178.0U 2022-06-07 2022-06-07 Broken pipe repairing device for internally inserting ground pipeline Active CN217503007U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221438178.0U CN217503007U (en) 2022-06-07 2022-06-07 Broken pipe repairing device for internally inserting ground pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221438178.0U CN217503007U (en) 2022-06-07 2022-06-07 Broken pipe repairing device for internally inserting ground pipeline

Publications (1)

Publication Number Publication Date
CN217503007U true CN217503007U (en) 2022-09-27

Family

ID=83360787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221438178.0U Active CN217503007U (en) 2022-06-07 2022-06-07 Broken pipe repairing device for internally inserting ground pipeline

Country Status (1)

Country Link
CN (1) CN217503007U (en)

Similar Documents

Publication Publication Date Title
CN101625061B (en) Pipelining emergent repairing method of prestressing steel cylinder concrete pipe
CN203585707U (en) Track plug-in type pipeline restoration sleeve
CN204717225U (en) A kind of fiber reinforced plastic pipe is damaged and is leaked maintenance unit
CN102392653A (en) Bent pipe one-sided freezing method for shield docking of stratum and freezing pipe driving device
CN217503007U (en) Broken pipe repairing device for internally inserting ground pipeline
CN213236570U (en) PE pipeline repair equipment
CN103470913B (en) The linkage structure of metglass Steel Lining rubber and plastic submerged pipeline and making connecting means
CN220337699U (en) Prefabricated directly buried heat preservation pipe joint structure
CN205101771U (en) Be used for prosthetic attach fitting of FRP pipe on -line interlude
CN201237041Y (en) Adaptor for pipeline
CN205857182U (en) A kind of end-protecting device for steel-pipe pile construction
CN201706091U (en) Pipe connection component
CN205298949U (en) Disconnect -type grout clamp tip sealing device
CN202065607U (en) Magnetic force combined type pipeline leaking stopper under pressure
CN214500496U (en) Pipeline non-excavation lining pipe compound circle aerifys clamping type sealing device
CN212178170U (en) Gas tubular product convenient to installation
CN212480442U (en) Hydraulic engineering protector
CN211118213U (en) Plastic composite pipe joint
CN103244769A (en) Connecting method for helical welding of arched steel bands and gas pipes
CN201462321U (en) Emergency repair structure of pipeline of prestressed concrete cylinder pipe (PCCP)
CN1126897C (en) Shape memory composition patch device for pipe connection
CN209524205U (en) A kind of spigot-and-socket steel push pipe connector
CN204554066U (en) A kind of novel pipeline clip
CN2186339Y (en) Steel-rubber compound tube with welding joint
CN211444920U (en) Narrow section major diameter concrete pipeline fork truck installation cover

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant