CN217424383U - Pre-buried device of settlement observation point - Google Patents

Pre-buried device of settlement observation point Download PDF

Info

Publication number
CN217424383U
CN217424383U CN202220770856.7U CN202220770856U CN217424383U CN 217424383 U CN217424383 U CN 217424383U CN 202220770856 U CN202220770856 U CN 202220770856U CN 217424383 U CN217424383 U CN 217424383U
Authority
CN
China
Prior art keywords
observation
frame structure
plate
frame
plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220770856.7U
Other languages
Chinese (zh)
Inventor
杨琪
范士凯
鲁文军
吕东轩
颜极伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Railway Investment Construction Group Co Ltd
Original Assignee
China State Railway Investment Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Railway Investment Construction Group Co Ltd filed Critical China State Railway Investment Construction Group Co Ltd
Priority to CN202220770856.7U priority Critical patent/CN217424383U/en
Application granted granted Critical
Publication of CN217424383U publication Critical patent/CN217424383U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Length-Measuring Instruments Using Mechanical Means (AREA)

Abstract

The utility model provides a settlement observation point pre-embedding device, which comprises an observation wall body, a filling reference block, a thread nesting, an L-shaped observation rod, a sealing end cover, a level ruler fixing frame structure, a scale positioning frame structure, a thread locking ring, a detachable protection frame structure and a raised baffle plate, wherein the filling reference block is poured on the right side inside the observation wall body; the threads are nested and poured at the right lower part of the inner side of the filling reference block; the lower part of the left side of the L-shaped observation rod is in threaded connection with the thread nesting sleeve; and the sealing end cover is connected to the lower part of the right side of the observation wall body through a screw. The utility model discloses the setting of cavity connecting frame and intercommunication spout is favorable to fixing the level bar, does not need the staff to hold by hand the level bar, reduces the intensity of labour who observes time measuring.

Description

Pre-buried device of settlement observation point
Technical Field
The utility model belongs to the technical field of subside the observation, especially, relate to a subside observation point pre-buried device.
Background
The settlement observation is that observation is carried out according to observation points arranged on the building and measurement points fixed (permanent level points), the settlement degree is measured and expressed by data, the observation points are arranged according to the design requirements of more than one layer of buildings and structures, and the settlement observation is arranged on manual work, soil foundations (sand foundations) and the like, the observation is carried out according to the schedule or the progress of the layer until the completion of the construction, the construction of the engineering building changes the original state of the ground, and a certain pressure is applied to the foundations of the buildings, so that the deformation of the foundations and the surrounding strata can be caused inevitably. In order to ensure the normal service life and safety of the building and provide reliable data and corresponding settlement parameters for future exploration, design and construction.
However, the existing embedded structure of the settlement observation point and the embedded device of the settlement observation point also have the problems that the leveling rod needs to be supported by hands of workers, the leveling rod cannot be positioned, and the exposed part is easily corroded by rainwater.
Therefore, the invention of the pre-burying device for the settlement observation point is very necessary.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a subside observation point pre-buried device, wherein the utility model discloses a can realize through following technical scheme:
a settlement observation point pre-embedding device comprises an observation wall body, a filling reference block, a thread nesting sleeve, an L-shaped observation rod, a sealing end cover, a level ruler fixing frame structure, a scale positioning frame structure, a thread locking ring, a conveniently-disassembled protection frame structure and a raised baffle, wherein the filling reference block is poured on the right side inside the observation wall body; the threads are nested and poured at the right lower part of the inner side of the filling reference block; the lower part of the left side of the L-shaped observation rod is in threaded connection with the thread nesting sleeve; the sealing end cover is connected to the lower part of the right side of the observation wall body through a screw; the level ruler fixing frame structure is arranged on the upper part of the right side of the sealing end cover; the scale positioning frame structure is arranged on the inner side of the level ruler fixing frame structure; the threaded locking ring is in threaded connection with the outer side of the L-shaped observation rod; the easy-to-dismount protection frame structure is arranged on the right side of the outer part of the sealing end cover; the raised baffle plates are respectively and integrally arranged at the four corners of the right side of the sealing end cover.
Preferably, the left side of the L-shaped observation rod penetrates through the inner side of the sealing end cover, and the left side of the threaded locking ring is tightly attached to the right side of the sealing end cover.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses in, the setting of cavity connecting frame and intercommunication spout, be favorable to fixing the level bar, do not need the staff to hold by hand the level bar, reduce the intensity of labour who observes time measuring.
2. The utility model discloses in, rectangle picture peg, side connecting plate and connection slot's setting, be favorable to being convenient for fix the cavity connecting frame on end cover's right side upper portion, the convenience is maintained after dismantling the cavity connecting frame simultaneously.
3. The utility model discloses in, the setting of triangle locating rack, be favorable to carrying out the location support to the left side of cavity connecting frame, guarantee that the lower part of cavity connecting frame sets up with end cover's right side is perpendicular.
4. The utility model discloses in, side locking plate and positioning groove's setting, be favorable to carrying out the centre gripping to the level bar, fix the level bar in positioning groove's inboard, prevent the upper portion left and right rocking of level bar.
5. The utility model discloses in, the setting of screw thread linkage board and double entry threaded rod, be favorable to the double entry screw thread transmission of constituteing through screw thread linkage board and double entry threaded rod, make the side locking board of the left and right sides remove simultaneously, fix a position the level bar.
6. The utility model discloses in, end fixing plate and rotating motor's setting, be favorable to fixing the double entry threaded rod to rotating motor drives double entry threaded rod autogiration.
7. The utility model discloses in, stainless steel protecting crust, slope rain cover and transparent observation window's setting, be favorable to protecting L type observation pole and end cover respectively, prevent that L type observation pole and end cover from being influenced by the wind and rain for a long time and appearing damaging.
8. The utility model discloses in, the setting of installation through-hole, rubber seal frame and protruding baffle, be favorable to fixing the outside at end cover with the stainless steel protecting crust to seal up the gap between stainless steel protecting crust and the observation wall body.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic structural view of the structure of the level bar fixing frame of the present invention.
Fig. 3 is a schematic structural view of the scale positioning frame structure of the present invention.
Fig. 4 is a schematic structural view of the protective frame structure convenient to disassemble.
In the figure:
1. observing the wall body; 2. filling a reference block; 3. nesting threads; 4. an L-shaped observation rod; 5. Sealing the end cap; 6. a level bar fixing frame structure; 61. a hollow connecting frame; 62. the connecting chute; 63. a triangular positioning frame; 64. a rectangular plug board; 65. a side connecting plate; 66. connecting the slots; 7. a scale positioning frame structure; 71. a side locking plate; 72. a positioning groove; 73. a threaded linkage plate; 74. a compound threaded rod; 75. an end fixing plate; 76. a rotary motor; 8. a threaded locking ring; 9. the protective frame structure is convenient to disassemble; 91. a stainless steel protective shell; 92. tilting the rain cover; 93. a transparent viewing window; 94. mounting a through hole; 95. a rubber sealing frame; 10. and (4) a raised baffle.
Detailed Description
The invention is further described below with reference to the accompanying drawings:
example (b):
as shown in fig. 1 and 2, the settlement observation point pre-embedding device comprises an observation wall body 1, a filling reference block 2, a thread nesting 3, an L-shaped observation rod 4, a sealing end cover 5, a level ruler fixing frame structure 6, a scale positioning frame structure 7, a thread locking ring 8, a conveniently-disassembled protective frame structure 9 and a protruding baffle 10, wherein the filling reference block 2 is poured on the right side inside the observation wall body 1; the thread insert 3 is poured at the right lower part of the inner side of the filling reference block 2; the lower part of the left side of the L-shaped observation rod 4 is in threaded connection with the threaded nest 3; the sealing end cover 5 is connected to the lower part of the right side of the observation wall body 1 through screws; the level ruler fixing frame structure 6 is arranged at the upper part of the right side of the sealing end cover 5; the scale positioning frame structure 7 is arranged on the inner side of the level ruler fixing frame structure 6; the threaded locking ring 8 is in threaded connection with the outer side of the L-shaped observation rod 4; the easy-to-dismount protection frame structure 9 is arranged on the right side of the outer part of the sealing end cover 5; the raised baffle plates 10 are respectively and integrally arranged at the four corners of the right side of the sealing end cover 5; the level ruler fixing frame structure 6 comprises a hollow connecting frame 61, a communicating sliding groove 62, a triangular positioning frame 63, a rectangular inserting plate 64, a side connecting plate 65 and a connecting slot 66, wherein the communicating sliding groove 62 is respectively arranged at the front end and the rear end of the inner side of the hollow connecting frame 61; the triangular positioning frames 63 are respectively and integrally arranged at the front end and the rear end of the left lower part of the hollow connecting frame 61; the rectangular inserting plates 64 are respectively and integrally arranged at the front end and the rear end of the left side of the hollow connecting frame 61; the side connecting plates 65 are respectively arranged at the front end and the rear end of the left side of the hollow connecting frame 61; the connecting slot 66 is formed in one side of the side connecting plate 65 close to the hollow connecting frame 61; the hollow connecting frame 61 is placed inside the side connecting plate 65, and the rectangular inserting plate 64 on the left side of the hollow connecting frame 61 is inserted inside the connecting slot 66, and the left side of the triangular positioning frame 63 is tightly pressed against the right side of the sealing end cover 5.
As shown in fig. 3, in the above embodiment, specifically, the scale positioning frame structure 7 includes two side locking plates 71, two positioning grooves 72, a thread linkage plate 73, a compound threaded rod 74, an end fixing plate 75 and a rotating motor 76, where the two side locking plates 71 are symmetrically arranged on the left and right sides inside the thread linkage plate 73; the positioning groove 72 is formed in the inner side of the side locking plate 71; the thread linkage plates 73 are respectively bolted at the front end and the rear end of the side locking plate 71; the compound threaded rod 74 is in threaded connection with the inner side of the thread linkage plate 73; the end fixing plates 75 are respectively coupled to the left and right sides of the compound threaded rod 74; the rotary motor 76 is connected to the right side of the end fixing plate 75 through bolts; the rotary motor 76 drives the compound threaded rod 74 to rotate, and the compound threaded rod 74 and the threaded linkage plate 73 are matched with each other to drive the side locking plates 71 on the left side and the right side to approach each other, so that the lower part of the level is clamped.
As shown in fig. 4, in the above embodiment, specifically, the easy-to-detach protection frame structure 9 includes a stainless steel protection shell 91, an inclined rain-shielding cover 92, a transparent observation window 93, a mounting through hole 94 and a rubber sealing frame 95, wherein the inclined rain-shielding cover 92 is hinged to the upper portion of the stainless steel protection shell 91; the transparent observation window 93 is embedded in the right side of the stainless steel protective shell 91; the mounting through hole 94 is formed in the left side of the inside of the stainless steel protective shell 91; the rubber sealing frame 95 is glued to the left side of the stainless steel protective shell 91; the stainless steel protecting shell 91 and the inclined rain-shielding cover 92 can prevent sandstorm and rainwater from contacting the L-shaped observation rod 4, and the rubber sealing frame 95 seals the gap between the stainless steel protecting shell 91 and the observation wall 1.
In the above embodiment, specifically, the left side of the side connecting plate 65 is bolted to the upper right side of the end cover 5.
In the above embodiment, specifically, the rectangular inserting plate 64 is inserted into the inner side of the connecting slot 66, so as to facilitate quick assembly and disassembly of the connecting position.
In the above embodiment, specifically, the triangular positioning frame 63 is disposed on the upper portion of the L-shaped observation rod 4, so as to ensure that the hollow connecting frame 61 and the end cap 5 are disposed perpendicular to each other.
In the above embodiment, specifically, the left side of the triangular positioning frame 63 is tightly attached to the right side of the sealing end cap 5.
In the above embodiment, specifically, the side locking plates 71 are respectively inserted into the left and right sides of the inside of the hollow connecting frame 61 to clamp the level.
In the above embodiment, specifically, the screw linkage plate 73 penetrates through the inner side of the communicating chute 62 to drive the side locking plate 71 on the inner side of the hollow connecting frame 61 to move.
In the above embodiment, specifically, the multiple threaded rods 74 are respectively disposed at the front and rear ends of the hollow connection frame 61, so as to ensure that the side locking plates 71 at the left and right sides move simultaneously.
In the above embodiment, specifically, the two end fixing plates 75 are respectively welded to the front and rear ends of the hollow connecting frame 61 as a group.
In the above embodiment, specifically, the output shaft of the rotary motor 76 is connected to the right screw of the multiple screw rod 74 through the end fixing plate 75.
In the above embodiment, specifically, the stainless steel protective shell 91 is sleeved on the right side of the outside of the end cover 5.
In the above embodiment, specifically, the raised baffles 10 are respectively clamped at four corners of the left side inside the stainless steel protective shell 91.
In the above embodiment, specifically, the left side of the rubber sealing frame 95 is closely attached to the right side of the observation wall 1.
In the above embodiment, specifically, the right side of the inclined rain cover 92 is inclined toward the lower right.
Principle of operation
In the utility model, when in use, the inclined rain cover 92 is opened, the hollow connecting frame 61 is firstly placed at the inner side of the side connecting plate 65, the left rectangular inserting plate 64 of the hollow connecting frame 61 is inserted at the inner side of the connecting slot 66, the left side of the triangular positioning frame 63 is tightly propped against the right side of the sealing end cover 5, then the level bar is inserted at the inner side of the hollow connecting frame 61, the portable external power supply is utilized to supply power to the rotating motor 76, the rotating motor 76 drives the compound threaded rod 74 to rotate, the compound threaded rod 74 and the thread linkage plate 73 are matched with each other to drive the side locking plates 71 at the left side and the right side to be close to each other, the lower part of the level bar is clamped, the lower part of the level bar is ensured to be attached to the upper right part of the L-shaped observation rod 4, the stainless steel protecting shell 91 and the inclined rain cover 92 can prevent sand and rainwater from contacting with the L-shaped observation rod 4, the rubber sealing frame 95 seals the gap between the stainless steel protecting shell 91 and the observation wall body 1, further preventing rain water from entering.
Utilize technical scheme, or technical personnel in the field are in the utility model discloses under technical scheme's the inspiration, design similar technical scheme, and reach above-mentioned technological effect, all fall into the utility model discloses a protection scope.

Claims (6)

1. The pre-buried device of the settlement observation point is characterized by comprising an observation wall body (1), a filling reference block (2), a thread nest (3), an L-shaped observation rod (4), a sealing end cover (5), a level bar fixing frame structure (6), a scale positioning frame structure (7), a thread locking ring (8), a conveniently-disassembled protective frame structure (9) and a protruding baffle plate (10), wherein the filling reference block (2) is poured on the right side of the inside of the observation wall body (1); the thread insert (3) is poured at the right lower part of the inner side of the filling reference block (2); the lower part of the left side of the L-shaped observation rod (4) is in threaded connection with the threaded nest (3); the sealing end cover (5) is connected to the lower part of the right side of the observation wall body (1) through screws; the horizontal ruler fixing frame structure (6) is arranged on the upper part of the right side of the sealing end cover (5); the scale positioning frame structure (7) is arranged on the inner side of the level ruler fixing frame structure (6); the threaded locking ring (8) is in threaded connection with the outer side of the L-shaped observation rod (4); the conveniently-disassembled protective frame structure (9) is arranged on the right side of the outer part of the sealing end cover (5); the raised baffle plates (10) are respectively and integrally arranged at the four corners of the right side of the sealing end cover (5); the horizontal ruler fixing frame structure (6) comprises a hollow connecting frame (61), a communicating sliding groove (62), a triangular positioning frame (63), a rectangular inserting plate (64), a side connecting plate (65) and a connecting slot (66), wherein the communicating sliding groove (62) is respectively formed in the front end and the rear end of the inner side of the hollow connecting frame (61); the triangular positioning frames (63) are respectively and integrally arranged at the front end and the rear end of the left lower part of the hollow connecting frame (61); the rectangular inserting plates (64) are respectively and integrally arranged at the front end and the rear end of the left side of the hollow connecting frame (61); the side connecting plates (65) are respectively arranged at the front end and the rear end of the left side of the hollow connecting frame (61); the connecting slot (66) is arranged on one side of the side connecting plate (65) close to the hollow connecting frame (61).
2. The pre-embedding device for the settlement observation points as claimed in claim 1, wherein the scale positioning frame structure (7) comprises two side locking plates (71), two positioning grooves (72), two threaded linkage plates (73), a compound threaded rod (74), two end fixing plates (75) and a rotating motor (76), wherein the two side locking plates (71) are symmetrically arranged at the left side and the right side of the interior of the threaded linkage plate (73); the positioning groove (72) is formed in the inner side of the side locking plate (71); the thread linkage plates (73) are respectively bolted at the front end and the rear end of the side locking plate (71); the compound threaded rod (74) is in threaded connection with the inner side of the threaded linkage plate (73); the end fixing plates (75) are respectively connected to the left side and the right side of the compound threaded rod (74) in a shaft mode; the rotary motor (76) is connected to the right side of the end fixing plate (75) through bolts.
3. The pre-buried device of settlement observation point of claim 1, wherein the removable protective frame structure (9) comprises a stainless steel protective shell (91), an inclined rain-shielding cover (92), a transparent observation window (93), an installation through hole (94) and a rubber sealing frame (95), wherein the inclined rain-shielding cover (92) is hinged on the upper part of the stainless steel protective shell (91); the transparent observation window (93) is embedded in the right side of the inside of the stainless steel protective shell (91); the mounting through hole (94) is formed in the left side of the inside of the stainless steel protective shell (91); the rubber sealing frame (95) is glued to the left side of the stainless steel protective shell (91).
4. The embedded device for the settlement observation points as claimed in claim 1, wherein the left side of the side connecting plate (65) is connected with the upper part of the right side of the sealing end cover (5) through bolts, and the rectangular inserting plate (64) is inserted into the inner side of the connecting slot (66).
5. The pre-buried device of settlement observation point of claim 1, wherein the triangular positioning frame (63) is arranged on the upper portion of the L-shaped observation rod (4), and the left side of the triangular positioning frame (63) is closely attached to the right side of the sealing end cover (5).
6. The embedded device of the settlement observation point as claimed in claim 2, wherein the side locking plates (71) are respectively inserted into the left and right sides of the hollow connecting frame (61), and the screw linkage plate (73) penetrates through the inner side of the communicating sliding groove (62).
CN202220770856.7U 2022-04-02 2022-04-02 Pre-buried device of settlement observation point Expired - Fee Related CN217424383U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220770856.7U CN217424383U (en) 2022-04-02 2022-04-02 Pre-buried device of settlement observation point

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220770856.7U CN217424383U (en) 2022-04-02 2022-04-02 Pre-buried device of settlement observation point

Publications (1)

Publication Number Publication Date
CN217424383U true CN217424383U (en) 2022-09-13

Family

ID=83180196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220770856.7U Expired - Fee Related CN217424383U (en) 2022-04-02 2022-04-02 Pre-buried device of settlement observation point

Country Status (1)

Country Link
CN (1) CN217424383U (en)

Similar Documents

Publication Publication Date Title
CN214116738U (en) Foundation pit deformation automatic monitoring device
CN217424383U (en) Pre-buried device of settlement observation point
CN211668508U (en) Total station
CN216158672U (en) Building engineering quality flatness detection device
CN212300283U (en) Flatness detection equipment for building worker detection
CN211373588U (en) Bridge detection device
CN211006610U (en) Real-time monitoring system for deep foundation pit
CN210127031U (en) Device for monitoring perpendicularity of tower crane in real time
CN213233492U (en) Safety protection device for excavation of building deep foundation pit
CN219390922U (en) Balance ruler with double-end anti-drop structure
CN211060895U (en) Building engineering surveyor's level
CN221100751U (en) Rock and soil crack detection positioning device
CN219319398U (en) Connecting and protecting device for static level
CN220818965U (en) Uneven settlement observation device for fan foundation
CN213629605U (en) Measuring device for construction engineering cost budget
CN221215069U (en) Site survey device for urban planning
CN216042691U (en) Concrete grouting machine
CN220903081U (en) Integrated comprehensive water quality detection device
CN220132962U (en) Municipal road inspection shaft prevents subsiding construction equipment
CN211949779U (en) Remove board house convenient to dismantle
CN220649680U (en) Water level measurement auxiliary device
CN213979083U (en) Foundation ditch support inclination measuring apparatu for engineering cost
CN220871753U (en) Straightness detection device hangs down
CN215596979U (en) Wall-attached type verticality measuring base
CN216620920U (en) Soil and water conservation monitoring devices

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220913