CN217353457U - Novel mounting operation platform for weir plate of circular sedimentation tank - Google Patents

Novel mounting operation platform for weir plate of circular sedimentation tank Download PDF

Info

Publication number
CN217353457U
CN217353457U CN202220577827.9U CN202220577827U CN217353457U CN 217353457 U CN217353457 U CN 217353457U CN 202220577827 U CN202220577827 U CN 202220577827U CN 217353457 U CN217353457 U CN 217353457U
Authority
CN
China
Prior art keywords
supporting
weir plate
installation work
work platform
sedimentation tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220577827.9U
Other languages
Chinese (zh)
Inventor
刘声望
王中杰
高鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Group Electromechanical Installation Co ltd
China Railway Construction Group Co Ltd
Original Assignee
China Railway Construction Group Electromechanical Installation Co ltd
China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Group Electromechanical Installation Co ltd, China Railway Construction Group Co Ltd filed Critical China Railway Construction Group Electromechanical Installation Co ltd
Priority to CN202220577827.9U priority Critical patent/CN217353457U/en
Application granted granted Critical
Publication of CN217353457U publication Critical patent/CN217353457U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Handcart (AREA)

Abstract

The utility model discloses a novel round sedimentation tank weir plate installation work platform, including installation work platform and truckle subassembly. The utility model has the advantages that: the utility model discloses nylon truckle is installed respectively with play basin perpendicular and horizontal plane contact department to weir plate mounting platform, guarantees that installation work platform can stably slide at play basin week length within range, and when installation work platform need carry out weir plate installation operation forward, the manpower promotes the wheel and slides forward. Installing proper supporting wood plates at the bottom of the trolley and 325mm above the bottom of the trolley so as to ensure that constructors can completely and comfortably stand for working; the utility model discloses when rainy day, embolia the steel pipe respectively in 4 root welding pipe departments at the platform top to set up the waterproof cloth, guarantee that installation work platform is rain-proof, and then can ensure the rainy day construction, avoid leading to the construction progress lag because of the weather condition, construction cost greatly reduced can guarantee constructor safety better simultaneously.

Description

Novel mounting operation platform for weir plate of circular sedimentation tank
Technical Field
The utility model relates to an installation work platform specifically is a novel circular sedimentation tank weir board installation work platform, belongs to water treatment engineering installation technical field.
Background
A mounting operation platform for a weir plate of a circular sedimentation tank is a working platform which is used for mounting a water outlet weir plate, a scum baffle and the like on a high-altitude operation surface of a circular tank body in sewage treatment engineering and the like and ensures the mounting safety and the operation convenience.
And there are some problems in the installation of current circular cell body weir plate:
1) the existing circular tank body weir plate installation needs to consume a large amount of labor and material resources, the efficiency and the installation quality are poor, and constructors are subjected to certain lateral impact force in the process of transversely driving expansion bolts, so that the expansion bolt holes are easily deviated, the weir plate fixing bolts are loosened, and even the risk of high-altitude operation safety quality accidents is caused;
2) current circular cell body weir plate receives the influence of weather when installing, when overcast and rainy weather, because mounting platform lacks rain-proof measure, leads to the unable normal clear of construction, reduces the efficiency of construction.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a novel installation and operation platform for the weir plate of the circular sedimentation tank in order to solve the problems.
The utility model discloses a following technical scheme realizes above-mentioned purpose: novel mounting operation platform for weir plate of circular sedimentation tank, include
The installation operation platform is formed by connecting two supporting cross rods and eight supporting vertical rods, four supporting vertical rods are arranged on the lower side of each supporting cross rod, each two supporting vertical rods form a group and are symmetrically arranged on two sides of the lower surface of each supporting cross rod respectively, and a connecting cross rod is fixedly connected between the end parts of the two sides of each supporting cross rod;
the caster wheel assembly is composed of a caster wheel I and a caster wheel II, wherein the caster wheel I is arranged on the lower side of the supporting cross rod in two modes, the caster wheel II is arranged on the opposite side of the supporting vertical rod through the wheel shaft, and the operation platform is convenient to move by arranging the caster wheel assembly.
As a further aspect of the present invention: and a reinforcing rod is fixedly connected between every two vertical supporting rods.
As a further aspect of the present invention: the installation operation platform is erected on the upper side of the water outlet groove and is in contact with the vertical surface and the horizontal surface of the water outlet groove through a second caster wheel and a first caster wheel.
As a further aspect of the present invention: appropriate supporting wood plates are arranged at the bottom of two sides of the installation operation platform and 325mm above the bottom of the installation operation platform.
As a further aspect of the present invention: and a personnel standing protective guard fixedly connected between the two outer supporting vertical rods is arranged between the two supporting wood boards.
As a further aspect of the present invention: two the equal fixed mounting in upside both ends of support horizontal pole has circular welded tube, the steel pipe has been cup jointed to the inside of circular welded tube, four the tarpaulin has been set up on the steel pipe.
As the utility model discloses further scheme again: the supporting cross rods, the supporting vertical rods and the connecting cross rods are all made of carbon steel.
The utility model has the advantages that:
1) the utility model discloses nylon truckle is installed respectively with play basin perpendicular and horizontal plane contact department to weir plate mounting platform, guarantees that installation work platform can stably slide at play basin week length within range, and when installation work platform need carry out weir plate installation operation forward, the manpower promotes the wheel and slides forward. Installing proper supporting wood plates at the bottom of the trolley and 325mm above the bottom of the trolley so as to ensure that constructors can completely and comfortably stand for working;
2) the utility model discloses when rainy day, embolia the steel pipe respectively in 4 root welding pipe departments at the platform top to set up the waterproof cloth, guarantee that installation work platform is rain-proof, and then can ensure the rainy day construction, avoid leading to the construction progress lag because of the weather condition, construction cost greatly reduced can guarantee constructor safety better simultaneously.
Drawings
FIG. 1 is a schematic view of the main structure of the installation operation platform of the present invention;
FIG. 2 is a schematic view of the top view of the installation operation platform of the present invention;
FIG. 3 is a schematic side view of the installation operation platform of the present invention;
FIG. 4 is a schematic view of the three-dimensional structure of the installation operation platform of the present invention;
FIG. 5 is a schematic view of the construction structure of the installation operation platform of the present invention;
fig. 6 is the utility model discloses installation work platform rainy day construction structure schematic diagram.
In the figure: 1. the installation work platform comprises a support cross rod 2, a caster I, a caster II, a caster 8, a support wood board 9, a personnel station protective guard 7, a water outlet groove 10, a steel pipe 11, a rain cloth 12, a rain cloth 13 and a connecting cross rod 3, a caster I, a caster 4, a reinforcing rod 5, a support vertical rod 6, a circular welding pipe.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example one
Referring to fig. 1 to 6, a novel mounting platform for a weir plate of a circular settling tank comprises
The installation operation platform 1 is formed by connecting two supporting cross rods 2 and eight supporting vertical rods 5, four supporting vertical rods 5 are installed on the lower side of each supporting cross rod 2, each two supporting vertical rods 5 form a group and are symmetrically installed on two sides of the lower surface of each supporting cross rod 2, and a connecting cross rod 13 is fixedly connected between the end parts of two sides of each supporting cross rod 2;
truckle subassembly, it comprises truckle one 3 and truckle two 7, and wherein truckle one 3 is installed two through the shaft the downside of supporting horizontal pole 2, wherein truckle two 7 are installed in the opposite side of supporting montant 5 through the shaft, through setting up the truckle subassembly, conveniently remove this work platform.
The embodiment of the utility model provides an in, every group is two support fixedly connected with stiffener 4 between the montant 5, can improve two firmness of supporting between the montant 5 and connecting.
The embodiment of the utility model provides an in, installation work platform 1 sets up the upside at play basin 10, installation work platform 1 respectively through truckle two 7 and truckle one 3 that set up and play basin 10's perpendicular, the horizontal plane department of contacting mutually, guarantees that this installation work platform can stably slide in play basin 10 week length within range, when installation work platform need carry out the weir plate installation work forward, the manpower promotes the truckle subassembly forward slide can.
The embodiment of the utility model provides an in, suitable support plank 8 is all installed with 325mm department above the bottom to the both sides bottom of installation work platform 1 to guarantee that constructor can be complete comfortable work of standing.
The embodiment of the utility model provides an in, two it is in to be provided with the rigid coupling between the plank 8 to support two personnel standing position rail guards 9 that support between the montant 5 in the outside, can guarantee that constructor can complete comfortable work of standing.
Example two
Referring to fig. 1 to 6, a novel mounting platform for a weir plate of a circular settling tank comprises
The installation operation platform 1 is formed by connecting two supporting cross rods 2 and eight supporting vertical rods 5, four supporting vertical rods 5 are installed on the lower side of each supporting cross rod 2, each two supporting vertical rods 5 form a group and are symmetrically installed on two sides of the lower surface of each supporting cross rod 2, and a connecting cross rod 13 is fixedly connected between the end parts of two sides of each supporting cross rod 2;
the caster wheel component comprises a caster wheel I3 and a caster wheel II 7, wherein the caster wheel I3 is arranged on the lower side of the supporting cross rod 2 through a wheel shaft, the caster wheel II 7 is arranged on the opposite side of the supporting vertical rod 5 through the wheel shaft, and the operation platform is convenient to move by arranging the caster wheel component.
The embodiment of the utility model provides an in, two the equal fixed mounting in upside both ends of support horizontal pole 2 has circular welded tube 6, steel pipe 11, four have been cup jointed to the inside of circular welded tube 6 the last waterproof cloth 12 of having set up of steel pipe 11 guarantees that installation work platform 1 can be rain-proof, and then can ensure the rainy day construction, avoids leading to the construction progress lag because of the weather condition.
The embodiment of the utility model provides an in, support horizontal pole 2, support montant 5 and connect horizontal pole 13 and all adopt the preparation of carbon steel material, be convenient for improve this installation work platform 1's crushing resistance, improve its life then.
The working principle is as follows: when using this kind of novel circular sedimentation tank weir plate installation work platform, will install work platform 1 and go out basin 10 perpendicular and horizontal plane contact department and install truckle two 7 and truckle one 3 respectively, can guarantee that installation work platform 1 can stably slide at play basin 10 girth within range, when installation work platform 1 need carry out the weir plate installation work forward, the manpower promotes the truckle and slides forward. The proper supporting wood plate 8 is installed at the position 325mm above the bottom of the installation operation platform 1, so that the construction personnel can completely and comfortably stand, a safety belt is hung at the circular welded pipe 6 of the upper end DN32 of the installation operation trolley by the personnel during construction, and the installation work of the water discharge weir plate is carried out at the supporting surface of the supporting wood plate 8. When needs carry out the during operation at rainy day, 6 punishment of 4 circular welded pipes at installation work platform 1's top embolia steel pipe 11 respectively, and set up waterproof cloth 12, thereby can guarantee that installation work platform 1 is rain-proof, and then can ensure the rainy day construction, avoid leading to the construction progress lag because of the weather condition, this work platform sets up installation such as scaffold frame with the tradition and goes out the weir plate and compare, save the time of setting up the manpower and materials and the horizontal range removal scaffold frame of scaffold frame, and can normally be under construction at rainy weather, therefore the efficiency obviously improves when adopting this work platform to carry out the construction, construction cost greatly reduced, simultaneously can guarantee constructor safety better.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (7)

1. A novel mounting operation platform for a weir plate of a circular sedimentation tank is characterized by comprising
The mounting operation platform (1) is formed by connecting two supporting cross rods (2) and eight supporting vertical rods (5), four supporting vertical rods (5) are mounted on the lower side of each supporting cross rod (2), each two supporting vertical rods (5) form a group and are symmetrically mounted on two sides of the lower surface of each supporting cross rod (2), and a connecting cross rod (13) is fixedly connected between the end parts of the two sides of each supporting cross rod (2);
the truckle subassembly, it comprises truckle (3) and truckle two (7), and wherein truckle (3) are installed two through the shaft the downside of supporting horizontal pole (2), wherein truckle two (7) are installed at the opposite side of supporting montant (5) through the shaft, through setting up the truckle subassembly, conveniently remove this operation platform.
2. The novel circular sedimentation tank weir plate installation work platform of claim 1, characterized in that: and a reinforcing rod (4) is fixedly connected between each two supporting vertical rods (5).
3. The novel circular sedimentation tank weir plate installation work platform of claim 1, characterized in that: the installation operation platform (1) is erected on the upper side of the water outlet groove (10), and the installation operation platform (1) is in contact with the vertical surface and the horizontal surface of the water outlet groove (10) through the arranged caster two (7) and the caster one (3).
4. The novel round sedimentation tank weir plate installation work platform of claim 1, wherein: and the supporting wood plates (8) are arranged at the positions 325mm above the bottoms and the bottoms of the two sides of the mounting operation platform (1).
5. The novel round sedimentation tank weir plate installation work platform of claim 4, wherein: a personnel standing protective guard (9) fixedly connected between the two supporting vertical rods (5) on the outer side is arranged between the two supporting wood plates (8).
6. The novel round sedimentation tank weir plate installation work platform of claim 1, wherein: two the equal fixed mounting in upside both ends of support horizontal pole (2) has circular welded tube (6), steel pipe (11), four have been cup jointed to the inside of circular welded tube (6) the tarpaulin (12) has been set up on steel pipe (11).
7. The novel round sedimentation tank weir plate installation work platform of claim 1, wherein: the supporting cross rods (2), the supporting vertical rods (5) and the connecting cross rods (13) are all made of carbon steel.
CN202220577827.9U 2022-03-16 2022-03-16 Novel mounting operation platform for weir plate of circular sedimentation tank Active CN217353457U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220577827.9U CN217353457U (en) 2022-03-16 2022-03-16 Novel mounting operation platform for weir plate of circular sedimentation tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220577827.9U CN217353457U (en) 2022-03-16 2022-03-16 Novel mounting operation platform for weir plate of circular sedimentation tank

Publications (1)

Publication Number Publication Date
CN217353457U true CN217353457U (en) 2022-09-02

Family

ID=83051843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220577827.9U Active CN217353457U (en) 2022-03-16 2022-03-16 Novel mounting operation platform for weir plate of circular sedimentation tank

Country Status (1)

Country Link
CN (1) CN217353457U (en)

Similar Documents

Publication Publication Date Title
CN217353457U (en) Novel mounting operation platform for weir plate of circular sedimentation tank
CN219893280U (en) Solar panel convenient to wash
CN210722260U (en) LED display screen provided with solar cell panel
CN216811746U (en) Layered surrounding rock tunnel construction is with tunnel supporting construction
CN112726426A (en) Novel movable protective shed of bracket and steel pipe column combined gantry type
CN213142228U (en) High-efficiency electrolytic anode plate
CN211597852U (en) Steam curing equipment for high-speed bridge
CN210621424U (en) Road bridge crack reinforcing apparatus
CN209244372U (en) A kind of high intensity wind resistance electric power tower
CN215558562U (en) Tower machine standard festival dismouting structure
CN213419106U (en) 12-meter long and light manual waterproof board hanging trolley
CN216741574U (en) Connecting structure and underground roof supporting device with same
CN102431743B (en) Tank roof fence device of tank truck
CN215593733U (en) Building bridge reinforcing construction device
CN217965427U (en) Steel bar welding bearing platform for water conservancy and hydropower engineering
CN212201219U (en) High support photovoltaic overhauls platform
CN213898095U (en) Working layer scaffold board of scaffold
CN218458621U (en) Glass water-sliding steel pipe upright post
CN214191105U (en) Waste material pool
CN217318514U (en) Automatic spraying and maintaining device for prefabricated box girder
CN213710549U (en) Parking shed capable of parking in two directions
CN214423176U (en) Bridge floor drainage construction operation dolly
CN214497216U (en) Novel movable protective shed of bracket and steel pipe column combined gantry type
CN219364516U (en) Construction platform based on radial gate
CN220847087U (en) Movable scaffold work platform suitable for bridge overhauls

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant