CN217438788U - Fastener is used in quick installation of highway guardrail - Google Patents

Fastener is used in quick installation of highway guardrail Download PDF

Info

Publication number
CN217438788U
CN217438788U CN202221309232.1U CN202221309232U CN217438788U CN 217438788 U CN217438788 U CN 217438788U CN 202221309232 U CN202221309232 U CN 202221309232U CN 217438788 U CN217438788 U CN 217438788U
Authority
CN
China
Prior art keywords
bolt
nut
guardrail
fastener
mounting hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221309232.1U
Other languages
Chinese (zh)
Inventor
朱晓龙
左艳芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Aoli Construction Hardware Co ltd
Original Assignee
Jiangsu Aoli Construction Hardware Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Aoli Construction Hardware Co ltd filed Critical Jiangsu Aoli Construction Hardware Co ltd
Priority to CN202221309232.1U priority Critical patent/CN217438788U/en
Application granted granted Critical
Publication of CN217438788U publication Critical patent/CN217438788U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a fastener technical field just discloses a fastener is used in quick installation of highway guardrail, include two bolts that correspond with the guardrail mounting hole, the one end fixedly connected with connecting block of bolt, the last fixed surface of connecting block is connected with the elastic hook of the type of falling V, the other end fixedly connected with guide block of elastic hook, the internal rotation of guide block is connected with the nut that corresponds with the bolt, the opening direction of nut corresponds with the tail end of bolt. Through being in the same place two bolted connections that correspond with the mounting hole to set up the elastic hook of two types of falling V, during the installation, the lug connection bolt is hung in the guardrail top, and the alignment mounting hole disect insertion is gone into, then rotates the nut and can install, need not workman fastening bolt on one side, and the screw in spiral shell has realized grafting convenience simultaneously, and is fixed convenient, has improved the installation effectiveness.

Description

Fastener is used in quick installation of highway guardrail
Technical Field
The utility model relates to a fastener technical field specifically is a fastener is used in quick installation of highway guardrail.
Background
The highway guardrail is arranged at two sides of a highway and plays a role in protecting the highway. The corrugated steel guardrail plates are mutually spliced and are in a continuous structure supported by the main column, and due to the fact that the corrugated beam guardrails are soft and flexible, the corrugated beam guardrails can absorb energy when vehicles collide, are not easy to crash, and can well protect the vehicles and drivers and passengers.
At present, when a highway guardrail is installed, a plurality of bolts are often needed for fixing between two adjacent guardrail plates, the guardrail plates are generally symmetrically designed, and an upper mounting hole and a lower mounting hole are formed in the guardrail plates. Due to the structural characteristics of the bolts, the bolts need to be aligned to the mounting holes firstly during mounting, then workers need to fasten the bolts on one side and screw in the nuts at the same time, the principle is simple, operation is troublesome, force is difficult to apply during mounting, and mounting efficiency is not high.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a fastener is used in quick installation of highway guardrail to solve the problem that the background art provided.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a fastener is used in quick installation of highway guardrail, includes two bolts that correspond with the guardrail mounting hole, the one end fixedly connected with connecting block of bolt, the last fixed surface of connecting block is connected with the elasticity couple of the type of falling V, the other end fixedly connected with guide block of elasticity couple, the internal rotation of guide block is connected with the nut that corresponds with the bolt, the opening direction of nut corresponds with the tail end of bolt.
Preferably, the tail end of the bolt is provided with a chamfer and corresponds to the opening of the nut.
Preferably, the connecting block is embedded with a magnetic block, and the magnetic block is magnetically attracted with an external road guardrail.
Preferably, the inner side surface of the connecting block is provided with a rubber layer.
(III) advantageous effects
Compared with the prior art, the utility model discloses possess following beneficial effect:
1. this kind of novel fastener is used in quick installation of highway guardrail, through being in the same place two bolted connection, and correspond with the mounting hole, connect the one end of two elastic hook of type of falling V above the connecting block, the nut that corresponds with the bolt is connected to the other end, during the installation, can directly connect the bolt and hang in the guardrail top, insert into to the mounting hole, then rotate the nut and can install, need not to aim at the mounting hole one by one at the workman, the fixing bolt that wastes energy again simultaneously, the grafting is convenient, and is convenient to fix, and the installation efficiency is improved.
2. This kind of novel fastener is used in quick installation of highway guardrail sets up to the chamfer structure through the one end with the bolt to bolted connection part has magnetism, can adsorb on the guardrail automatically during the installation, and fixed position, the convenience of installation is further improved to the nut of being convenient for and being connected between the bolt.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the overall structure of the elastic hook of the present invention;
fig. 3 is a schematic view of the cross-sectional structure of the connecting block of the present invention.
In the figure: 1. a bolt; 2. connecting blocks; 3. an elastic hook; 4. a guide block; 5. a nut; 6. a magnetic block; 7. a rubber layer.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1 and 2, the fastener for quickly installing the highway guardrail comprises two bolts 1 corresponding to guardrail installation holes, and is characterized in that one end of each bolt 1 is fixedly connected with a connecting block 2, the upper surface of the connecting block 2 is fixedly connected with an inverted-V-shaped elastic hook 3, the other end of each elastic hook 3 is fixedly connected with a guide block 4, a nut 5 corresponding to the bolt 1 is connected in the guide block 4 in a rotating manner, and the opening direction of the nut 5 corresponds to the tail end of the bolt 1. During the installation, hang elastic hook 3 in the guardrail top earlier, two bolts 1 correspond with the mounting hole, and link together through connecting block 2, can insert two bolts 1 simultaneously, guide block 4 corresponds with the tail end of bolt 1, make the position of nut 5 correspond with the tail end of bolt 1, the workman can directly rotate nut 5, couple together it with 1 threaded connection of bolt, and two 1 interconnect of bolt, and plug in the mounting hole, in order can not rotate along with nut 5, the workman need not fastening bolt on one side, the screw in spiral shell simultaneously, the convenience of pegging graft has been realized, and is fixed convenient, and the installation efficiency is improved.
As shown in fig. 1, furthermore, the tail end of the bolt 1 is chamfered and corresponds to the opening of the nut 4, so that the tail end of the bolt 1 is easier to be screwed by the nut 4 after the nut 4 is contacted with the bolt 1, and the threads of the nut and the nut can be more easily attached together.
As shown in fig. 3, further, the embedded magnetic path 6 that is equipped with of connecting block 2, magnetic path 6 and external highway guardrail magnetism inhale the setting, because every guardrail erection column often need respectively install a set of bolt 1 at last lower extreme, this design can be after bolt 1 inserts the mounting hole, adsorb on the guardrail automatically, when having avoided installation lower extreme bolt 1, the workman needs the work of manual fixed connection piece 2, and then the workman of being convenient for butt joint nut 4 and bolt 1.
As shown in fig. 3, further, the inner side surface of the connection block 2 is provided with a rubber layer 7, which is designed to prevent corrosion between the guard rail and the bimetal of the connection block, thereby reducing damage to the device.
The working principle is as follows: when installing the rail guard upside, hang elastic hook 3 in the guardrail top earlier, the shift position corresponds two bolts 1 with the mounting hole, can insert the mounting hole simultaneously with two bolts 1, when installing the rail guard downside, bolt 1 inserts behind the mounting hole, magnetic path 6 adsorbs on the guardrail, can fix the position, guide block 4 corresponds with the tail end of bolt 1 this moment, make the position of nut 5 correspond with the tail end of bolt 1, the workman can directly rotate nut 5, couple together it with bolt 1 threaded connection, and two bolt 1 interconnect, and plug in the mounting hole, with bolt 1 can not rotate along with nut 5, the workman need not fasten bolt 1 on one side, screw in nut 5 on one side, the convenience of pegging graft has been realized, and is convenient, and the installation efficiency is improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (4)

1. The utility model provides a fastener is used in quick installation of highway guardrail, includes two bolts (1) that correspond with the guardrail mounting hole, a serial communication port, the one end fixedly connected with connecting block (2) of bolt (1), the last fixed surface of connecting block (2) is connected with elastic hook (3) of the type of falling V, the other end fixedly connected with guide block (4) of elastic hook (3), the internal rotation of guide block (4) is connected with nut (5) that correspond with bolt (1), the opening direction of nut (5) corresponds with the tail end of bolt (1).
2. The fastener for quickly installing the highway guardrail according to claim 1, wherein the tail end of the bolt (1) is chamfered and corresponds to the opening of the nut (5).
3. The fastener for quickly installing the road guardrail as claimed in claim 1, wherein a magnetic block (6) is embedded in the connecting block (2), and the magnetic block (6) is magnetically attracted with the external road guardrail.
4. A fastener for quick installation of a road guardrail according to claim 1, wherein the inner side surface of the connecting block (2) is provided with a rubber layer (7).
CN202221309232.1U 2022-05-26 2022-05-26 Fastener is used in quick installation of highway guardrail Active CN217438788U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221309232.1U CN217438788U (en) 2022-05-26 2022-05-26 Fastener is used in quick installation of highway guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221309232.1U CN217438788U (en) 2022-05-26 2022-05-26 Fastener is used in quick installation of highway guardrail

Publications (1)

Publication Number Publication Date
CN217438788U true CN217438788U (en) 2022-09-16

Family

ID=83222209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221309232.1U Active CN217438788U (en) 2022-05-26 2022-05-26 Fastener is used in quick installation of highway guardrail

Country Status (1)

Country Link
CN (1) CN217438788U (en)

Similar Documents

Publication Publication Date Title
CN217438788U (en) Fastener is used in quick installation of highway guardrail
CN201575234U (en) Hose fixing device
CN108374594A (en) A kind of reinforcing device and method for inner sleeve tower
CN109707044B (en) Anti-vibration type connecting structure for steel structure house
CN218040549U (en) Plugging device of power cable protection pipe
CN107387585A (en) A kind of portable shaft coupling
CN110617371A (en) Automobile pipeline clamp
CN102881742A (en) Press fitting device for solar photovoltaic panel
CN212840124U (en) Pump line protection device
CN212156073U (en) Building engineering water supply pipe fixing device
CN208474612U (en) A kind of easy-to-dismount starting solenoid valve
CN206157907U (en) Antidetonation connecting piece
CN208545993U (en) Building hoist basement top plate returns back to top structure
CN206564384U (en) Jumper plug collection frame is used on a kind of junction box
CN217843056U (en) Movable flange for coal mine underground pipeline conveying system
CN215255564U (en) Simple and easy type well way waterproof construction
CN218274766U (en) Device for fixing water pipe
CN219451964U (en) Waterproof connection structure of flood control baffle
CN218732919U (en) Flexible flange type cable pipeline sealing device
CN215419447U (en) Intelligent coal-winning machine cable protector
CN220151698U (en) Lock bolt group
CN219612341U (en) Battery management system fixing device
CN215635426U (en) Bending elastic pipe clamp
CN215185701U (en) Cable hook for cable laying
CN202888733U (en) Locomotive cable clamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant