CN217410278U - Paint spraying waste gas purification device - Google Patents
Paint spraying waste gas purification device Download PDFInfo
- Publication number
- CN217410278U CN217410278U CN202123082740.9U CN202123082740U CN217410278U CN 217410278 U CN217410278 U CN 217410278U CN 202123082740 U CN202123082740 U CN 202123082740U CN 217410278 U CN217410278 U CN 217410278U
- Authority
- CN
- China
- Prior art keywords
- water
- main body
- paint spraying
- connecting pipe
- water inlet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
- Y02P70/10—Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working
Landscapes
- Details Or Accessories Of Spraying Plant Or Apparatus (AREA)
Abstract
The utility model discloses a paint spraying waste gas purifying device, which comprises a base and a paint spraying room main body arranged on the base, wherein a first water tank and a second water tank are respectively arranged on two sides of the paint spraying room main body, and a drying component is arranged on the paint spraying room main body; the first water tank is provided with a first water inlet and a first water outlet, and the first water outlet is connected with the spraying assembly; the second water tank is provided with a second water inlet and a second water outlet, the second water inlet is provided with a water inlet pipe, and the water inlet pipe is connected with the paint spray booth main body; the spray assembly comprises a water pump, a first connecting pipe, a second connecting pipe and a spray head, the water pump is arranged on one side of the first water tank, the input end of the water pump is connected with the first water outlet through the first connecting pipe, the output end of the water pump is connected with one end of the second connecting pipe, the other end of the second connecting pipe penetrates through the paint spraying room main body and extends to the inside, and the lower surface of the second connecting pipe is provided with the spray head. The utility model discloses a set up the second water tank and be used for retrieving the waste water that sprays the in-process and produce, the centralized processing of being convenient for.
Description
Technical Field
The utility model relates to a workshop exhaust-gas treatment technical field sprays paint especially involves a waste gas purification device sprays paint.
Background
The painting booth, as the name implies, is a booth for painting and coloring the filtered painting objects in a single room, also called a baking booth. The paint spray booth is equipment for providing special environment for coating operation, and can meet the requirements of coating operation on temperature, humidity, illuminance, air cleanliness and the like; can limit and treat the paint mist and organic waste gas generated in the paint spraying operation and then discharge the paint mist and the organic waste gas, and is environment-friendly coating equipment.
Present cascade spray booth that has certain limitation, lacks waste water recovery unit, and the easy outflow of waste water that produces in the use causes secondary pollution, and the drying rate in spray booth is slower simultaneously, does not utilize continuous use. Therefore, there is a need for an improved structure that overcomes the above-mentioned deficiencies.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a waste gas purification device sprays paint for solve current spray booth and lack waste gas purification device, the waste gas that produces among the paint spraying process directly discharges in the air, causes the problem of pollution easily.
The above technical purpose of the utility model is realized with following technical scheme:
a paint spraying waste gas purification device comprises a base and a paint spraying room main body arranged on the base, wherein a first water tank and a second water tank are respectively arranged on two sides of the paint spraying room main body, and a drying assembly is arranged on the paint spraying room main body;
a first water inlet and a first water outlet are formed in the first water tank, and the first water outlet is connected with the spraying assembly;
the second water tank is provided with a second water inlet and a second water outlet, the second water inlet is provided with a water inlet pipe, and the water inlet pipe penetrates through the base and is connected with the main body of the paint spray booth;
the spray assembly comprises a water pump, a first connecting pipe, a second connecting pipe and spray heads, the water pump is arranged on one side of the first water tank, the input end of the water pump is connected with the first water outlet through the first connecting pipe, the output end of the water pump is connected with one end of the second connecting pipe, the other end of the second connecting pipe penetrates through the paint spray booth main body and extends to the inside, and the lower surface of the second connecting pipe is provided with a plurality of spray heads.
The utility model discloses a further set up to: the drying component comprises a fan, a first drying pipe, a second drying pipe and a drying box, the fan is arranged on the paint spray booth main body, the input end of the fan is connected with the paint spray booth main body through the first drying pipe, the output end of the fan is connected with the drying box, the second drying pipe is arranged on the drying box, and a filter plate is arranged inside the drying box.
The utility model discloses a further set up to: and valves with the same structure and used for controlling the on-off of the pipeline are arranged on the first water inlet, the first water outlet, the second water inlet and the second water outlet.
The utility model discloses a further set up to: be provided with the window that is used for observing spray booth main part inside on spray booth main part's the lateral wall.
The utility model discloses a further set up to: one side of the paint spray booth main body is provided with a sealing door.
The utility model discloses a further set up to: the filter is the active carbon material.
To sum up, the utility model discloses following beneficial effect has:
1. the sewage that produces in spraying can enter into the second water tank through the pipeline and concentrate the collection, and the subsequent processing of being convenient for prevents that sewage from leaking, causes secondary pollution.
2. Be provided with the fan, can take out the humid air in the spray booth for the drying rate in spray booth.
Drawings
Fig. 1 is a front view of the present invention.
Fig. 2 is a side view of the present invention.
Fig. 3 is a schematic diagram of the internal structure of the present invention.
Fig. 4 is a schematic diagram of the internal structure of the drying box of the present invention.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention will be further described with reference to the drawings and the specific embodiments.
As shown in fig. 1 to 4, the paint spraying waste gas purifying device provided by the present invention comprises a base 1 and a paint spraying room main body 2 arranged on the base 1, wherein a first water tank 3 and a second water tank 4 are respectively arranged on two sides of the paint spraying room main body 2, and a drying assembly is arranged on the paint spraying room main body 2;
a first water inlet 5 and a first water outlet 6 are arranged on the first water tank 3, and the first water outlet 6 is connected with a spraying assembly;
a second water inlet 7 and a second water outlet 8 are formed in the second water tank 4, a water inlet pipe 9 is arranged on the second water inlet 7, and the water inlet pipe 9 penetrates through the base 1 and is connected with the paint spray booth main body 2;
the spraying assembly comprises a water pump 10, a first connecting pipe 11, a second connecting pipe 12 and spray heads 13, the water pump 10 is arranged on one side of the first water tank 3, the input end of the water pump 10 is connected with the first water inlet 5 through the first connecting pipe 11, the output end of the water pump 10 is connected with one end of the second connecting pipe 12, the other end of the second connecting pipe 12 penetrates through the paint spraying room main body 2 and extends to the inside, and the spray heads 13 are arranged on the lower surface of the second connecting pipe 12, so that when the spraying assembly is used, the water pump 10 is started to pump out water in the first water tank 3 and is sprayed out of the spray heads 13 through the first connecting pipe 11 and the second connecting pipe 12.
The utility model discloses a further set up to: drying assembly includes fan 14, first drying tube 15, second drying tube 16 and drying cabinet 17, fan 14 sets up on spray booth main part 2, and fan 14's input is connected with spray booth main part 2 through first drying tube 15, and fan 14's output is connected with drying cabinet 17, is provided with second drying tube 16 on the drying cabinet 17, and drying cabinet 17's inside is provided with filter 21, during the use, starts fan 14, takes moist air in the spray booth out, discharges in the air after filter 21 filters.
The utility model discloses a further set up to: and valves 18 with the same structure and used for controlling the on-off of the pipeline are arranged on the first water inlet 5, the first water outlet 6, the second water inlet 7 and the second water outlet 8.
The utility model discloses a further set up to: and a window 19 for observing the interior of the main paint spray booth body 2 is arranged on the side wall of the main paint spray booth body 2.
The utility model discloses a further set up to: and a sealing door 20 is arranged on one side of the paint spray booth main body 2.
The utility model discloses a further set up to: the filter 21 is the active carbon material for filter the waste gas that sprays paint, prevent to cause the pollution to the air.
The utility model discloses a use and principle as follows: during sewage through spray assembly in the use flows into second water tank 4 through second water inlet 7 and inlet tube 9, and secondary pollution is avoided in centralized processing, and after sewage was collected and was accomplished, start fan 14 and take out the humid air in the spray booth for drying rate.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "left", "right", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, or orientations or positional relationships that are conventionally placed when the products of the present invention are used, or orientations or positional relationships that are conventionally understood by those skilled in the art, and are only for convenience of description of the present invention and simplification of description, but do not indicate or imply that the designated devices or elements must have a specific orientation, be configured and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and the like are used merely to distinguish one description from another, and are not to be construed as indicating or implying relative importance. In the description of the present invention, it should be further noted that, unless otherwise explicitly stated or limited, the terms "disposed" and "connected" should be broadly construed, for example, "connected" may be a fixed connection, a detachable connection, or an integral connection; can be mechanically or electrically connected; the connection may be direct or indirect via an intermediate medium, and may be a communication between the two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art. As used herein, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, including not only those elements listed, but also other elements not expressly listed.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (6)
1. A paint spraying waste gas purification device comprises a base (1) and a paint spraying room main body (2) arranged on the base (1), and is characterized in that a first water tank (3) and a second water tank (4) are respectively arranged on two sides of the paint spraying room main body (2), and a drying assembly is arranged on the paint spraying room main body (2);
a first water inlet (5) and a first water outlet (6) are formed in the first water tank (3), and the first water outlet (6) is connected with the spraying assembly;
a second water inlet (7) and a second water outlet (8) are formed in the second water tank (4), a water inlet pipe (9) is formed in the second water inlet (7), and the water inlet pipe (9) penetrates through the base (1) and is connected with the paint spray booth main body (2);
the spray assembly comprises a water pump (10), a first connecting pipe (11), a second connecting pipe (12) and spray heads (13), wherein the water pump (10) is arranged on one side of the first water tank (3), the input end of the water pump (10) is connected with the first water inlet (5) through the first connecting pipe (11), the output end of the water pump (10) is connected with one end of the second connecting pipe (12), the other end of the second connecting pipe (12) penetrates through the paint spray room main body (2) and extends to the inside, and a plurality of spray heads (13) are arranged on the lower surface of the second connecting pipe (12).
2. The exhaust gas purification device for paint spraying according to claim 1, characterized in that the drying component comprises a fan (14), a first drying pipe (15), a second drying pipe (16) and a drying box (17), the fan (14) is arranged on the main body (2) of the paint spraying room, the input end of the fan (14) is connected with the main body (2) of the paint spraying room through the first drying pipe (15), the output end of the fan (14) is connected with the drying box (17), the second drying pipe (16) is arranged on the drying box (17), and a filter plate (21) is arranged inside the drying box (17).
3. The paint spraying waste gas purification device according to claim 1, characterized in that valves (18) with the same structure for controlling the on-off of the pipeline are arranged on the first water inlet (5), the first water outlet (6), the second water inlet (7) and the second water outlet (8).
4. A painting exhaust gas purification apparatus according to claim 1, wherein a window (19) for observing the inside of the main body (2) of the painting booth is provided on a side wall of the main body (2) of the painting booth.
5. A painting exhaust gas purification apparatus according to claim 1, wherein a sealing door (20) is provided at one side of the painting booth main body (2).
6. A paint spray exhaust gas purification device according to claim 2, wherein the filter plate (21) is made of activated carbon.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123082740.9U CN217410278U (en) | 2021-12-09 | 2021-12-09 | Paint spraying waste gas purification device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123082740.9U CN217410278U (en) | 2021-12-09 | 2021-12-09 | Paint spraying waste gas purification device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217410278U true CN217410278U (en) | 2022-09-13 |
Family
ID=83168785
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202123082740.9U Active CN217410278U (en) | 2021-12-09 | 2021-12-09 | Paint spraying waste gas purification device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217410278U (en) |
-
2021
- 2021-12-09 CN CN202123082740.9U patent/CN217410278U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211189597U (en) | Spray paint exhaust-gas treatment cascade cabinet | |
WO2021208189A1 (en) | Online automatic cleaning and oil removing device | |
CN217410278U (en) | Paint spraying waste gas purification device | |
CN210159398U (en) | Industrial waste gas preprocessing device | |
CN204816116U (en) | Application exhaust -gas treatment equipment | |
CN210674780U (en) | Waste gas biological deodorization treatment equipment | |
CN210906711U (en) | Environment-friendly steel construction spray booth | |
CN210357754U (en) | Paint spray booth | |
CN209810529U (en) | Paint spray booth with paint mist purification function | |
CN215782416U (en) | Furniture processing lacquer house exhaust treatment device | |
CN218794884U (en) | Heat accumulating type catalytic oxidation equipment | |
CN219091615U (en) | Tail gas environmental protection equipment for spray booth | |
CN219355821U (en) | Acid-base waste gas environmental protection treatment device | |
CN216396824U (en) | Environment-friendly paint room | |
CN210613278U (en) | High-efficient exhaust-gas treatment system that sprays paint | |
CN217473112U (en) | High efficiency waste gas acid and alkali lye treatment facility | |
CN214050951U (en) | Novel exhaust-gas treatment equipment | |
CN215138207U (en) | High-efficiency waste gas treatment system | |
CN212039714U (en) | Peculiar smell treatment device of reaction kettle | |
CN213960032U (en) | Production device for filter shell | |
CN216320919U (en) | Water smoke dust collector for graphite production | |
CN219333753U (en) | Cyclone spraying active carbon adsorption waste gas treatment device | |
CN210584250U (en) | Purifier in automobile coating spray booth | |
CN217120599U (en) | Paint spraying apparatus of environmental protection | |
CN210729112U (en) | Paint room exhaust treatment device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |