CN217427599U - Intensive bus capable of being rapidly inserted - Google Patents

Intensive bus capable of being rapidly inserted Download PDF

Info

Publication number
CN217427599U
CN217427599U CN202122908198.1U CN202122908198U CN217427599U CN 217427599 U CN217427599 U CN 217427599U CN 202122908198 U CN202122908198 U CN 202122908198U CN 217427599 U CN217427599 U CN 217427599U
Authority
CN
China
Prior art keywords
fixing shell
intensive
generating line
set casing
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122908198.1U
Other languages
Chinese (zh)
Inventor
周英杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Kunze Power Engineering Technology Co ltd
Original Assignee
Shaanxi Kunze Power Engineering Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Kunze Power Engineering Technology Co ltd filed Critical Shaanxi Kunze Power Engineering Technology Co ltd
Priority to CN202122908198.1U priority Critical patent/CN217427599U/en
Application granted granted Critical
Publication of CN217427599U publication Critical patent/CN217427599U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Abstract

The utility model relates to the technical field of power equipment, and an intensive generating line that can peg graft fast is disclosed, including the generating line body, connect and the connection piece, connect the fixed both ends that set up at the generating line body, connect and constitute for multi-disc parallel arrangement's inserted sheet, the connection piece is located between two adjacent inserted sheets, the fixed first set casing that is equipped with in generating line body left end, the fixed second set casing that is equipped with of right-hand member of generating line body, it is located the inside of first set casing and second set casing to connect, the fixed two inserted bars that are equipped with of right-hand member of first set casing, two and inserted bar assorted slots have been seted up to the left end of second set casing lateral wall, be equipped with buckle mechanism in the slot, first set casing and second set casing all are through first bolt and nut and a plurality of inserted sheets and connection piece fastening connection. The utility model discloses intensive generating line can peg graft fast promotes the installation effectiveness of generating line.

Description

Intensive bus capable of being rapidly inserted
Technical Field
The utility model relates to a power equipment technical field especially relates to an intensive generating line that can peg graft fast.
Background
The plug-in bus is also called as an intensive bus, is a power distribution device for efficiently transmitting current, is suitable for power supply and distribution system engineering of three-phase four-wire and three-phase five-wire systems with the alternating current of 50Hz, the rated voltage of 380V and the rated current of 250A-4000A, and is particularly suitable for the requirements of higher and higher buildings and large-scale factory economic and reasonable wiring because of the advantages of convenient maintenance, strong overload capacity, good heat dissipation performance and the like.
Intensive bus often need be pegged graft to it and cooperate the use when the in-service use, but current intensive bus is comparatively complicated in the aspect of pegging graft, needs the cooperation of a plurality of people jointly just can accomplish, only wastes time and energy, provides an intensive bus that can peg graft fast for this.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the current intensive generating line among the prior art and comparatively complicated in the aspect of pegging graft, need the common cooperation of a plurality of people just can accomplish, only the problem that wastes time and energy, and the intensive generating line that can peg graft fast that provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an intensive generating line that can peg graft fast, includes generating line body, joint and connection piece, its characterized in that, the joint is fixed to be set up at the both ends of generating line body, the joint comprises for the inserted sheet of multi-disc parallel arrangement, the connection piece is located between two adjacent inserted sheets, the generating line body left end is fixed and is equipped with first set casing, the fixed second set casing that is equipped with of right-hand member of generating line body, the joint is located the inside of first set casing and second set casing, the fixed two inserted bars that are equipped with of right-hand member of first set casing, two and inserted bar assorted slots have been seted up to the left end of second set casing lateral wall, be equipped with buckle mechanism in the slot, first set casing and second set casing all are through first bolt and nut and a plurality of inserted sheets and connection piece fastening connection.
Preferably, buckle mechanism includes fixture block, spring and fixed block, spacing hole has all been seted up on the inner wall of slot and the pole wall of inserted bar, the fixed block is located two one side that spacing hole was carried on the back mutually, the spring is fixed to be set up between fixed block and second set casing, the one end of fixture block is fixed to be set up on the fixed block, the other end of fixture block run through spring and spacing hole and with the inner wall sliding connection in spacing hole.
Preferably, a handle is fixedly arranged at the upper end of the fixing block.
Preferably, the left side of the clamping block at one end of the limiting hole is provided with an arc surface.
Preferably, the opening at the left end of the slot is arranged on a circular table top.
Preferably, the opposite ends of the two adjacent inserting pieces are fixedly provided with a lug for limiting the connecting piece.
Preferably, the upper ends of the first and second fixing cases are fixedly connected with a cover plate through a second bolt.
Compared with the prior art, the utility model provides a can peg graft intensive generating line fast possesses following beneficial effect:
1. this intensive generating line that can peg graft fast blocks the inserted bar through buckle mechanism's fixture block, realizes earlier tentatively fixing and fixing a position two this intensive generating lines, makes the staff can loosen this intensive generating line earlier, carries out other installation operation, not only more convenient quick installation, has still reduced the manual work.
2. This intensive generating line that can peg graft fast is through first bolt and nut with a plurality of connection pieces and joint respectively with first set casing and second set casing fastening connection, and first bolt is spacing to the inserted bar equally to fastening connectivity between this intensive generating line has been strengthened.
3. This intensive generating line that can peg graft fast, through the second bolt with whole apron fastening installation in the upper end of first fixed shell and the fixed shell of second, not only effectively protected connection piece and joint, through the wholeness of apron, further strengthened the fastening connectivity between this intensive generating line.
The part that does not relate to in the device all is the same with prior art or can adopt prior art to realize, the utility model discloses intensive generating line can peg graft fast promotes the installation effectiveness of generating line.
Drawings
Fig. 1 is a schematic top view of an intensive bus capable of being quickly plugged according to the present invention;
FIG. 2 is an enlarged view of a portion A of FIG. 1;
FIG. 3 is an enlarged view of a portion B of FIG. 2;
fig. 4 is a schematic front view of the intensive bus capable of being rapidly plugged.
In the figure: the bus bar comprises a bus bar body 1, a joint 2, a first fixing shell 3, a second fixing shell 4, a connecting piece 5, a protruding block 6, an inserting rod 7, a first bolt 8, a nut 9, a second bolt 10, a cover plate 11, a clamping block 12, a spring 13, a fixing block 14, a handle 15 and an inserting piece 16.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-4, an intensive bus capable of being quickly plugged comprises a bus body 1, a connector 2 and a connecting sheet 5, wherein the connector 2 is fixedly arranged at two ends of the bus body 1, the connector 2 is composed of a plurality of plugging sheets 16 arranged in parallel, the connecting sheet 5 is arranged between two adjacent plugging sheets 16, a first fixing shell 3 is fixedly arranged at the left end of the bus body 1, a second fixing shell 4 is fixedly arranged at the right end of the bus body 1, the connector 2 is arranged inside the first fixing shell 3 and the second fixing shell 4, two plugging rods 7 are fixedly arranged at the right end of the first fixing shell 3, two slots matched with the plugging rods 7 are arranged at the left end of the side wall of the second fixing shell 4, the opening at the left end of each slot is a circular table surface, the plugging rods 7 can be conveniently inserted into the slots, a buckling mechanism is arranged in the slots, the first fixing shell 3 and the second fixing shell 4 are fixedly connected with the plugging sheets 16 and the connecting sheet 5 through a first bolt 8 and a nut 9, the lug 6 used for limiting the connecting piece 5 is fixedly arranged at one end, opposite to the two adjacent inserting pieces 16, so that the connecting piece 5 can be conveniently put in, and the upper ends of the first fixing shell 3 and the second fixing shell 4 are fixedly connected with the cover plate 11 through the second bolt 10.
Buckle mechanism includes fixture block 12, spring 13 and fixed block 14, spacing hole has all been seted up on the inner wall of slot and the pole wall of inserted bar 7, fixed block 14 is located two one sides that spacing hole was carried on the back mutually, spring 13 is fixed to be set up between fixed block 14 and second set casing 4, the fixed setting of one end of fixture block 12 is on fixed block 14, the other end of fixture block 12 run through spring 13 and spacing hole and with the inner wall sliding connection in spacing hole, the fixed handle 15 that is equipped with in upper end of fixed block 14, the left side that fixture block 12 is located spacing hole one end is the cambered surface setting, make inserted bar 7 can insert the slot smoothly.
In the utility model, when in actual use, the worker adjusts the first fixing shell 3 and the second fixing shell 4 of the intensive bus to be spliced into opposite ends, inserts the inserted bar 7 into the slot, blocks the inserted bar 7 through the fixture block 12 of the buckle mechanism, realizes the preliminary fixing and positioning of the two intensive buses, at the moment, the worker can loosen the intensive bus, then puts the connecting piece 5 between the inserting pieces 16, after the putting is completed, the worker fastens the connecting pieces 5 and the joint 2 with the first fixing shell 3 and the second fixing shell 4 respectively through the first bolt 8 and the nut 9, and the first bolt 8 also limits the inserted bar 7, thereby strengthening the fastening connectivity between the intensive buses, after the first bolt 8 and the nut 9 are installed, the whole cover plate 11 is fastened and installed at the upper ends of the first fixing shell 3 and the second fixing shell 4 through the second bolt 10, not only effectively protect connecting piece 5 and joint 2, through the wholeness of apron 11, further strengthened the fastening connectivity between this intensive generating line.
The above, only be the embodiment of the preferred of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, which are designed to be replaced or changed equally, all should be covered within the protection scope of the present invention.

Claims (7)

1. An intensive bus capable of being quickly plugged comprises a bus body (1), a connector (2) and a connecting piece (5), and is characterized in that the connector (2) is fixedly arranged at two ends of the bus body (1), the connector (2) is composed of a plurality of plugging pieces (16) which are arranged in parallel, the connecting piece (5) is positioned between two adjacent plugging pieces (16), a first fixing shell (3) is fixedly arranged at the left end of the bus body (1), a second fixing shell (4) is fixedly arranged at the right end of the bus body (1), the connector (2) is positioned inside the first fixing shell (3) and the second fixing shell (4), two plugging rods (7) are fixedly arranged at the right end of the first fixing shell (3), two slots matched with the plugging rods (7) are formed at the left end of the side wall of the second fixing shell (4), and a buckle mechanism is arranged in each slot, the first fixing shell (3) and the second fixing shell (4) are fixedly connected with the plurality of inserting sheets (16) and the connecting sheets (5) through first bolts (8) and nuts (9).
2. The intensive bus bar capable of being rapidly plugged according to claim 1, wherein the clamping mechanism comprises a clamping block (12), a spring (13) and a fixing block (14), the inner wall of the slot and the rod wall of the inserted rod (7) are respectively provided with a limiting hole, the fixing block (14) is positioned on one side of the two limiting holes, the spring (13) is fixedly arranged between the fixing block (14) and the second fixing shell (4), one end of the clamping block (12) is fixedly arranged on the fixing block (14), and the other end of the clamping block (12) penetrates through the spring (13) and the limiting holes and is slidably connected with the inner wall of the limiting hole.
3. The bus bar capable of being quickly plugged according to claim 2, wherein a handle (15) is fixedly arranged at the upper end of the fixing block (14).
4. The intensive bus bar capable of being quickly plugged according to claim 2, wherein the left side of the fixture block (12) at one end of the limiting hole is provided with an arc surface.
5. The intensive bus bar capable of being quickly plugged according to claim 1, wherein the opening at the left end of the slot is arranged on a circular table surface.
6. The bus bar capable of being quickly plugged and connected in an intensive manner according to claim 1, wherein the opposite ends of two adjacent plugging pieces (16) are fixedly provided with a bump (6) for limiting the connecting piece (5).
7. The fast-plugging intensive bus bar according to claim 1, wherein the upper ends of the first fixing shell (3) and the second fixing shell (4) are tightly connected with a cover plate (11) through a second bolt (10).
CN202122908198.1U 2021-11-24 2021-11-24 Intensive bus capable of being rapidly inserted Active CN217427599U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122908198.1U CN217427599U (en) 2021-11-24 2021-11-24 Intensive bus capable of being rapidly inserted

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122908198.1U CN217427599U (en) 2021-11-24 2021-11-24 Intensive bus capable of being rapidly inserted

Publications (1)

Publication Number Publication Date
CN217427599U true CN217427599U (en) 2022-09-13

Family

ID=83170290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122908198.1U Active CN217427599U (en) 2021-11-24 2021-11-24 Intensive bus capable of being rapidly inserted

Country Status (1)

Country Link
CN (1) CN217427599U (en)

Similar Documents

Publication Publication Date Title
CN217427599U (en) Intensive bus capable of being rapidly inserted
CN215580275U (en) Novel distribution network frame wiring structure
CN211045981U (en) Power distribution cabinet power equipment installation frame with wire collection function
CN215301291U (en) Underwater uncontrolled rectification power supply system
CN206060114U (en) It is a kind of to be easy to fixed bus duct
CN201629516U (en) Three-connected extension-resisting clamp for extra HVDC transmission line
CN214153644U (en) Easily install assembled high-voltage board
CN205070175U (en) Upper and lower split type generating line fixed structure
CN107171121A (en) A kind of special power distribution cabinet power supply module
CN210041084U (en) Drawer type power distribution cabinet
CN210577664U (en) T-shaped cable clamp convenient to mount and dismount
CN210041238U (en) Hanging bracket for laying bus duct
CN210088404U (en) Handheld quick-witted fixing device of ammeter
CN209730755U (en) A kind of plug-in type epoxy coating bus duct adaptation connection row
CN215816453U (en) Interface anti-drop's undercurrent earthing device
CN217281414U (en) Mobile energy storage emergency power supply quick access device
CN220629196U (en) Rectifying input copper bar plate for high voltage
CN2091498U (en) Multi-functional safety ground rod
CN218788603U (en) Novel subway low-voltage cabinet transition mechanism
CN216121232U (en) Control protection plate for mounting high-voltage power supply system
CN220347265U (en) Auxiliary tool for on-line drilling of bus in bus duct
CN212462711U (en) Connecting structure of low-voltage bus duct
CN214478708U (en) Direct current screen electronic components installation fixed equipment
CN211439191U (en) Bus waste assembly recovery processing device with high stability
CN214124335U (en) Lighting power distribution cabinet convenient to disassemble and assemble

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant