CN217352786U - Urban road sewer line convenient to construction - Google Patents
Urban road sewer line convenient to construction Download PDFInfo
- Publication number
- CN217352786U CN217352786U CN202220223497.3U CN202220223497U CN217352786U CN 217352786 U CN217352786 U CN 217352786U CN 202220223497 U CN202220223497 U CN 202220223497U CN 217352786 U CN217352786 U CN 217352786U
- Authority
- CN
- China
- Prior art keywords
- pipe
- fixed
- limiting
- urban road
- sewer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses an urban road sewer pipe convenient to construction, including the stake pipe, the stake pipe upper end is fixed with the sleeve pipe, the stake pipe both ends all are connected with the drain pipe, the stake pipe both ends all are fixed with spacing inner tube, just spacing annular has all been seted up to spacing inner tube outer wall, the drain pipe is close to the both sides of stake pipe one end all seted up with spacing annular matched with spout, it is equipped with the stopper all to slide in the spout. This sewer pipe adopts the prefab of being convenient for the equipment to the difficult emergence of junction is not hard up, thereby can be convenient for be under construction urban road sewer pipe, can adjust the height of bearing cylinder according to the distance between drain pipe and the ground moreover, and can filter the sewage that gets into in the sewer pipe, thereby can make the difficult emergence of sewer pipe block up.
Description
Technical Field
The utility model relates to a sewer pipe technical field particularly, relates to an urban road sewer pipe convenient to construction.
Background
With the continuous popularization and deepening of the concept of green cities, green vegetation appears more and more in cities, and particularly, urban roads are greened more and more widely; because urban road's afforestation trees can drop more leaf, and the raise dust is also more on the urban road, and the silt that dropped leaf and dust formed often can flow into urban road sewer well head along with ponding together, collects in sewer pipe at last, causes sewer pipe's siltation jam more easily. Therefore need set up the filtering capability structure of debris such as leaf, silt in the urban road well head of launching, this has just led to urban road sewer pipe structure comparatively complicated, and the construction process is comparatively loaded down with trivial details to sewer pipe lies in that drainage pipe's junction takes place easily not hard up, makes the sealed inefficacy of junction, thereby can lead to sewage to leak.
An effective solution to the problems in the related art has not been proposed yet.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an urban road sewer line convenient to construction to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme: the urban road sewer pipeline convenient for construction comprises a support pipe, wherein a sleeve is fixed at the upper end of the support pipe, two ends of the support pipe are connected with drain pipes, two ends of the support pipe are respectively fixed with a limiting inner pipe, the outer wall of each limiting inner pipe is provided with a limiting ring groove, two sides of one end of each drain pipe, which is close to the support pipe, are provided with sliding grooves matched with the limiting ring grooves, limiting blocks are arranged in the sliding grooves in a sliding mode, a fixing frame is fixed inside one end, which is far away from the limiting blocks, of each sliding groove, a spring is fixedly connected between each limiting block and the fixing frame, a sewer pipe is arranged inside the upper end of the sleeve pipe in a sliding mode, a bearing cylinder is fixed on the outer wall of the upper end of the sewer pipe, a locking mechanism is arranged on the outer wall of the sewer pipe, a filter cylinder is arranged inside the upper end of the sewer pipe, and a limiting ring matched with the bearing cylinder is fixed on the outer wall of the upper end of the filter cylinder, the limiting ring is provided with a well cover, and the well cover is provided with a plurality of drain holes.
Furthermore, a settling tank is fixed at the lower end of the support pipe.
Furthermore, a first annular groove is formed in one end, close to the support pipe, of the drain pipe, a second annular groove matched with the first annular groove is formed in the two ends of the support pipe, and a sealing ring is fixed in the second annular groove.
Furthermore, all be fixed with the connecting rod on the stopper, the connecting rod is kept away from the one end of stopper all is fixed with sealing baffle, sealing baffle outer wall all is fixed with the handle.
Furthermore, a diversion ring is fixed at one end of the limiting inner pipe, which is far away from the support pipe, and the cross section of the diversion ring is arranged into a triangular structure.
Furthermore, locking mechanism includes bolt, nut and semi-annular clamp, downcomer both sides outer wall all is equipped with semi-annular clamp, pass through bolt and nut fixed connection between the both ends of semi-annular clamp.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model discloses a through setting up support tube, sleeve pipe, drain pipe, spacing inner tube, spacing spout, stopper, spring, bearing cylinder, locking mechanism, cartridge filter and well lid, can be through adopting the prefab of being convenient for assemble, and the junction is difficult for taking place not hard uply, thus can be convenient for to be under construction to urban road sewer pipe, and can adjust the height of bearing cylinder according to the distance between drain pipe and the ground, and can filter the sewage that gets into in the sewer pipe, thereby can make the sewer pipe difficult for taking place the jam;
2. the utility model can utilize the sealing ring to increase the sealing performance between the drain pipe and the bracket pipe by arranging the first ring groove, the second ring groove and the seal, thereby preventing the sewage leakage at the joint;
3. the utility model has the advantages that by arranging the connecting rod, the sealing baffle and the handle, the limiting block can be pulled out from the limiting ring groove through the handle, so that the drain pipe can be separated from the support pipe, and the sealing baffle can prevent earth from entering the chute to influence the sliding of the limiting block;
4. the utility model discloses a set up bolt, nut and clamp, can fix the outer wall at the downcomer through bolt and nut with the semi-annular clamp to can carry out the bearing to the downcomer, and then can stretch into the length in the cover to the downcomer and fix.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic structural diagram of an urban road sewer pipeline convenient for construction according to an embodiment of the present invention;
fig. 2 is a sectional view of an urban road sewer line for facilitating construction according to an embodiment of the present invention;
fig. 3 is a sectional view of a bracket pipe and a drain pipe in a sewer pipe of an urban road convenient for construction according to an embodiment of the present invention;
FIG. 4 is an enlarged view of the structure at A in FIG. 3;
fig. 5 is a schematic structural diagram of a locking mechanism in an urban road sewer pipeline convenient for construction according to the utility model discloses an embodiment.
Reference numerals:
1. a stent tube; 2. a sleeve; 3. a drain pipe; 4. limiting the inner pipe; 5. a limiting ring groove; 6. a chute; 7. a limiting block; 8. a fixing frame; 9. a spring; 10. a sewer pipe; 11. a supporting cylinder; 12. a locking mechanism; 13. a filter cartridge; 14. a limiting ring; 15. a well cover; 16. a settling tank; 17. a seal ring; 18. a connecting rod; 19. sealing the baffle; 20. a handle; 21. a flow guide ring; 22. a bolt; 23. a nut; 24. semi-annular clamp.
Detailed Description
The following description of the present invention will be made with reference to the accompanying drawings and the detailed description thereof:
the embodiment is as follows:
referring to fig. 1-5, according to an embodiment of the present invention, an urban road sewer pipeline convenient for construction includes a support tube 1, a sleeve 2 is fixed on the upper end of the support tube 1, drain tubes 3 are connected to both ends of the support tube 1, limit inner tubes 4 are fixed on both ends of the support tube 1, limit ring grooves 5 are formed on the outer walls of the limit inner tubes 4, sliding grooves 6 matching with the limit ring grooves 5 are formed on both sides of one end of the drain tubes 3 close to the support tube 1, limit blocks 7 are slidably arranged in the sliding grooves 6, a fixed frame 8 is fixed inside one end of the sliding grooves 6 far from the limit blocks 7, a spring 9 is fixedly connected between the limit blocks 7 and the fixed frame 8, a sewer pipe 10 is slidably arranged inside the upper end of the sleeve 2, a bearing cylinder 11 is fixed on the outer wall of the upper end of the sewer pipe 10, a locking mechanism 12 is arranged on the outer wall of the sewer pipe 10, the utility model discloses a sewer pipe, including downcomer 10, filter cartridge 13, bearing cylinder 11, well lid 15, prefabricated component, sewage pipe 10, filter cartridge 13 upper end inside is equipped with cartridge filter 13, cartridge filter 13 upper end outer wall be fixed with bearing cylinder 11 assorted spacing ring 14, be equipped with well lid 15 on the spacing ring 14, just well lid 15 has seted up a plurality of wash ports, can be through adopting the prefab of being convenient for to the equipment, and the difficult emergence of junction is not hard up, thereby can be convenient for be under construction urban road sewer pipe, can adjust bearing cylinder 11's height according to the distance between drain pipe 3 and the ground moreover, and can filter the sewage that gets into in downcomer 10, thereby can make the difficult emergence of sewer pipe block up.
In a further embodiment, a settling tank 16 is fixed at the lower end of the support tube 1, the settling tank 16 can be used for settling impurities such as soil and fine stones in sewage, and the settling tank 16 can be opened and cleaned by taking out the filter cartridge 13.
In a further embodiment, the drain pipe 3 is close to the one end of prop up stand pipe 1 has all seted up first annular, prop up stand pipe 1 both ends all seted up with first annular assorted second annular, just all be fixed with sealing washer 17 in the second annular, can utilize sealing washer 17 to increase the leakproofness between drain pipe 3 and the prop up stand pipe 1 to can make the difficult sewage that takes place of junction leak.
In further embodiment, all be fixed with connecting rod 18 on the stopper 7, connecting rod 18 keeps away from the one end of stopper 7 all is fixed with sealing baffle 19, the 19 outer walls of sealing baffle all are fixed with handle 20, can pull out stopper 7 from spacing annular 5 through handle 20 to can part drain pipe 3 and stand pipe 1, and sealing baffle 19 can prevent earth from getting into the slip that influences stopper 7 in the spout 6.
In a further embodiment, a diversion ring 21 is fixed at one end of the limiting inner pipe 4 far away from the support pipe 1, and the cross section of the diversion ring 21 is set to be a triangular structure, wherein the diversion ring 21 can divert the water in the drain pipe 3 and the support pipe 1, so that the water flow is smoother.
In a further embodiment, the locking mechanism 12 includes a bolt 22, a nut 23 and a semi-annular clamp 24, the semi-annular clamp 24 is disposed on the outer walls of the two sides of the downcomer 10, the two ends of the semi-annular clamp 24 are fixedly connected through the bolt 22 and the nut 23, and the semi-annular clamp 24 can be fixed on the outer wall of the downcomer 10 through the bolt 22 and the nut 23, so that the downcomer 10 can be supported, and the length of the downcomer 10 extending into the casing 2 can be fixed.
For the convenience of understanding the technical solution of the present invention, the following detailed description is made on the working principle or the operation mode of the present invention in the practical process.
In practical application, a drainage pipeline laying channel is dug in advance, then the drainage pipe 3 and the support pipe 1 are spliced in the laying channel, when the splicing is carried out, only the limiting inner pipes 4 at two ends of the support pipe 1 are inserted into the prefabricated drainage pipe 3, the limiting blocks 7 can be pushed into the limiting ring grooves 5 under the action of the springs 9, so that the drainage pipe 3 and the support pipe 1 can be firmly spliced together without loosening, in addition, the splicing positions of the spliced drainage pipe 3 and the support pipe 1 can be sealed by the sealing rings 17 between the drainage pipe 3 and the support pipe 1, then the sewer pipe 10 is inserted into the sleeve pipe 2, the height of the bearing cylinder 11 is adjusted, the upper surface of the bearing cylinder 11 is flush with the ground, then the semi-annular clamp 24 is fixed on the outer wall of the sewer pipe 10 through the bolts 22 and the nuts 23, and the semi-annular clamp 24 is supported by the upper end of the sleeve pipe 2, thereby can highly fix bearing cylinder 11, then put into downcomer 10 with cartridge filter 13, utilize bearing cylinder 11 to carry out the bearing to spacing ring 14, put spacing ring 14 top with well lid 15 again, reuse earth at last to lay the canal fill and level up can, can lay the concrete at the upper surface when needing, drain pipe 3, mounting tube 1 and downcomer 10 all adopt the prefab of the equipment of being convenient for, the concatenation is convenient, stability is good, thereby can be convenient for be under construction to urban road sewer pipe.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The urban road sewer line convenient for construction is characterized by comprising a support pipe (1), wherein a sleeve (2) is fixed at the upper end of the support pipe (1), drain pipes (3) are connected at two ends of the support pipe (1), limiting inner pipes (4) are fixed at two ends of the support pipe (1), limiting annular grooves (5) are formed in the outer walls of the limiting inner pipes (4), sliding grooves (6) matched with the limiting annular grooves (5) are formed in two sides of one end, close to the support pipe (1), of the drain pipes (3), limiting blocks (7) are arranged in the sliding grooves (6) in a sliding mode, a fixing frame (8) is fixed inside one end, far away from the limiting blocks (7), of each sliding groove (6), a spring (9) is fixedly connected between each limiting block (7) and the fixing frame (8), a sewer pipe (10) is arranged in the upper end of the sleeve (2) in a sliding mode, the outer wall of the upper end of the sewer pipe (10) is fixedly provided with a bearing cylinder (11), the outer wall of the sewer pipe (10) is provided with a locking mechanism (12), a filter cylinder (13) is arranged inside the upper end of the sewer pipe (10), the outer wall of the upper end of the filter cylinder (13) is fixedly provided with a limiting ring (14) matched with the bearing cylinder (11), a well cover (15) is arranged on the limiting ring (14), and a plurality of drain holes are formed in the well cover (15).
2. The urban road sewer pipeline convenient for construction according to claim 1, wherein a settling tank (16) is fixed at the lower end of the support pipe (1).
3. The urban road sewer line convenient to construct according to claim 1, wherein a first ring groove is formed at one end of the drain pipe (3) close to the support pipe (1), a second ring groove matched with the first ring groove is formed at both ends of the support pipe (1), and a sealing ring (17) is fixed in each second ring groove.
4. The urban road sewer pipeline convenient for construction according to claim 1, wherein the limiting blocks (7) are respectively fixed with a connecting rod (18), one ends of the connecting rods (18) far away from the limiting blocks (7) are respectively fixed with a sealing baffle (19), and the outer walls of the sealing baffles (19) are respectively fixed with a handle (20).
5. The urban road sewer pipe convenient to construct according to claim 1, wherein a diversion ring (21) is fixed to one end of the limiting inner pipe (4) far away from the support pipe (1), and the cross section of the diversion ring (21) is arranged to be a triangular structure.
6. The urban road sewer pipe convenient to construct according to claim 1, wherein the locking mechanism (12) comprises a bolt (22), a nut (23) and a semi-annular clamp (24), the outer walls of two sides of the sewer pipe (10) are respectively provided with the semi-annular clamp (24), and two ends of the semi-annular clamp (24) are fixedly connected through the bolt (22) and the nut (23).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220223497.3U CN217352786U (en) | 2022-01-27 | 2022-01-27 | Urban road sewer line convenient to construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220223497.3U CN217352786U (en) | 2022-01-27 | 2022-01-27 | Urban road sewer line convenient to construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217352786U true CN217352786U (en) | 2022-09-02 |
Family
ID=83043502
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220223497.3U Active CN217352786U (en) | 2022-01-27 | 2022-01-27 | Urban road sewer line convenient to construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217352786U (en) |
-
2022
- 2022-01-27 CN CN202220223497.3U patent/CN217352786U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20100008787A (en) | Pit for managing dust removal | |
CN110644506A (en) | Side slope protection structure | |
CN217352786U (en) | Urban road sewer line convenient to construction | |
CN110318370A (en) | A kind of ecological revetment and its construction method | |
CN113756349B (en) | Foundation pit drainage structure and construction method thereof | |
CN214833286U (en) | Overflow type diversion three-way well | |
CN214709317U (en) | Ecological compound green structure of side slope | |
CN212327645U (en) | Flushing type soft filtering device in front of pump | |
KR20190076949A (en) | Apparatus for sewerage system including French drainage | |
CN208251270U (en) | A kind of municipal wastewater drainpipe with filtering function | |
CN210194819U (en) | New and old sewage conduit deep-well point connection structure | |
CN210013303U (en) | Connecting structure for new and old sewage pipelines | |
CN220827868U (en) | Drainage tank | |
CN213965418U (en) | Mud-water separation pipe | |
CN215669949U (en) | Hidden side slope rapid trough structure | |
CN211285642U (en) | Hydraulic slope drainage system | |
CN215482083U (en) | Intelligent rainwater guiding device based on municipal road engineering | |
CN219794066U (en) | Sponge city earth surface rainwater collecting and recycling system | |
CN214401273U (en) | Highway road surface drainage structure | |
CN212316962U (en) | Basement drainage device that falls | |
CN220434068U (en) | Inner drainage type organized seepage and drainage collecting system | |
CN219220505U (en) | Internal ponding discharging device for tunnel safety construction | |
CN217462247U (en) | Waterproof drainage structure for highway tunnel construction | |
CN215630565U (en) | Sewage intercepting device | |
CN115387171A (en) | Road high fill district construction drainage structures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |