CN217480689U - Hang stone material subassembly futilely - Google Patents

Hang stone material subassembly futilely Download PDF

Info

Publication number
CN217480689U
CN217480689U CN202123273569.XU CN202123273569U CN217480689U CN 217480689 U CN217480689 U CN 217480689U CN 202123273569 U CN202123273569 U CN 202123273569U CN 217480689 U CN217480689 U CN 217480689U
Authority
CN
China
Prior art keywords
left end
suspender
clamping
jib
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123273569.XU
Other languages
Chinese (zh)
Inventor
李彦红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Engineering Co ltd
Original Assignee
Zhongtian Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Engineering Co ltd filed Critical Zhongtian Construction Engineering Co ltd
Priority to CN202123273569.XU priority Critical patent/CN217480689U/en
Application granted granted Critical
Publication of CN217480689U publication Critical patent/CN217480689U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/24Structural elements or technologies for improving thermal insulation
    • Y02A30/244Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a dry hanging stone component, which comprises a left end suspender and a right end suspender, wherein two clamping nails are provided, one clamping nail is fixedly connected at the inner side of the left end suspender, the other clamping nail is slidably connected in the inner cavity of the right end suspender, two thread grooves are respectively arranged at the outer sides of the left end suspender and the right end suspender, fixing screws are in thread grooves, a clamping board is fixedly connected at the outer end of the left end suspender, a clamping groove is arranged at the outer end of the right end suspender, the clamping board corresponds to the clamping groove in the same size, when assembling the stone board and the suspender, supporting grooves are symmetrically arranged at the two sides of the stone board, then the stone board is clamped in the clamping nail between the two suspenders, thereby enhancing the stability between the stone board and the suspenders, when assembling two groups of stone boards, the left end suspender of the latter group is clamped with the right end suspender of the former group, the clamping board is connected with the clamping groove, this kind of mode has reduced the gap between two suspension assembly for the decoration of wall is more exquisite.

Description

Hang stone material subassembly futilely
Technical Field
The utility model relates to a subassembly technical field is hung futilely to the stone material, especially relates to a hang stone material subassembly futilely.
Background
In order to improve the aesthetic degree of decoration, a construction process for dry hanging stone on the outer wall of a building is provided. The stone dry hanging method is also named as a blank hanging method. Is a novel construction process in wall decoration. The method uses the metal hanging piece to directly hang the facing stone on the wall surface or hang the facing stone on the steel frame in the air, and grouting and pasting are not needed. The principle is that main stress points are arranged on a main body structure, and stone is fixed on a building through a metal hanging piece to form the stone decorative curtain wall.
However, a plurality of stone material boards can have great gap when hanging the concatenation, and the gap not only influences the pleasing to the eye of wall body, also can fall into a large amount of dusts moreover to when hanging the slabstone usually, adopt the mode of joint with slabstone village card on metal pendant, this kind of mode stability can be lower, operate simultaneously very inconveniently.
SUMMERY OF THE UTILITY MODEL
In order to overcome prior art's not enough, the utility model provides a hang stone material subassembly futilely drills in the both sides of stone material board, with the direct card of stone material board between two jibs, has strengthened the stability of stone material board, and the outer end of left end jib and right-hand member jib is equipped with cardboard and double-layered groove respectively simultaneously, has reduced the gap that produces when connecting between two sets of jib subassemblies for the hanging of stone material board is more exquisite, also prevents simultaneously that the dust from falling into between the double-layered seam.
In order to solve the technical problem, the utility model provides a following technical scheme: the utility model provides a hang stone material subassembly futilely, includes left end jib and right-hand member jib, the left end jib with the inboard of right-hand member jib is equipped with hangs the subassembly, it includes bail, thread groove, set screw, cardboard and double-layered groove to hang the subassembly, the bail is equipped with two, one of them bail fixed connection in the inboard of left end jib, another bail sliding connection in the inner chamber of right-hand member jib, the thread groove is equipped with two, two the thread groove is located respectively the left end jib with the outside of right-hand member jib, set screw threaded connection in the thread groove, cardboard fixed connection in the outer end of left end jib, double-layered groove is seted up in the outer end of right-hand member jib, just the cardboard with it corresponds to press from both sides the groove size same position.
As a preferred technical scheme of the utility model, the linkage assembly still includes draw-in groove and card post, the draw-in groove is seted up in the outer end of cardboard, card post fixed connection in press from both sides in the inner chamber in groove, just the draw-in groove with card post quantity is the same, the position corresponds.
As a preferred technical scheme of the utility model, the left end jib with the spread groove has been seted up to the inboard of right-hand member jib, the inner chamber of spread groove has been seted up and has been hung the hole, it is equipped with a plurality ofly to hang the hole, just the inner chamber threaded connection who hangs the hole has the screw that hangs.
As a preferred technical scheme of the utility model, one side fixedly connected with connecting rod of left end jib, the connecting rod is equipped with two, two the connecting rod about the left end jib symmetry, the inner chamber sliding connection of connecting rod has the slide bar, the other end fixed connection of slide bar in the outside of right-hand member jib.
As a preferred technical scheme of the utility model, the connecting rod with the fixed slot has all been seted up to one side of slide bar, the fixed slot is equipped with a plurality ofly, just the inner chamber joint of fixed slot has the backup pad.
As a preferred technical scheme of the utility model, the left end jib with the right-hand member jib is L shape.
Compared with the prior art, the utility model discloses the beneficial effect that can reach is:
1. through the bail that sets up, when equipment stone material board and jib, the grooving is seted up to bilateral symmetry at the stone material board, again with stone material board joint in the bail between two jibs, and then the stability between stone material board and the jib has been strengthened, cardboard and clamp groove through setting up, during the equipment two sets of stone material boards, with a set of left end jib in back and preceding right-hand member jib joint together, cardboard and clamp groove link together this moment, two gaps between the subassembly that hang have been reduced to this kind of mode, make the decoration of wall more exquisite.
2. Through the spread groove that sets up, when using the fixed jib of suspension screw, hang the screw joint in the inboard spread groove of jib, make the stone material board can laminate with the jib is accurate, the roughness of stone material board with the jib joint has been guaranteed, connecting rod and slide bar through setting up, the slide bar can drive the right-hand member jib and slide, thereby adjust the interval between left end jib and the right-hand member jib, be applicable to the stone material board of multiple size, the backup pad of setting can strengthen the stability of stone material board between two jibs, prevent that the stone material board from receiving the extrusion inwards to warp.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is an enlarged view of the structure of FIG. 1A according to the present invention;
FIG. 3 is an enlarged view of the structure of FIG. 1 at B according to the present invention;
FIG. 4 is a schematic structural view of the left boom of the present invention;
fig. 5 is an enlarged view of the structure of fig. 4 at C according to the present invention;
fig. 6 is an enlarged view of the structure of fig. 1 at D.
Wherein: 1. a left end boom; 2. a right end suspender; 3. a suspension assembly; 301. a staple bolt; 302. A thread groove; 303. a set screw; 304. clamping a plate; 305. a card slot; 306. a clamping groove; 307. Clamping the column; 4. connecting grooves; 5. a hanging hole; 6. a suspension screw; 7. a connecting rod; 8. a slide bar; 9. a fixing groove; 10. and a support plate.
Detailed Description
In order to make the technical means, the creation features, the achievement purposes and the functions of the invention easy to understand, the invention is further explained below with reference to the specific embodiments, but the following embodiments are only the preferred embodiments of the invention, not all. Based on the embodiments in the implementation, other embodiments obtained by those skilled in the art without any creative work belong to the protection scope of the present invention. The experimental procedures in the following examples are conventional ones unless otherwise specified, and materials, reagents and the like used in the following examples are commercially available without otherwise specified.
Example (b):
as shown in fig. 1-6, the utility model provides a hang stone material subassembly futilely, including left end jib 1 and right-hand member jib 2, the inboard of left end jib 1 and right-hand member jib 2 is equipped with hangs subassembly 3, it includes bail 301 to hang subassembly 3, thread groove 302, set screw 303, cardboard 304 and clamp groove 306, bail 301 is equipped with two, one of them bail 301 is fixed connection in the inboard of left end jib 1, another bail 301 is connected in the inner chamber of right-hand member jib 2 in a sliding manner, thread groove 302 is equipped with two, two thread grooves 302 are located the outside of left end jib 1 and right-hand member jib 2 respectively, set screw 303 threaded connection is in thread groove 302, cardboard 304 is fixed connection in the outer end of left end jib 1, clamp groove 306 is seted up in the outer end of right-hand member jib 2, and cardboard 304 corresponds with clamp groove 306 size looks identical position;
firstly fixing a left end suspender 1 at the outer end of a wall body, symmetrically drilling two holes at two sides of a stone plate respectively, wherein the upper hole is provided with screw threads, the lower hole is smooth, then clamping the stone plate in a clamping nail 301 at the inner side of the left end suspender 1, then fixing a right end suspender 2 on the wall body according to the size of the stone plate, sliding the clamping nail 301 at the inner side of the right end suspender 2 to clamp the clamping nail into a lower hole at the right side of the stone plate, turning the stone plate to ensure that the stone plate is attached to the two suspenders, after turning the stone plate, penetrating a fixing screw 303 through a screw thread groove 302 to ensure that the fixing screw is in threaded connection with the upper holes at two sides of the stone plate, thereby connecting the stone plate and the two suspenders together, wherein the connection mode has high stability, the stone plate is not easy to fall off, the decoration of the wall body is safer, when assembling two groups of suspenders 3, clamping the left end suspender 1 of the next group and the right end 2 of the previous group together, at this moment, the clamping plate 304 at the outer end of the left end suspender 1 is connected with the clamping groove 306 at the outer end of the right end suspender 2, and the gap between the two suspension assemblies 3 is reduced by the mode, so that the wall surface is more exquisite in decoration.
In other embodiments, the suspension assembly 3 further includes a locking slot 305 and a locking column 307, the locking slot 305 is opened at the outer end of the locking plate 304, the locking column 307 is fixedly connected in the inner cavity of the clamping slot 306, and the number and the position of the locking slot 305 are the same as the number and the position of the locking column 307;
when cardboard 304 clip groove 306 connects together, the card post 307 joint in the clip groove 306 is in the draw-in groove 305 of cardboard 304 outer end, and a plurality of draw-in grooves 305 are connected with card post 307, have further strengthened the stability that two sets of suspension assembly 3 connect for two sets of suspension assembly 3 are difficult not hard up.
In other embodiments, the inner sides of the left end suspender 1 and the right end suspender 2 are provided with connecting grooves 4, the inner cavity of each connecting groove 4 is provided with a plurality of hanging holes 5, and the inner cavity of each hanging hole 5 is in threaded connection with a hanging screw 6;
when fixed left end jib 1 and right-hand member jib 2, will hang screw 6 and pass the hole 5 that hangs in the 4 inner chambers of spread groove to make and hang screw 6 and wall body interconnect, the existence of spread groove 4 makes and hangs the screw card in spread groove 4, avoids bellied screw to make between stone material board and two jibs inconsistent, and then makes the connection of stone material board and two jibs level and more smooth.
In other embodiments, one side of the left end suspender 1 is fixedly connected with two connecting rods 7, the two connecting rods 7 are symmetrical about the left end suspender 1, the inner cavity of the connecting rod 7 is slidably connected with a sliding rod 8, and the other end of the sliding rod 8 is fixedly connected to the outer side of the right end suspender 2;
before left end jib 1, right-hand member jib 2 were connected with the stone material board, earlier fix left end jib 1 on the wall body, slide bar 8 in the connecting rod 7 that slides simultaneously to slide bar 8 drives right-hand member jib 2 and removes, fixes right-hand member jib 2 on the wall body again after removing suitable position, and the interval between two jibs is adjusted simple and conveniently, is applicable to the stone material board of multiple footpath.
In other embodiments, fixing grooves 9 are formed in one sides of the connecting rod 7 and the sliding rod 8, a plurality of fixing grooves 9 are formed in the fixing grooves 9, and a supporting plate 10 is clamped in an inner cavity of each fixing groove 9;
add the backup pad 10 of establishing corresponding quantity between two connecting rods 7 and two slide bars 8 according to the demand after fixed left end jib 1 and right-hand member jib 2 for backup pad 10 joint has strengthened the stability between stone material board and two jibs on the one hand in fixed slot 9, adds backup pad 10 of establishing, prevents simultaneously that the stone material board from receiving the inside sunken deformation of extrusion.
In other embodiments, the left end suspender 1 and the right end suspender 2 are both L-shaped;
l shape's left end jib 1 and right-hand member jib 2 can make the both sides of stone material board and jib flush mutually for the decoration of hanging of stone material board is more exquisite, and makes the stone material board laminate more naturally with being connected of jib.
In the present disclosure, unless expressly stated or limited otherwise, the first feature "on" or "under" the second feature may comprise direct contact between the first and second features, or may comprise direct contact between the first and second features but via another feature in between. Also, the first feature being "on," "above" and "over" the second feature includes the first feature being directly on and obliquely above the second feature, or merely indicating that the first feature is at a higher level than the second feature. "beneath," "under" and "beneath" a first feature includes the first feature being directly beneath and obliquely beneath the second feature, or simply indicating that the first feature is at a lesser elevation than the second feature.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. The skilled person in this trade should understand that the utility model is not limited by the above-mentioned embodiment, and what describe in the above-mentioned embodiment and the description is only the preferred embodiment of the utility model, not used for limiting the utility model discloses, not breaking away from the utility model discloses under the prerequisite of the spirit and scope, the utility model discloses still have various changes and improvements, these changes and improvement all fall into the scope of the utility model of claim protection. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a hang stone material subassembly futilely, includes left end jib (1) and right-hand member jib (2), its characterized in that: the inner sides of the left end suspender (1) and the right end suspender (2) are provided with a suspension assembly (3), the suspension assembly (3) comprises an attachment clip (301), a thread groove (302), a fixing screw (303), a clamping plate (304) and a clamping groove (306), the attachment clip (301) is provided with two, one attachment clip (301) is fixedly connected with the inner side of the left end suspender (1), the other attachment clip (301) is slidably connected in the inner cavity of the right end suspender (2), the thread grooves (302) are provided with two, the two thread grooves (302) are respectively arranged at the outer sides of the left end suspender (1) and the right end suspender (2), the fixing screw (303) is in threaded connection with the thread groove (302), the clamping plate (304) is fixedly connected with the outer end of the left end suspender (1), and the clamping groove (306) is arranged at the outer end of the right end suspender (2), and the card board (304) corresponds to the clip groove (306) in the same size and position.
2. A dry hang stone assembly as set forth in claim 1, further comprising: the suspension assembly (3) further comprises a clamping groove (305) and clamping columns (307), the clamping groove (305) is formed in the outer end of the clamping plate (304), the clamping columns (307) are fixedly connected into the inner cavity of the clamping groove (306), and the clamping groove (305) and the clamping columns (307) are the same in number and correspond in position.
3. A dry hang stone assembly as set forth in claim 1, further comprising: the left end suspender (1) and the right end suspender (2) are provided with a connecting groove (4), the inner cavity of the connecting groove (4) is provided with a hanging hole (5), the hanging hole (5) is provided with a plurality of hanging holes, and the inner cavity of the hanging hole (5) is in threaded connection with a hanging screw (6).
4. A dry hang stone assembly as set forth in claim 1, further comprising: one side fixedly connected with connecting rod (7) of left end jib (1), connecting rod (7) are equipped with two, two connecting rod (7) about left end jib (1) symmetry, the inner chamber sliding connection of connecting rod (7) has slide bar (8), the other end fixed connection of slide bar (8) in the outside of right-hand member jib (2).
5. A dry hang stone assembly as claimed in claim 4, wherein: fixing grooves (9) are formed in one sides of the connecting rods (7) and the sliding rods (8), a plurality of fixing grooves (9) are formed in the fixing grooves, and supporting plates (10) are clamped in inner cavities of the fixing grooves (9).
6. A dry hang stone assembly as set forth in claim 1, further comprising: the left end suspender (1) and the right end suspender (2) are both L-shaped.
CN202123273569.XU 2021-12-23 2021-12-23 Hang stone material subassembly futilely Active CN217480689U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123273569.XU CN217480689U (en) 2021-12-23 2021-12-23 Hang stone material subassembly futilely

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123273569.XU CN217480689U (en) 2021-12-23 2021-12-23 Hang stone material subassembly futilely

Publications (1)

Publication Number Publication Date
CN217480689U true CN217480689U (en) 2022-09-23

Family

ID=83301808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123273569.XU Active CN217480689U (en) 2021-12-23 2021-12-23 Hang stone material subassembly futilely

Country Status (1)

Country Link
CN (1) CN217480689U (en)

Similar Documents

Publication Publication Date Title
CN210976227U (en) Curtain decorative board mounting structure
CN217480689U (en) Hang stone material subassembly futilely
CN215670736U (en) Novel plug-in type dry-hanging stone structure
CN207436424U (en) A kind of decoration panel cladding system
CN110725842A (en) Wall nail assembly and hook, decorative board, wall hanging and mirror using same
CN212129646U (en) Light steel gypsum suspended ceiling support of rapid Assembly
CN107620442A (en) A kind of novel unit formula exterior wall panel cladding system
CN115182500A (en) Building hoist and mount are with hidden buddha's warrior attendant fossil fragments fast-assembling structure
CN214614961U (en) General embedded decorative board mosaic structure of furred ceiling
CN210976241U (en) Large-span glass curtain wall structure
CN206888297U (en) A kind of bright hidden conversion glass curtain wall
CN112302281A (en) Wall surface stone detachable design structure and installation method thereof
CN207469647U (en) A kind of novel unit formula exterior wall panel cladding system
CN217924306U (en) Stone curtain wall hanging installation structure
CN216075863U (en) Embedded keel connecting piece and ceiling system
CN216195816U (en) Low-carbon energy-saving building curtain wall with installation positioning structure
CN220644819U (en) Decorative suspended ceiling fixing structure
CN211037476U (en) Building curtain wall connecting structure
CN211114335U (en) Ceiling wall internal corner structure convenient to construction
CN205513738U (en) Quick assembly disassembly aluminum alloy frame
CN216552638U (en) Indoor furred ceiling structure easy to assemble
CN212689471U (en) Line board convenient to installation is dismantled
CN210949439U (en) Wall nail assembly and hook, decorative board, wall hanging and mirror using same
CN215630910U (en) Stone curtain wall mounting and fixing structure for building construction decoration
CN209817196U (en) Beam frame unit and curtain wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant