CN217379343U - Pre-buried antidetonation support that wall body and heel post are connected - Google Patents

Pre-buried antidetonation support that wall body and heel post are connected Download PDF

Info

Publication number
CN217379343U
CN217379343U CN202123033989.0U CN202123033989U CN217379343U CN 217379343 U CN217379343 U CN 217379343U CN 202123033989 U CN202123033989 U CN 202123033989U CN 217379343 U CN217379343 U CN 217379343U
Authority
CN
China
Prior art keywords
wall body
rod
support
seismic support
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123033989.0U
Other languages
Chinese (zh)
Inventor
宋丹丹
宋康康
崔恒
崔晶晶
霍祥朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Dahua Hongye Construction Co.,Ltd.
Original Assignee
Hebei Heyu Fastener Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Heyu Fastener Manufacturing Co ltd filed Critical Hebei Heyu Fastener Manufacturing Co ltd
Priority to CN202123033989.0U priority Critical patent/CN217379343U/en
Application granted granted Critical
Publication of CN217379343U publication Critical patent/CN217379343U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model belongs to the technical field of anti-seismic support, in particular to a pre-buried anti-seismic support for connecting a wall body and bearing columns, which comprises a wall body arranged between two bearing columns, wherein a fixing component is arranged in the bearing columns, an anti-seismic support body is arranged on the fixing component, one end of the anti-seismic support body extends into the wall body, a connecting component is arranged in the wall body, and two ends of the connecting component are respectively connected with the anti-seismic support bodies on two sides, the utility model discloses an anti-seismic support body positioned on the fixing component is arranged, a support rod is fixed on a fixed seat, and the other end of the support rod plays a supporting role for the connecting component, the support rod is fastened on the fixed seat through a pull rod, thereby forming a triangular structure among the support rod, the pull rod and the fixed seat, thereby increasing the anti-seismic strength of the anti-seismic support body, and solving the problem that the existing anti-seismic support has a simple structure, the problem of deformation of the bracket can be caused after the bracket is extruded by gravity.

Description

Pre-buried antidetonation support that wall body and heel post are connected
Technical Field
The utility model belongs to the technical field of the antidetonation support, concretely relates to pre-buried antidetonation support that wall body and heel post are connected.
Background
When the house is built, the steel bars are adopted to manufacture the anti-seismic support between the wall body and the bearing column, and the anti-seismic strength between the wall body and the bearing column is improved through the anti-seismic support.
The existing anti-seismic support is simple in structure, the support can be deformed after being extruded by gravity, and meanwhile, deformed reinforcing steel bars cannot restore to the original positions.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pre-buried antidetonation support that wall body and heel post are connected to solve the current antidetonation support simple structure who provides among the above-mentioned background art, can lead to the support to take place deformation after the extrusion that receives gravity, the unable normal position that resumes of reinforcing bar that warp simultaneously, current antidetonation support does not have fastener, can not carry out the problem fixed to the strengthening rib.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pre-buried antidetonation support that wall body and heel post are connected, is including setting up the wall body between two heel posts, be provided with fixed subassembly in the heel post, be provided with antidetonation support body on the fixed subassembly, the one end of antidetonation support body extends to in the wall body, be provided with coupling assembling in the wall body, coupling assembling's both ends respectively with this body coupling of antidetonation support of both sides.
Preferably, coupling assembling includes that connecting rod and connecting rod both ends rotate the external member that sets up, be provided with the strengthening rib on the connecting rod, be provided with fastening assembly between strengthening rib and the connecting rod.
Preferably, the fastening assembly comprises a connecting piece and spring buckles fixedly connected with two ends of the connecting piece, the spring buckles are respectively arranged at the upper end and the lower end of the connecting piece, and the two spring buckles are connected with the reinforcing rib in a clamping manner.
Preferably, the fixing assembly comprises a fixing rod and a fixing seat fixedly arranged on the fixing rod, and the fixing rod is vertically arranged inside the bearing column.
Preferably, the antidetonation support body includes that branch and branch middle part rotate the pull rod of connecting, the one end of branch and the bottom fixed connection of fixing base, the one end of pull rod is rotated with the top of fixing base and is connected.
Preferably, the sleeve is arranged on the support rod and is connected with the support rod in a sliding mode.
Preferably, the connecting rod is provided with a through hole, and the reinforcing rib is arranged in the through hole.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the utility model discloses set up the antidetonation support body that is located fixed subassembly, branch is fixed on the fixing base, and the other end of branch plays the supporting role to coupling assembling, fastens branch on the fixing base through the pull rod to with forming the triangle-shaped structure between branch, pull rod and the fixing base, thereby increased the shock resistance of antidetonation support body, solved current antidetonation support simple structure, can lead to the support to take place the problem of deformation after receiving the extrusion of gravity.
(2) The utility model discloses set up the fastening components who is located block between strengthening rib and the connecting rod, the strengthening rib passes through the through-hole and establishes ties on the connecting rod, blocks two snak links respectively on the strengthening rib of both sides about the connecting rod to with the tight block of strengthening rib on the connecting rod, realized that the strengthening rib fastens fast on the connecting rod function, solved current antidetonation support and had not fastener, can not carry out the problem of fixing to the strengthening rib.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a top view of the present invention;
FIG. 3 is a top view of the connecting rod and reinforcing ribs of the present invention;
fig. 4 is a side view of the fastening assembly of the present invention;
in the figure: 1. a load-bearing column; 2. an anti-seismic support body; 3. a pull rod; 4. a strut; 5. a connection assembly; 6. a connecting rod; 7. a kit; 8. reinforcing ribs; 9. a fixing assembly; 10. a fixing rod; 11. a fixed seat; 12. a fastening assembly; 13. a through hole; 14. a spring buckle; 15. a connecting member; 16. a wall body.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a pre-buried antidetonation support that wall body and heel post are connected, is provided with fixed subassembly 9 in the heel post 1 including setting up the wall body 16 between two heel posts 1, is provided with antidetonation support body 2 on the fixed subassembly 9, and the one end of antidetonation support body 2 extends to wall body 16, is provided with coupling assembling 5 in the wall body 16, and coupling assembling 5's both ends are connected with the antidetonation support body 2 of both sides respectively.
Further, coupling assembling 5 includes that connecting rod 6 and 6 both ends of connecting rod rotate the external member 7 that sets up, is provided with strengthening rib 8 on the connecting rod 6, is provided with fastening components 12 between strengthening rib 8 and the connecting rod 6, through fastening components 12 with the fastening of strengthening rib 8 firmly on connecting rod 6, avoids strengthening rib 8 to break away from connecting rod 6, and elastic material through snak clasp 14 simultaneously can be quick fastens strengthening rib 8.
Specifically, the fastening assembly 12 includes a connecting member 15 and two spring buckles 14 fixedly connected to two ends of the connecting member 15, the two spring buckles 14 are respectively disposed at the upper and lower ends of the connecting member 15, and the two spring buckles 14 are both connected to the reinforcing rib 8 in a clamping manner.
It should be noted that the fixing assembly 9 includes a fixing rod 10 and a fixing seat 11 fixedly disposed on the fixing rod 10, and the fixing rod 10 is vertically disposed inside the bearing column 1.
Further, antidetonation support body 2 includes that branch 4 and 4 middle parts of branch rotate the pull rod 3 of connecting, and the one end of branch 4 and the bottom fixed connection of fixing base 11, the one end of pull rod 3 and the top of fixing base 11 are rotated and are connected, and pull rod 3 increases the shock strength of branch 4.
Furthermore, the sleeve member 7 is arranged on the support rod 4 and is in sliding connection with the support rod 4, when vibration occurs, the sleeve member 7 slides on the support rod 4, so that the connection strength of the connecting rod 6 is increased, and after the vibration stops, the connecting rod 6 can reset on the support rod 4 through the sleeve member 7, so that the function that the connecting component 5 cannot be reset quickly after being deformed is avoided.
Furthermore, a through hole 13 is formed in the connecting rod 6, and the reinforcing rib 8 is arranged in the through hole 13.
The utility model discloses a theory of operation and use flow: the utility model discloses when using, fixed subassembly 9 sets up in heel post 1 through dead lever 10 is perpendicular, fixing base 11 provides the holding position for antidetonation support body 2, 3 strengthening support 4's of pull rod antidetonation intensity, connecting rod 6 on the coupling assembling 5 connects respectively on the branch 4 of both sides through external member 7, connect strengthening rib 8 between connecting rod 6 through-hole 13, block respectively on the strengthening rib 8 of connecting rod 6 both sides with two snaks 14 on the fastening component 12 to fasten strengthening rib 8 on connecting rod 6.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a pre-buried antidetonation support that wall body and heel post are connected which characterized in that: including setting up wall body (16) between two heel posts (1), be provided with fixed subassembly (9) in heel post (1), be provided with antidetonation support body (2) on fixed subassembly (9), the one end of antidetonation support body (2) extends to in wall body (16), be provided with coupling assembling (5) in wall body (16), the both ends of coupling assembling (5) are connected with the antidetonation support body (2) of both sides respectively.
2. The embedded anti-seismic support for connecting the wall body and the bearing column according to claim 1, which is characterized in that: coupling assembling (5) are including connecting rod (6) and connecting rod (6) both ends rotate external member (7) that set up, be provided with strengthening rib (8) on connecting rod (6), be provided with fastening component (12) between strengthening rib (8) and connecting rod (6).
3. The embedded anti-seismic support for connecting the wall body and the bearing column as claimed in claim 2, is characterized in that: fastening components (12) include connecting piece (15) and connecting piece (15) both ends fixed connection's snak link (14), two snak link (14) set up respectively in the upper and lower both ends of connecting piece (15), and two snak links (14) all are connected with strengthening rib (8) block.
4. The embedded anti-seismic support for connecting the wall body and the bearing column according to claim 1, which is characterized in that: the fixing assembly (9) comprises a fixing rod (10) and a fixing seat (11) fixedly arranged on the fixing rod (10), and the fixing rod (10) is vertically arranged inside the bearing column (1).
5. The pre-buried anti-seismic support that wall body and heel post are connected of claim 4, its characterized in that: antidetonation support body (2) include branch (4) and branch (4) middle part and rotate pull rod (3) of connecting, the one end of branch (4) and the bottom fixed connection of fixing base (11), the one end of pull rod (3) is rotated with the top of fixing base (11) and is connected.
6. The pre-buried anti-seismic support that wall body and heel post are connected of claim 5, its characterized in that: the supporting rod (4) is provided with a sleeve piece (7), and the sleeve piece (7) is connected with the supporting rod (4) in a sliding mode.
7. The pre-buried anti-seismic support that wall body and heel post are connected of claim 3, its characterized in that: the connecting rod (6) is provided with a through hole (13), and the reinforcing rib (8) is arranged in the through hole (13).
CN202123033989.0U 2021-12-06 2021-12-06 Pre-buried antidetonation support that wall body and heel post are connected Active CN217379343U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123033989.0U CN217379343U (en) 2021-12-06 2021-12-06 Pre-buried antidetonation support that wall body and heel post are connected

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123033989.0U CN217379343U (en) 2021-12-06 2021-12-06 Pre-buried antidetonation support that wall body and heel post are connected

Publications (1)

Publication Number Publication Date
CN217379343U true CN217379343U (en) 2022-09-06

Family

ID=83084817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123033989.0U Active CN217379343U (en) 2021-12-06 2021-12-06 Pre-buried antidetonation support that wall body and heel post are connected

Country Status (1)

Country Link
CN (1) CN217379343U (en)

Similar Documents

Publication Publication Date Title
CN213030310U (en) Supporting component frame convenient for covering sofa fabric with skin
CN111248681B (en) Supporting component of functional sofa iron frame
CN217379343U (en) Pre-buried antidetonation support that wall body and heel post are connected
CN110847368A (en) Buckling restrained brace component with aluminum alloy wood structure
CN201037282Y (en) Building carrying plate
CN213087498U (en) Anti-falling frame for building construction
CN212302873U (en) Sand table for urban construction planning
CN214996272U (en) Steel structure reinforcing device
CN209353810U (en) A kind of force-bearing plate bicycle shed fixed frame
CN214364038U (en) Building high-rise wind diversion structure
KR100913729B1 (en) Pole for mesh fence
CN215622482U (en) Frame of scooter
CN109027639B (en) High-strength aluminum alloy support hanger anti-seismic diagonal bracing connecting assembly and diagonal bracing installation method
CN212251438U (en) Building drain valve lower margin
CN210947185U (en) Framework fixing piece for assembling single shed
CN217949332U (en) High strength light steel structure for building
CN216379950U (en) Novel house steel structural member convenient to assemble and disassemble
CN215495948U (en) Show exhibition frame of fast curtain with stability
CN221106834U (en) Outdoor climbing frame split mounting structure
CN216772989U (en) Transformer assembling support
CN216041711U (en) Internal supporting and reinforcing frame for steel structure house
CN216641889U (en) Fast assembly forming's no welding point steel door
CN218176620U (en) Template for building construction
CN219794222U (en) Building steel structure supporting structure
CN221778640U (en) Steel construction beam column node means

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240517

Address after: No. 2, 3rd Floor, Unit 1, Building 2, No. 9-2, Zhangba East Road, Yanta District, Xi'an City, Shaanxi Province, 710000

Patentee after: Wang Xiaowei

Country or region after: China

Address before: East Village, Beishikou Village, Linmingguan Town, Yongnian District, Handan City, Hebei Province, 057150

Patentee before: Hebei Heyu Fastener Manufacturing Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240621

Address after: 710000, No. 291, West 5th Street, East Wall, Beifeng Village, Doumen Street Office, Fengdong New City, Xi'an City, Shaanxi Province

Patentee after: Shaanxi Dahua Hongye Construction Co.,Ltd.

Country or region after: China

Address before: No. 2, 3rd Floor, Unit 1, Building 2, No. 9-2, Zhangba East Road, Yanta District, Xi'an City, Shaanxi Province, 710000

Patentee before: Wang Xiaowei

Country or region before: China