CN217480519U - Assembled double-steel-plate combined shear wall connecting node - Google Patents

Assembled double-steel-plate combined shear wall connecting node Download PDF

Info

Publication number
CN217480519U
CN217480519U CN202221368183.9U CN202221368183U CN217480519U CN 217480519 U CN217480519 U CN 217480519U CN 202221368183 U CN202221368183 U CN 202221368183U CN 217480519 U CN217480519 U CN 217480519U
Authority
CN
China
Prior art keywords
steel
prefabricated
shrouding
horizontal
shear wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221368183.9U
Other languages
Chinese (zh)
Inventor
高璐
张勋
陈子龙
王继浩
张文丽
闫文龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University
Original Assignee
Zhengzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University filed Critical Zhengzhou University
Priority to CN202221368183.9U priority Critical patent/CN217480519U/en
Application granted granted Critical
Publication of CN217480519U publication Critical patent/CN217480519U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model provides an assembled double steel plates compound shear wall connected node, two precast steel boards and shutoff including vertical setting are two the prefabricated shrouding at the horizontal both ends of precast steel board, two the horizontal both ends of medial surface of precast steel board are pasted respectively and are equipped with a root length channel-section steel, a plurality of horizontal square holes have evenly been seted up on the long channel-section steel, correspond every on the prefabricated shrouding horizontal square hole is provided with L shape couple respectively, a right-angle edge tip of L shape couple with prefabricated shrouding is connected perpendicularly, the vertical bending downwards in another right-angle edge, the vertical both ends of prefabricated shrouding are provided with the lock and are in the hem in the horizontal both ends outside of precast steel board. The assembled double-steel-plate combined shear wall connecting joint has the advantages of scientific design, easiness in construction, smooth steel plate surface and difficulty in reducing the long-term use strength.

Description

Assembled double-steel-plate combined shear wall connecting node
Technical Field
The utility model relates to an assembly type structure, specific theory has related to an assembly type double steel plates compound shear wall connected node.
Background
The steel plate shear wall is composed of embedded steel plates and edge members (frame beams, columns and stiffening plate members), and can be mainly divided into a single-steel-plate combined shear wall and a double-steel-plate combined shear wall. The single steel plate composite shear wall is mainly connected in an all-welded or all-bolted mode, bolt-welded mixed connection is generally not considered, welding labor cost is high, quality is not guaranteed, bolt connection has high requirements on construction, bolt connection nodes with low precision are difficult to install subsequently, and the phenomenon of 'untwisting' is easy to occur in traditional bolt connection.
The double-steel-plate composite shear wall is strong in vertical bearing capacity, is mainly applied to a super high-rise mixed structure system, and compared with a single-steel-plate composite shear wall, the double-steel-plate composite shear wall needs to consider the connection between two steel plates and the cooperative work of the double steel plates and concrete in addition to the connection between wall beams and wall columns. The stud is the most commonly used connection mode for ensuring the synergy of the steel plate and the concrete, and the stud is formed by punching a hole in the steel plate, penetrating the stud into the concrete, fixing the stud by utilizing the friction and the embedding action of the stud and the concrete, and penetrating the stud through the steel plates on two sides, thereby ensuring the synergy of the double steel plates and the internally filled concrete.
In summary, the conventional bolting method mainly has the following disadvantages: (1) the pre-tightening force of the bolted joint is easy to lose and can not reach the expected pre-tightening force; (2) the bolted joint is also broken, so that the cooperative work of the steel plate and the concrete is influenced; (3) the ends of the pegs extend to the steel plate, resulting in uneven steel plate surfaces; (4) the subsequent maintenance difficulty is high; (5) the requirement on the construction precision is high.
In order to solve the above problems, people are always seeking an ideal technical solution.
Disclosure of Invention
The utility model aims at prior art's not enough to a design science, easy construction, steel sheet surfacing, the difficult assembled double steel plates composite shear wall connected node that reduces of long-term use intensity are provided.
In order to realize the purpose, the utility model discloses the technical scheme who adopts is: the utility model provides an assembled double steel plates compound shear wall connected node, two including vertical two prefabricated steel sheets and the shutoff of setting are in two the prefabricated shrouding at the horizontal both ends of prefabricated steel sheet, two the horizontal both ends of medial surface of prefabricated steel sheet are pasted respectively and are equipped with a root length channel-section steel, a plurality of horizontal square holes have evenly been seted up on the long channel-section steel, correspond every on the prefabricated shrouding horizontal square hole is provided with L shape couple respectively, a right angle limit tip of L shape couple with prefabricated shrouding is connected perpendicularly, the vertical downward buckling in another right angle limit, the vertical both ends of prefabricated shrouding are provided with the lock and are in the hem in the horizontal both ends outside of prefabricated steel sheet.
Based on the above, long channel-section steel opening side lock welds on the prefabricated steel inboard surface, the both ends of long channel-section steel extend to the vertical both ends of prefabricated steel sheet.
Based on the above, two prefabricated steel sheet and two prefabricated shrouding encloses into the cuboid space, the concrete has been pour in the cuboid space.
The utility model discloses relative prior art has substantive characteristics and progress, specific theory, the utility model has the advantages of it is following:
(1) the prefabricated sealing plate penetrates through the transverse square hole by the L-shaped hook and then sinks, so that the L-shaped hook is hung on the long channel steel to form a buckle type design, the requirement on alignment precision is low during construction, and extra welding operation is not needed, so that the construction convenience is greatly improved; compared with the traditional stud structure, the problems of unexpected pretightening force and untwisting are not achieved, and the surface of the steel plate can be kept flat.
(2) Utilize the bulging force of inside concreting to reach the self-compaction effect, make two steel sheets and concrete atress in coordination well, guarantee wall body intensity.
(3) In the construction stage, the prefabricated steel plate and the prefabricated sealing plate can be used as a concrete template, the steps of formwork supporting and formwork removing are omitted, the construction cost is saved, the construction efficiency is improved, and the flanges at the two longitudinal ends of the prefabricated sealing plate can ensure that slurry does not leak when concrete is poured.
(4) Each component is easy to prefabricate, produce on a large scale, is convenient to disassemble and replace, and can reduce the production cost and the maintenance cost.
Drawings
Fig. 1 is the structure schematic diagram of the connection node of the middle assembled double steel plates combined shear wall of the present invention.
Fig. 2 is the structure diagram of another angle of the middle assembled double steel plates combined shear wall connection node of the present invention.
Fig. 3 is the installation schematic diagram of the prefabricated steel plate and the prefabricated shrouding in the utility model.
Fig. 4 is a schematic structural diagram of the middle prefabricated steel plate of the present invention.
Fig. 5 is the structural schematic diagram of the prefabricated shrouding in the utility model discloses.
In the figure: 1. prefabricating a steel plate; 2. prefabricating a sealing plate; 3. long channel steel; 4. a transverse square hole; 5. an L-shaped hook; 6. and (7) folding edges.
Detailed Description
The technical solution of the present invention will be described in further detail through the following embodiments.
As shown in fig. 1-5, an assembled double-steel-plate combined shear wall connection node comprises two vertically-arranged precast steel plates 1 and precast seal plates 2 plugged at two transverse ends of the two precast steel plates 1, wherein two transverse ends of inner side surfaces of the two precast steel plates 1 are respectively provided with a long steel channel 3 in an attached manner, an opening side of the long steel channel 3 is in buckling welding with the inner side surfaces of the precast steel plates 1, two ends of the long steel channel 3 extend to two vertical ends of the precast steel plates 2 so as to form a through support for the precast seal plates 2, and a plurality of transverse square holes 4 are uniformly formed in the long steel channel 3; correspond every on the prefabricated shrouding 2 horizontal square hole 4 is provided with L shape couple 5 respectively, L shape couple 5 a right angle limit tip with prefabricated shrouding 2 is connected perpendicularly, another right angle limit is vertical buckles downwards, the vertical both ends of prefabricated shrouding 2 are provided with the lock and are in the hem 6 in the 1 horizontal both ends outside of prefabricated steel sheet, two prefabricated steel sheet 1 and two prefabricated shrouding 2 encloses into the cuboid space, the concrete has been pour in the cuboid space.
During the construction, two 1 vertical settings of prefabricated steel sheet, two prefabricated shrouding 2 sinks after wearing a plurality of horizontal square holes 4 on the overlength channel-section steel 3 with L shape couple 5, makes L shape couple 5 is hung on the channel-section steel 3, accomplish the buckle and connect, this moment, 6 locks of hem at two vertical both ends of prefabricated shrouding 2 are in the 1 horizontal both ends outside of prefabricated steel sheet, regard two prefabricated steel sheet 1 and two prefabricated shrouding 2 as the template, pour the concrete in to the cuboid space, solidify the back and accomplish the construction promptly.
This assembled double steel plates compound shear wall connected node has following advantage:
(1) prefabricated shrouding 2 with prefabricated steel sheet 1 adopts buckle formula connected mode, and during the construction, the counterpoint required precision is low, and need not to carry out extra welding operation, has improved the construction convenience greatly, compares with traditional peg structure, does not reach anticipated pretightning force, separates the knob problem, prefabricated steel sheet 1's surface also can keep leveling.
(2) The expansive force of the internally poured concrete is utilized to achieve the self-compacting effect, so that the double steel plates and the concrete can be well stressed in a synergistic manner, and the strength of the wall body is ensured.
(3) In the construction stage, the prefabricated steel plate 1 and the prefabricated sealing plate 2 are used as a concrete template, the steps of formwork supporting and formwork removing are omitted, the construction cost is saved, the construction efficiency is improved, and the flanges 6 at the two longitudinal ends of the prefabricated sealing plate 2 can ensure that slurry does not leak when concrete is poured.
(4) Each component is easy to prefabricate, produce on a large scale, is convenient to disassemble and replace, and can reduce the production cost and the maintenance cost.
Finally, it should be noted that the above embodiments are only used for illustrating the technical solutions of the present invention and not for limiting the same; although the present invention has been described in detail with reference to preferred embodiments, it should be understood by those skilled in the art that: the invention can be modified or equivalent substituted for some technical features; without departing from the spirit of the present invention, it should be understood that the scope of the claims is intended to cover all such modifications and variations.

Claims (3)

1. The utility model provides an assembled double steel plates compound shear wall connected node which characterized in that: two prefabricated steel sheets and the shutoff including vertical setting are two the prefabricated shrouding at the horizontal both ends of prefabricated steel sheet, two the horizontal both ends of medial surface of prefabricated steel sheet are pasted respectively and are equipped with a root length channel-section steel, a plurality of horizontal square holes have evenly been seted up on the length channel-section steel, correspond every on the prefabricated shrouding horizontal square hole is provided with L shape couple respectively, a right-angle side tip of L shape couple with prefabricated shrouding is perpendicular to be connected, the vertical downward buckling in another right-angle side, the vertical both ends of prefabricated shrouding are provided with the lock and are in the hem in the horizontal both ends outside of prefabricated steel sheet.
2. The fabricated double-steel-plate composite shear wall connection node of claim 1, wherein: the opening side of the long channel steel is buckled and welded on the inner side surface of the prefabricated steel plate, and two ends of the long channel steel extend to the two vertical ends of the prefabricated steel plate.
3. The fabricated double-steel-plate composite shear wall connection node of claim 2, wherein: two prefabricated steel sheet and two prefabricated shrouding enclose into the cuboid space, the concrete has been pour in the cuboid space.
CN202221368183.9U 2022-06-02 2022-06-02 Assembled double-steel-plate combined shear wall connecting node Active CN217480519U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221368183.9U CN217480519U (en) 2022-06-02 2022-06-02 Assembled double-steel-plate combined shear wall connecting node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221368183.9U CN217480519U (en) 2022-06-02 2022-06-02 Assembled double-steel-plate combined shear wall connecting node

Publications (1)

Publication Number Publication Date
CN217480519U true CN217480519U (en) 2022-09-23

Family

ID=83313262

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221368183.9U Active CN217480519U (en) 2022-06-02 2022-06-02 Assembled double-steel-plate combined shear wall connecting node

Country Status (1)

Country Link
CN (1) CN217480519U (en)

Similar Documents

Publication Publication Date Title
CN204826619U (en) Mould is hung to superimposed sheet instrument formula
CN105143570B (en) Building structure and construction method for same
CN203452204U (en) Connecting node of prefabricated hollow steel-reinforced concrete column and steel girder
CN105756202A (en) Tooth groove type connection structure of assembled shear wall in combination with superimposed floor slab
CN109667354B (en) Vertical energy dissipation seam connecting device of assembled shear force wall
CN203200760U (en) Detachable prestress support frame system
CN206053131U (en) Precast floor slab steel reinforcement cage component and floor
CN104727476A (en) Assembly type light 3D steel bar truss floor plate and manufacturing method thereof
CN207700438U (en) A kind of fabricated shear wall cross connected structure
CN204551848U (en) Assembling light body 3D steel bar girder floor plates
CN207919737U (en) A kind of assembled steel-Combined concrete frame structure
CN217480519U (en) Assembled double-steel-plate combined shear wall connecting node
CN207003673U (en) A kind of connecting node of beam and wallboard
CN217870942U (en) Beam column connecting structure
CN213926884U (en) Buckle formula shear force wall horizontal connection structure
CN215329894U (en) Wet node concrete placement system is connected to assembled structure beam column
CN207244957U (en) A kind of modularization Prefabricated stacking floor for being used to drop plate region
CN112900748A (en) Prefabricated assembly type square steel tube honeycomb steel rib concrete combined column and manufacturing method thereof
CN108277878A (en) A kind of assembled steel-Combined concrete frame structure
CN207700531U (en) The framework of steel reinforcement of removable bed die and cast-in-place building panel
CN201381803Y (en) T-shaped base of beam pumper
CN217204819U (en) Rigid template steel bar truss floor bearing plate
CN212773441U (en) Construction transformation construction outside single face formwork structure
CN213296761U (en) Prefabricated steel prestress shear wall convenient to install
CN103866884A (en) Pre-stress honeycombed section steel plate shear wall