CN217439488U CN202220095322.9U CN202220095322U CN217439488U CN 217439488 U CN217439488 U CN 217439488U CN 202220095322 U CN202220095322 U CN 202220095322U CN 217439488 U CN217439488 U CN 217439488U
Authority
CN
China
Prior art keywords
base
platform
welded
fixed
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220095322.9U
Other languages
Chinese (zh)
Inventor
鲍友谊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220095322.9U priority Critical patent/CN217439488U/en
Application granted granted Critical
Publication of CN217439488U publication Critical patent/CN217439488U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses an over-and-under type construction platform for housing construction engineering relates to the construction platform field. This an over-and-under type construction platform for housing construction engineering includes the platform main part, the platform main part includes the base, the bottom of base and be close to four corners department and all install the movable wheel, the below of base and be close to left and right sides edge and be equipped with the antiskid ribbed tile of mutual symmetry, the top of base is provided with preceding back symmetry cut the formula frame, both sides around cut and connect through a plurality of evenly distributed's connecting rod between the formula frame, the top of cutting the formula frame is equipped with the workstation, the right side of platform main part just is located and is equipped with the bamboo joint ladder between base and the workstation. This an over-and-under type construction platform for housing construction engineering, constructor can upwards climb to the workstation through the bamboo joint ladder, avoids following the workstation and removes and produce great potential safety hazard to prevent to cause the interference to other constructors, thereby improve the efficiency of construction.

Description

一种用于房屋建筑工程的升降式施工平台A lifting construction platform for house construction engineering

技术领域technical field

本实用新型涉及施工平台技术领域,具体为一种用于房屋建筑工程的升降式施工平台。The utility model relates to the technical field of construction platforms, in particular to a lift-type construction platform used in house construction projects.

背景技术Background technique

房屋建筑工程施工通常指各类房屋建筑的附属设施和配套的线路、管道、设备安装及室内外装修等施工工作。在进行房屋建筑工程施工时,由于施工人员无法对建筑内部较高的部分进行施工工作,通过需要采用升降式的施工平台辅助进行施工。The construction of housing construction usually refers to the construction work of the auxiliary facilities and supporting lines, pipelines, equipment installation and indoor and outdoor decoration of various housing buildings. During the construction of housing construction, since the construction personnel cannot carry out construction work on the higher parts of the building, the construction needs to be assisted by a lifting construction platform.

现有的升降式施工平台多不具备扶梯结构,在施工过程中,施工人员只能通过升降平台进行上下移动,但是,升降平台上下移动的过程中易产生一定的晃动,对平台上的施工人员产生影响,并产生较大的安全隐患。另外,当部分人员需要到施工平台的下方取用物品时,需要通过升降平台进行向下移动,进行移动时会影响他人的施工工作,从而导致房屋建筑工程的施工效率降低,因此我们提出一种用于房屋建筑工程的升降式施工平台。Most of the existing lifting construction platforms do not have an escalator structure. During the construction process, the construction personnel can only move up and down through the lifting platform. have an impact and create a greater security risk. In addition, when some personnel need to go to the bottom of the construction platform to get items, they need to move down through the lifting platform, which will affect the construction work of others and reduce the construction efficiency of housing construction projects. Therefore, we propose a Elevating construction platform for house construction works.

实用新型内容Utility model content

(一)解决的技术问题(1) Technical problems solved

针对现有技术的不足,本实用新型公开了一种用于房屋建筑工程的升降式施工平台,以解决上述背景技术中提出的问题。Aiming at the deficiencies of the prior art, the utility model discloses a lifting construction platform used in house construction projects, so as to solve the problems raised in the above background technology.

(二)技术方案(2) Technical solutions

为实现以上目的,本实用新型通过以下技术方案予以实现:一种用于房屋建筑工程的升降式施工平台,包括:In order to achieve the above purpose, the present utility model is realized through the following technical solutions: a lifting construction platform for housing construction projects, comprising:

平台主体,所述平台主体包括底座,所述底座的底部且靠近四角处均安装有活动轮,所述底座的下方且靠近左右两侧边缘处设有相互对称的防滑板,所述底座的上方设置有前后对称的剪式架,前后两侧的所述剪式架之间通过若干均匀分布的连接杆进行连接,所述剪式架的上方设有工作台;Platform main body, the platform main body includes a base, the bottom of the base and near the four corners are installed with movable wheels, the bottom of the base and near the edges of the left and right sides are provided with mutually symmetrical anti-skid plates, the upper part of the base The front and rear symmetrical scissor frames are arranged, the front and rear sides of the scissor frames are connected by a plurality of evenly distributed connecting rods, and a workbench is arranged above the scissor frames;

竹节梯,所述竹节梯设置在平台主体的右侧,且位于底座与工作台之间,所述竹节梯的底端与底座的顶部转动连接,所述竹节梯的顶端与工作台的底部转动连接。Bamboo ladder, the bamboo ladder is arranged on the right side of the platform main body, and is located between the base and the workbench, the bottom end of the bamboo ladder is rotatably connected to the top of the base, and the top of the bamboo ladder is connected to the working table. The bottom of the table is connected with a swivel.

优选的,所述防滑板的顶部且靠近中心处焊接固定有螺纹杆,所述螺纹杆的外侧设有活动套,所述螺纹杆与活动套的内壁螺纹连接,所述活动套贯穿底座,且与底座转动连接,所述防滑板的顶部且靠近前后两侧边缘处均设有伸缩杆,所述伸缩杆的顶端与底座焊接固定,所述伸缩杆的底端与防滑板焊接固定。Preferably, a threaded rod is welded and fixed on the top of the anti-skid plate near the center, a movable sleeve is provided on the outer side of the threaded rod, the threaded rod is threadedly connected with the inner wall of the movable sleeve, the movable sleeve penetrates through the base, and It is rotatably connected with the base, and the top of the anti-skid plate is provided with telescopic rods near the front and rear edges.

优选的,所述剪式架的上下两端且靠近左侧边缘处设有前后对称的导轨,各个所述导轨分别与底座和工作台焊接固定,所述剪式架通过连接杆与导轨滑动连接,所述剪式架的上下两端且靠近右侧边缘处设有前后对称的固定座,各个所述固定座分别与底座和工作台焊接固定,所述剪式架通过连接杆与固定座转动连接。Preferably, the upper and lower ends of the scissor frame are provided with front and rear symmetrical guide rails near the left edge, each of the guide rails is welded and fixed to the base and the worktable respectively, and the scissor frame is slidably connected to the guide rails through connecting rods , the upper and lower ends of the scissor frame and near the right edge are provided with front and rear symmetrical fixing seats, each of the fixing seats is welded and fixed with the base and the worktable respectively, and the scissors frame is rotated through the connecting rod and the fixing seat connect.

优选的,所述剪式架的内侧安装有上下平行的液压缸,所述液压缸的两端分别与对应的连接杆转动连接。Preferably, the inner side of the scissor frame is provided with a vertical parallel hydraulic cylinder, and both ends of the hydraulic cylinder are respectively connected in rotation with the corresponding connecting rods.

优选的,所述工作台的顶部且靠近边缘处焊接固定有护栏,所述护栏上且靠近底端处焊接固定有挡板,所述护栏的右侧设有活动门,所述活动门通过铰链与护栏铰接配合。Preferably, a guardrail is welded and fixed on the top of the workbench and near the edge, a baffle is welded and fixed on the guardrail and near the bottom end, and a movable door is provided on the right side of the guardrail, and the movable door is hinged Hinged fit with guardrail.

优选的,所述竹节梯由若干相互套接配合的竖杆组成,各个所述竖杆的外侧且靠近顶端处均焊接固定有横撑,所述竖杆的外侧且靠近底端处设有活动环,所述竖杆的内侧且靠近顶端处设有限位环,所述竖杆、所述活动环以及所述限位环一体成型。Preferably, the bamboo ladder is composed of a plurality of vertical rods that are sleeved and matched with each other, each of the vertical rods is welded and fixed on the outer side and near the top end, and the outer side of the vertical rod and near the bottom end is provided with a cross brace. In the movable ring, a limit ring is arranged on the inner side of the vertical rod and near the top end, and the vertical rod, the movable ring and the limit ring are integrally formed.

优选的,所述竹节梯的底端设有第一连接座,所述竹节梯的底端与第一连接座转动连接,所述第一连接座的底部与底座焊接固定,所述竹节梯的顶端设有第二连接座,所述竹节梯的顶端与第二连接座转动连接,所述第二连接座与工作台的底部焊接固定。Preferably, the bottom end of the bamboo ladder is provided with a first connecting seat, the bottom end of the bamboo ladder is rotatably connected with the first connecting seat, the bottom of the first connecting seat is welded and fixed to the base, and the bamboo The top of the ladder is provided with a second connection seat, the top of the bamboo ladder is rotatably connected with the second connection seat, and the second connection seat is welded and fixed to the bottom of the workbench.

本实用新型公开了一种用于房屋建筑工程的升降式施工平台,其具备的有益效果如下:The utility model discloses an elevating construction platform used for house construction projects, which has the following beneficial effects:

1、该用于房屋建筑工程的升降式施工平台,通过设置有竹节梯,当工作台上下移动时,竹节梯的顶端可跟随工作台移动,从而将竹节梯逐渐展开,施工人员通过竹节梯可向上攀爬到工作台中,从而避免跟随工作台上下移动而产生较大的安全隐患,同时,施工人员通过竹节梯上下施工平台,可避免对其他施工人员产生干扰,从而提高房屋建筑工程的施工效率。1. The elevating construction platform used for house construction is provided with a bamboo ladder. When the worktable moves up and down, the top of the bamboo ladder can move with the worktable, so that the bamboo ladder can be gradually unfolded, and the construction workers can pass the ladder. The bamboo ladder can climb up to the workbench, so as to avoid the potential safety hazards caused by moving up and down with the workbench. At the same time, the construction personnel can go up and down the construction platform through the bamboo ladder to avoid interference with other construction personnel, thereby improving the construction of the building. Construction efficiency of construction projects.

2、该用于房屋建筑工程的升降式施工平台,底座的下方通过设置有相互对称的活动套,在进行施工工作时,转动活动套,使活动套与螺纹杆相对运动,可使螺纹杆推动防滑板向下移动,从而使防滑板的底部与地面贴合进行防滑,防止施工平台在施工过程中产生移动,从而提高施工时的安全性。2. The lifting construction platform used for housing construction projects has a mutually symmetrical movable sleeve under the base. During construction, the movable sleeve is rotated to make the movable sleeve move relative to the threaded rod, so that the threaded rod can be pushed The anti-skid plate moves downward, so that the bottom of the anti-skid plate is attached to the ground for anti-skid, preventing the construction platform from moving during the construction process, thereby improving the safety during construction.

附图说明Description of drawings

图1为本实用新型整体结构示意图;Fig. 1 is the overall structure schematic diagram of the present utility model;

图2为本实用新型底座结构示意图;Fig. 2 is the base structure schematic diagram of the utility model;

图3为本实用新型剪式架结构示意图;Fig. 3 is the structural schematic diagram of the utility model scissor frame;

图4为本实用新型工作台结构示意图;FIG. 4 is a schematic structural diagram of a workbench of the present invention;

图5为本实用新型竹节梯结构示意图;Fig. 5 is the structural schematic diagram of the bamboo ladder of the present utility model;

图6为本实用新型竹节梯局部机构示意图。FIG. 6 is a schematic diagram of the partial mechanism of the bamboo ladder of the present invention.

图中:1、底座;11、活动轮;12、防滑板;13、螺纹杆;131、活动套; 14、伸缩杆;2、剪式架;21、连接杆;22、导轨;23、固定座;24、液压缸; 3、工作台;31、护栏;32、挡板;33、活动门;4、竹节梯;41、竖杆;411、活动环;412、限位环;42、横撑;43、第一连接座;44、第二连接座。In the picture: 1. base; 11. movable wheel; 12. anti-skid plate; 13. threaded rod; 131. movable sleeve; 14. telescopic rod; 2. scissor frame; 21. connecting rod; seat; 24, hydraulic cylinder; 3, workbench; 31, guardrail; 32, baffle; 33, movable door; 4, bamboo ladder; 41, vertical rod; 411, movable ring; 412, limit ring; 42, 43. The first connecting seat; 44. The second connecting seat.

具体实施方式Detailed ways

本实用新型实施例公开一种用于房屋建筑工程的升降式施工平台。The embodiment of the utility model discloses an elevating construction platform used for house construction engineering.

如图1所示,包括平台主体,平台主体包括底座1,底座1的底部且靠近四角处均安装有活动轮11,底座1的下方且靠近左右两侧边缘处设有相互对称的防滑板12,底座1的上方设置有前后对称的剪式架2,前后两侧的剪式架2之间通过若干均匀分布的连接杆21进行连接,剪式架2的上方设有工作台3;As shown in FIG. 1 , it includes a platform body. The platform body includes a base 1. The bottom of the base 1 and near the four corners are equipped with movable wheels 11, and the bottom of the base 1 and near the edges of the left and right sides are provided with mutually symmetrical anti-skid plates 12. , the top of the base 1 is provided with a front and rear symmetrical scissor frame 2, the front and rear sides of the scissor frame 2 are connected by a number of evenly distributed connecting rods 21, and a workbench 3 is arranged above the scissor frame 2;

竹节梯4,竹节梯4设置在平台主体的右侧,且位于底座1与工作台3之间,竹节梯4的底端与底座1的顶部转动连接,竹节梯4的顶端与工作台3 的底部转动连接。The bamboo ladder 4, the bamboo ladder 4 is arranged on the right side of the platform main body, and is located between the base 1 and the workbench 3, the bottom end of the bamboo ladder 4 is rotatably connected with the top of the base 1, and the top of the bamboo ladder 4 is connected to the base 1. The bottom of the workbench 3 is connected in rotation.

如图2所示,防滑板12的顶部且靠近中心处焊接固定有螺纹杆13,螺纹杆13的外侧设有活动套131,螺纹杆13与活动套131的内壁螺纹连接,活动套131贯穿底座1,且与底座1转动连接,活动套131的顶部安装有摇杆,通过摇杆方便对活动套131进行转动,防滑板12的顶部且靠近前后两侧边缘处均设有伸缩杆14,伸缩杆14的顶端与底座1焊接固定,伸缩杆14的底端与防滑板12焊接固定,转动活动套131,使活动套131与螺纹杆13相对运动,可使螺纹杆13推动防滑板12向下移动,同时通过伸缩杆14提高防滑板12 的稳定性,从而方便防滑板12与地面贴合进行防滑。As shown in FIG. 2 , a threaded rod 13 is welded and fixed on the top of the anti-skid plate 12 and near the center. A movable sleeve 131 is provided on the outer side of the threaded rod 13. The threaded rod 13 is threadedly connected to the inner wall of the movable sleeve 131, and the movable sleeve 131 penetrates through the base. 1, and is rotatably connected with the base 1, a rocker is installed on the top of the movable sleeve 131, and the movable sleeve 131 is easily rotated by the rocker. The top of the anti-skid plate 12 is provided with telescopic rods 14 near the edges of the front and rear sides. The top end of the rod 14 is welded and fixed to the base 1, and the bottom end of the telescopic rod 14 is welded and fixed to the anti-skid plate 12. Rotate the movable sleeve 131 to make the movable sleeve 131 move relative to the threaded rod 13, so that the threaded rod 13 can push the anti-skid plate 12 downward. At the same time, the stability of the anti-skid plate 12 is improved by the telescopic rod 14, so as to facilitate the anti-skid plate 12 to adhere to the ground for anti-skid.

如图3所示,剪式架2的上下两端且靠近左侧边缘处设有前后对称的导轨22,各个导轨22分别与底座1和工作台3焊接固定,剪式架2通过连接杆 21与导轨22滑动连接,剪式架2的上下两端且靠近右侧边缘处设有前后对称的固定座23,各个固定座23分别与底座1和工作台3焊接固定,剪式架2通过连接杆21与固定座23转动连接。As shown in FIG. 3 , the upper and lower ends of the scissor frame 2 are provided with front and rear symmetrical guide rails 22 near the left edge. Each guide rail 22 is welded and fixed to the base 1 and the worktable 3 respectively. It is slidably connected with the guide rail 22. The upper and lower ends of the scissor frame 2 are provided with front and rear symmetrical fixing seats 23 near the right edge. The rod 21 is rotatably connected with the fixed seat 23 .

剪式架2的内侧安装有上下平行的液压缸24,液压缸24的两端分别与对应的连接杆21转动连接,两组液压缸24同时运转推动连接杆21移动,可快速将剪式架2伸缩,从而提高工作台3的升降速度,并增强工作台3的稳定性。The inner side of the scissor frame 2 is installed with up and down parallel hydraulic cylinders 24. Both ends of the hydraulic cylinders 24 are respectively connected with the corresponding connecting rods 21 in rotation. 2. Telescopic, thereby increasing the lifting speed of the workbench 3 and enhancing the stability of the workbench 3.

如图4所示,工作台3的顶部且靠近边缘处焊接固定有护栏31,通过护栏31可在工作台3的边缘进行防护,从而提高施工时的安全性,护栏31上且靠近底端处焊接固定有挡板32,挡板32可在护栏31的底端进行阻挡,防止工作台3中的物品滑落,从而增强安全性,护栏31的右侧设有活动门33,活动门33通过铰链与护栏31铰接配合。As shown in FIG. 4 , a guardrail 31 is welded and fixed on the top of the workbench 3 and near the edge. The guardrail 31 can protect the edge of the workbench 3 so as to improve the safety during construction. The baffle 32 is welded and fixed, and the baffle 32 can block the bottom end of the guardrail 31 to prevent the items in the workbench 3 from slipping, thereby enhancing the safety. The right side of the guardrail 31 is provided with a movable door 33, and the movable door 33 is hinged It is hinged with the guardrail 31 .

如图5和图6所示,竹节梯4由若干相互套接配合的竖杆41组成,各个竖杆41的外侧且靠近顶端处均焊接固定有横撑42,通过横撑42方便施工人员进行攀爬移动,竖杆41的外侧且靠近底端处设有活动环411,竖杆41的内侧且靠近顶端处设有限位环412,竖杆41、活动环411以及限位环412一体成型,当竹节梯4进行伸展时,通过活动环411和限位环412方便带动相邻的竖杆41滑动,同时,竹节梯4展开后,上方竖杆41的活动环411可与下方竖杆41的限位环412卡接配合,从而提高竹节梯4的稳定性。As shown in FIG. 5 and FIG. 6 , the bamboo ladder 4 is composed of a plurality of vertical rods 41 that are sleeved and matched with each other. The outer side of each vertical rod 41 and near the top end are welded and fixed with horizontal braces 42, which are convenient for construction personnel through the horizontal braces 42. For climbing movement, a movable ring 411 is provided on the outer side of the vertical rod 41 and near the bottom end, and a limit ring 412 is provided on the inner side of the vertical rod 41 and near the top end. The vertical rod 41, the movable ring 411 and the limit ring 412 are integrally formed , when the bamboo ladder 4 is stretched, it is convenient to drive the adjacent vertical rods 41 to slide through the movable ring 411 and the limit ring 412. At the same time, after the bamboo ladder 4 is unfolded, the movable ring 411 of the upper vertical rod 41 can be vertical with the bottom The limit ring 412 of the rod 41 is snap-fitted, thereby improving the stability of the bamboo ladder 4 .

竹节梯4的底端设有第一连接座43,竹节梯4的底端与第一连接座43转动连接,第一连接座43的底部与底座1焊接固定,竹节梯4的顶端设有第二连接座44,竹节梯4的顶端与第二连接座44转动连接,第二连接座44与工作台3的底部焊接固定,通过第一连接座43和第二连接座44可使竹节梯4 的两端自由转动,从而方便竹节梯4伸展。The bottom end of the bamboo ladder 4 is provided with a first connecting seat 43, the bottom end of the bamboo ladder 4 is rotatably connected with the first connecting seat 43, the bottom of the first connecting seat 43 is welded and fixed to the base 1, and the top of the bamboo ladder 4 is fixed by welding. A second connecting seat 44 is provided, the top of the bamboo ladder 4 is rotatably connected with the second connecting seat 44, and the second connecting seat 44 is welded and fixed to the bottom of the workbench 3. Both ends of the bamboo ladder 4 are made to rotate freely, so that the bamboo ladder 4 can be extended easily.

工作原理:当一种用于房屋建筑工程的升降式施工平台在使用的时候,首先,推动底座1,将施工平台移动到施工地点附近,然后,转动活动套131,使活动套131与螺纹杆13相对运动,使螺纹杆13带动防滑板12向下移动,同时伸缩杆14进行伸缩,提高防滑板12移动时的稳定性,使防滑板12的底部与地面贴合,从而使防滑板12进行支撑防滑;Working principle: When a lifting construction platform for house construction is in use, first, push the base 1 to move the construction platform to the vicinity of the construction site, and then turn the movable sleeve 131 to make the movable sleeve 131 and the threaded rod. 13 is relatively moved, so that the threaded rod 13 drives the anti-skid plate 12 to move downward, and at the same time the telescopic rod 14 expands and contracts, which improves the stability of the anti-skid plate 12 when moving, so that the bottom of the anti-skid plate 12 is attached to the ground, so that the anti-skid plate 12 can move. non-slip support;

在进行施工时,首先,使液压缸24运转推动剪式架2内部的连接杆21 移动,使连接杆21在导轨22中滑动,使连接杆21在固定座23上转动,使剪式架2逐渐伸展,使剪式架2的顶部推动工作台3上下移动,将工作台3 移动至合适位置,工作台3向上移动时带动第一连接座43向上移动,使第一连接座43带动竹节梯4顶部的横撑42向上移动,横撑42带动最上方的竖杆 41向上移动,上侧的竖杆41通过活动环411在下侧竖杆41的内部滑动,当活动环411与限位环412接触时,通过限位环412拉动下方的竖杆41向上移动,从而将竹节梯4逐渐展开,施工人员通过竹节梯4可攀爬到工作台3的内部进行施工。During construction, first, the hydraulic cylinder 24 is operated to push the connecting rod 21 inside the scissor frame 2 to move, so that the connecting rod 21 slides in the guide rail 22, and the connecting rod 21 rotates on the fixed seat 23, so that the scissor frame 2 is moved. Gradually stretch, so that the top of the scissor frame 2 pushes the worktable 3 to move up and down, and the worktable 3 is moved to a suitable position. When the worktable 3 moves upward, it drives the first connecting seat 43 to move upward, so that the first connecting seat 43 drives the bamboo joint. The horizontal support 42 at the top of the ladder 4 moves upward, the horizontal support 42 drives the uppermost vertical rod 41 to move upward, and the upper vertical rod 41 slides inside the lower vertical rod 41 through the movable ring 411. When the movable ring 411 and the limit ring When the 412 is in contact, the vertical rod 41 below is pulled by the limit ring 412 to move upward, so that the bamboo ladder 4 is gradually unfolded, and the construction personnel can climb to the interior of the workbench 3 through the bamboo ladder 4 for construction.

以上显示和描述了本实用新型的基本原理和主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。The basic principles and main features of the present invention and the advantages of the present invention are shown and described above. It should be understood by those skilled in the art that the present invention is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the present invention. Without departing from the spirit and scope of the present invention, the present invention There will also be various changes and improvements in the new model, which all fall within the scope of the claimed invention. The claimed scope of the present invention is defined by the appended claims and their equivalents.

Claims (7)

1.一种用于房屋建筑工程的升降式施工平台,其特征在于,包括:1. an elevating construction platform for housing construction, is characterized in that, comprises: 平台主体,所述平台主体包括底座(1),所述底座(1)的底部且靠近四角处均安装有活动轮(11),所述底座(1)的下方且靠近左右两侧边缘处设有相互对称的防滑板(12),所述底座(1)的上方设置有前后对称的剪式架(2),前后两侧的所述剪式架(2)之间通过若干均匀分布的连接杆(21)进行连接,所述剪式架(2)的上方设有工作台(3);A platform main body, the platform main body includes a base (1), and movable wheels (11) are installed at the bottom of the base (1) and near the four corners, and the bottom of the base (1) and close to the edges of the left and right sides are provided with movable wheels (11). There are mutually symmetrical anti-skid plates (12), a front and rear symmetrical scissor frame (2) is arranged above the base (1), and the scissor frames (2) on the front and rear sides are connected by several evenly distributed connections. The rods (21) are connected, and a workbench (3) is arranged above the scissor frame (2); 竹节梯(4),所述竹节梯(4)设置在平台主体的右侧,且位于底座(1)与工作台(3)之间,所述竹节梯(4)的底端与底座(1)的顶部转动连接,所述竹节梯(4)的顶端与工作台(3)的底部转动连接。Bamboo ladder (4), the bamboo ladder (4) is arranged on the right side of the platform main body, and is located between the base (1) and the workbench (3), the bottom end of the bamboo ladder (4) and the The top of the base (1) is rotatably connected, and the top of the bamboo ladder (4) is rotatably connected with the bottom of the workbench (3). 2.根据权利要求1所述的一种用于房屋建筑工程的升降式施工平台,其特征在于:所述防滑板(12)的顶部且靠近中心处焊接固定有螺纹杆(13),所述螺纹杆(13)的外侧设有活动套(131),所述螺纹杆(13)与活动套(131)的内壁螺纹连接,所述活动套(131)贯穿底座(1),且与底座(1)转动连接,所述防滑板(12)的顶部且靠近前后两侧边缘处均设有伸缩杆(14),所述伸缩杆(14)的顶端与底座(1)焊接固定,所述伸缩杆(14)的底端与防滑板(12)焊接固定。2. A lifting construction platform for house construction according to claim 1, characterized in that: a threaded rod (13) is welded and fixed on the top of the anti-skid plate (12) and near the center, and the The outer side of the threaded rod (13) is provided with a movable sleeve (131), the threaded rod (13) is threadedly connected with the inner wall of the movable sleeve (131), and the movable sleeve (131) penetrates through the base (1) and is connected to the base (131). 1) Rotating connection, the top of the anti-skid plate (12) and near the edges of the front and rear sides are provided with telescopic rods (14), the top of the telescopic rod (14) is welded and fixed to the base (1), the telescopic rod The bottom end of the rod (14) is fixed by welding with the antiskid plate (12). 3.根据权利要求1所述的一种用于房屋建筑工程的升降式施工平台,其特征在于:所述剪式架(2)的上下两端且靠近左侧边缘处设有前后对称的导轨(22),各个所述导轨(22)分别与底座(1)和工作台(3)焊接固定,所述剪式架(2)通过连接杆(21)与导轨(22)滑动连接,所述剪式架(2)的上下两端且靠近右侧边缘处设有前后对称的固定座(23),各个所述固定座(23)分别与底座(1)和工作台(3)焊接固定,所述剪式架(2)通过连接杆(21)与固定座(23)转动连接。3. A kind of lifting construction platform for house construction according to claim 1, characterized in that: the upper and lower ends of the scissor frame (2) and near the left edge are provided with front and rear symmetrical guide rails (22), each of the guide rails (22) is welded and fixed to the base (1) and the workbench (3) respectively, and the scissor frame (2) is slidably connected to the guide rail (22) through a connecting rod (21). The upper and lower ends of the scissor frame (2) and near the right edge are provided with front and rear symmetrical fixing seats (23), and each of the fixing seats (23) is welded and fixed to the base (1) and the workbench (3) respectively, The scissor frame (2) is rotatably connected with the fixing seat (23) through a connecting rod (21). 4.根据权利要求1所述的一种用于房屋建筑工程的升降式施工平台,其特征在于:所述剪式架(2)的内侧安装有上下平行的液压缸(24),所述液压缸(24)的两端分别与对应的连接杆(21)转动连接。4. A lifting construction platform for house construction according to claim 1, characterized in that: the inner side of the scissor frame (2) is installed with a vertical parallel hydraulic cylinder (24), the hydraulic Both ends of the cylinder (24) are rotatably connected with the corresponding connecting rods (21). 5.根据权利要求1所述的一种用于房屋建筑工程的升降式施工平台,其特征在于:所述工作台(3)的顶部且靠近边缘处焊接固定有护栏(31),所述护栏(31)上且靠近底端处焊接固定有挡板(32),所述护栏(31)的右侧设有活动门(33),所述活动门(33)通过铰链与护栏(31)铰接配合。5. A lifting construction platform for house construction according to claim 1, characterized in that: a guardrail (31) is welded and fixed on the top of the workbench (3) and near the edge, and the guardrail A baffle plate (32) is welded and fixed on the (31) and near the bottom end, and a movable door (33) is arranged on the right side of the guardrail (31), and the movable door (33) is hinged to the guardrail (31) through a hinge Cooperate. 6.根据权利要求1所述的一种用于房屋建筑工程的升降式施工平台,其特征在于:所述竹节梯(4)由若干相互套接配合的竖杆(41)组成,各个所述竖杆(41)的外侧且靠近顶端处均焊接固定有横撑(42),所述竖杆(41)的外侧且靠近底端处设有活动环(411),所述竖杆(41)的内侧且靠近顶端处设有限位环(412),所述竖杆(41)、所述活动环(411)以及所述限位环(412)一体成型。6. A kind of elevating construction platform for house construction project according to claim 1, it is characterized in that: described bamboo ladder (4) is made up of several vertical rods (41) which are sleeved and matched with each other. A transverse brace (42) is welded and fixed on the outer side of the vertical rod (41) and near the top end, and a movable ring (411) is provided on the outer side of the vertical rod (41) and near the bottom end. The vertical rod (41) ) is provided with a limit ring (412) on the inner side and near the top end, and the vertical rod (41), the movable ring (411) and the limit ring (412) are integrally formed. 7.根据权利要求1所述的一种用于房屋建筑工程的升降式施工平台,其特征在于:所述竹节梯(4)的底端设有第一连接座(43),所述竹节梯(4)的底端与第一连接座(43)转动连接,所述第一连接座(43)的底部与底座(1)焊接固定,所述竹节梯(4)的顶端设有第二连接座(44),所述竹节梯(4)的顶端与第二连接座(44)转动连接,所述第二连接座(44)与工作台(3)的底部焊接固定。7. A lifting construction platform for house construction according to claim 1, characterized in that: the bottom end of the bamboo ladder (4) is provided with a first connecting seat (43), the bamboo The bottom end of the ladder (4) is rotatably connected with the first connecting seat (43), the bottom of the first connecting seat (43) is welded and fixed to the base (1), and the top of the bamboo ladder (4) is provided with The second connecting seat (44), the top of the bamboo ladder (4) is rotatably connected with the second connecting seat (44), and the second connecting seat (44) is welded and fixed to the bottom of the workbench (3).
CN202220095322.9U 2022-01-14 2022-01-14 Lifting type construction platform for house building engineering Expired - Fee Related CN217439488U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220095322.9U CN217439488U (en) 2022-01-14 2022-01-14 Lifting type construction platform for house building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220095322.9U CN217439488U (en) 2022-01-14 2022-01-14 Lifting type construction platform for house building engineering

Publications (1)

Publication Number Publication Date
CN217439488U true CN217439488U (en) 2022-09-16

Family

ID=83211904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220095322.9U Expired - Fee Related CN217439488U (en) 2022-01-14 2022-01-14 Lifting type construction platform for house building engineering

Country Status (1)

Country Link
CN (1) CN217439488U (en)

Similar Documents

Publication Publication Date Title
CN205114983U (en) Folding lift platform of safety and stability
CN202558574U (en) Crawler-type spider-shaped aerial work platform
CN209703975U (en) A municipal scaffolding
CN206278874U (en) A kind of construction Special lifting ladder
CN203998856U (en) Lifting mode power equipment maintaining device
CN207313068U (en) A kind of mobile lifting platform
CN208122264U (en) Hanging basket for building exterior wall decoration
CN206477588U (en) White washed wall construction operation hoistable platform
CN205953456U (en) Aerial working platform with safety arrangement
CN217439488U (en) Lifting type construction platform for house building engineering
CN211873797U (en) A mobile climbing ladder protection device for scaffolding that can be folded and stretched
CN212453553U (en) A sliding operation frame with protective function
CN221442065U (en) Movable ascending device for engineering construction
CN107221879A (en) Supply line's inspection platform
CN209091151U (en) A telescopic arm type window cleaner
CN207166021U (en) Supply line's inspection platform
CN217439486U (en) Scaffold for building construction for preventing slope collapse
CN107386138B (en) Totally-enclosed sound insulation screen construction vehicle and totally-enclosed sound insulation screen installation method
CN211850709U (en) A simple scaffold for house construction
CN206110628U (en) Portable lift
CN214462412U (en) Construction platform with adjustable elevartor shaft
CN210370017U (en) A kind of scaffolding for construction engineering
CN210337912U (en) Electrified construction ladder car of adjustable level railway
CN207484319U (en) A kind of totally-enclosed gobo work car
CN204125120U (en) Distribution insulated elevating platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220916