CN217461384U - Scaffold for house construction - Google Patents

Scaffold for house construction Download PDF

Info

Publication number
CN217461384U
CN217461384U CN202221434515.9U CN202221434515U CN217461384U CN 217461384 U CN217461384 U CN 217461384U CN 202221434515 U CN202221434515 U CN 202221434515U CN 217461384 U CN217461384 U CN 217461384U
Authority
CN
China
Prior art keywords
shell
fixedly connected
spacing
bracing piece
dead lever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221434515.9U
Other languages
Chinese (zh)
Inventor
秦川
刘朝鹏
温登松
田如祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group Co Ltd
China Railway Construction Engineering Group Second Construction Co Ltd
Original Assignee
China Railway Construction Engineering Group Co Ltd
China Railway Construction Engineering Group Shandong Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group Co Ltd, China Railway Construction Engineering Group Shandong Co Ltd filed Critical China Railway Construction Engineering Group Co Ltd
Priority to CN202221434515.9U priority Critical patent/CN217461384U/en
Application granted granted Critical
Publication of CN217461384U publication Critical patent/CN217461384U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a scaffold frame for construction is built in room, including two fixing device, fixing device includes first dead lever, first gag lever post and second gag lever post, and the top and the equal fixedly connected with location shell in bottom of the relative one side of two first dead levers, equal swing joint has folding mechanism between the relative one side of four location shells, folding mechanism includes first round bar, second round bar, first spacing shell, second bracing piece and the spacing shell of second, has the spacing shell of second through pivot swing joint between the relative one side of two first round bars, has first spacing shell through pivot swing joint between the relative one side of two second round bars, fixedly connected with second bracing piece between the relative one side of first spacing shell and second spacing shell. The utility model discloses a set up the cooperation of fixing device, location shell, folding mechanism, third spacing ring and couple and use, solved current scaffold frame for the construction of building and did not possess the problem folding to the scaffold frame.

Description

Scaffold for house construction
Technical Field
The utility model belongs to the technical field of the construction tool is built in the room, especially, relate to scaffold frame is used in construction is built in room.
Background
The scaffold is various supports erected for workers to operate and work at a high place on a construction site, and is mainly used for outer walls, interior decoration or places with higher floor height and incapable of being directly constructed on a construction site.
In the technical field of construction tools is built in a room, a scaffold for construction needs to be used, the existing scaffold is inconvenient to disassemble and assemble, and therefore a worker needs to carry one scaffold part when transporting the scaffold, so that a great deal of time is wasted when carrying the scaffold.
SUMMERY OF THE UTILITY MODEL
Problem to prior art existence, the utility model provides a scaffold frame for construction is built in room possesses and carries out folding advantage to scaffold frame, has solved current scaffold frame for construction of building and has not possessed the problem folding to scaffold frame.
The utility model is realized in such a way, the scaffold for building construction comprises two fixing devices, the fixing devices comprise a first fixing rod, a first limiting rod and a second limiting rod, the top and the bottom of one side of the two first fixing rods opposite to each other are fixedly connected with a positioning shell, a folding mechanism is movably connected between the opposite sides of the four positioning shells, the folding mechanism comprises a first round rod, a second round rod, a first limiting shell, a second supporting rod and a second limiting shell, the second limiting shell is movably connected between the opposite sides of the two first round rods through a shaft pin, the first limiting shell is movably connected between the opposite sides of the two second round rods through a shaft pin, the second supporting rod is fixedly connected between the opposite sides of the first limiting shell and the second limiting shell, one sides of the first round rod and the second round rod close to the positioning shells are movably connected with the positioning shells through shaft pins, the stop plate is movably connected between the surfaces of the two first limiting rods, the supporting mechanism is sleeved on the rear side of the surface of the second limiting rod and comprises a first limiting ring and a second limiting ring, the inner cavity of the first limiting ring is fixedly connected with the second limiting rod, and the inner cavity of the second limiting ring is fixedly connected with the second round rod.
As the utility model discloses it is preferred, the first gag lever post of top fixedly connected with of first dead lever front side, the front side fixedly connected with second dead lever of first gag lever post, the bottom and the second gag lever post fixed connection of second dead lever rear side, the top fixedly connected with locating lever of second gag lever post, the top of locating lever and the bottom fixed connection of first gag lever post, the front side fixedly connected with third gag lever post of locating lever, the front side and the second dead lever fixed connection of third gag lever post.
As the utility model discloses preferred, the first bracing piece of the equal fixedly connected with in bottom of two first round bars, the bottom and the second round bar fixed connection of first bracing piece, through pivot and first spacing shell swing joint between the relative one side of two second round bars, the top and the second bracing piece fixed connection of first spacing shell, the top and the spacing shell fixed connection of second bracing piece, the both sides of the spacing shell of second are all through pivot and first round bar swing joint.
As the utility model discloses it is preferred, the equal fixedly connected with set casing in relative one side of two first spacing rings, the inner chamber of set casing has the movable block through pivot swing joint, the surperficial swing joint of movable block has the third bracing piece, the top swing joint of third bracing piece has the fixture block, the rear side and the second spacing ring fixed connection of fixture block, the draw-in groove has been seted up to the front side of fixture block, the top fixedly connected with extension spring of draw-in groove, the top fixedly connected with pull rod of extension spring, the inner chamber to the draw-in groove is run through to the bottom of pull rod.
As the utility model discloses it is preferred, the bottom fixedly connected with third spacing ring of location shell, the surface with first dead lever is established to the third spacing ring cover.
As the utility model discloses it is preferred, the surface cover of second gag lever post is equipped with the couple, the inner chamber and the third bracing piece swing joint of couple.
As the utility model discloses preferred, the top and the bottom of second bracing piece all overlap and are equipped with the stopper, two stopper opposite one side respectively with first spacing shell and the spacing shell fixed connection of second.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a set up fixing device, location shell, folding mechanism, station board, supporting mechanism, third spacing ring and the cooperation of couple and use, solved current scaffold frame for the construction of building and did not possess the problem folding to the scaffold frame.
2. The utility model discloses a cooperation that sets up first dead lever, first gag lever post, second dead lever, locating lever and third gag lever post is used, has played the fixed action to folding mechanism, station board and supporting mechanism.
3. The utility model discloses a set up first round bar, first bracing piece, the second round bar, first spacing shell, the cooperation of the spacing shell of second bracing piece and second is used, when the staff splices the scaffold, through the first dead lever of pulling, first dead lever drives first round bar and second round bar through the pivot activity in the location shell when being pulled and removes, first round bar and second round bar drive first spacing shell and the spacing shell of second and remove when removing to open the scaffold frame and use.
4. The utility model discloses a set up first spacing ring, the set casing, the movable block, the third bracing piece, the fixture block, the second spacing ring, the draw-in groove, the cooperation of extension spring and pull rod is used, the back is opened with the scaffold to the staff, through the backward movement third bracing piece, the third bracing piece backward movement drives the movable block and moves about, the staff is through pulling the pull rod, the pull rod passes through extension spring rebound, and put into the inner chamber of draw-in groove to the third bracing piece, carry on spacingly to the third bracing piece through unclamping the pull rod, the third bracing piece has played the supporting role to folding mechanism.
5. The utility model discloses a set up the third spacing ring, played the fixed action to the location shell, prevent simultaneously that the location shell from taking place to drop at the during operation.
6. The utility model discloses a set up the couple, played the supporting role to the third bracing piece, prevent simultaneously that the third bracing piece from taking place to drop when not using.
7. The utility model discloses a set up the stopper, played the limiting displacement to the second bracing piece, prevent simultaneously that the second bracing piece from taking place to drop when using.
Drawings
Fig. 1 is a schematic structural diagram provided in an embodiment of the present invention;
fig. 2 is a left side view of a partial structure provided by an embodiment of the present invention;
fig. 3 is a front view of a partial structure provided by an embodiment of the present invention;
fig. 4 is a front view of a partial structure provided by the embodiment of the present invention.
In the figure: 1. a fixing device; 101. a first fixing lever; 102. a first limit rod; 103. a second limiting rod; 104. a second fixing bar; 105. positioning a rod; 106. a third limiting rod; 2. a positioning shell; 3. a folding mechanism; 301. a first round bar; 302. a first support bar; 303. a second round bar; 304. a first limit case; 305. a second support bar; 306. a second limit shell; 307. a limiting block; 4. standing the plate; 5. a support mechanism; 501. a first limit ring; 502. a stationary case; 503. a movable block; 504. a third support bar; 505. a clamping block; 506. a second stop collar; 507. a card slot; 508. a tension spring; 509. a pull rod; 6. a third limit ring; 7. and (4) hanging hooks.
Detailed Description
In order to further understand the contents, features and effects of the present invention, the following embodiments are illustrated and described in detail with reference to the accompanying drawings.
The structure of the present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1 to 4, the scaffold for building construction provided by the embodiment of the present invention comprises two fixing devices 1, the fixing devices 1 comprise first fixing rods 101, first limiting rods 102 and second limiting rods 103, the top and bottom of the opposite side of the two first fixing rods 101 are fixedly connected with positioning shells 2, the opposite sides of the four positioning shells 2 are movably connected with a folding mechanism 3, the folding mechanism 3 comprises a first round rod 301, a second round rod 303, a first limiting shell 304, a second supporting rod 305 and a second limiting shell 306, the opposite side of the two first round rods 301 is movably connected with the second limiting shell 306 through a pin, the opposite side of the two second round rods 303 is movably connected with the first limiting shell 304 through a pin, the opposite side of the first limiting shell 304 and the second limiting shell 306 is fixedly connected with the second supporting rod 305, the side of the first round rod 301 and the second round rod 303 close to the positioning shells 2 are movably connected with the positioning shells 2 through a pin, the standing plate 4 is movably connected between the surfaces of the two first limiting rods 102, the supporting mechanism 5 is sleeved on the rear side of the surface of the second limiting rod 103, the supporting mechanism 5 comprises a first limiting ring 501 and a second limiting ring 506, the inner cavity of the first limiting ring 501 is fixedly connected with the second limiting rod 103, and the inner cavity of the second limiting ring 506 is fixedly connected with the second round rod 303.
Referring to fig. 2, a first limit rod 102 is fixedly connected to the top of the front side of a first fixing rod 101, a second fixing rod 104 is fixedly connected to the front side of the first limit rod 102, the bottom of the rear side of the second fixing rod 104 is fixedly connected to a second limit rod 103, a positioning rod 105 is fixedly connected to the top of the second limit rod 103, the top of the positioning rod 105 is fixedly connected to the bottom of the first limit rod 102, a third limit rod 106 is fixedly connected to the front side of the positioning rod 105, and the front side of the third limit rod 106 is fixedly connected to the second fixing rod 104.
Adopt above-mentioned scheme: the first fixing rod 101, the first limiting rod 102, the second limiting rod 103, the second fixing rod 104, the positioning rod 105 and the third limiting rod 106 are arranged to be matched for use, so that the folding mechanism 3, the standing plate 4 and the supporting mechanism 5 are fixed.
Referring to fig. 3, the bottoms of the two first round rods 301 are fixedly connected with a first supporting rod 302, the bottom of the first supporting rod 302 is fixedly connected with a second round rod 303, one opposite side of the two second round rods 303 is movably connected with a first limiting shell 304 through a shaft pin, the top of the first limiting shell 304 is fixedly connected with a second supporting rod 305, the top of the second supporting rod 305 is fixedly connected with a second limiting shell 306, and two sides of the second limiting shell 306 are movably connected with the first round rods 301 through shaft pins.
Adopt above-mentioned scheme: through setting up first round bar 301, first bracing piece 302, second round bar 303, first spacing shell 304, the cooperation of second bracing piece 305 and the spacing shell 306 of second is used, when the staff splices the scaffold, through the first dead lever 101 of pulling, first round bar 301 and the removal of second round bar 303 are driven through the pivot activity in location shell 2 when first dead lever 101 is pulled, first round bar 301 and second round bar 303 drive first spacing shell 304 and the spacing shell 306 of second and remove when removing, thereby open the scaffold and use.
Referring to fig. 4, the opposite sides of the two first limiting rings 501 are fixedly connected with a fixed shell 502, the inner cavity of the fixed shell 502 is movably connected with a movable block 503 through a shaft pin, the surface of the movable block 503 is movably connected with a third support rod 504, the top of the third support rod 504 is movably connected with a fixture block 505, the rear side of the fixture block 505 is fixedly connected with a second limiting ring 506, a clamping groove 507 is formed in the front side of the fixture block 505, the top of the clamping groove 507 is fixedly connected with a tension spring 508, the top of the tension spring 508 is fixedly connected with a pull rod 509, and the bottom of the pull rod 509 penetrates through the inner cavity of the clamping groove 507.
Adopt above-mentioned scheme: through setting up first spacing ring 501, set casing 502, movable block 503, third bracing piece 504, fixture block 505, second spacing ring 506, draw-in groove 507, extension spring 508 and pull rod 509's cooperation is used, the back is opened to the staff with the scaffold, through backward movement third bracing piece 504, third bracing piece 504 backward movement drives movable block 503 and moves about, the staff is through pulling pull rod 509, pull rod 509 passes through extension spring 508 rebound, and put into the inner chamber of draw-in groove 507 third bracing piece 504, it is spacing to third bracing piece 504 through unclamping pull rod 509, third bracing piece 504 has played the supporting role to folding mechanism 3.
Referring to fig. 1, the bottom of the positioning shell 2 is fixedly connected with a third limiting ring 6, and the third limiting ring 6 is sleeved on the surface of the first fixing rod 101.
Adopt above-mentioned scheme: through setting up third spacing ring 6, played the fixed action to location shell 2, prevent simultaneously that location shell 2 from taking place to drop at the during operation.
Referring to fig. 1, a hook 7 is sleeved on the surface of the second limiting rod 103, and an inner cavity of the hook 7 is movably connected with the third support rod 504.
Adopt above-mentioned scheme: through setting up couple 7, played the supporting role to third bracing piece 504, prevent simultaneously that third bracing piece 504 from taking place to drop when not using.
Referring to fig. 3, the top and the bottom of the second support rod 305 are both sleeved with a stop block 307, and the opposite sides of the two stop blocks 307 are respectively fixedly connected with the first stop shell 304 and the second stop shell 306.
Adopt above-mentioned scheme: through setting up stopper 307, played the limiting displacement to second bracing piece 305, prevent simultaneously that second bracing piece 305 from taking place to drop when using.
The utility model discloses a theory of operation:
when using, when the staff splices the scaffold, through pulling first dead lever 101, first round bar 301 and second round bar 303 are driven through the pivot activity in location shell 2 to remove when first dead lever 101 is pulled, first round bar 301 and second round bar 303 drive first spacing shell 304 and the spacing shell 306 of second and move when removing, thereby open the scaffold and use, the staff opens the back with the scaffold, through removing third bracing piece 504 backward, third bracing piece 504 moves backward and drives movable block 503 and move about, the staff is through pulling pull rod 509, pull rod 509 passes through extension spring 508 rebound, and put third bracing piece 504 into the inner chamber of draw-in groove 507, it is spacing to carry out third bracing piece 504 through loosening pull rod 509, third bracing piece 504 supports folding mechanism 3.
In summary, the following steps: this scaffold frame for building construction uses through fixing device 1, location shell 2, folding mechanism 3, station board 4, supporting mechanism 5, third spacing ring 6 and couple 7's cooperation, has solved current scaffold frame for building construction and has not possessed the problem folding to the scaffold frame.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. Scaffold frame for construction is built in room, including two fixing device (1), its characterized in that: the fixing device (1) comprises first fixing rods (101), first limiting rods (102) and second limiting rods (103), positioning shells (2) are fixedly connected to the tops and the bottoms of opposite sides of the two first fixing rods (101), folding mechanisms (3) are movably connected between opposite sides of the four positioning shells (2), each folding mechanism (3) comprises a first round rod (301), a second round rod (303), a first limiting shell (304), a second supporting rod (305) and a second limiting shell (306), the second limiting shell (306) is movably connected between opposite sides of the two first round rods (301) through a shaft pin, the first limiting shell (304) is movably connected between opposite sides of the two second round rods (303), and the second supporting rod (305) is fixedly connected between opposite sides of the first limiting shell (304) and the second limiting shell (306), first round bar (301) and second round bar (303) are close to one side of location shell (2) and all pass through pivot and location shell (2) swing joint, and swing joint has stop plate (4) between the surface of two first gag lever posts (102), the rear side cover on second gag lever post (103) surface is equipped with supporting mechanism (5), supporting mechanism (5) include first spacing ring (501) and second spacing ring (506), the inner chamber and second gag lever post (103) fixed connection of first spacing ring (501), the inner chamber and second round bar (303) fixed connection of second spacing ring (506).
2. The scaffold for building construction according to claim 1, wherein: the utility model discloses a fixing device for fixing a car seat, including first dead lever (101), first dead lever (102), the front side fixedly connected with second dead lever (104) of first dead lever (101) front side, the bottom and second dead lever (103) fixed connection of second dead lever (104) rear side, the top fixedly connected with locating lever (105) of second dead lever (103), the top of locating lever (105) and the bottom fixed connection of first dead lever (102), the front side fixedly connected with third dead lever (106) of locating lever (105), the front side and second dead lever (104) fixed connection of third dead lever (106).
3. The scaffold for building construction according to claim 1, wherein: the equal first bracing piece (302) of fixedly connected with in bottom of two first round bars (301), the bottom and the second round bar (303) fixed connection of first bracing piece (302), through pivot and first spacing shell (304) swing joint between the relative one side of two second round bars (303), the top and second bracing piece (305) fixed connection of first spacing shell (304), the top and the spacing shell (306) fixed connection of second bracing piece (305), the both sides of the spacing shell of second (306) are all through pivot and first round bar (301) swing joint.
4. The scaffold for building construction according to claim 1, wherein: the equal fixedly connected with set casing (502) in relative one side of two first spacing rings (501), the inner chamber of set casing (502) has movable block (503) through pivot pin swing joint, the surperficial swing joint of movable block (503) has third bracing piece (504), the top swing joint of third bracing piece (504) has fixture block (505), the rear side and the second spacing ring (506) fixed connection of fixture block (505), draw-in groove (507) have been seted up to the front side of fixture block (505), the top fixedly connected with extension spring (508) of draw-in groove (507), the top fixedly connected with pull rod (509) of extension spring (508), the inner chamber to draw-in groove (507) is run through to the bottom of pull rod (509).
5. The scaffold for house construction according to claim 1, wherein: the bottom fixedly connected with third spacing ring (6) of location shell (2), third spacing ring (6) cover establish with the surface of first dead lever (101).
6. The scaffold for building construction according to claim 1, wherein: the surface of the second limiting rod (103) is sleeved with a hook (7), and the inner cavity of the hook (7) is movably connected with the third supporting rod (504).
7. The scaffold for building construction according to claim 1, wherein: the top and the bottom of second bracing piece (305) all overlap and are equipped with stopper (307), and the opposite one side of two stopper (307) respectively with first spacing shell (304) and second spacing shell (306) fixed connection.
CN202221434515.9U 2022-06-08 2022-06-08 Scaffold for house construction Active CN217461384U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221434515.9U CN217461384U (en) 2022-06-08 2022-06-08 Scaffold for house construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221434515.9U CN217461384U (en) 2022-06-08 2022-06-08 Scaffold for house construction

Publications (1)

Publication Number Publication Date
CN217461384U true CN217461384U (en) 2022-09-20

Family

ID=83236580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221434515.9U Active CN217461384U (en) 2022-06-08 2022-06-08 Scaffold for house construction

Country Status (1)

Country Link
CN (1) CN217461384U (en)

Similar Documents

Publication Publication Date Title
CN109626797A (en) A kind of supporting device of vial processing
CN217461384U (en) Scaffold for house construction
CN210190122U (en) Automatic maintenance device for prefabricated parts
CN212054114U (en) Safety protection isolating device is used in road and bridge construction
CN217400306U (en) Scaffold frame for building engineering convenient to build
CN217044535U (en) Ultra-large horizontal clapper die spotting press
CN206028650U (en) Work piece of warding off shell assembly line breaks away from mechanism
CN211257322U (en) A assembled building frame for in construction
CN210616803U (en) Positioning device for wood processing
CN210598068U (en) Novel scaffold convenient to install and detach
CN219826059U (en) Operation platform for building external construction
CN210907939U (en) Riveting machine for bicycle mudguard
CN106112350B (en) Section bar column positioning tool and the positioning table using the positioning tool
CN212532230U (en) Module lifting device
CN216474508U (en) Highway bridge construction is with foldable outer basket of hanging
CN218348346U (en) Air compressor's removal support body
CN218541405U (en) Construction scaffold that can build fast
CN215883682U (en) Factory building equipment moves quick-witted device
CN212897471U (en) Folding construction stool
CN104625799A (en) Fixture capable of automatically mounting, dismounting and machining piston cooling nozzle body opening
CN219632752U (en) Portable hydraulic multipurpose corner cutting machine
CN216130539U (en) High building scaffold of security
CN217924883U (en) Template fixing device convenient to detach for building engineering
CN217871718U (en) Attached lifting protection platform steel frame steel plate net
CN218137762U (en) Automobile engine disassembling platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 100071 Nord tower 1, 128 South Fourth Ring Road West, Fengtai District, Beijing.

Patentee after: China Railway Construction Engineering Group

Patentee after: China Railway Construction Group No.2 Construction Co.,Ltd.

Address before: 100000 Nord tower 1, 128 South Fourth Ring Road West, Fengtai District, Beijing.

Patentee before: China Railway Construction Engineering Group

Patentee before: CHINA RAILWAY CONSTRUCTION ENGINEERING GROUP SHANDONG Co.,Ltd.