CN217375419U - Novel pipeline storage rack for road and bridge engineering - Google Patents

Novel pipeline storage rack for road and bridge engineering Download PDF

Info

Publication number
CN217375419U
CN217375419U CN202220272552.8U CN202220272552U CN217375419U CN 217375419 U CN217375419 U CN 217375419U CN 202220272552 U CN202220272552 U CN 202220272552U CN 217375419 U CN217375419 U CN 217375419U
Authority
CN
China
Prior art keywords
box
placing
storage rack
road
bridge engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220272552.8U
Other languages
Chinese (zh)
Inventor
王俊文
张云甫
陈嘉宾
吕奎元
窦思扬
景美蓉
李永扩
廖绪春
陈城
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Road and Bridge Engineering Group Co Ltd
Original Assignee
Anhui Road and Bridge Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Road and Bridge Engineering Group Co Ltd filed Critical Anhui Road and Bridge Engineering Group Co Ltd
Priority to CN202220272552.8U priority Critical patent/CN217375419U/en
Application granted granted Critical
Publication of CN217375419U publication Critical patent/CN217375419U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/80Packaging reuse or recycling, e.g. of multilayer packaging

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a pipeline storage rack technical field specifically discloses a novel pipeline storage rack for road bridge engineering, including placing box and a plurality of baffle of dismantling the connection in placing the box, the bilateral symmetry rigid coupling of placing the box has the strake, it has a plurality of spacing grooves to place one side that the box was equipped with the strake and evenly open, it has a plurality of jacks with the spacing groove one-to-one to open on the strake, the screens piece of spacing inslot can be gone into to the bilateral symmetry rigid coupling of baffle, the equal rigid coupling in free end of screens piece has the inserted bar that can insert in the jack, the bilateral symmetry rigid coupling of placing the box has the fixed strip, it has a plurality of spacing holes that can supply the inserted bar male all to open on the fixed strip, the utility model provides a traditional pipeline storage rack because can't be according to the pipeline classification deposit lead to the trouble problem of pipeline taking.

Description

Novel pipeline storage rack for road and bridge engineering
Technical Field
The application relates to the technical field of pipeline storage racks, and particularly discloses a novel pipeline storage rack for road and bridge engineering.
Background
In the building site, the pipeline that required used is mostly by orderly stack on construction site, because construction site's ground unevenness, the pipeline that is located the below is impaired easily, and the pipeline after the impaired can cause the infiltration if the later stage is installed after, and it is very troublesome to install again, and current pipeline strorage device is only simple leaves all pipelines together, but the pipe diameter of different pipelines is different, and is more troublesome when the pipeline of not categorised placing takes.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve traditional pipeline storage rack because can't be according to depositing the trouble problem of pipeline taking with pipeline classification.
In order to achieve the above object, the present invention provides the following basic scheme: including placing the box and a plurality of baffle of connection in placing the box of dismantling, the bilateral symmetry rigid coupling of placing the box has the strake, and one side of placing the box and being equipped with the strake is evenly opened has a plurality of spacing grooves, and it has a plurality of jacks with the spacing groove one-to-one to open on the strake, and the bilateral symmetry rigid coupling of baffle can block into the screens piece of spacing inslot, and the equal rigid coupling in free end of screens piece has the inserted bar that can insert in the jack, and the bilateral symmetry rigid coupling of placing the box has the fixed strip, all opens on the fixed strip and has a plurality of spacing holes that can supply the inserted bar to insert.
The principle and effect of this basic scheme lie in:
1. compared with the prior art, the utility model discloses simple structure thinks about ingeniously, and the baffle will be placed the inner space and separate in the inside of placing the box, inserts the pipeline of the space between two adjustable baffles of different spacing inslot in order to adapt to different diameters with the baffle, can carry out effectual classification to the pipeline and deposit and solved traditional pipeline storage rack owing to can't be according to depositing the pipeline classification and lead to the pipeline trouble problem of taking.
Furthermore, a plurality of fixing holes are symmetrically formed in the inner bottom surface of the placing box, and the partition plates are symmetrically and slidably connected with supporting rods capable of being inserted into the fixing holes. The bracing piece inserts the fixed orifices inner shell of placing the box bottom and makes the baffle place the box in stable not producing and rock, has increased the stability of baffle.
Furthermore, through holes are symmetrically formed in the partition plate, the supporting rods are respectively inserted into the through holes, and fixing blocks are fixedly connected to the ends, far away from the fixing holes, of the supporting rods. The fixed block plays a role in limiting the supporting rod to slide out of the through hole.
Furthermore, the one side that the baffle was equipped with the screens piece all the rigid coupling have be convenient for lift the handle of baffle. The handle is convenient for lifting the partition plate when the position of the partition plate is adjusted.
Further, place box below and be equipped with the support frame, place the box and rotate and connect on the support frame. The placing box can rotate on the supporting frame, so that a long pipeline is convenient to take and store.
Furthermore, the two sides of the placing box are symmetrically and fixedly connected with rotating shafts, and the rotating shafts are respectively connected with the two sides of the supporting frame in a rotating mode. The rotating shaft is connected with the placing box for supporting.
Furthermore, one side of the placing box is provided with a handle which is convenient for rotating the placing box. The handle is convenient for rotate and place the box, and the box of placing of pipeline is more bearing, and it can be laborsaving to set up the handle.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the description below are only some embodiments of the present application, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
Fig. 1 shows a schematic structural diagram of a novel pipeline storage rack for road and bridge engineering according to an embodiment of the present application;
fig. 2 shows a top view of fig. 1 of a novel pipeline storage rack for road and bridge engineering according to an embodiment of the present application;
fig. 3 shows a left side view of fig. 1 of a novel pipeline storage rack for road and bridge engineering according to an embodiment of the present application.
Detailed Description
To further illustrate the technical means and effects of the present invention adopted to achieve the objects of the present invention, the following detailed description of the embodiments, structures, features and effects according to the present invention will be made with reference to the accompanying drawings and preferred embodiments.
Reference numerals in the drawings of the specification include: placing box 1, support frame 2, baffle 3, spacing groove 4, jack 5, screens piece 6, inserted bar 7, fixed strip 8, spacing hole 9, fixed orifices 10, bracing piece 11.
Examples are shown in fig. 1 and 2:
the utility model provides a novel pipeline storage rack for road bridge engineering, including supporting to raise the grief and rotate the box 1 of placing of connecting between support frame 2, it has the strake to place the equal rigid coupling in box 1 top left and right sides, evenly open six through-holes on the strake, the top of placing box 1 left and right sides wall all is equipped with the spacing groove 4 with through-hole position one-to-one, it is equipped with three baffles 3 in the box 1 to place, the left and right sides symmetry rigid coupling of baffle 3 has screens piece 6, the equal rigid coupling in bottom of screens piece 6 has inserted bar 7, inserted bar 7 inserts in the through-hole respectively, screens piece 6 can block into spacing groove 4, the left and right sides wall of placing box 1 still rigid coupling has fixed strip 8, evenly be provided with six spacing holes 9 on fixed strip 8, the bottom of the inserted bar 7 of interlude through-hole can block into the spacing hole 9 on fixed strip 8.
Symmetrical sliding connection has bracing piece 11 on the baffle 3, places box 1 bottom and is equipped with a plurality of fixed orifices 10, and the bottom of bracing piece 11 can insert the fixed orifices 10 that correspond in, and the equal rigid coupling in top of bracing piece 11 has the fixed block, and 3 tops of baffle all are equipped with the handle that the convenience was mentioned baffle 3.
The left side and the right side of the placing box 1 are symmetrically provided with rotating shafts which are respectively connected with the supporting frames 2 in a rotating way, as shown in figure 3, the rear side of the placing box 1 is also provided with a handle, and the handle is convenient for rotating the heavy placing box 1.
The specific implementation process comprises the following steps: when depositing the pipeline, constructor can classify and deposit the pipeline of different diameters, only need place the distance between the baffle 3 in box 1 in the adjustment and just can will place box 1 and separate out the space of equidimension not, be used for depositing the great pipeline of diameter between the baffle 3 that the distance is big, be used for depositing the less pipeline of diameter between the baffle 3 that the distance is little.
It should be noted that support rod 11 on the baffle 3 is inserted into the fixed orifices 10 of placing the bottom surface of box 1 correspondingly when inserting baffle 3, and support rod 11 can play fixed stay's effect to baffle 3, because longer pipeline is not good to take when getting to take the pipeline of placing in the box 1, can handle simultaneously and rotate and place box 1 in order to conveniently take the pipeline.
The utility model discloses set up baffle 3 of adjustable quantity and distance in placing box 1, solved traditional pipeline storage rack because can't be according to depositing the pipeline classification and lead to the trouble problem of pipeline taking.
The above description is only a preferred embodiment of the present invention, and the present invention is not limited to the above description, and although the present invention has been disclosed by the preferred embodiment, it is not limited to the present invention, and any person skilled in the art can make modifications or changes equivalent to the equivalent embodiments by utilizing the above disclosed technical contents without departing from the technical scope of the present invention, but all the modifications, changes and changes of the technical spirit of the present invention made to the above embodiments are also within the scope of the technical solution of the present invention.

Claims (7)

1. The utility model provides a novel pipeline storage rack for road bridge engineering which characterized in that: including placing the box and a plurality of baffle of connection in placing the box of dismantling, the bilateral symmetry rigid coupling of placing the box has the strake, and one side of placing the box and being equipped with the strake is evenly opened has a plurality of spacing grooves, and it has a plurality of jacks with the spacing groove one-to-one to open on the strake, and the bilateral symmetry rigid coupling of baffle can block into the screens piece of spacing inslot, and the equal rigid coupling in free end of screens piece has the inserted bar that can insert in the jack, and the bilateral symmetry rigid coupling of placing the box has the fixed strip, all opens on the fixed strip and has a plurality of spacing holes that can supply the inserted bar to insert.
2. The novel pipeline storage rack for road and bridge engineering as claimed in claim 1, wherein a plurality of fixing holes are symmetrically formed in the inner bottom surface of the storage box, and the partition plates are symmetrically and slidably connected with supporting rods capable of being inserted into the fixing holes.
3. The novel pipeline storage rack for road and bridge engineering as claimed in claim 2, wherein the partition plates are symmetrically provided with through holes, the support rods are respectively inserted into the through holes, and the ends of the support rods far away from the fixing holes are fixedly connected with fixing blocks.
4. The novel pipeline storage rack for road and bridge engineering according to claim 1, wherein a handle for conveniently lifting the partition plate is fixedly connected to one side of the partition plate, which is provided with the clamping block.
5. The novel pipeline storage rack for road and bridge engineering as claimed in claim 1, wherein a support frame is arranged below the placing box, and the placing box is rotatably connected to the support frame.
6. The novel pipeline storage rack for road and bridge engineering as claimed in claim 5, wherein the two sides of the storage box are symmetrically and fixedly connected with rotating shafts, and the rotating shafts are respectively rotatably connected with the two sides of the support frame.
7. The novel pipeline storage rack for road and bridge engineering as claimed in claim 6, wherein a handle for rotating the storage box is arranged on one side of the storage box.
CN202220272552.8U 2022-02-10 2022-02-10 Novel pipeline storage rack for road and bridge engineering Expired - Fee Related CN217375419U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220272552.8U CN217375419U (en) 2022-02-10 2022-02-10 Novel pipeline storage rack for road and bridge engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220272552.8U CN217375419U (en) 2022-02-10 2022-02-10 Novel pipeline storage rack for road and bridge engineering

Publications (1)

Publication Number Publication Date
CN217375419U true CN217375419U (en) 2022-09-06

Family

ID=83098649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220272552.8U Expired - Fee Related CN217375419U (en) 2022-02-10 2022-02-10 Novel pipeline storage rack for road and bridge engineering

Country Status (1)

Country Link
CN (1) CN217375419U (en)

Similar Documents

Publication Publication Date Title
CN217375419U (en) Novel pipeline storage rack for road and bridge engineering
CN114572676A (en) Copper pipe clamping and feeding device
CN116730112A (en) Auxiliary stand for cable threading and laying
CN212489339U (en) Drawing board show shelf for visual transmission design
CN115324381A (en) Strutting arrangement is used in whole construction of pipe truss
CN112388594A (en) A store device for wisdom blackboard
CN211168124U (en) Steel pipe storage rack
CN219313654U (en) Storage refrigeration product rack
CN207932291U (en) A kind of adjustable pipeline support frame for civil construction
CN206385803U (en) New high-supported formwork combined support frame
CN214942771U (en) Construction strutting arrangement for construction
CN206137723U (en) Lifting support
CN221565494U (en) Municipal administration water supply and drainage pipe feeding device
CN214643558U (en) Civil engineering pipeline that is difficult for droing puts frame
CN218355219U (en) Drawing hanging device
CN216393403U (en) Draft holder for construction
CN214144620U (en) Auxiliary device for 5G network construction
CN217677516U (en) Subside fungus and detect support convenient to adjust
CN216862082U (en) Feed processing transfer device
CN215443030U (en) A well word ladder for side fascia installation
CN219887419U (en) Assembled green energy-saving building external wall board
CN221487619U (en) Photovoltaic support stand with adjustable
CN215445321U (en) Fixing device for laying construction in large-diameter heat supply pipeline groove
CN213117924U (en) Groove type reducing butt joint
CN207152402U (en) One kind improves wall rail forming device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220906