CN217480795U - Combined building formwork structure - Google Patents
Combined building formwork structure Download PDFInfo
- Publication number
- CN217480795U CN217480795U CN202121209633.5U CN202121209633U CN217480795U CN 217480795 U CN217480795 U CN 217480795U CN 202121209633 U CN202121209633 U CN 202121209633U CN 217480795 U CN217480795 U CN 217480795U
- Authority
- CN
- China
- Prior art keywords
- steel form
- big steel
- fixedly connected
- tower crane
- operation platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a modular building die carrier structure, including two big steel form that the symmetry set up, two A-frame supports of fixedly connected with symmetrically outside the upper end of two big steel form, the locking strip is connected to fixedly connected with between two big steel form tops, is equipped with decorative pattern steel sheet formation operation platform at two A-frame supports and connection locking strip upper berth. The utility model combines the two large steel templates together, and integrates the operation platform and the triangular fixing frame on the two large steel templates, so that the tower crane can be lifted together during lifting; the integrated operation platform is convenient for concrete workers to pour, and is safe and efficient; the triangle-shaped mount can be used for putting two big steel form boards, practices thrift the time of tower crane, and the tower crane need not to wait for the template installation to consolidate and accomplish and loosely tie up again.
Description
Technical Field
The utility model relates to a modular building die carrier structure belongs to building die carrier technical field.
Background
The existing vertical steel template wall construction process is as follows: after the binding and acceptance of the wall steel bars are finished, a tower crane hoists steel templates stored in a stock yard to corresponding structural positions, a split screw and an inclined strut are arranged for reinforcement, concrete is poured after the template installation and acceptance are finished, a large steel template is disassembled, split bolts and inclined struts are loosened, and the tower crane is used for hoisting the steel templates back to the stock yard for placement. The existing large vertical steel formwork has a single function, is only a simple formwork, is not provided with a protection platform, needs an auxiliary on-site construction moving ladder for installation in the construction process, and is difficult to move by workers particularly when concrete is cast on site; the template is not provided with a triangular fixing frame, and workers need to timely wear split bolts and arrange inclined struts when the tower crane is placed, so that the template is prevented from overturning; when handling to on-the-spot stockpile, the tiling of template causes the serial number confusion easily, causes the wallboard hole site to be wrong when later stage hoist and mount again, needs the on-the-spot trompil again, inefficiency.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a simple structure, construction convenience, can improve the modular building die carrier structure of efficiency of construction to overcome not enough among the prior art.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a modular building die carrier structure, includes two big steel form that the symmetry set up, two A-frame of fixedly connected with symmetrically outside the upper end of two big steel form, fixedly connected with connects the locking strip between two big steel form tops, is equipped with decorative pattern steel sheet formation operation platform at two A-frame and connection locking strip upper berths, has bracing and horizontal pole at the lower part symmetric connection of two big steel form, and the one end of bracing and horizontal pole all welds on the sleeve, bracing, horizontal pole and sleeve form triangle-shaped mount, have a screw rod at sleeve female connection.
Furthermore, the lower end of the screw is fixedly connected with a chassis.
Furthermore, the outer side of the triangular support is fixedly provided with a protective railing.
Since the technical scheme is used, the utility model discloses an advantage has below:
firstly, the utility model combines two large steel templates together, and integrates an operating platform and a triangular fixing frame on the two large steel templates, so that the tower crane can be hoisted together during hoisting; the integrated operation platform is convenient for concrete workers to pour, and is safe and efficient; the triangular fixing frame can be used for placing two large steel templates, the tower crane time is saved, the tower crane does not need to wait for the loose binding after the template is installed and reinforced, and the triangular fixing frame has the functions of stabilizing and fixing the template;
the tops of the two large steel templates are fixed by using the connecting lock bar, so that the use of split bolts is reduced, the split holes are prevented from being blocked in the later period, and the workload of workers is reduced;
the tower crane directly transfers the combined steel template away, and the combined steel template can be vertically placed on a stock ground through a triangular fixing frame, so that the combined steel template is convenient to hoist. The combination steel form that puts immediately is difficult to the chaotic serial number, and the hole site is to last when avoiding the installation of second time.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The embodiment of the utility model provides a: referring to fig. 1, a modular building formwork structure, including two big steel form 1 that the symmetry set up, fixedly connected with two A-frame 2 in the upper end outside symmetry of two big steel form 1, fixedly connected with connection locking bar 3 between two big steel form 1 tops, it forms operation platform 4 to spread the decorative pattern steel sheet on two A-frame 2 and connection locking bar 3, there are bracing 6 and horizontal pole 7 in the lower part symmetric connection of two big steel form 1, and the one end of bracing 6 and horizontal pole 7 all welds on sleeve 8, bracing 6, horizontal pole 7 and sleeve 8 form the triangle-shaped mount, there is a screw rod 9 at sleeve 8 female connection. The lower end of the screw rod 9 is fixedly connected with a chassis 10, so that the triangular fixing frame is stably placed. The outside fixed mounting of A-frame 2 has protection railing 5, improves the security of construction.
The utility model combines two large steel templates 1 together, and integrates the operation platform 4 and the triangle fixing frame on the two large steel templates 1, so that the tower crane can be lifted together when being lifted; the integrated operation platform is convenient for concrete workers to pour, and is safe and efficient; the triangular fixing frame can be used for placing two large steel templates 1, so that the time of the tower crane is saved, the tower crane does not need to wait for the template installation and reinforcement to be completed and then loose binding, and the triangular fixing frame has the functions of stabilizing and fixing the templates; the tops of the two large steel templates 1 are fixed by using the connecting lock bar, so that the use of split bolts is reduced, the split holes are prevented from being blocked in the later period, and the workload of workers is reduced; the tower crane directly transfers the two large steel templates 1 away together, and the two large steel templates can be vertically placed on a stock yard through the triangular fixing frame, so that the hoisting is facilitated. The combination steel form that puts immediately is difficult to the chaotic serial number, and the hole site is to last when avoiding the installation of second time.
Claims (3)
1. The utility model provides a modular building die carrier structure, includes two big steel form (1) that the symmetry set up, its characterized in that: two A-frame supports (2) of fixedly connected with symmetrically outside the upper end of two big steel form (1), fixedly connected with connects the locking bead (3) between two big steel form (1) tops, two A-frame supports (2) and connect locking bead (3) upper berth and be equipped with decorative pattern steel sheet formation operation platform (4), there are bracing (6) and horizontal pole (7) in the lower part symmetric connection of two big steel form (1), and the one end of bracing (6) and horizontal pole (7) all welds on sleeve (8), there is a screw rod (9) at sleeve (8) female connection.
2. The modular construction formwork structure of claim 1 wherein: the lower end of the screw rod (9) is fixedly connected with a chassis (10).
3. The modular construction formwork structure of claim 1 wherein: the outer side of the triangular support (2) is fixedly provided with a guard rail (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121209633.5U CN217480795U (en) | 2021-06-01 | 2021-06-01 | Combined building formwork structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121209633.5U CN217480795U (en) | 2021-06-01 | 2021-06-01 | Combined building formwork structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217480795U true CN217480795U (en) | 2022-09-23 |
Family
ID=83303470
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121209633.5U Active CN217480795U (en) | 2021-06-01 | 2021-06-01 | Combined building formwork structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217480795U (en) |
-
2021
- 2021-06-01 CN CN202121209633.5U patent/CN217480795U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105971271B (en) | Unilateral cantilever form and its construction method of climbing certainly | |
CN207160585U (en) | Superelevation outer wall of basement Bailey bracket single side formwork architecture | |
CN113235913B (en) | Construction equipment and method for hanging, splicing and lifting vertical templates of building | |
CN217175692U (en) | Intelligent hydraulic lifting formwork system for super high-rise core tube construction | |
CN202401769U (en) | Detachable concrete cloth machine for self-elevating creeping formwork system | |
CN217480795U (en) | Combined building formwork structure | |
CN111705677A (en) | A smooth frame that rises for high pier stud turns over mould construction | |
CN113957919B (en) | Gravity type round caisson concrete breast wall bottom die supporting system | |
CN215291319U (en) | Multi-point elevator shaft construction lifting platform | |
CN211110630U (en) | Multifunctional lifting appliance for lifting high-speed rail concrete box girder | |
CN210507298U (en) | Integrated template for wave dissipation hole breast wall | |
CN210659227U (en) | Exterior wall formwork system free of external scaffold | |
CN221194195U (en) | Can have enough to meet need scaffold frame operation platform | |
CN206903178U (en) | Hoisting type elevator steel platform | |
CN106760464B (en) | Elevator shaft operating platform and its construction method | |
CN221031324U (en) | Telescopic shaft platform with turnover hanging head | |
CN214270021U (en) | Operation radius lengthening device for tower crane | |
CN214885569U (en) | Aluminum template lifting device | |
CN218521829U (en) | Novel caisson inner core template integrating reinforcement | |
CN217203935U (en) | Trash rack pier template hoisting device | |
CN219471532U (en) | Multifunctional formwork climbing hanger | |
CN110230265A (en) | A kind of construction method for high pier | |
CN221168651U (en) | Single-side hydraulic automatic climbing external hanging type climbing die system | |
CN211547404U (en) | Movable type formwork mounting and dismounting rack for bridge anti-collision guardrail | |
CN221116795U (en) | Retaining wall steel form hoisting assembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |