CN217441277U - Engineering cost mapping equipment - Google Patents

Engineering cost mapping equipment Download PDF

Info

Publication number
CN217441277U
CN217441277U CN202122927324.8U CN202122927324U CN217441277U CN 217441277 U CN217441277 U CN 217441277U CN 202122927324 U CN202122927324 U CN 202122927324U CN 217441277 U CN217441277 U CN 217441277U
Authority
CN
China
Prior art keywords
disc
bracing piece
connecting plate
supporting rod
cost mapping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122927324.8U
Other languages
Chinese (zh)
Inventor
田红杰
薛丽敏
黄海娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122927324.8U priority Critical patent/CN217441277U/en
Application granted granted Critical
Publication of CN217441277U publication Critical patent/CN217441277U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to the technical field of engineering equipment, in particular to engineering cost mapping equipment, which comprises a supporting rod, wherein the upper end of the supporting rod is provided with a mapper, the surface of the supporting rod is provided with a first chute, a first slide block is connected on the first chute in a sliding way, the right side of the first slide block is fixedly connected with a disc, the upper end thread of the disc penetrates through a plurality of threaded rivets, a second gear tooth is connected with a gear in a meshing way, the surface of the supporting rod is provided with a limit sliding mechanism, the utility model can match the disc through the first chute and the first slide block, a user can drive the threaded rivets to move downwards when the disc moves downwards, the threaded rivets are convenient to be inserted into the ground, the disc can be matched with the threaded rivets to support the supporting rod on a slope section, and the round rod is prevented from displacing and inclining, the support rod can be fixed on a smooth road surface by matching the disc with the threaded rivet.

Description

Engineering cost mapping equipment
Technical Field
The utility model relates to an engineering equipment technical field specifically is an engineering cost mapping equipment.
Background
The engineering measuring instrument is a measuring instrument for various aspects of orientation, distance measurement, angle measurement, height measurement, mapping, photogrammetry and the like required by measurement in planning design, construction and operation management stages of engineering construction.
Among the prior art, engineering surveying instrument on the market generally is that the triangular prism supports, and technical staff needs very careful operation when surveying the appearance, because the triangular prism in case the displacement appears will lead to measured data to appear the deviation, and the engineering surveying instrument that some existing triangular prisms supported can't survey and draw at the great highway section of slope, for this reason, we propose an engineering cost mapping equipment and solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an engineering cost mapping equipment to solve the problem that proposes in the above-mentioned background art.
The technical scheme of the utility model is that: a construction cost mapping device comprises a support rod, a mapping instrument is arranged at the upper end of the support rod, the surface of the supporting rod is provided with a first sliding chute which is connected with a first sliding block in a sliding way, a disc is fixedly connected to the right side of the first sliding block, a plurality of threaded rivets penetrate through the upper end threads of the disc, the surface of the supporting rod is provided with a movable groove, the inner wall of the movable groove is rotationally connected with a gear, a connecting plate is arranged in the movable groove, the bottom end of the connecting plate penetrates through the inner wall of the movable groove and is fixedly connected with the first slide block, the side wall of the connecting plate is fixedly connected with a plurality of first gear teeth which are meshed with the gear, the surface of the supporting rod is provided with an L-shaped plate, the side wall of the L-shaped plate is fixedly connected with a plurality of second gear teeth, the second gear teeth are meshed with the gear, and a limiting sliding mechanism is arranged on the surface of the supporting rod.
Preferably, the limiting sliding mechanism comprises a second sliding groove, a second sliding block is connected to the second sliding groove in a sliding mode, and the right side of the second sliding block is fixedly connected with the L-shaped plate.
Preferably, the threaded rivets are arranged in a pairwise symmetrical mode, and the bottom ends of the threaded rivets are arranged in a conical mode.
Preferably, the connecting plate is a metal plate, and the connecting plate is matched with the inner wall of the movable groove.
Preferably, the support rod is made of alloy materials, and the bottom end of the support rod is arranged in a conical shape.
Preferably, the upper surface of the lower half part of the L-shaped plate is provided with anti-skid grains.
The utility model discloses an improve and provide an engineering cost mapping equipment here, compare with prior art, have following improvement and advantage:
one is as follows: the utility model discloses, through setting up first spout, first slider cooperation disc, the user can be with the downward disc position of foot, will drive screw rivet shift down position when disc shift down position, and the screw rivet of being convenient for injects ground, makes things convenient for disc cooperation screw rivet to hold the bracing piece in slope soil highway section, avoids the round bar to take place displacement and slope, also can fix the bracing piece on level and smooth road surface through disc cooperation screw rivet.
The second step is as follows: the utility model discloses, through setting up the gear, the L shaped plate cooperation second teeth of a cogwheel, when stepping on the L shaped plate downwards hard, the L shaped plate will drive gear revolve through the second teeth of a cogwheel, will drive the connecting plate rising position through the first teeth of a cogwheel when gear revolve, makes things convenient for the connecting plate to drive the disc rising position through first slider, and the user of being convenient for through this kind of operation takes out screw rivet in the soil, has played easy operation, and convenient practicality is strong purpose.
Drawings
The invention is further explained below with reference to the figures and examples:
FIG. 1 is a schematic cross-sectional view of the present invention;
FIG. 2 is a schematic view of the three-dimensional structure of the disc of the present invention;
fig. 3 is an enlarged schematic view of a portion a in fig. 1.
Description of reference numerals:
1. a support bar; 2. a surveying instrument; 3. a first chute; 4. a first slider; 5. a disc; 6. a threaded rivet; 7. a movable groove; 8. a gear; 9. a connecting plate; 10. a first gear tooth; 11. an L-shaped plate; 12. a second gear tooth; 13. a second chute; 14. and a second slider.
Detailed Description
The present invention will be described in detail below, and it is apparent that the technical solutions in the embodiments of the present invention are described clearly and completely. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model discloses an improve and provide an engineering cost mapping equipment here, the technical scheme of the utility model is:
as shown in fig. 1-3, a construction cost mapping device comprises a support rod 1, and is characterized in that: the upper end of the support rod 1 is provided with a surveying instrument 2, the surface of the support rod 1 is provided with a first chute 3, the first chute 3 is connected with a first slide block 4 in a sliding way, the right side of the first slide block 4 is fixedly connected with a disc 5, the upper end thread of the disc 5 is penetrated with a plurality of threaded rivets 6, the upper end thread of the disc 5 is penetrated with the plurality of threaded rivets 6, the threaded rivets 6 are convenient to adjust the length, the threaded rivets 6 can be used in different environments, the surface of the support rod 1 is provided with a movable groove 7, the inner wall of the movable groove 7 is rotatably connected with a gear 8, a connecting plate 9 is arranged in the movable groove 7, the bottom end of the connecting plate 9 is penetrated through the inner wall of the movable groove 7 and fixedly connected with the first slide block 4, the side wall of the connecting plate 9 is fixedly connected with a plurality of first gear teeth 10, the first gear teeth 10 are meshed with the gear 8, the surface of the support rod 1 is provided with an L-shaped plate 11, the lateral wall fixedly connected with of L shaped plate 11 is a plurality of second teeth of a cogwheel 12, and second teeth of a cogwheel 12 is connected with the meshing of gear 8, and the surface of bracing piece 1 is provided with spacing slide mechanism, and spacing slide mechanism includes second spout 13, and sliding connection has second slider 14 on second spout 13, the right side and the L shaped plate 11 fixed connection of second slider 14.
Further, a plurality of screw rivets 6 set up for two bisymmetry, and the bottom of a plurality of screw rivets 6 is the toper setting, and the bottom through setting up a plurality of screw rivets 6 is the toper setting, makes things convenient for screw rivet 6 to insert ground, is convenient for fix bracing piece 1.
Further, connecting plate 9 is the metal sheet, and connecting plate 9 and activity groove 7's inner wall phase-match make things convenient for connecting plate 9 to drive first slider 4 and reciprocate the position through setting up connecting plate 9 for the metal sheet, have improved the life of connecting plate 9.
Further, bracing piece 1 is made for the alloy material, and the bottom of bracing piece 1 is the toper setting, and the bottom through setting up bracing piece 1 is the toper setting, and in the bracing piece 1 bottom of being convenient for entered into the soil, improved the stability of bracing piece 1.
Further, the upper surface of the lower half part of the L-shaped plate 11 is provided with anti-slip lines, and the anti-slip lines improve the friction force of the sole of a user and avoid slipping.
The working principle is as follows: when surveying and mapping the ground surface at the slope, at first make bracing piece 1 keep the vertical state, later step on disc 5 downwards again, will drive screw rivet 6 downstream when disc 5 downstream, at this moment screw rivet 6 will inject in the soil, just can cooperate disc 5 to prop up bracing piece 1 when screw rivet 6 is in the soil, avoid bracing piece 1 to take place the slope, when using up back reuse power down to step on connecting plate 9, connecting plate 9 will drive gear 8 through second teeth of a cogwheel 12 and rotate, will drive connecting plate 9 through first teeth of a cogwheel 10 rising position when gear 8 rotates, make things convenient for connecting plate 9 to drive disc 5 rising position through first slider 4, will remove screw rivet 6 from the soil when disc 5 rising position.
The previous description is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (6)

1. The utility model provides an engineering cost mapping equipment, includes bracing piece (1), its characterized in that: the upper end of bracing piece (1) is provided with surveying instrument (2), first spout (3) have been seted up on the surface of bracing piece (1), sliding connection has first slider (4) on first spout (3), the right side fixedly connected with disc (5) of first slider (4), the upper end screw thread of disc (5) runs through has a plurality of screw thread rivets (6), movable groove (7) have been seted up on the surface of bracing piece (1), the inner wall rotation of movable groove (7) is connected with gear (8), be provided with connecting plate (9) in movable groove (7), the inner wall and first slider (4) fixed connection of movable groove (7) are run through to the bottom of connecting plate (9), the lateral wall fixedly connected with a plurality of first teeth of a cogwheel (10) of connecting plate (9), first teeth of a cogwheel (10) are connected with gear (8) meshing, the surface of bracing piece (1) is provided with L shaped plate (11), a plurality of second teeth of a cogwheel (12) of lateral wall fixedly connected with of L shaped plate (11), the second teeth of a cogwheel (12) are connected with gear (8) meshing, the surface of bracing piece (1) is provided with spacing slide mechanism.
2. A construction cost mapping apparatus according to claim 1, wherein: spacing slide mechanism includes second spout (13), sliding connection has second slider (14) on second spout (13), the right side and L shaped plate (11) fixed connection of second slider (14).
3. A construction cost mapping apparatus according to claim 1, wherein: the plurality of threaded rivets (6) are arranged in pairwise symmetry, and the bottom ends of the plurality of threaded rivets (6) are arranged in a conical shape.
4. A construction cost mapping apparatus according to claim 1, wherein: the connecting plate (9) is a metal plate, and the connecting plate (9) is matched with the inner wall of the movable groove (7).
5. A construction cost mapping apparatus according to claim 1, wherein: the supporting rod (1) is made of alloy materials, and the bottom end of the supporting rod (1) is arranged in a conical mode.
6. A construction cost mapping apparatus according to claim 1, wherein: and anti-skid grains are arranged on the upper surface of the lower half part of the L-shaped plate (11).
CN202122927324.8U 2021-11-24 2021-11-24 Engineering cost mapping equipment Active CN217441277U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122927324.8U CN217441277U (en) 2021-11-24 2021-11-24 Engineering cost mapping equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122927324.8U CN217441277U (en) 2021-11-24 2021-11-24 Engineering cost mapping equipment

Publications (1)

Publication Number Publication Date
CN217441277U true CN217441277U (en) 2022-09-16

Family

ID=83209885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122927324.8U Active CN217441277U (en) 2021-11-24 2021-11-24 Engineering cost mapping equipment

Country Status (1)

Country Link
CN (1) CN217441277U (en)

Similar Documents

Publication Publication Date Title
CN217441277U (en) Engineering cost mapping equipment
CN210741310U (en) Mechanical multifunctional measuring device
CN214248927U (en) Geological exploration equipment for geological exploration
CN210716802U (en) Tripod for measurement
CN210344879U (en) Total powerstation spud pile
CN212567407U (en) Engineering survey sighting rod
CN214614239U (en) Foundation detection device for building engineering quality detection
CN214747982U (en) Engineering measurement equipment based on communication tower under sunshine
CN212988375U (en) Fixed point marking device for geological exploration
CN210893131U (en) Multi-functional land mapping device
CN211824383U (en) Measuring device for road construction
CN115031100A (en) Area measuring instrument for land planning design
CN211409080U (en) Height, weight and abdominal circumference measurement integrated device
CN218724210U (en) Marker post for engineering surveying and mapping
CN217784751U (en) Prism adjusting device for mapping engineering
CN218122790U (en) Foundation pit horizontal displacement alarm device
CN217153691U (en) On-spot exploration device for architectural design
CN213812300U (en) Geographic information engineering mapping device
CN217329244U (en) Surveyor's level for engineering is surveyed to geology
CN214010335U (en) High-stability level gauge support
CN218762468U (en) Fixed anti-skidding device for mine survey tripod
CN217011877U (en) Green cutting device of planting in greenbelt of municipal administration usefulness
CN211899970U (en) Installation device of LED street lamp pole
CN214663223U (en) Surveying instrument positioner for surveying and mapping engineering
CN216447820U (en) Conveniently stand surveying and mapping support of adjusting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant