CN217419381U - Protective device for railway contact net - Google Patents

Protective device for railway contact net Download PDF

Info

Publication number
CN217419381U
CN217419381U CN202220101192.5U CN202220101192U CN217419381U CN 217419381 U CN217419381 U CN 217419381U CN 202220101192 U CN202220101192 U CN 202220101192U CN 217419381 U CN217419381 U CN 217419381U
Authority
CN
China
Prior art keywords
ceiling
net
railway contact
contact net
stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220101192.5U
Other languages
Chinese (zh)
Inventor
王俊平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guoneng Baotou Shenzhou Railway Co ltd
Original Assignee
Guoneng Baotou Shenzhou Railway Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guoneng Baotou Shenzhou Railway Co ltd filed Critical Guoneng Baotou Shenzhou Railway Co ltd
Priority to CN202220101192.5U priority Critical patent/CN217419381U/en
Application granted granted Critical
Publication of CN217419381U publication Critical patent/CN217419381U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Abstract

The utility model discloses a protector for railway contact net relates to railway contact net protection canopy field, including two first stands, two one side of first stand all is equipped with the weeping pipe, two the top fixed mounting of first stand has same top frame, four edges of ceiling fixed mounting respectively have front guardrail, rear guardrail and two side guardrails, the top side of top frame is equipped with ceiling, first elasticity fag end and second elasticity fag end. The utility model discloses rational in infrastructure, easy operation, thing such as the stone that falls through the elastic force cushioning effect of first elasticity rope net on with second elasticity rope net, make the stone that falls slow down, and the protection ceiling is directly pounded or is punctured by the great impact force of stone, so both can protect the railway contact net of below, can reduce the ceiling again to the high crashproof performance requirement of material, has reduced protector's the manufacturing cost and the transportation degree of difficulty of material.

Description

Protective device for railway contact net
Technical Field
The utility model relates to a railway contact net protection canopy field, in particular to protector for railway contact net.
Background
The high-speed railway contact system is a special form of power transmission line which is erected overhead along a railway line and supplies power to an electric locomotive, and consists of a contact suspension part, a supporting device, a positioning device, a support and a foundation.
Among the prior art, can be equipped with the guardrail usually in the top of tunnel portal, the guardrail needs to be changed after old, the work progress of demolising old guardrail and building new guardrail is generally longer, and the operation of railway can not be because of it stops for a long time, so need take the fender bracket above the railway line, prevent influence train operation such as the stone that drops in the work progress, in order to prevent breakdown fender bracket such as stone, the top of fender bracket need adopt the big steel sheet of thickness, this not only causes huge cost-rise, also bring very big trouble for the transportation of fender bracket raw and other materials simultaneously, therefore we disclose a railway for contact net protector satisfy people's demand.
SUMMERY OF THE UTILITY MODEL
An object of this application is to provide a protector for railway contact net to solve the problem that provides in the above-mentioned background art, this mixing arrangement can shovel soil and carry out the intensive mixing in stirring the storehouse with corresponding material at the in-process of path, and the soil after the mixture is directly shed subaerial, can adjust the soil degree of depth of shoveling as required simultaneously.
In order to achieve the above purpose, the present application provides the following technical solutions: a protective device for a railway contact net comprises two first upright posts, wherein a plurality of uniformly arranged circular brackets are arranged on the two first upright posts, water leakage pipes are sleeved in the circular brackets on the same first upright post, the top ends of the two first upright posts are fixedly provided with a same top frame, a ceiling and a plurality of second upright posts are fixedly arranged on the top side of the top frame, a front guardrail, a rear guardrail and two side guardrails are respectively and fixedly arranged on the four edges of the ceiling, the top surface of ceiling be close to two side guardrails with the position department of back guardrail all is equipped with the hole that leaks, two the hole that leaks with two the position of leaking the water pipe is corresponding respectively, and is a plurality of the top position department and the equal fixed mounting in middle part position department of second stand have the tensioning frame, two install first elasticity rope net and second elasticity rope net on the tensioning frame respectively.
Based on above structure, the ceiling is the slope form, and the stone that falls etc. drop and fall and be in topmost first elasticity rope is netted, through the elasticity cushioning effect of first elasticity rope net makes the stone that falls slow down, through setting up the setting of second elasticity rope net can provide the secondary buffering to the great stone of weight, in order to protect the ceiling is directly hit by the great impact force of stone and punctures, front guardrail, rear guardrail and two side guardrails can block the stone and stay the top of ceiling prevents that direct falling from pounding from injuring passerby, if meet rainy day, the slope can be followed to the rainwater the ceiling trickles, through two the hourglass water pipe trickles to ground.
Preferably, the meshes of the second elastic rope net are smaller than those of the first elastic rope net.
Furthermore, first elasticity rope net with the elasticity of second elasticity rope net is different, and the size warp of stone first elasticity rope net mesh is once screened, makes first elasticity rope net mainly bear the great stone impact force of volume, makes second elasticity rope net mainly bears the relatively less stone impact force of volume, and is right the ceiling plays better protection, can make first elasticity rope net with second elasticity rope net obtains make full use of simultaneously.
Preferably, an inclined bracket is fixedly mounted in front of each of the two first upright posts and the top frame.
Furthermore, the two brackets contribute to providing a better support for the top frame to withstand the impact of falling rocks.
Preferably, the top frame is inclined, and one side of the top frame where the rear guardrail is installed is lower than one side of the top frame where the front guardrail is installed.
Furthermore, the top frame with the inclined surface enables the top surface of a ceiling installed on the top frame to be in an inclined state, and rainwater can flow easily.
Preferably, two the equal fixed mounting in bottom of first stand has the fixed plate, two a plurality of mounting holes have all been seted up on the fixed plate.
Furthermore, the fixing plate and the plurality of mounting holes are convenient for the mounting and fixing of the first upright post.
Preferably, a ladder is arranged on one side of the ceiling.
Furthermore, the ladder is convenient for the operator to climb to the top of ceiling, debris such as the stone that the clearance falls.
Preferably, one side of the rear guardrail is provided with a plurality of fixing rods.
Furthermore, through a plurality of the dead lever can with the ceiling is with tunnel portal lateral wall fixed connection, makes protector more firm, can reduce the distance of protector and tunnel portal lateral wall simultaneously, better accepts the object that falls.
The utility model discloses a technological effect and advantage:
1. the utility model discloses rational in infrastructure, thing such as the stone that falls passes through the elasticity cushioning effect of first elasticity rope net on the net with second elasticity rope net, make the stone that falls slow down, dual rope net can provide the secondary buffering to the great stone of weight, the protection ceiling is directly pounded in or is punctured by the great impact force of stone, the railway contact net of below both can be protected like this, can reduce the high requirement of ceiling to the material again, protector's manufacturing cost has directly been reduced, the transportation degree of difficulty of material has been reduced simultaneously, setting through a plurality of guardrails, can block the top that the stone stayed the ceiling, prevent directly to fall to injure passerby by crashing, if meet rainy day, the rainwater can follow the ceiling trickling of slope, trickling to ground through two weeping pipes.
2. The utility model discloses in, the size of stone is once screened through first elasticity rope net mesh, make the great stone impact force of first elasticity rope net main bearing volume, make second elasticity rope net main bearing volume less stone impact force relatively, play better protection to the canopy of propping up, can make first elasticity rope net and second elasticity rope net obtain make full use of simultaneously, can be with ceiling and tunnel mouth lateral wall fixed connection through a plurality of dead levers, it is more firm to make protector, can reduce the distance of protector and tunnel mouth lateral wall simultaneously, the better object of falling of accepting.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
fig. 2 is a front view of the present invention;
fig. 3 is a cross-sectional view taken along line a-a of fig. 2 in accordance with the present invention;
fig. 4 is a top view of the present invention.
In the figure: 1. a first upright post; 2. a circular support; 3. a water leakage pipe; 4. an inclined bracket; 5. a top frame; 6. a front guardrail; 7. a fixing plate; 8. mounting holes; 9. a ladder; 10. a second upright post; 11. a tensioning frame; 12. a first elastic net of rope; 13. a rear guardrail; 14. side guardrails; 15. a ceiling; 16. a water leakage hole; 17. fixing the rod; 18. a second elastic net of rope.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The embodiment is as follows: referring to fig. 1-4, the protection device for the railway catenary comprises two first columns 1. The two first vertical columns 1 can be any one of the columns in the prior art, such as a metal cylinder.
A plurality of evenly arranged circular supports 2 are arranged on the two first upright posts 1. The plurality of circular brackets 2 may be pipe clamps in the prior art, such as plastic pipe clamps, and are fixedly mounted on the first upright 1 by a fixing method in the prior art, such as bolt screwing.
A plurality of circular brackets 2 on the same first upright post 1 are sleeved with water leakage pipes 3. The drain pipe 3 may be a water pipe of the prior art, such as a PVC pipe.
The top ends of the two first upright posts 1 are fixedly provided with the same top frame 5. The top frame 5 may be made of various materials known in the art, such as square steel, and is fixedly connected by one of the known methods, such as welding or bolting.
A ceiling 15 and a plurality of second uprights 10 are fixedly mounted to the top side of the top frame 5. The ceiling 15 may be any one of a number of flat plates, such as steel plates, and the second upright 10 may be any one of a number of bars, such as metal bars, connected to the top frame 5 by any one of a number of techniques, such as welding.
The four edges of the ceiling 15 are fixedly provided with a front guardrail 6, a rear guardrail 13 and two side guardrails 14 respectively. The front guard rail 6, the rear guard rail 13 and the two side guard rails 14 are connected to the ceiling 15 by any one of the prior art techniques, such as welding.
The top surface of the ceiling 15 is provided with water leakage holes 16 at positions close to the two side guardrails 14 and the rear guardrail 13, and the two water leakage holes 16 correspond to the two water leakage pipes 3 respectively. The two water leakage holes 16 are positioned at the lowest points of the two sides of the ceiling 15, so that the rainwater on the ceiling 15 can flow out through the water leakage pipe 3 conveniently.
The top end positions and the middle positions of the second upright columns 10 are fixedly provided with tensioning frames 11.
The two tensioning frames 11 are respectively provided with a first elastic rope net 12 and a second elastic rope net 18. The first elastic rope net 12 and the second elastic rope net 18 may be a protective net with certain elasticity in the prior art, such as a nylon rope net.
Based on above structure, ceiling 15 is the slope form, the thing such as the stone that falls drops is on the first elasticity rope net 12 that is in the top, elasticity cushioning effect through first elasticity rope net 12, make the stone that falls slow down, setting through the second elasticity rope net 18 that sets up, can provide the secondary buffering to the great stone of weight, in order to protect ceiling 15 directly to receive the great impact force of stone to pound or puncture, preceding guardrail 6, back guardrail 13 and two side guardrails 14 can block the top that the stone was stayed ceiling 15, prevent directly to fall to pound and injure passerby, if meet rainy day, the rainwater can follow the ceiling 15 trickling of slope, 3 trickles to ground through two water leakage pipes.
In this embodiment, the mesh of second elasticity fag end net 18 is less than first elasticity fag end net 12, the benefit that sets up like this is, first elasticity fag end net 12 is different with the elasticity of second elasticity fag end net 18, the size of stone is once screened through first elasticity fag end net 12 mesh, make first elasticity fag end net 12 mainly bear the great stone impact force of volume, make second elasticity fag end net 18 mainly bear the relatively less stone impact force of volume, play better protection in order to canopy 15, can make first elasticity fag end net 12 and second elasticity fag end net 18 obtain make full use of simultaneously.
In this embodiment, there are 4 inclined supports before two first stands 1 and top frame 5 respectively fixed mounting, do benefit to and provide better supporting role to top frame 5 to bear the impact force of falling the stone.
In this embodiment, the top frame 5 is an inclined surface, and one side of the installed rear guardrail 13 is lower than one side of the installed front guardrail 6, so that the top surface of the ceiling 15 installed on the top frame 5 is inclined, and rainwater can flow more favorably.
In this embodiment, the equal fixed mounting in bottom of two first stands 1 has fixed plate 7, has all seted up a plurality of mounting holes 8 on two fixed plates 7, the installation and the fixing of the first stand 1 of being convenient for.
In this embodiment, one side of ceiling 15 is equipped with ladder 9, and the operator of being convenient for climbs to ceiling 15's top, debris such as the stone of clearance falling.
In this embodiment, one side of rear guardrail 13 is equipped with a plurality of dead levers 17, can be with ceiling 15 and tunnel portal lateral wall fixed connection through a plurality of dead levers 17, makes protector more firm, can reduce the distance of protector and tunnel portal lateral wall simultaneously, the better object of accepting falling.
This practical theory of operation: objects such as the stone that falls pass through on first elasticity fag end 12 with the elasticity cushioning effect of second elasticity fag end 18, make the stone that falls slow down, dual fag end can provide the secondary buffering to the great stone of weight, protection ceiling 15 directly receives the great impact force of stone to pound in or puncture, the railway contact net of below both can be protected like this, can reduce ceiling 15 again to the high requirement of material, protector's manufacturing cost has directly been reduced, the transportation degree of difficulty of material has been reduced simultaneously, setting through a plurality of guardrails, can block the top that the stone was stayed ceiling 15, prevent directly to fall to pound and injure passerby, if meet rainy day, the rainwater can follow the ceiling 15 trickling of slope, 3 trickles to ground through two weeping pipes.
The size of stone is once screened through first elasticity rope net 12 mesh, make first elasticity rope net 12 mainly bear the great stone impact force of volume, make second elasticity rope net 18 mainly bear the relatively less stone impact force of volume, play better protection to canopy 15, can make first elasticity rope net 12 and second elasticity rope net 18 obtain make full use of simultaneously, can be with ceiling 15 and tunnel mouth lateral wall fixed connection through a plurality of dead levers 17, make protector more firm, can reduce the distance of protector and tunnel mouth lateral wall simultaneously, the better object that falls of accepting.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (7)

1. The utility model provides a protector for railway contact net, includes two first stands (1), its characterized in that: the two first columns (1) are respectively provided with a plurality of uniformly arranged circular supports (2), a plurality of circular supports (2) positioned on the same first column (1) are respectively sleeved with a water leakage pipe (3), the top ends of the two first columns (1) are fixedly provided with the same top frame (5), the top side of the top frame (5) is fixedly provided with a ceiling (15) and a plurality of second columns (10), four edges of the ceiling (15) are respectively fixedly provided with a front guardrail (6), a rear guardrail (13) and two side guardrails (14), the top surface of the ceiling (15) close to the two side guardrails (14) and the position of the rear guardrail (13) are respectively provided with water leakage holes (16), the two water leakage holes (16) correspond to the positions of the two water leakage pipes (3), and the top end positions and the middle position of the second columns (10) are respectively fixedly provided with tensioning frames (11), a first elastic rope net (12) and a second elastic rope net (18) are respectively arranged on the two tensioning frames (11).
2. The protection device for the railway contact net of claim 1, characterized in that: the meshes of the second elastic rope net (18) are smaller than those of the first elastic rope net (12).
3. The protection device for the railway contact net of claim 1, characterized in that: and inclined brackets (4) are respectively and fixedly arranged in front of the two first upright columns (1) and the top frame (5).
4. The protection device for the railway contact net of claim 1, characterized in that: the top frame (5) is an inclined plane, and one side of the rear guardrail (13) is lower than one side of the front guardrail (6).
5. The protection device for the railway contact net of claim 4, characterized in that: two the equal fixed mounting in bottom of first stand (1) has fixed plate (7), two a plurality of mounting holes (8) have all been seted up on fixed plate (7).
6. The protection device for the railway contact net of claim 1, characterized in that: a ladder (9) is arranged on one side of the ceiling (15).
7. The protection device for the railway contact net of claim 1, characterized in that: one side of the rear guardrail (13) is provided with a plurality of fixing rods (17).
CN202220101192.5U 2022-01-15 2022-01-15 Protective device for railway contact net Active CN217419381U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220101192.5U CN217419381U (en) 2022-01-15 2022-01-15 Protective device for railway contact net

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220101192.5U CN217419381U (en) 2022-01-15 2022-01-15 Protective device for railway contact net

Publications (1)

Publication Number Publication Date
CN217419381U true CN217419381U (en) 2022-09-13

Family

ID=83176170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220101192.5U Active CN217419381U (en) 2022-01-15 2022-01-15 Protective device for railway contact net

Country Status (1)

Country Link
CN (1) CN217419381U (en)

Similar Documents

Publication Publication Date Title
CN101974886A (en) Combined rock fall shed tunnel and installation method thereof
CN204738243U (en) Novel flexible protection grating net
CN217419381U (en) Protective device for railway contact net
CN214939446U (en) Road side slope multi-stage protection system
CN109281260B (en) But cyclic utilization keeps off husky wall and keeps off husky wall system
CN216240114U (en) Building construction is with regulation railing that has safeguard function
CN216238193U (en) Passive protective net with buffer function
CN211815589U (en) Public road bridge roof beam safety protective guard structure
CN210066543U (en) Wind-proof sound barrier
CN210530504U (en) Multifunctional protective railing for construction site
CN112726426A (en) Novel movable protective shed of bracket and steel pipe column combined gantry type
KR100629909B1 (en) Device for preventing falling rock having double supporfing establishment for road
CN220869005U (en) Mining passageway guardrail
CN216617119U (en) Foundation ditch guardrail for construction that security performance is high
CN214497216U (en) Novel movable protective shed of bracket and steel pipe column combined gantry type
CN219528661U (en) Modular enclosure
CN216197087U (en) Reduce assembled of windage can open municipal administration and enclose fender
CN217399685U (en) A protective structure for excavation of high slope earth and rock
CN215518445U (en) Avalanche protector
CN217027449U (en) Assembled steel bar processing shed
CN216948008U (en) Guardrail device for roadside safety clean area
CN218786788U (en) Small-size water-rock flow protective structure of high-speed railway tunnel entrance to a cave natural gully
CN220247798U (en) Roof court composite railing purse net structure
CN219794919U (en) Vertical retaining wall of river course
CN214695417U (en) Flood control fence capable of preventing sand bags from being washed away

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant