CN217419628U - Civil engineering pile foundation construction auxiliary positioning device - Google Patents

Civil engineering pile foundation construction auxiliary positioning device Download PDF

Info

Publication number
CN217419628U
CN217419628U CN202220863183.XU CN202220863183U CN217419628U CN 217419628 U CN217419628 U CN 217419628U CN 202220863183 U CN202220863183 U CN 202220863183U CN 217419628 U CN217419628 U CN 217419628U
Authority
CN
China
Prior art keywords
wall
civil engineering
pile foundation
foundation construction
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220863183.XU
Other languages
Chinese (zh)
Inventor
廖凤明
陈洪进
廖小明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongxian Construction Group Co ltd
Original Assignee
Zhongxian Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongxian Construction Group Co ltd filed Critical Zhongxian Construction Group Co ltd
Priority to CN202220863183.XU priority Critical patent/CN217419628U/en
Application granted granted Critical
Publication of CN217419628U publication Critical patent/CN217419628U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a civil engineering pile foundation construction auxiliary positioning device, including the location base, the supplementary side pipe of location base top side fixedly connected with, the square internally connected of pipe has a positioning sleeve, four corners of location base link up respectively and are equipped with the screw hole, and infrared generator can make the effect of carrying out the assistance-localization real-time before the pile, does not need artifical rely on naked eye or the article of markedness to carry out the location operation, accuracy nature when having improved the construction location greatly, under the effect of guide bar, can improve more stable when the drill way protects a section of thick bamboo installation and sinks, avoids the in-process drill way that the installation descends to protect a section of thick bamboo and takes place crooked condition emergence, and the movable end of electricity liquid push rod carries out the centre gripping through the drill way that the centre gripping post was placed to the barrel inner chamber and fixes, can make more stable in-process that the drill way protected a section of thick bamboo installation, avoid when construction operation drill way to protect a section of thick bamboo and take place crooked because of ground is soft, The case of offset occurs.

Description

Civil engineering pile foundation construction auxiliary positioning device
Technical Field
The utility model relates to a civil engineering pile foundation construction assistance-localization real-time device belongs to foundation pile construction technical field.
Background
Civil engineering refers to the engineering entity that is used for surveying, planning, designing, constructing, installing, maintaining and other technical works of newly-built, reconstructed or expanded buildings, structures, related supporting facilities and the like of various projects and the completion of the technical works, in addition to house buildings, the engineering entity needs to install an orifice casing in a preset drill hole in the construction process of a civil engineering pile foundation at present, then the inside of the orifice casing is continuously drilled, poured and formed, but when the orifice casing is installed, the orifice casing cannot be effectively positioned in an auxiliary mode, the orifice casing is easy to shift without positioning support in the installation process, and therefore the auxiliary positioning device for civil engineering pile foundation construction is provided.
SUMMERY OF THE UTILITY MODEL
The utility model discloses the technical problem who solves overcomes current defect, provides a civil engineering pile foundation construction assistance-localization real-time device, can effectively solve the problem in the background art.
In order to solve the technical problem, the utility model provides a following technical scheme:
the utility model provides a civil engineering pile foundation construction auxiliary positioning device, includes the location base, the supplementary side pipe of location base top side fixedly connected with, the internal connection of supplementary side pipe has a position sleeve, four corners of location base link up respectively and are equipped with the screw hole, screw hole internal thread is connected with positioning bolt.
As a further description of the above scheme, a connector is arranged on the right side of the positioning base, the connector is communicated with the wall cavity, a positioning plate is movably connected inside the connector, and a connecting port is communicated with the middle part of the top side of the positioning base.
As a further description of above scheme, the inside location platform that is equipped with of the connection opening of locating plate, location platform top side middle part is inlayed and is established and be fixed with infrared generator, the equidistance is equipped with the support bar on the location platform outer wall, the support bar is connected opening inner wall fixed connection with the locating plate.
As a further description of the above scheme, the inner wall of the auxiliary square tube is respectively dug with rectangular grooves around, a guide rod is fixedly connected between the inner walls of the rectangular grooves, a lifting tube is slidably sleeved on the outer wall of the guide rod, and an L-shaped linking rod is fixedly connected to the outer side of the lifting tube.
As a further description of the above scheme, the positioning sleeve comprises a barrel body and installation blocks, the installation blocks are arranged on the outer wall of the barrel body at equal intervals, hanging rings are fixedly connected to the outer sides of the installation blocks, and the barrel body is fixedly sleeved with the L-shaped connecting rods through the hanging rings.
As a further description of the above scheme, equidistance fixedly connected with electricity liquid push rod on the barrel outer wall, electricity liquid push rod is located between the installation piece respectively, the equidistance link up on the barrel inner wall is equipped with the through-hole, inside electricity liquid push rod's expansion end stretched into the through-hole, and fixedly connected with centre gripping post.
The utility model discloses beneficial effect:
1. the positioning plate and the infrared generator are arranged, so that the connecting port on the positioning plate is overlapped with the connecting port on the positioning base, the infrared generator can perform auxiliary positioning before piling, positioning operation is not required to be manually performed by naked eyes or marked objects, and the accuracy in construction positioning is greatly improved;
2. by arranging the lifting pipe and the guide rod, when the orifice casing descends in a hole preset in the ground, the stability of the orifice casing during installation and sinking can be improved under the action of the guide rod, and the orifice casing is prevented from being inclined in the process of installation and descending;
3. through setting up link, electricity liquid push rod and centre gripping post, the drill way that the expansion end of electricity liquid push rod placed the barrel inner chamber through the centre gripping post protects a section of thick bamboo outer wall and carries out the centre gripping fixed, can make the drill way protect the in-process stability more of a section of thick bamboo installation, avoids when construction operation the drill way protect a section of thick bamboo to take place the condition of skew, skew because of the soil is soft.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the principles of the invention.
Fig. 1 is the utility model relates to a civil engineering pile foundation construction assistance-localization real-time device's outward appearance structure schematic diagram.
Fig. 2 is the utility model relates to a civil engineering pile foundation construction assistance-localization real-time device's location base expandes the structure sketch map.
Fig. 3 is the utility model relates to a civil engineering pile foundation construction assistance-localization real-time device's supplementary square tubular section structure sketch map.
Fig. 4 is the utility model relates to a civil engineering pile foundation construction assistance-localization real-time device's position sleeve section structure plan view.
Reference numbers in the figures: 1. positioning a base; 2. auxiliary square tubes; 3. a positioning sleeve; 4. a threaded hole; 5. positioning a bolt; 6. a connecting port; 7. positioning a plate; 8. connecting the ports; 9. a positioning table; 10. an infrared ray generator; 11. a supporting strip; 12. a rectangular groove; 13. a guide bar; 14. a lifting pipe; 15. an L-shaped joint rod; 16. a barrel; 17. mounting blocks; 18. hanging a ring; 19. an electro-hydraulic push rod; 20. a through hole; 21. the post is clamped.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a civil engineering pile foundation construction auxiliary positioning device, includes location base 1, 1 top side fixedly connected with auxiliary side pipe 2 of location base, auxiliary side pipe 2 internal connection has a position sleeve 3, 1 four corners of location base link up respectively and are equipped with screw hole 4, 4 internal thread connection in the screw hole has positioning bolt 5.
Specifically, as shown in fig. 2, a connecting port 6 is arranged on the right side of the positioning base 1, the connecting port 6 is in through connection with a wall cavity, a positioning plate 7 is movably connected inside the connecting port 6, a connecting port 8 is arranged in through connection between the positioning plate 7 and the top side middle part of the positioning base 1, a positioning table 9 is arranged inside the connecting port 8 of the positioning plate 7, an infrared generator 10 is fixedly embedded in the top side middle part of the positioning table 9, supporting bars 11 are equidistantly arranged on the outer wall of the positioning table 9, the supporting bars 11 are fixedly connected with the inner wall of the connecting port 8 of the positioning plate 7, by arranging the positioning plate 7 and the infrared generator 10, after the positioning base 1 is installed on the target ground of the pre-piling, the positioning plate 7 is inserted into the wall cavity of the positioning base 1 from the connecting port 6, so that the connecting port 8 on the positioning plate 7 overlaps with the connecting port 8 on the positioning base 1, and the infrared generator 10 is started, the infrared generator 10 can assist in positioning before piling, and does not need to manually perform positioning operation by naked eyes or marked objects, so that the accuracy in construction positioning is greatly improved.
Specifically, as shown in fig. 3, 2 inner walls of auxiliary square pipe dig respectively all around and are equipped with rectangle recess 12, fixedly connected with guide bar 13 between the 12 inner walls of rectangle recess, the slip cover is equipped with fall way 14 on the guide bar 13 outer wall, fall way 14 outside fixedly connected with L type linking pole 15, through setting up fall way 14 and guide bar 13, after L type linking pole 15 outside was located to link 18 cover respectively on 16 outer walls of barrel, when the drill way protects a section of thick bamboo and descends in the hole that ground was predetermine, under the effect of guide bar 13, can improve drill way and protect a section of thick bamboo installation more stable when sinking, avoid the installation decline in-process drill way to protect a section of thick bamboo and take place crooked condition emergence.
Specifically, as shown in fig. 4, the positioning sleeve 3 includes a barrel 16 and an installation block 17, the installation block 17 is equidistantly disposed on the outer wall of the barrel 16, a hanging ring 18 is fixedly connected to the outer side of the installation block 17, the barrel 16 is fixedly connected with an L-shaped linking rod 15 through the hanging ring 18, an electro-hydraulic push rod 19 is fixedly connected to the outer wall of the barrel 16 at equal intervals, the electro-hydraulic push rod 19 is respectively located between the installation blocks 17, through holes 20 are formed in the inner wall of the barrel 16 at equal intervals in a penetrating manner, the movable end of the electro-hydraulic push rod 19 extends into the through holes 20, a clamping column 21 is fixedly connected to the movable end of the electro-hydraulic push rod 19, the barrel 16 is inserted into an auxiliary square tube 2 when the orifice protecting tube is installed, the hanging ring 18 on the outer wall of the barrel 16 is hung with the L-shaped linking rod 15, the electro-hydraulic push rod 19 is simultaneously started, the movable end of the electro-hydraulic push rod 19 clamps and fixes the outer wall of the orifice protecting tube placed in the inner cavity of the barrel 16 through the clamping column 21, the installation process of the orifice pile casing is more stable, and the condition that the orifice pile casing is inclined and deviated due to loose soil during construction operation is avoided.
When the utility model is used, after the positioning base 1 is arranged on the target ground of the pre-piling, the positioning plate 7 is inserted into the wall cavity of the positioning base 1 from the connecting port 6, the connecting port 8 on the positioning plate 7 is overlapped with the connecting port 8 on the positioning base 1, the infrared generator 10 is started, the infrared generator 10 can perform the auxiliary positioning function before piling, after the hanging rings 18 on the outer wall of the cylinder 16 are respectively sleeved outside the L-shaped connecting rods 15, when the orifice protecting cylinder descends in a hole preset on the ground, under the action of the guide rod 13, the stability of the orifice protecting cylinder during installation and sinking can be improved, and when the orifice protecting cylinder is installed, the cylinder 16 is inserted into the auxiliary square pipe 2, the hanging ring 18 on the outer wall of the cylinder 16 is hung with the L-shaped connecting rod 15, and simultaneously, starting the electro-hydraulic push rod 19, and clamping and fixing the outer wall of the orifice casing placed in the inner cavity of the barrel 16 by the movable end of the electro-hydraulic push rod 19 through a clamping column 21.
The above is the preferred embodiment of the present invention, and the technical personnel in the field of the present invention can also change and modify the above embodiment, therefore, the present invention is not limited to the above specific embodiment, and any obvious improvement, replacement or modification made by the technical personnel in the field on the basis of the present invention all belong to the protection scope of the present invention.

Claims (6)

1. The utility model provides a civil engineering pile foundation construction auxiliary positioning device, includes location base (1), its characterized in that, location base (1) top side fixedly connected with auxiliary side pipe (2), auxiliary side pipe (2) internal connection has position sleeve (3), four corners of location base (1) link up respectively and are equipped with screw hole (4), screw hole (4) internal thread is connected with positioning bolt (5).
2. The civil engineering pile foundation construction auxiliary positioning device of claim 1, wherein: positioning base (1) right side is equipped with connector (6), connector (6) and wall chamber through connection, the inside swing joint of connector (6) has locating plate (7), locating plate (7) link up with positioning base (1) top side middle part and are equipped with connection opening (8).
3. The civil engineering pile foundation construction auxiliary positioning device of claim 2, wherein: the utility model discloses a solar energy infrared ray locating device, including locating plate (7), connecting opening (8) inside location platform (9) that is equipped with of locating plate (7), location platform (9) top side middle part inlays and establishes and is fixed with infrared generator (10), the equidistance is equipped with support bar (11) on location platform (9) outer wall, support bar (11) and connecting opening (8) inner wall fixed connection of locating plate (7).
4. The civil engineering pile foundation construction auxiliary positioning device of claim 1, wherein: supplementary side pipe (2) inner wall is dug respectively all around and is equipped with rectangle recess (12), fixedly connected with guide bar (13) between rectangle recess (12) inner wall, sliding sleeve is equipped with fall way (14) on guide bar (13) outer wall, fall way (14) outside fixedly connected with L type linking rod (15).
5. The civil engineering pile foundation construction auxiliary positioning device of claim 1, wherein: positioning sleeve (3) include barrel (16), installation piece (17) equidistance sets up on barrel (16) outer wall, installation piece (17) outside fixedly connected with link (18), barrel (16) cup joint fixedly through link (18) and L type linking pole (15).
6. The civil engineering pile foundation construction auxiliary positioning device of claim 5, wherein: equidistance fixedly connected with electricity liquid push rod (19) on barrel (16) outer wall, electricity liquid push rod (19) are located respectively between installation piece (17), the equidistance link up on barrel (16) inner wall is equipped with through-hole (20), the expansion end of electricity liquid push rod (19) stretches into inside through-hole (20), and fixedly connected with centre gripping post (21).
CN202220863183.XU 2022-04-14 2022-04-14 Civil engineering pile foundation construction auxiliary positioning device Active CN217419628U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220863183.XU CN217419628U (en) 2022-04-14 2022-04-14 Civil engineering pile foundation construction auxiliary positioning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220863183.XU CN217419628U (en) 2022-04-14 2022-04-14 Civil engineering pile foundation construction auxiliary positioning device

Publications (1)

Publication Number Publication Date
CN217419628U true CN217419628U (en) 2022-09-13

Family

ID=83183382

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220863183.XU Active CN217419628U (en) 2022-04-14 2022-04-14 Civil engineering pile foundation construction auxiliary positioning device

Country Status (1)

Country Link
CN (1) CN217419628U (en)

Similar Documents

Publication Publication Date Title
CN214089864U (en) Double-lock pipe protecting cylinder for pebble bed leading hole
CN217419628U (en) Civil engineering pile foundation construction auxiliary positioning device
CN208701697U (en) A kind of narrow foundation trench adjustable supporting device
CN210482316U (en) Assembled foundation pit supporting structure device
CN114045856B (en) Photovoltaic power station integrated piling and drilling mechanism and construction method
CN111576440B (en) Deep foundation pit supporting bar planting hanging net fixing device
CN212656257U (en) Assembled retaining wall
CN108798508A (en) The excavation method of stake holes
CN212865912U (en) Waterproof curtain device for super high-rise residential building
CN103924603A (en) Tool for preventing pole pit soil collapse and method for using same to dig pole pit
CN211368673U (en) Buried boundary pile
CN209760257U (en) Deep foundation pit safety arrangement that construction used
CN210262920U (en) Multi-functional water conservancy slope protection net
CN209323529U (en) A kind of frame-type double-row pile cement soil wall foundation pit enclosure structure
CN208416441U (en) A kind of Cadge ladder for construction of deep base pit
CN212956551U (en) Deep foundation pit supporting bar planting hanging net fixing device
CN206015695U (en) Buried pipe
CN110670936B (en) Be used for electric power line pole root anti-collapse device of earthing up
CN212338776U (en) Exploration device for hydrogeology
CN210369077U (en) Auxiliary positioning device for drilled pile
CN214573947U (en) Tubular column positioning tool
CN212688989U (en) Convenient drainage's building engineering pit foundation drainage underdrain
CN215803690U (en) Foundation ditch safety device for highway engineering
CN219864449U (en) Protective fence for construction engineering
CN219410886U (en) Light combined upright post structure for water area foundation pit engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant