CN217356170U - Direct-buried foundation bolt mounting part - Google Patents
Direct-buried foundation bolt mounting part Download PDFInfo
- Publication number
- CN217356170U CN217356170U CN202221392165.4U CN202221392165U CN217356170U CN 217356170 U CN217356170 U CN 217356170U CN 202221392165 U CN202221392165 U CN 202221392165U CN 217356170 U CN217356170 U CN 217356170U
- Authority
- CN
- China
- Prior art keywords
- bolt
- shaped connecting
- telescopic assembly
- rods
- adjusting screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to the technical field of building construction, in particular to a direct-buried foundation bolt mounting piece, which comprises a support frame and a bolt fixing frame, wherein the bolt fixing frame can be detachably fixed on the support frame, the bolt fixing frame comprises two groups of T-shaped connecting rods, two of each group are horizontally arranged, and a first telescopic assembly is connected between the cross rods of the two T-shaped connecting rods; the vertical rods of the two groups of T-shaped connecting rods are oppositely arranged, and a second telescopic assembly is connected between the two opposite vertical rods; locking parts are arranged on the first telescopic assembly and the second telescopic assembly for locking; a fixing seat is arranged on a cross rod of the T-shaped connecting rod, a bolt hole is formed in the middle of the fixing seat, and a foundation bolt is installed in the bolt hole and fixed through a fixing nut; the foundation bolt is convenient and quick to mount by adopting the utility model, and the mounting efficiency of the bolt is improved; this installing frame suitability is in the rag bolt setting of various intervals, and application scope is wide, can use in the turnover in the project that need not be under construction, has reduced construction cost.
Description
Technical Field
The utility model relates to a construction technical field especially relates to a direct-burried rag bolt installed part.
Background
In the construction process of industrial buildings, embedded foundation bolts often appear in steel structure plants and equipment foundations; the embedded bolt has high installation precision requirement, the precision requirement is a key process of quality control in industrial buildings, the embedded bolt cannot be checked and accepted once in most cases in the embedded installation process of the bolt, and the qualification rate is low; the foundation bolt is inaccurate in positioning often appears in the work progress, the bolt verticality can not meet the installation accuracy requirement, or the foundation bolt positioning is disturbed in the concrete pouring process, so that the problems of foundation bolt dislocation, inconsistent bolt elevation and the like are caused, the equipment is difficult to install or even can not be installed, the engineering quality is seriously influenced, rework is even needed, and the delay of the field construction period is caused.
The fixing frame of the prior application No. CN201811602579.3 comprises a supporting frame and a plurality of bolt fixing frames arranged on the supporting frame, the anchor bolts are fixed by the bolt fixing frames and then poured; the applicant discovers in the work progress that prior art's bolt mount need be according to the construction demand preparation to the interval and the elevation welded fastening of design are fixed on the supporting rack on the supporting frame, and the unable reuse in later stage more can't be according to different construction demands adjustment rag bolt interval.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the above problem to provide a can be suitable for different interval rag bolt, can have enough to meet the need the direct-burried rag bolt installed part of use.
Utility model solves the problem, the technical scheme who adopts is:
a direct-buried foundation bolt mounting piece comprises a supporting frame and a bolt fixing frame, wherein the bolt fixing frame is detachably fixed on the supporting frame and comprises two groups of T-shaped connecting rods, each group of T-shaped connecting rods is arranged horizontally, a first telescopic assembly is connected between cross rods of the two T-shaped connecting rods, first inserting holes are symmetrically formed in vertical rods of the two T-shaped connecting rods of the same group, and a first measuring ruler is arranged in the two first inserting holes in a penetrating mode; the vertical rods of the two groups of T-shaped connecting rods are oppositely arranged, a second telescopic assembly is connected between the two opposite vertical rods, second jacks are symmetrically arranged on the cross rods of the two groups of T-shaped connecting rods, and second measuring rules are arranged in the two second jacks in a penetrating manner; locking parts are arranged on the first telescopic assembly and the second telescopic assembly for locking; be equipped with the fixing base on the horizontal pole of T type connecting rod, seted up the bolt hole in the middle of the fixing base, rag bolt installs in the bolt hole and fixes through fixation nut.
Adopt above-mentioned technical scheme the utility model discloses, compare with prior art, its outstanding characteristics are:
the foundation bolt is convenient and quick to install by adopting the utility model, and the bolt installation efficiency is improved; this installing frame suitability is in the rag bolt setting of various intervals, and application scope is wide, can use in the turnover in the project that need not be under construction, has reduced construction cost.
Preferably, the present invention further provides:
the first telescopic assembly comprises a first adjusting handle, and the second telescopic assembly comprises a second adjusting handle; two ends of the first adjusting handle are respectively in threaded connection with a first adjusting screw rod, the first adjusting screw rod is fixedly connected to the connecting end of the cross rod, two ends of the second adjusting handle are respectively in threaded connection with a second adjusting screw rod, and the second adjusting screw rod is fixedly connected to the connecting end of the vertical rod; the locking piece comprises a first locking nut and a second locking nut, the first locking nut is in threaded connection with the first adjusting screw rod and is used for locking and fixing the first adjusting handle and the first adjusting screw rod, the second locking nut is in threaded connection with the second adjusting screw rod and is used for locking and fixing the second adjusting handle and the second adjusting screw rod; the length of the first telescopic assembly can be adjusted by rotating the first adjusting handle, the length of the second telescopic assembly can be adjusted by rotating the second adjusting handle, and the telescopic adjusting device is simple in structure and convenient to adjust.
Each T-shaped connecting rod is provided with a horizontal bubble; whether the support frame is installed horizontally can be detected, and the foundation bolt is guaranteed to be vertical all the time in the concrete pouring process.
The bolt fixing frame is detachably fixed on the supporting frame through the tiger clamp; simple structure and firm fixation.
Drawings
Fig. 1 is a schematic structural view of a directly-buried anchor bolt mounting member according to an embodiment of the present invention;
FIG. 2 is a schematic structural view of another directly-buried anchor bolt mounting member according to an embodiment of the present invention;
fig. 3 is a schematic structural diagram of a slot card according to an embodiment of the present invention.
In the figure: 1. a T-shaped connecting rod; 101. a cross bar; 102. a vertical rod; 103. a first jack; 104. a second jack; 2. a first telescoping assembly; 201. a first adjustment handle; 202. a first adjusting screw; 3. a second telescoping assembly; 301. a second adjustment handle; 302. a second adjusting screw; 4. a fixed seat; 401. bolt holes; 5. anchor bolts; 6. fixing a nut; 7. a support frame; 8. a tiger card; 9. a locking member; 901. a first lock nut; 902. a second lock nut; 10. horizontal bubble; 11. a first measuring ruler; 12. and a second measuring ruler.
Detailed Description
The invention will be further described with reference to the following examples, which are intended only for better understanding of the invention and therefore do not limit the scope of the invention.
As shown in fig. 1 to 3, a direct-burried foundation bolt mounting part includes a support frame 7 and a bolt fixing bracket; the supporting frame 7 comprises two oppositely arranged door-shaped frames, each door-shaped frame comprises two upright posts, the bottoms of the upright posts are planted on the foundation bottom plate, the upper ends of the two upright posts are connected with a cross beam, and two inclined struts are arranged between the two door-shaped frames in an X shape; the supporting middle upright posts, the cross beams and the inclined struts are all made of angle steel of 50X 5; the bolt fixing frame is fixedly clamped on a cross beam of the supporting frame 7 through a tiger clamp 8; the bolt fixing frame comprises two groups of T-shaped connecting rods 1, each group comprises two T-shaped connecting rods 1 which are horizontally arranged, a first telescopic component 2 is connected between cross rods 101 of the two T-shaped connecting rods 1, first inserting holes 103 are symmetrically formed in vertical rods 102 of the two T-shaped connecting rods 1, a first measuring ruler 11 is inserted between the two first inserting holes 103, and the first measuring ruler 11 can measure the distance between two transverse foundation bolts 5 (on the upper side or on the lower side); the vertical rods 102 of the two groups of T-shaped connecting rods 1 are arranged oppositely, the second telescopic assemblies 3 are connected between the two opposite vertical rods 102, the second jacks 104 are symmetrically arranged on the cross rods 101 of the two groups of T-shaped connecting rods 1, the second measuring ruler 12 is arranged between the two second jacks 104 in a penetrating mode, and the distance between two (left or right) longitudinal foundation bolts 5 can be measured; locking pieces 9 are arranged on the first telescopic assembly 2 and the second telescopic assembly 3 for locking; the cross rods of the four T-shaped connecting rods 1 are provided with the fixed seats 4, and the four fixed seats 4 are positioned in the same horizontal plane; a bolt hole 401 is formed in the middle of the fixing seat 4, and the foundation bolt 5 is installed in the bolt hole 401 and fixed through a fixing nut 6.
Further, the first telescopic assembly 2 comprises a first adjusting handle 201, and the second telescopic assembly 3 comprises a second adjusting handle 301; two ends of the first adjusting handle 201 are respectively in threaded connection with a first adjusting screw 202, the first adjusting screw 202 is fixedly connected to the connecting end of the cross rod, two ends of the second adjusting handle 301 are respectively in threaded connection with a second adjusting screw 302, and the second adjusting screw 302 is fixedly connected to the connecting end of the vertical rod; the locking piece 9 comprises a first locking nut 901 and a second locking nut 902, the first locking nut 901 is in threaded connection with the first adjusting screw 202 to lock and fix the first adjusting handle 201 and the first adjusting screw 202, and the second locking nut 902 is in threaded connection with the second adjusting screw 302 to lock and fix the second adjusting handle 301 and the second adjusting screw 302.
Further, each T-shaped connecting rod 1 is provided with a horizontal bubble 10. The level bubble 10 is a plastic bubble level meter, is specifically installed on the cross bar of the T-shaped connecting rod 1, and is located on one side of the fixed seat 4.
When manufacturing the bolt fixing frame, it should be noted that when the fixing seats 4 are welded on the four T-shaped connecting rods 1, the four fixing seats 4 are ensured to be positioned in the same horizontal plane; a cross auxiliary line is carved on the fixed seat 4 to assist constructors in fixing the foundation bolts 5; before the bolt fixing frame is clamped and fixed on the cross beam of the support frame 7, the support frame is leveled by a level gauge to ensure that two cross beams of the support frame are positioned on a horizontal plane; then, a first measuring tape 11 and a second measuring tape 12 are taken and installed; rotating the first adjusting handle 201 and the second adjusting handle 301 according to a preset distance between the four foundation bolts 5, aligning the cross auxiliary line with the first measuring ruler 11 or the second measuring ruler 12 for reading, observing the distance between the foundation bolts 5 through the readings at two sides, and adjusting the distance between the four bolt holes 401 on the bolt fixing frame while reading; after adjusting to the preset distance, the bolt fixing frame is tightly clamped and fixed on the fixing seat 7 by a tiger clamp 8; finally, inserting the foundation bolts 5 into the bolt holes 401, checking whether the four horizontal bubbles 10 are all in the middle position, and retesting whether the distance between the foundation bolts 5 meets the preset distance by using a measuring ruler 11; and after the inspection is qualified, welding and fixing the lower end of the foundation bolt 5 and the fixed seat 7, and pouring concrete.
Adopt the utility model discloses installation rag bolt 5 can guarantee to pour in-process every group (four a set of) rag bolt 5 and remain perpendicular and elevation unanimous throughout, guarantees that later stage equipment once installation is successful, avoids doing over again, has promoted the installation effectiveness, has guaranteed the installation quality.
The above description is only a preferred and practical embodiment of the present invention, and not intended to limit the scope of the present invention, and all equivalent variations made by using the contents of the specification and the drawings are included in the scope of the present invention.
Claims (4)
1. The utility model provides a direct-burried rag bolt installed part, includes support frame and bolt mount, its characterized in that: the bolt fixing frame is detachably fixed on the support frame and comprises two groups of T-shaped connecting rods, two T-shaped connecting rods are arranged in each group, a first telescopic assembly is connected between cross rods of the two T-shaped connecting rods, first inserting holes are symmetrically formed in vertical rods of the two T-shaped connecting rods in the same group, and a first measuring ruler is arranged in the two first inserting holes in a penetrating mode; the vertical rods of the two groups of T-shaped connecting rods are oppositely arranged, a second telescopic assembly is connected between the two opposite vertical rods, second jacks are symmetrically arranged on the cross rods of the two groups of T-shaped connecting rods, and second measuring rules are arranged in the two second jacks in a penetrating manner; locking parts are arranged on the first telescopic assembly and the second telescopic assembly for locking; be equipped with the fixing base on the horizontal pole of T type connecting rod, seted up the bolt hole in the middle of the fixing base, rag bolt installs in the bolt hole and fixes through fixation nut.
2. A direct-burried anchor bolt installation of claim 1, wherein: the first telescopic assembly comprises a first adjusting handle, and the second telescopic assembly comprises a second adjusting handle; two ends of the first adjusting handle are respectively in threaded connection with a first adjusting screw rod, the first adjusting screw rod is fixedly connected to the connecting end of the cross rod, two ends of the second adjusting handle are respectively in threaded connection with a second adjusting screw rod, and the second adjusting screw rod is fixedly connected to the connecting end of the vertical rod; the retaining member includes first lock nut and second lock nut, and first lock nut threaded connection locks fixed first regulation handle and first adjusting screw on first adjusting screw, and second lock nut threaded connection locks fixed second regulation handle and second adjusting screw on second adjusting screw.
3. The in-line anchor bolt mount of claim 1, wherein: each T-shaped connecting rod is provided with a horizontal bubble.
4. A direct-burried anchor bolt installation of claim 1, wherein: the bolt fixing frame is detachably fixed on the supporting frame through the tiger clamp.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221392165.4U CN217356170U (en) | 2022-06-07 | 2022-06-07 | Direct-buried foundation bolt mounting part |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221392165.4U CN217356170U (en) | 2022-06-07 | 2022-06-07 | Direct-buried foundation bolt mounting part |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217356170U true CN217356170U (en) | 2022-09-02 |
Family
ID=83016047
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221392165.4U Active CN217356170U (en) | 2022-06-07 | 2022-06-07 | Direct-buried foundation bolt mounting part |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217356170U (en) |
-
2022
- 2022-06-07 CN CN202221392165.4U patent/CN217356170U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7823348B1 (en) | Device and method for the support of both steel and precast concrete wall posts for installation | |
CN111851565B (en) | Steel structure stand column alignment structure with cup-mouth type foundation and construction method thereof | |
CN220150941U (en) | Pre-buried rag bolt locating component | |
CN217356170U (en) | Direct-buried foundation bolt mounting part | |
CN219410562U (en) | Bent cap staple bolt mounting platform | |
CN106351246A (en) | Installing method of the integral sleeve of a kind of T -bolt (diameter <= 48mm) | |
CN114703888A (en) | Mounting rack for direct-buried embedded foundation bolt | |
CN213952280U (en) | Support system of concrete track foundation embedded bolt | |
CN216159888U (en) | Fixing support for roadbed and pavement settlement observation scale | |
CN210194439U (en) | Unloading device for adjusting pier stud tie beam and cover beam bracket elevation | |
CN208455656U (en) | A kind of anchor ear support device | |
CN218521964U (en) | Steel sheet built-in fitting subassembly with adjustable high accuracy | |
CN216194782U (en) | Steel pipe column positioning system | |
KR100940913B1 (en) | Vertical loaded beam-fixing structure | |
CN114876093B (en) | Construction method of reaction wall with stiff concrete hollow structure | |
CN220794242U (en) | Testing device for improving installation line type precision of anti-collision steel guardrail | |
CN218813850U (en) | Multi-foundation bolt pre-embedding structure | |
CN213979025U (en) | Steel column rag bolt is pre-buried installs fixing device | |
CN215631656U (en) | Fixing device | |
CN214883714U (en) | Lattice column positioning device | |
CN216920426U (en) | Positioning tool for steam turbine foundation embedded part | |
CN216328249U (en) | Prism pole rack | |
CN219261797U (en) | Positioning device for steel column in building construction | |
CN221095871U (en) | Wall post template supports straightness correction integral type instrument that hangs down | |
CN219434072U (en) | Fixed mounting platform of measuring equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |