CN217388181U - Novel cable terminal platform - Google Patents
Novel cable terminal platform Download PDFInfo
- Publication number
- CN217388181U CN217388181U CN202221044775.5U CN202221044775U CN217388181U CN 217388181 U CN217388181 U CN 217388181U CN 202221044775 U CN202221044775 U CN 202221044775U CN 217388181 U CN217388181 U CN 217388181U
- Authority
- CN
- China
- Prior art keywords
- cable
- stretcher
- station
- seat type
- cable terminal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
The utility model relates to the technical field of power maintenance, in particular to a novel cable terminal platform, which comprises two cement poles which are oppositely arranged, and a stretcher is arranged between the two cement poles; a plurality of mounting plates which are arranged at equal intervals are arranged on the stretcher; the mounting plate is provided with a seat type cable terminal and a seat type lightning arrester; the seat type cable terminal and the seat type lightning arrester are connected with a jumper wire; and the wire inlet end and the wire outlet end of the seat type cable terminal are respectively connected with an in-station cable and an out-station cable. The utility model relates to a cable termination platform can solve the out-of-station tower problem that framework atress and angle are unsatisfied to require. The line does not need to be reformed outside the station, and various difficulties such as enclosure, crossing civil houses related to arbitrary path change and the like are considered. The power failure construction time is short, the equal-diameter rod is simple in structure, and construction and transportation are convenient.
Description
Technical Field
The utility model relates to an electric power maintenance technical field specifically is a novel cable termination platform.
Background
Along with the development of a power grid, only two power supply incoming lines of a transformer substation with a longer operation life are arranged on one section of bus, the requirement for overhauling the bus of the transformer substation cannot be met, the safety operation risk of the power grid exists when the section of bus where a power supply is arranged is completely stopped, one power supply circuit needs to be adjusted to the second section of bus according to the requirement of a dispatching mode, and partial primary equipment and line equipment need to be expanded for adjustment.
The existing transformer substation layout, the environment outside the station, the current tower situation, civil facilities and other factors influence the following difficulties: the space available in the transformer substation is very small, the line outgoing of the out-of-station line is complex, and the change of the line outgoing path can interfere with residents in nearby areas; and the condition that the power failure construction time is short and the construction must be finished in a short time is also met, so that the normal power utilization of the area is ensured.
SUMMERY OF THE UTILITY MODEL
The utility model discloses to the technical problem who exists among the prior art, provide a neotype cable termination platform and solve above-mentioned problem.
The utility model provides an above-mentioned technical problem's technical scheme as follows: a novel cable terminal platform comprises two cement rods which are oppositely erected, and a stretcher is erected between the two cement rods; a plurality of mounting plates which are arranged at equal intervals are arranged on the stretcher; the mounting plate is provided with a seat type cable terminal and a seat type lightning arrester; the seat type cable terminal and the seat type lightning arrester are connected with a jumper wire; and the wire inlet end and the wire outlet end of the seat type cable terminal are respectively connected with an in-station cable and an out-station cable.
On the basis of the technical scheme, the utility model discloses can also do following improvement.
Further, the outside of station cable still is equipped with the cable protection pipe, two still be equipped with the protection tube support that is used for fixed cable protection pipe between the cement pole.
Further, a fixing frame which is positioned right above the stretcher is erected between the two cement poles.
Further, the mount includes the mount crossbeam of two sets of relative settings, is equipped with a plurality of mount diagonal braces that are triangle-shaped and arrange between two mount crossbeams.
Furthermore, the stretcher comprises two groups of stretcher beams which are oppositely arranged, and a plurality of reinforcing beams are arranged between the two stretcher beams.
Furthermore, a stretcher inclined strut is arranged between the stretcher beam and the cement rod.
The beneficial effects of the utility model are that:
the utility model relates to a cable termination platform can solve the outer tower problem that stands of unsatisfied requirement of framework atress and angle.
The utility model relates to a cable termination platform no longer need to reform transform the circuit outside the station, considers enclosure and the crossing over all sorts of difficulties such as civilian houses that the arbitrary route that changes relates to.
The utility model relates to a cable termination platform, the power failure engineering time is short, and constant diameter pole simple structure, construction and transportation are all convenient.
The utility model relates to a cable termination platform, the maintainer overhauls the potential safety hazard and reduces greatly after having implemented, and the generating line has a power failure and overhauls safelyr.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic view of the top view structure of the stretcher of the present invention;
fig. 3 is a schematic top view of the fixing frame of the present invention;
FIG. 4 is a schematic diagram of a scheme of a substation full-line interval regulation in the embodiment;
fig. 5 is a schematic structural diagram of the practical application of the present invention.
In the drawings, the reference numbers indicate the following list of parts:
1. cement pole, 2, stretcher, 201, stretcher crossbeam, 202, stiffening beam, 203, stretcher bracing, 3, mounting panel, 4, seat formula cable termination, 5, seat formula arrester, 6, jumper wire, 7, station cable, 8, station cable, 9, cable protection pipe, 91, protection pipe support, 10, mount, 101, mount crossbeam, 102, mount bracing.
Detailed Description
The principles and features of the present invention are described below in conjunction with the following drawings, the examples given are only intended to illustrate the present invention and are not intended to limit the scope of the present invention.
It should be noted that, unless otherwise expressly specified or limited, the terms "mounted," "connected," and "connected" are intended to be construed broadly, as if they were connected either fixedly or removably, or as integrally formed structures. To those of ordinary skill in the art, the specific meaning of such terms in this patent may be understood as appropriate.
Taking the 110kV zijin station in the valley city of xiangyang as an example, two power supply incoming lines, fen zizi line and zibai line, of the 110kV zijin station are both located on one section of bus, and the original violet protection line on the two sections of bus needs to quit operation due to the mode, so that the station has the risk of the power grid. According to the requirement of a dispatching mode, the Fenzilian cable needs to be adjusted to a two-section bus, the existing interval of the two-section bus is a main transformer interval and an original purple protector, the scheme analysis and design are needed to be carried out when the interval is adjusted to which interval, and partial primary equipment and line equipment adjustment is carried out simultaneously. And selecting the optimal scheme for adjusting the interval by analyzing the current situation of the station and comparing and selecting various schemes. Finally, a novel door-shaped framework cable platform is developed to optimize the interval adjustment scheme.
The current interval arrangement is successively purple, main transformer interval, subsection, fen purple, main transformer interval and white purple from the west, south to the east and north, and particularly refer to fig. 4.
The construction is influenced by the existing transformer substation layout and the pole and tower arrangement outside the substation, the work is difficult and heavy, and firstly, the space available in the Zijin substation is very small. Secondly, the transformer substation is put into operation for 40 years, and the framework, the tower material and the ground lead are corroded, so that a plurality of potential safety hazards exist; thirdly, the line outgoing of the line outside the station is complex, a civil house near a line corridor is subjected to a seam insertion, and any path change can involve crossing the civil house; fourthly, the power failure construction time is short, and the construction must be finished in a short time, so that the power utilization of the purple gold supply area is ensured. Fifthly, the tower position of the existing 35kV cable terminal is used up and occupies the original 110kV outgoing tower position. The normal incoming and outgoing lines of 110kV are influenced. Sixthly, after the interval adjustment is finished, the maintenance safety of personnel needs to be considered. All of the above cases bring unprecedented risks and challenges to this adjustment interval engineering.
To the above-mentioned problem, to this the utility model provides a novel cable termination platform solves above-mentioned problem.
The embodiment of the utility model is as follows
As shown in fig. 1 and fig. 2, the novel cable termination platform designed by the present invention comprises two oppositely erected cement poles 1, wherein the cement pole 1 has a length of 12 meters and a diameter of 0.3 meter; a stretcher 2 is arranged between the two cement rods 1; a plurality of mounting plates 3 which are arranged at equal intervals are arranged on the stretcher 2; the mounting plate 3 is provided with a seat type cable terminal 4 and a seat type lightning arrester 5; the seat type cable terminal 4 and the seat type lightning arrester 5 are connected with a jumper 6; the wire inlet end and the wire outlet end of the seat type cable terminal 4 are respectively connected with an in-station cable 7 and an out-station cable 8 which are respectively used for connecting in-station and out-station inlet and outlet wires. The station cable 7 can be laid by adopting a station cable trench, and the length of a single cable is 70 m.
As shown in figure 5, the utility model relates to a neotype cable termination platform, the position of taking up an area of can be very big sparingly, take up an area of for a short time than steel pipe pole basis, the position of affairs standing between enclosure and road.
As an implementation mode, the cable protection pipe 9 is further sleeved outside the station cable 7, and a protection pipe bracket 91 for fixing the cable protection pipe 9 is further arranged between the two cement rods 1 so as to isolate and protect the station cable 7.
As an embodiment, a fixing frame 10 is further erected between the two cement poles 1 and located right above the stretcher 2, so as to increase the horizontal stress strength between the two cement poles 1 and reduce the internal stress of the stretcher 2.
Specifically, as shown in fig. 3, the fixing frame 10 includes two sets of fixing frame beams 101 disposed oppositely, and a plurality of fixing frame diagonal braces 102 arranged in a triangular shape are disposed between the two fixing frame beams 101, so as to reduce structural consumption and achieve high structural strength.
As an embodiment, as shown in fig. 2, the stretcher 2 includes two sets of opposing stretcher beams 201, and a plurality of stiffening beams 202 are disposed between the two stretcher beams 201, so as to reduce the material consumption and improve the carrying capacity, thereby stably installing the power distribution equipment.
In addition, a stretcher inclined strut 203 is further arranged between the stretcher cross beam 201 and the cement pole 1, and the structural force of the stretcher cross beam 201 relative to the vertical direction of the cement pole 1 is increased.
The above description is only for the preferred embodiment of the present invention, and should not be construed as limiting the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention.
Claims (6)
1. A novel cable terminal platform is characterized by comprising two cement rods (1) which are oppositely erected, wherein a stretcher (2) is erected between the two cement rods (1); a plurality of mounting plates (3) which are arranged at equal intervals are arranged on the stretcher (2); the mounting plate (3) is provided with a seat type cable terminal (4) and a seat type lightning arrester (5); the seat-type cable terminal (4) and the seat-type lightning arrester (5) are connected with a jumper (6); the incoming line end and the outgoing line end of the seat type cable terminal (4) are respectively connected with an in-station cable (7) and an out-station cable (8).
2. The novel cable termination platform according to claim 1, wherein a cable protection tube (9) is further sleeved outside the in-station cable (7), and a protection tube support (91) for fixing the cable protection tube (9) is further arranged between the two cement poles (1).
3. The new cable termination platform according to claim 1, characterized in that a fixing frame (10) is also erected between the two cement poles (1) directly above the stretcher (2).
4. A novel cable termination platform according to claim 3, characterized in that the fixture (10) comprises two sets of oppositely arranged fixture beams (101), and a plurality of triangularly arranged fixture struts (102) are arranged between two fixture beams (101).
5. A novel cable termination platform according to claim 1, characterized in that the stretcher (2) comprises two sets of oppositely arranged stretcher beams (201), between two stretcher beams (201) are provided a plurality of stiffening beams (202).
6. The new cable termination platform according to claim 5, characterized in that stretcher braces (203) are also provided between the stretcher beam (201) and the cement pole (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221044775.5U CN217388181U (en) | 2022-05-05 | 2022-05-05 | Novel cable terminal platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221044775.5U CN217388181U (en) | 2022-05-05 | 2022-05-05 | Novel cable terminal platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217388181U true CN217388181U (en) | 2022-09-06 |
Family
ID=83109284
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221044775.5U Active CN217388181U (en) | 2022-05-05 | 2022-05-05 | Novel cable terminal platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217388181U (en) |
-
2022
- 2022-05-05 CN CN202221044775.5U patent/CN217388181U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2012078073A1 (en) | Transition tower for an overhead electrical transmission line into a power cable, and overhead electrical transmission line having such a tower | |
CN208508441U (en) | A kind of distribution low-voltage circuit junction box | |
CN217388181U (en) | Novel cable terminal platform | |
CN109449867A (en) | +/-1100 KV direct-current line strain tower lightning arrester device and dismounting method | |
CN214506064U (en) | 500kV main transformer overhead incoming line structure of 500kV indoor transformer substation | |
CN213043236U (en) | Power transformation framework | |
CN212478731U (en) | Three-loop cable terminal iron tower with high-altitude area maintenance platform | |
CN212359263U (en) | Power transformation framework | |
CN210349469U (en) | Transmission line support insulator gold utensil end | |
CN205159803U (en) | 220 outdoor GIS of formula arrangement structure that is qualified for next round of competitions is united to kilovolt sail | |
CN108766725B (en) | Supporting and shielding structure for dry type air-core reactor | |
CN207651992U (en) | A kind of 110 kv cable outdoor terminal platforms | |
CN111864546A (en) | Power transformation framework | |
CN210867041U (en) | GIS (geographic information system) outgoing line framework with two loops and one span | |
CN111864543A (en) | Power transformation framework | |
CN216197038U (en) | Double-loop pi connects strain insulator steel pipe pole | |
CN212359262U (en) | Power transformation framework | |
CN110535036A (en) | A kind of indoor GIS device bilayer "-" type outlet arragement construction of 220kV | |
CN219535583U (en) | 110kV single-circuit flat-bed-free type cable terminal tower | |
CN205029186U (en) | Built on stilts outlet structure of two article fonts of indoor transformer substation combination formula | |
CN216290105U (en) | Self-supporting cable terminal support platform | |
CN221031765U (en) | 220KV double-circuit short type cable terminal rod | |
CN217282133U (en) | Tower arrangement structure on high tension cable | |
CN212626526U (en) | Power transformation framework | |
CN115749418A (en) | Cable platform for double-loop steel pipe tower of power transmission line |