CN217422929U - Quick drainage device of gas bomb - Google Patents
Quick drainage device of gas bomb Download PDFInfo
- Publication number
- CN217422929U CN217422929U CN202220298321.4U CN202220298321U CN217422929U CN 217422929 U CN217422929 U CN 217422929U CN 202220298321 U CN202220298321 U CN 202220298321U CN 217422929 U CN217422929 U CN 217422929U
- Authority
- CN
- China
- Prior art keywords
- gas
- drainage device
- base
- gas bomb
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The utility model relates to a gas bomb quick drainage device, a quick drainage device body comprises a drainage device, a fixed seat is arranged at the bottom of the drainage device, an embedded installation base is embedded in the fixed seat, a vertically installed gas bomb installation seat is arranged at the upper end of the base and is connected with the fixed seat in an embedded manner, a storage bin is arranged in the gas bomb installation seat, and an arc contraction port at the bottom of the storage bin corresponds to and is communicated with a through hole outlet position in the middle of the base; the through-hole that the outside circumference of center run through is established to the connection face of base and gas bomb mount pad, gets into storage facility and from the lower and upright extension after the trachea transversely gets into the through-hole, tracheal outer port and pressure gas's air supply unit intercommunication, the utility model discloses in putting into drainage device's storage facility down the gas storage bottleneck, the trachea stretches into inside the gas bomb, and the compressed air who gets into with the trachea is as drive gas, says that outside the inside water of gas bomb extrudes the gas bomb in the twinkling of an eye, has improved the speed of drainage greatly to can clean up the water in the gas bomb completely.
Description
Technical Field
The utility model relates to a quick drainage device of gas bomb.
Background
As shown in fig. 4, the gas cylinder 001 needs to be internally filled with water to test the leakage and strength of the gas cylinder 001 in a state that high-pressure water is used as a medium, after the water pressure test is completed, the opening of the gas cylinder 001 needs to be turned downwards, and the gas cylinder 001 is inverted in a discharge tank to automatically flow out the water in the gas cylinder 001; similar approaches are conventional and traditional, but have inevitable drawbacks: due to the structure limitation of the gas storage bottle 001, the inner volume of the bottle body is large, the bottle mouth is small, and when the bottle is inverted to drain water, external air is not easy to enter a filling space, so that the gas storage bottle drains water slowly; secondly, even after the water in the gas bomb 001 automatically flows downwards, the water drops adhered to the inner wall of the gas bomb 001 cannot be naturally drained in a short time.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problems, the quick drainage device body comprises a drainage device, a fixed seat is arranged at the bottom of the drainage device, an embedded installation base is embedded in the fixed seat, a vertically installed gas cylinder installation seat is arranged at the upper end of the base and is connected with the fixed seat in an embedded manner, a storage bin is arranged in the gas cylinder installation seat, and an arc contraction port at the bottom of the storage bin corresponds to and is communicated with the outlet position of a through hole in the middle of the base; the through-hole that the outside circumference of center run through is established to the connection face of base and gas bomb mount pad, gets into storage facility and from the lower and upright extension after the trachea transversely gets into the through-hole, tracheal outer port and pressure gas's air supply unit intercommunication, the utility model discloses in putting into drainage device's storage facility down the gas storage bottleneck, the trachea stretches into inside the gas bomb, and the compressed air who gets into with the trachea is as drive gas, says that outside the inside water of gas bomb extrudes the gas bomb in the twinkling of an eye, has improved the speed of drainage greatly to can clean up the water in the gas bomb completely.
The utility model discloses a gas bomb quick drainage device, which comprises a quick drainage device body, wherein the quick drainage device body comprises a drainage device, a fixed seat is arranged at the bottom of the drainage device, and a base which is embedded and combined from top to bottom is arranged in the fixed seat;
the upper end of the base is provided with a vertically installed gas cylinder installation seat, the lower end of the gas cylinder installation seat is connected with the fixed seat in an embedded mode, a storage bin is arranged in the gas cylinder installation seat, and an arc contraction port at the bottom of the storage bin corresponds to and is communicated with the outlet of the through hole in the middle of the base;
a through hole with a center penetrating to the outer circumference is formed in the connecting surface of the base and the gas storage bottle mounting seat, and the gas pipe transversely enters the through hole, then enters the storage bin and vertically extends from bottom to top;
the outer port of the air pipe is communicated with the air supply device.
The air pipe is connected with the arc contraction opening and the outlet end of the outer circumference of the base in an enclosing mode through a supporting seat, and the supporting seat is connected with the arc contraction opening and the outlet end of the outer circumference of the base in an embedded mode through a through hole.
Further setting, the shape of containing storehouse matches with the appearance of gas bomb.
Further setting, the height of trachea upper end is not higher than storage facility.
The air pipe can be further provided with a one-way valve between the supporting seat and the air supply device, and the one-way valve is opened in one way after the air supply device outputs the air.
The utility model has the advantages that:
the utility model discloses in putting into drainage device's collecting storage bin down the gas storage bottleneck, inside the trachea stretched into the gas bomb, the compressed air who gets into with the trachea was as drive gas, and outside saying the inside water of gas bomb extruded the gas bomb in the twinkling of an eye, improved the speed of drainage greatly to can clean up the internal water of gas bomb completely.
Drawings
Fig. 1 is a schematic view of the present invention;
FIG. 2 is a cross-sectional view of FIG. 1;
FIG. 3 is a schematic diagram of the application connection of FIG. 1;
fig. 4 is a static view of the drainage application of fig. 1.
In the figure: the gas bomb 001, the quick drainage device body 002, the gas bomb mounting base 2, the storage bin 21, the gas pipe 3, the base 4, the supporting base 5, the gas supply device 6, the fixing base 7 and the drainage device 8.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative work belong to the protection scope of the present invention based on the embodiments of the present invention.
Referring to fig. 1-2, a gas cylinder quick drainage device, a quick drainage device body 002 comprises a drainage device 8, a fixed seat 7 is arranged at the bottom of the drainage device 8, a mounting base 4 is embedded in the fixed seat 7, a gas cylinder mounting base 2 which is vertically mounted is arranged at the upper end of the base 4 and is connected with the fixed seat 7 in an embedded manner, a storage bin 21 is arranged in the gas cylinder mounting base 2, and an arc contraction port at the bottom of the storage bin 21 corresponds to and is communicated with the outlet position of a through hole in the middle of the base 4; the base 4 and the connecting face of gas bomb mount pad 2 establish the through-hole that the outside circumference of center runs through, trachea 3 transversely gets into storage compartment 21 after getting into the through-hole and from down and upright extension, trachea 3's outer port and the 6 intercommunication of gaseous air feeder of pressure, in using, as shown in fig. 3, put into drainage device 8's storage compartment 21 downwards to gas bomb 001 mouth, inside the trachea stretches into the gas bomb, the compressed air that the trachea got into is as drive gas, say outside the inside water of gas bomb 001 extrudes the gas bomb 001 in the twinkling of an eye, the speed of having improved the drainage greatly, and can arrange the water in the gas bomb completely.
The shape of the storage bin 21 is matched with the shape of the gas cylinder 001, as shown in fig. 3, the gas cylinder 001 is placed in the storage bin 21 in an inverted mode, the arc of the gas cylinder 001 is placed in the arc cavity of the storage bin 21 to abut against the arc cavity, the upper position and the lower position of the gas cylinder 001 are synchronously supported, and the positions where the gas cylinders 001 are placed are unified.
The height of the upper end of the air pipe 3 is not higher than the storage bin 21, when the quick drainage is applied, as shown in figure 4, the air storage bottle 001 is placed in the storage bin 21 in the air storage bottle mounting seat 2 in an inverted mode, the opening of the air pipe 3 is upward and is synchronously positioned in the air storage bottle 001, high-pressure air provided by the air supply device 6 is fed from the air pipe 3, and is ejected from an orifice at the upper end of an air pipe 3 in the gas storage bottle 001, high-pressure gas continuously entering the gas storage bottle 001 provides filled air for the gas storage bottle 001, and the water in the gas cylinder 001 is discharged from the lower end of the bottle mouth and is discharged to the outside from the bottom of the gas cylinder mounting seat 2, simultaneously, high-pressure gas also further blows away the water droplet of adhesion at the gas bomb 001 inner wall and the outside of discharging, utilizes compressed air as drive gas, extrudes the inside water of gas bomb 001 outside the gas bomb 001 in the twinkling of an eye, has improved the speed of drainage greatly to can arrange the water in the gas bomb body completely.
The air pipe 3 can be provided with a one-way valve 31 between the support base 5 and the air supply device 6, the one-way valve 31 is opened in one way after the air supply device 6 outputs, the high-level water in the air storage bottle 001 is prevented from flowing back to enter the air supply device 6 when the air supply device 6 stops the compressed air input due to failure, and the potential hazards which may be generated are eliminated.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof, and therefore, the present invention is considered to be exemplary and not restrictive in any way, since the scope of the present invention is defined by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein, without any reference thereto being construed as limiting the claim concerned.
Furthermore, it should be understood that although the present specification describes embodiments, not every embodiment includes only a single embodiment, and such description is for clarity purposes only, and it is to be understood that all embodiments may be combined as appropriate by one of ordinary skill in the art to form other embodiments as will be apparent to those of skill in the art from the description herein.
Claims (5)
1. The utility model provides a quick drainage device of gas bomb, contains quick drainage device body (002), its characterized in that: the quick drainage device body (002) comprises a drainage device (8), a fixed seat (7) is arranged at the bottom of the drainage device (8), and a base (4) which is embedded and combined from top to bottom is arranged in the fixed seat (7);
the upper end of the base (4) is provided with a vertically-installed gas cylinder installation seat (2), the lower end of the gas cylinder installation seat (2) is connected with the fixed seat (7) in an embedded mode, a storage bin (21) is arranged in the gas cylinder installation seat (2), and an arc contraction opening at the bottom of the storage bin (21) corresponds to and is communicated with an outlet of a through hole in the middle of the base (4);
a through hole with the center penetrating to the outer circumference is formed in the connecting surface of the base (4) and the gas storage bottle mounting seat (2), and the gas pipe (3) transversely enters the through hole, then enters the storage bin (21) and vertically extends from bottom to top;
the outer port of the air pipe (3) is communicated with the air supply device (6).
2. The quick drainage device of the gas cylinder as claimed in claim 1, wherein: the air pipe (3) is connected with the arc contraction opening and the outer circumference outlet end of the base (4) in an enclosing mode through a supporting seat (5), and the supporting seat (5) is connected with the arc contraction opening and the outer circumference outlet end of the base (4) in an embedded mode through a through hole.
3. The quick drainage device of the gas cylinder as claimed in claim 1, wherein: the shape of the storage bin (21) is matched with the shape of the gas storage bottle (001).
4. The quick drainage device for the gas storage cylinder as claimed in claim 1, wherein: the height of the upper end of the air pipe (3) is not higher than the storage bin (21).
5. The quick drainage device of the gas cylinder as claimed in claim 1, wherein: the air pipe (3) can be provided with a one-way valve (31) between the supporting seat (5) and the air supply device (6), and the one-way valve (31) is opened in one way after the air supply device (6) outputs.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220298321.4U CN217422929U (en) | 2022-02-15 | 2022-02-15 | Quick drainage device of gas bomb |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220298321.4U CN217422929U (en) | 2022-02-15 | 2022-02-15 | Quick drainage device of gas bomb |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217422929U true CN217422929U (en) | 2022-09-13 |
Family
ID=83177116
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220298321.4U Active CN217422929U (en) | 2022-02-15 | 2022-02-15 | Quick drainage device of gas bomb |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217422929U (en) |
-
2022
- 2022-02-15 CN CN202220298321.4U patent/CN217422929U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8151378B2 (en) | Pressure flushing device | |
CN217422929U (en) | Quick drainage device of gas bomb | |
CN202481538U (en) | Structurally improved water storage barrel with pressure | |
CN202402621U (en) | Pressure water storage barrel | |
CN216443466U (en) | Oil tank port and oil tank cover assembly structure for engineering machinery | |
CN217270264U (en) | Hollow anchor rod grouting device | |
CN209870896U (en) | Hollow blowing filling head and self-supporting bag sealing blowing type filling device | |
CN221643268U (en) | Liquid frothing device | |
CN206816419U (en) | A kind of safe anti-overflow oil Oiltank structure | |
CN217630289U (en) | Pressure-increasing water-saving flushing device | |
CN218713573U (en) | Self-cleaning anti-dead water energy-saving air pressure tank | |
CN210808851U (en) | Fish tank | |
CN220318047U (en) | High-pressure spinneret structure | |
CN220582505U (en) | Portable gas-filled stove | |
CN215053601U (en) | Pressurizing aerating flushing pipe fitting | |
CN217264811U (en) | Be used for gravity flow antiseptic solution filling stationary flow mechanism | |
CN219126163U (en) | Split-assembled bottomless toilet bowl and toilet chair | |
CN214668431U (en) | Ecological greening concrete water permeability detection device | |
CN211449232U (en) | Inflating and displaying device for energy accumulator | |
CN213979187U (en) | Hidden pressure boost bubbling flushing tank | |
CN210204463U (en) | External water seat for bottled water | |
CN219363233U (en) | Full-mouth filling exhaust valve structure | |
CN208457577U (en) | A kind of the water injection end corking and gas cylinder of gas cylinder | |
CN211077096U (en) | Sealed storage tank | |
CN210582207U (en) | Water dispenser for bottled water |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |