CN217347857U - Bear frame based on construction management construction usefulness - Google Patents

Bear frame based on construction management construction usefulness Download PDF

Info

Publication number
CN217347857U
CN217347857U CN202220726490.3U CN202220726490U CN217347857U CN 217347857 U CN217347857 U CN 217347857U CN 202220726490 U CN202220726490 U CN 202220726490U CN 217347857 U CN217347857 U CN 217347857U
Authority
CN
China
Prior art keywords
sliding
sleeve
fixedly connected
frame
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220726490.3U
Other languages
Chinese (zh)
Inventor
丁亚杰
薛洪刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaocheng Longhao Construction Co ltd
Original Assignee
Liaocheng Longhao Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaocheng Longhao Construction Co ltd filed Critical Liaocheng Longhao Construction Co ltd
Priority to CN202220726490.3U priority Critical patent/CN217347857U/en
Application granted granted Critical
Publication of CN217347857U publication Critical patent/CN217347857U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to the technical field of bearing frames, in particular to a bearing frame for construction based on building management, which comprises a base, wherein the top end of the base is fixedly connected with a sliding frame, the inner side of the top end of the sliding frame is slidably connected with a sliding plate, one end of the sliding plate is fixedly connected with a connecting rod, the other end of the connecting rod is fixedly connected with a second screw rod, the outer side of the second screw rod is spirally connected with a second connecting ring, the inner side of the bottom end of the second connecting ring is spirally connected with a second sleeve, and the second sleeve is fixedly connected with the base, the height of the bearing frame is conveniently adjusted under the matching of the screw connection of the second connecting ring, the second sleeve and the second screw rod, the sliding connection of the second screw rod and the second sleeve, and the sliding connection of the sliding plate and the sliding frame, the reliable bearing of steel pipes with different quantities is ensured, and the height of the bearing frame is reliably adjusted after partial steel pipes are taken out, guarantee that the staff conveniently takes out and bears bottom steel pipe, increase the practicality of device.

Description

Bear frame based on construction management construction usefulness
Technical Field
The utility model relates to a bear technical field, specifically be a bear frame based on construction management construction usefulness.
Background
The building refers to an asset formed by artificial construction, belongs to the category of fixed assets, and comprises two categories of houses and structures, wherein the houses refer to engineering buildings for people to live in, work, study, produce, manage, entertain, store articles and perform other social activities.
Use the steel pipe in a large number in the construction process, fixed height bears the frame and is unfavorable for the reliable placement of different quantity steel pipes, and the unadjustable bearing frame of height is unfavorable for the staff to take out bottom steel pipe after part steel pipe takes out simultaneously, reduces work efficiency, and the length of steel pipe is different in addition, and the bearing frame of fixed length is unfavorable for the reliable bearing of different length steel pipes, and the steel pipe both sides need reliably spacing the roll-off of avoiding to bear the frame simultaneously.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a bear frame based on construction management construction usefulness to solve the reliable placing that the fixed height who provides among the above-mentioned background art bears the frame and take out and the problem that the roll-off was born to the reliable spacing roll-off of avoiding of steel pipe both sides need be reliably avoided to different quantity steel pipes.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a bear frame based on construction management construction usefulness, includes the base, the top fixedly connected with sliding frame of base, the inboard sliding connection in top of sliding frame has the sliding plate, the one end fixedly connected with connecting rod of sliding plate, the other end fixedly connected with second hob of connecting rod, the outside screwed connection of second hob has the second go-between, the inboard screwed connection in bottom of second go-between has the second sleeve, and second sleeve and base fixed connection.
Preferably, the equal sliding connection in left end inboard and the right-hand member inboard of base has the fixture block, the one end fixedly connected with movable plate of fixture block, the one end fixedly connected with button of sliding frame, and button and movable plate sliding connection, the first sleeve of top fixedly connected with of movable plate, first telescopic top outside spiral connection has first connecting ring, the inboard spiral connection in top of first connecting ring has first hob, and first hob and first sleeve sliding connection, first telescopic one end fixedly connected with baffle, the one end fixedly connected with dead lever of first hob, the bottom fixedly connected with folding layer of dead lever, and folding layer and baffle fixed connection.
Preferably, the inner sides of the left end and the right end of the base are provided with sliding grooves, and the clamping blocks are connected with the base in a sliding mode through the sliding grooves.
Preferably, jacks are uniformly arranged on the inner side of the top end of the moving plate, the buttons are in sliding connection with the moving plate through the jacks, sliding grooves are formed in the inner side of the top end of the sliding frame, and the sliding plate is in sliding connection with the sliding frame through the sliding grooves.
Preferably, the top outside of first sleeve is provided with the external screw thread, and first connecting ring passes through external screw thread and first sleeve screwed connection, the outside of first hob is provided with the external screw thread, and first connecting ring passes through external screw thread and first hob screwed connection.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses in, through the sliding frame that sets up, the sliding plate, the second hob, second go-between and second sleeve, can conveniently increase and bear the frame, guarantee the reliable of different quantity steel pipes and bear, simultaneously bear the frame height in convenient adjustment after the steel pipe part is taken out, waste time and energy when avoiding the staff to take out bottom steel pipe, at second go-between and second sleeve and second hob difference screwed connection, second hob and second sleeve sliding connection and sliding plate and sliding frame sliding connection's cooperation down to bearing the high convenient adjustment of frame, guarantee the reliable of different quantity steel pipes and bear, simultaneously bear the frame height in reliable adjustment after partial steel pipe is taken out, guarantee that the staff conveniently takes out and bears bottom steel pipe, increase the practicality of device.
2. The utility model discloses in, through the first hob that sets up, first sleeve, first connecting ring, the fixture block, the button, the movable plate, baffle and folding layer, can reliably place the steel pipe of different length, guarantee the reliable spacing of steel pipe simultaneously, avoid the steel pipe roll-off to bear the frame, convenient adjustment movable plate exposes length increase and bears frame length under fixture block and movable plate sliding connection's cooperation, the button is reliably fixed to the movable plate, at first connecting ring and first sleeve and first hob difference screwed connection and first hob and first sleeve sliding connection's cooperation down to the convenient adjustment of the whole height of baffle and folding layer, guarantee to the steel pipe of different quantity reliably spacing, avoid the steel pipe roll-off, the practicality that increases the device bears the frame.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the structure at A of FIG. 1 according to the present invention;
FIG. 3 is a schematic view of the structure of FIG. 1 at B according to the present invention;
FIG. 4 is a schematic view of the structure of FIG. 1 at C according to the present invention;
fig. 5 is a schematic structural diagram of the present invention at the position D of fig. 1.
In the figure: the device comprises a base 1, a moving plate 2, a baffle 3, a first sleeve 4, a folding layer 5, a first screw rod 6, a connecting rod 7, a second screw rod 8, a first connecting ring 9, a second sleeve 10, a sliding frame 11, a sliding plate 12, a fixed rod 13, a second connecting ring 14, a clamping block 15 and a button 16.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution:
the utility model provides a bear frame based on construction management construction usefulness, includes base 1, the top fixedly connected with sliding frame 11 of base 1, the inboard sliding connection in top of sliding frame 11 has sliding plate 12, the one end fixedly connected with connecting rod 7 of sliding plate 12, the other end fixedly connected with second hob 8 of connecting rod 7, the outside screwed connection of second hob 8 has second go-between 14, the inboard screwed connection in bottom of second go-between 14 has second sleeve 10, and second sleeve 10 and base 1 fixed connection.
The inner sides of the left end and the right end of the base 1 are both connected with a clamping block 15 in a sliding manner, one end of the clamping block 15 is fixedly connected with a movable plate 2, one end of a sliding frame 11 is fixedly connected with a button 16, the button 16 is connected with the movable plate 2 in a sliding manner, the top end of the movable plate 2 is fixedly connected with a first sleeve 4, the outer side of the top end of the first sleeve 4 is spirally connected with a first connecting ring 9, the inner side of the top end of the first connecting ring 9 is spirally connected with a first spiral rod 6, the first spiral rod 6 is connected with the first sleeve 4 in a sliding manner, one end of the first sleeve 4 is fixedly connected with a baffle 3, one end of the first spiral rod 6 is fixedly connected with a fixed rod 13, the bottom end of the fixed rod 13 is fixedly connected with a folding layer 5, the folding layer 5 is fixedly connected with the baffle 3, the bearing frame is guaranteed to reliably bear steel pipes with different lengths in the using process, and the baffle 3 and the folding layer 5 reliably limit the steel pipes, the steel pipe is prevented from sliding out of the bearing frame; the inner sides of the left end and the right end of the base 1 are provided with sliding grooves, and the fixture block 15 is in sliding connection with the base 1 through the sliding grooves, so that the stable movement of the moving plate 2 is ensured in the use process; jacks are uniformly arranged on the inner side of the top end of the moving plate 2, the button 16 is in sliding connection with the moving plate 2 through the jacks, a sliding groove is formed in the inner side of the top end of the sliding frame 11, the sliding plate 12 is in sliding connection with the sliding frame 11 through the sliding groove, the sliding connection of the button 16 and the moving plate 2 ensures that the moving plate 2 is reliably fixed in the using process, and the sliding connection of the sliding plate 12 and the sliding frame 11 ensures that the height of the bearing frame is stably adjusted; the top outside of first sleeve 4 is provided with the external screw thread, and first connecting ring 9 passes through external screw thread and 4 screwed connection of first sleeve, and the outside of first hob 6 is provided with the external screw thread, and first connecting ring 9 passes through external screw thread and 6 screwed connection of first hob, guarantees the convenient adjustment of first sleeve 4 and 6 overall height of first hob in the use.
The working process is as follows: the utility model discloses a bearing frame can conveniently increase, guarantee the reliable bearing of different quantity steel pipes, conveniently adjust bearing frame height after the steel pipe part is taken out simultaneously, avoid the staff to take time and energy when taking out bottom steel pipe, when needing to increase bearing frame, screw down second sleeve 10 with second go-between 14 under the cooperation of second go-between 14 and second sleeve 10 screwed connection, increase the exposure length of second hob 8 under the cooperation of second hob 8 and second sleeve 10 sliding connection, second hob 8 drives sliding plate 12 part under the cooperation of sliding plate 12 and sliding frame 11 sliding connection and exposes sliding frame 11, after adjusting to suitable height, second go-between 14 is screwed up second sleeve 10 again, thereby reliably fix second hob 8 and sliding plate 12, after the staff uninstalled part steel pipe in the bearing frame, screw down second sleeve 10 with second go-between 14 and rotate second go-between 14 to second hob 8 top, until the second screw rod 8 partially slides downwards and retreats into the second sleeve 10, and the top of the second screw rod 8 is slightly higher than the inner steel tube of the bearing frame, the second connecting ring 14 is screwed on the second sleeve 10 again, so that the worker can conveniently take out the inner steel tube of the bearing frame with the reduced height, in addition, the steel tubes with different lengths can be reliably placed, the reliable limit of the steel tubes is ensured, the steel tubes are prevented from sliding out of the bearing frame, when the length of the bearing frame needs to be adjusted, the button 16 is pressed to withdraw the steel tubes from the movable plate 2, the movable plate 2 is stably moved outwards under the matching of the sliding connection of the clamping block 15 and the base 1, the button 16 is aligned with the nearby jack inside the movable plate 2 after being moved to a proper position, the button 16 is pressed to be inserted into the movable plate 2 to be reliably fixed, the exposed length of the first screw rod 6 is adjusted under the matching of the spiral connection of the first connecting ring movable plate 9 and the first sleeve 4 and the sliding connection of the first sleeve 4 and the first screw rod 6, thereby extension or shorten 3 heights of baffle under the cooperation of folded layer 5, reliably spacing the steel pipe of different length under the cooperation of baffle 3 and folded layer 5, avoid the steel pipe roll-off to bear the frame.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a bear frame based on construction management construction usefulness, includes base (1), its characterized in that: the top fixedly connected with sliding frame (11) of base (1), the inboard sliding connection in top of sliding frame (11) has sliding plate (12), the one end fixedly connected with connecting rod (7) of sliding plate (12), the other end fixedly connected with second hob (8) of connecting rod (7), the outside screwed connection of second hob (8) has second go-between (14), the inboard screwed connection in bottom of second go-between (14) has second sleeve (10), and second sleeve (10) and base (1) fixed connection.
2. The loading frame for construction based on building management as claimed in claim 1, wherein: the inner sides of the left end and the right end of the base (1) are both connected with a clamping block (15) in a sliding manner, one end of the clamping block (15) is fixedly connected with a movable plate (2), one end of the sliding frame (11) is fixedly connected with a button (16), the button (16) is connected with the movable plate (2) in a sliding manner, the top end of the movable plate (2) is fixedly connected with a first sleeve (4), the outer side of the top end of the first sleeve (4) is spirally connected with a first connecting ring (9), the inner side of the top end of the first connecting ring (9) is spirally connected with a first spiral rod (6), the first spiral rod (6) is connected with the first sleeve (4) in a sliding manner, one end of the first sleeve (4) is fixedly connected with a baffle (3), one end of the first spiral rod (6) is fixedly connected with a fixing rod (13), and the bottom end of the fixing rod (13) is fixedly connected with a folding layer (5), and the folding layer (5) is fixedly connected with the baffle (3).
3. The loading frame for construction based on building management as claimed in claim 2, wherein: the inner sides of the left end and the right end of the base (1) are provided with sliding grooves, and the clamping blocks (15) are connected with the base (1) in a sliding mode through the sliding grooves.
4. The loading frame for construction based on building management as claimed in claim 2, characterized in that: jacks are uniformly arranged on the inner side of the top end of the moving plate (2), the button (16) is in sliding connection with the moving plate (2) through the jacks, a sliding groove is arranged on the inner side of the top end of the sliding frame (11), and the sliding plate (12) is in sliding connection with the sliding frame (11) through the sliding groove.
5. The loading frame for construction based on building management as claimed in claim 2, wherein: the top outside of first sleeve (4) is provided with the external screw thread, and just first adapter ring (9) are through external screw thread and first sleeve (4) threaded connection, the outside of first hob (6) is provided with the external screw thread, and just first adapter ring (9) are through external screw thread and first hob (6) threaded connection.
CN202220726490.3U 2022-03-31 2022-03-31 Bear frame based on construction management construction usefulness Active CN217347857U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220726490.3U CN217347857U (en) 2022-03-31 2022-03-31 Bear frame based on construction management construction usefulness

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220726490.3U CN217347857U (en) 2022-03-31 2022-03-31 Bear frame based on construction management construction usefulness

Publications (1)

Publication Number Publication Date
CN217347857U true CN217347857U (en) 2022-09-02

Family

ID=83052614

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220726490.3U Active CN217347857U (en) 2022-03-31 2022-03-31 Bear frame based on construction management construction usefulness

Country Status (1)

Country Link
CN (1) CN217347857U (en)

Similar Documents

Publication Publication Date Title
CN109088583A (en) The clipping photovoltaic solar panel auxiliary installation device of adjustable-angle
CN217347857U (en) Bear frame based on construction management construction usefulness
CN208272473U (en) A kind of electric power overhaul platform that stability is high
CN211474147U (en) Stable form steel construction of interim support
CN214738259U (en) Assembled rectangle utility tunnel structure
CN210216639U (en) Trench cover plate telescopic bracket
CN210879540U (en) Debugging workbench for software development
CN211173221U (en) Connecting piece fixing device is used in civil engineering construction
CN219573026U (en) Portable house building measuring device
CN212802717U (en) Support device for building templates
CN217422396U (en) Positioning support for water supply and drainage engineering pipeline
CN220929258U (en) Rush repair ladder
CN220195990U (en) Thin-wall tube correction device
CN212408456U (en) Adjusting device for architectural lighting
CN213361301U (en) Municipal administration sewage pipeline docks installation with interim strutting arrangement
CN217000880U (en) Toilet reserved sleeve positioning die
CN217915148U (en) Municipal pipeline maintenance device capable of performing emergency repair on pipeline
CN215760846U (en) Novel shed roof structure convenient to expand and contract
CN214222640U (en) Accurate measuring apparatu of construction
CN217728477U (en) Construction structure of lintel ventilation pipeline
CN210771268U (en) Engineering detector support frame for construction
CN214963883U (en) Novel drawing show for building electrical design device
CN220747640U (en) Building template supporting device for house building
CN211178493U (en) Novel centering rod is automatic vertical device
CN217028081U (en) Frame post template reinforcing apparatus is built in room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Ding Yajie

Inventor after: Xue Honggang

Inventor before: Ding Yajie

Inventor before: Xue Honggang

CB03 Change of inventor or designer information