CN217359091U - Geological mineral resource exploration equipment - Google Patents

Geological mineral resource exploration equipment Download PDF

Info

Publication number
CN217359091U
CN217359091U CN202220878417.8U CN202220878417U CN217359091U CN 217359091 U CN217359091 U CN 217359091U CN 202220878417 U CN202220878417 U CN 202220878417U CN 217359091 U CN217359091 U CN 217359091U
Authority
CN
China
Prior art keywords
fixedly connected
fence
accomodate
mainboard
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220878417.8U
Other languages
Chinese (zh)
Inventor
华磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Eighth Geological Brigade of Shandong Geological and Mineral Exploration and Development Bureau
Original Assignee
Eighth Geological Brigade of Shandong Geological and Mineral Exploration and Development Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Eighth Geological Brigade of Shandong Geological and Mineral Exploration and Development Bureau filed Critical Eighth Geological Brigade of Shandong Geological and Mineral Exploration and Development Bureau
Priority to CN202220878417.8U priority Critical patent/CN217359091U/en
Application granted granted Critical
Publication of CN217359091U publication Critical patent/CN217359091U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a geological mineral resources exploration equipment, including removing the mainboard, remove four gim pegs of mainboard upper end threaded connection, it has the exploration hole to remove mainboard upper end right part, remove mainboard left end fixedly connected with and accomodate the fence, it has placed continuous takeover in the fence to accomodate, it pushes away the fence to accomodate fence left end fixedly connected with, remove mainboard upper end left part fixedly connected with pillar, the lift case has been cup jointed to the pillar surface, be provided with elevating system in the lift case, lift case upper end right part fixedly connected with work box, the work box output runs through lift case and fixedly connected with probing nest of tubes. A geological mineral resources exploration equipment, accomodate the fence through removing mainboard left end fixed mounting, when accomplishing exploration during operation, the screw thread rail that continuous takeover upper end set up receives the effect of reverse force and can easily dismantle, continuous takeover under the dismantlement can be put and accomodate the completion in the fence and accomodate.

Description

Geological mineral resource exploration equipment
Technical Field
The utility model relates to a mineral exploration technical field, in particular to geological mineral resources exploration equipment.
Background
The geological exploration is to survey and detect geology by various means and methods, determine a proper bearing stratum, determine a foundation type according to the foundation bearing capacity of the bearing stratum, calculate the investigation and research activities of basic parameters, find mineral deposits with industrial significance in the mineral product general survey, provide mineral reserve and geological data required by mine construction design for finding out the quality and quantity of the mineral products and the technical conditions of mining and utilization, and carry out investigation and research work on the geological conditions of rocks, stratums, structures, mineral products, hydrology, landforms and the like in a certain area, wherein the existing geological mineral resource exploration equipment has at least the following defects: 1. the existing geological exploration equipment has the defects that the smaller drilling depth is not enough, and the good exploration effect cannot be achieved; 2. the drill pipe of the existing geological exploration equipment is troublesome to disassemble and inconvenient to store, and more manpower can be wasted during carrying, so that a new geological mineral resource exploration equipment is pushed out.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a geological mineral resources exploration equipment can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a geological mineral resources exploration equipment, includes and removes the mainboard, remove four gim pegs of mainboard upper end threaded connection, it has the exploration hole to remove mainboard upper end right part, it accomodates the fence to remove mainboard left end fixedly connected with, it has placed continuous takeover in accomodating the fence, it pushes away the fence to accomodate fence left end fixedly connected with, remove mainboard upper end left part fixedly connected with pillar, the lift case has been cup jointed to the pillar surface, be provided with elevating system in the lift case, lift case upper end right part fixedly connected with work box, the work box output runs through lift case and fixedly connected with probing nest of tubes.
Preferably, the sliding groove is opened to the pillar front end, pillar upper end fixedly connected with stopper, elevating system includes rack and motor, the lower case wall fixedly connected with fixed block in the lifting box, motor output fixedly connected with gear.
Preferably, motor fixed mounting runs through the lifting box front end inside the fixed block and motor front portion, the gear is connected with the rack meshing, rack fixed connection is on pillar right-hand member upper portion.
Preferably, accomodate fence right-hand member sliding connection and have the sliding door of carrying, carry the equal fixedly connected with slide rail in sliding door front end and rear end, it all is provided with the spout to accomodate the antetheca right side in the fence and interior back wall right side.
Preferably, the sliding rail is connected with the sliding groove in a sliding manner.
Preferably, the drilling pipe set comprises a fixing pipe, a connecting pipe, a continuous connecting pipe and a sampling pipe, two fixing holes are formed in the lower portion of the outer surface of the fixing pipe and the upper portion of the outer surface of the connecting pipe, threaded rails are fixedly connected to the upper portion of the outer surface of the continuous connecting pipe and the upper portion of the outer surface of the sampling pipe, threaded grooves are formed in the lower portion of the inner surface of the continuous connecting pipe and the lower portion of the inner surface of the connecting pipe, a drill bit is fixedly connected to the lower end of the sampling pipe, and the threaded rails are in threaded connection with the threaded grooves.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. in the utility model, a plurality of continuous connecting pipes are additionally arranged, and the continuous connecting pipes can be connected between the sampling pipe and the connecting pipes through the thread rails, thereby effectively prolonging the drilling depth and leading the exploration effect to be more visual and obvious;
2. the utility model discloses in, through removing mainboard left end fixed mounting and taking in the fence, when accomplishing exploration work, the screw thread rail that continuous takeover upper end set up receives the effect of reverse force can easily dismantle, and continuous takeover under the dismantlement can be put and is accomplished taking in the fence, fine solution dismantle the difficulty, take in the problem of difficulty.
Drawings
FIG. 1 is a schematic view of the overall structure of a geological mineral resource exploration apparatus according to the present invention;
FIG. 2 is a schematic view of the overall structure of the elevating mechanism of the geological mineral resource exploration apparatus of the present invention;
FIG. 3 is a sectional view of the overall structure of the storage column of the prospecting equipment for geological mineral resources according to the present invention;
fig. 4 is the overall structure schematic diagram of the fixing tube, the connecting tube, the continuous connecting tube and the sampling tube of the geological mineral resource exploration device of the utility model.
In the figure: 1. moving the main board; 2. a fixing bolt; 3. exploratory holes; 4. pushing the fence; 5. a storage column; 6. continuously taking over the pipe; 7. a work box; 8. a drilling pipe string; 10. a pillar; 11. a lifting box; 12. a lifting mechanism; 101. a sliding groove; 102. a limiting block; 121. a rack; 122. a motor; 123. a fixed block; 124. a gear; 51. lifting the door; 52. a slide rail; 53. a chute; 81. a fixed tube; 82. a connecting pipe; 83. a sampling tube; 811. a fixing hole; 821. a thread groove; 831. a threaded rail; 832. a drill bit.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Examples
Referring to fig. 1-4, the present invention provides a technical solution:
the utility model provides a geological mineral resources exploration equipment, including removing mainboard 1, remove 1 upper end threaded connection of mainboard and have four gim peg 2, it has exploration hole 3 to remove 1 upper end right part of mainboard, remove 1 left end fixedly connected with of mainboard and accomodate fence 5, it has continued takeover 6 to place in accomodating fence 5, accomodate 5 left end fixedly connected with of fence and push away fence 4, remove 1 upper end left part fixedly connected with pillar 10 of mainboard, lift case 11 has been cup jointed to pillar 10 surface, be provided with elevating system 12 in the lift case 11, 11 upper end right parts fixedly connected with work box 7 of lift case, 7 output ends of work box run through lift case 11 and fixedly connected with probing nest of tubes 8.
In this embodiment, the front end of the pillar 10 is provided with a sliding groove 101, the upper end of the pillar 10 is fixedly connected with a limit block 102, the lifting mechanism 12 comprises a rack 121 and a motor 122, the lower wall of the lifting box 11 is fixedly connected with a fixed block 123, the output end of the motor 122 is fixedly connected with a gear 124, the motor 122 is fixedly installed inside the fixed block 123, the front part of the motor 122 penetrates through the front end of the lifting box 11, the gear 124 is engaged with the rack 121, the rack 121 is fixedly connected to the upper part of the right end of the pillar 10, the right end of the storage column 5 is slidably connected with a lifting door 51, the front end and the rear end of the lifting door 51 are both fixedly connected with slide rails 52, the slide rails 52 and the slide grooves 53 are both arranged on the right side of the inner front wall and the right side of the inner rear wall of the storage column 5, the storage column 5 is fixedly installed on the left end of the movable main board 1, when the exploration work is completed, the threaded rail 831 arranged on the upper end of the continuous connecting pipe 6 can be easily disassembled under the action of reverse force, the continuous takeover 6 which is disassembled can be placed in the containing column 5 to be contained, so that the problems of difficult disassembly and difficult containing are solved.
In this embodiment, the drilling pipe set 8 includes a fixed pipe 81, a connection pipe 82, a continuous connection pipe 6 and a sampling pipe 83, two fixing holes 811 are disposed on the lower portion of the outer surface of the fixed pipe 81 and the upper portion of the outer surface of the connection pipe 82, a thread rail 831 is fixedly connected to the upper portion of the outer surface of the continuous connection pipe 6 and the upper portion of the outer surface of the sampling pipe 83, thread grooves 821 are disposed on the lower portion of the inner portion of the continuous connection pipe 6 and the lower portion of the inner portion of the connection pipe 82, a drill bit 832 is fixedly connected to the lower end of the sampling pipe 83, the thread rail 831 is in threaded connection with the thread grooves 821, the continuous connection pipe 6 is connected between the sampling pipe 83 and the connection pipe 82 through the thread rail 831 by adding, the drilling depth is effectively extended, the exploration effect is more visual and obvious, and the thread grooves 821 and the thread rail 831 disposed in the drilling pipe set 8 can also enable the drilling pipe set 8 to be easily disassembled.
It should be noted that, the utility model relates to a geological mineral resource exploration equipment, in the using process, firstly, the equipment is moved to the designated position through the pushing fence 4, after moving to the designated position, the equipment is fixed through the rotating fixing bolt 2, the lifting door 51 of the containing fence 5 is opened, the continuous connection pipe 6 is taken out from the lower part of the lifting door 51, the length of the drilling pipe group 8 can be prolonged through connecting the continuous connection pipe 6 between the connecting pipe 82 and the sampling pipe 83 by screw thread, the upper end of the movable main board 1 is fixedly provided with the pillar 10, the front end of the pillar 10 is provided with the sliding groove 101, the outer surface of the pillar 10 is sleeved with the lifting box 11, the arrangement of the sliding groove 101 can keep the lifting box 11 balanced, the front end of the lifting box 11 is movably connected with the motor 122, the output end of the motor 122 is fixedly connected with the gear 124, the gear 124 is meshed with the rack 121, the working box 7 is started, the output end of the working box 7 drives the drilling pipe group 8 to rotate, the manual adjusting motor 122 is used for moving downwards, after drilling work is completed, the manual adjusting motor 122 is used for adjusting upwards, the continuous connecting pipe 6 is disassembled, the continuous connecting pipe 6 is stored in the storage column 5, and the fixing bolt 2 is screwed out to complete work.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. Geological mineral resource exploration equipment, comprising a mobile main board (1), characterized in that: remove mainboard (1) upper end threaded connection and have four gim peg (2), it has exploration hole (3) to open at removal mainboard (1) upper end right part, remove mainboard (1) left end fixedly connected with accomodates fence (5), continuous takeover (6) have been placed in accomodating fence (5), it pushes away fence (4) to accomodate fence (5) left end fixedly connected with, remove mainboard (1) upper end left part fixedly connected with pillar (10), elevator case (11) have been cup jointed to pillar (10) surface, be provided with elevating system (12) in elevator case (11), right part fixedly connected with work box (7) in elevator case (11), work box (7) output runs through elevator case (11) and fixedly connected with drilling nest of tubes (8).
2. A geological mineral resource exploration device, according to claim 1, characterized by: sliding groove (101) have been opened to pillar (10) front end, pillar (10) upper end fixedly connected with stopper (102), elevating system (12) include rack (121) and motor (122), lower case wall fixedly connected with fixed block (123) in cage (11), motor (122) output end fixedly connected with gear (124).
3. A geological mineral resource exploration device, according to claim 2, characterized in that: the motor (122) is fixedly installed inside the fixing block (123), the front portion of the motor (122) penetrates through the front end of the lifting box (11), the gear (124) is meshed with the rack (121), and the rack (121) is fixedly connected to the upper portion of the right end of the supporting column (10).
4. A geological mineral resource exploration device, according to claim 1, characterized by: accomodate fence (5) right-hand member sliding connection and carry sliding door (51), carry sliding door (51) front end and the equal fixedly connected with slide rail (52) in rear end, it all is provided with spout (53) to accomodate fence (5) interior antetheca right side and interior back wall right side.
5. Geological mineral resource exploration equipment, according to claim 4, characterized in that: the sliding rail (52) is connected with the sliding groove (53) in a sliding mode.
6. A geological mineral resource exploration device, according to claim 1, characterized by: drilling pipe group (8) are including fixed pipe (81), connecting pipe (82), continue to connect pipe (6) and sampling tube (83), fixed pipe (81) surface lower part and connecting pipe (82) surface upper portion all are provided with two fixed orificess (811), continue to connect pipe (6) surface upper portion and sampling tube (83) surface upper portion all fixedly connected with thread track (831), it all is provided with thread groove (821) to continue lower part in taking over (6) and connecting pipe (82), sampling tube (83) lower extreme fixedly connected with drill bit (832), thread track (831) and thread groove (821) threaded connection.
CN202220878417.8U 2022-04-15 2022-04-15 Geological mineral resource exploration equipment Active CN217359091U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220878417.8U CN217359091U (en) 2022-04-15 2022-04-15 Geological mineral resource exploration equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220878417.8U CN217359091U (en) 2022-04-15 2022-04-15 Geological mineral resource exploration equipment

Publications (1)

Publication Number Publication Date
CN217359091U true CN217359091U (en) 2022-09-02

Family

ID=83055869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220878417.8U Active CN217359091U (en) 2022-04-15 2022-04-15 Geological mineral resource exploration equipment

Country Status (1)

Country Link
CN (1) CN217359091U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117569737A (en) * 2024-01-16 2024-02-20 山东省地质矿产勘查开发局第八地质大队(山东省第八地质矿产勘查院) Drilling device for hydraulic loop geology

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117569737A (en) * 2024-01-16 2024-02-20 山东省地质矿产勘查开发局第八地质大队(山东省第八地质矿产勘查院) Drilling device for hydraulic loop geology
CN117569737B (en) * 2024-01-16 2024-03-26 山东省地质矿产勘查开发局第八地质大队(山东省第八地质矿产勘查院) Drilling device for hydraulic loop geology

Similar Documents

Publication Publication Date Title
CN217359091U (en) Geological mineral resource exploration equipment
CN211819382U (en) Sampling device for prospecting
CN215565702U (en) Drilling device for hydraulic ring geological exploration
CN212003085U (en) Geological survey drilling equipment
CN210918867U (en) Drilling rig for geological survey
CN216621807U (en) Continuous exploration equipment for geological engineering and sampling device thereof
CN213068269U (en) Soil layer sampling device for geological exploration
CN111982568B (en) Surveying equipment and method for geological survey
CN112504734A (en) Drilling and sampling device for non-viscous soil layer
CN115372059B (en) Mineral geology investigation sampling device
CN209117386U (en) A kind of geological prospecting sampler
CN214702816U (en) Geological survey sampling device
CN215525135U (en) Portable sampling device for geological mineral exploration
CN216665598U (en) Drill rod for coal mine geological drilling
CN216247317U (en) Core sampling device for geological exploration
CN215979188U (en) Drilling device for geological exploration
CN213016167U (en) Perforating machine convenient to move and fix for geological exploration
CN210603991U (en) Ecological environment geological survey sampling device
CN210322382U (en) Sampling device for geology
CN113865930A (en) Soil sampling device for geological survey
CN112304673A (en) Mineral exploitation exploration equipment
CN211904696U (en) Sampling equipment for geological mineral exploration
CN211081837U (en) Drilling device for geological exploration
CN217765585U (en) Rock sample sampling device
CN218629083U (en) Geological stratification sampling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant