CN217345407U - Construction pipeline fixing device - Google Patents
Construction pipeline fixing device Download PDFInfo
- Publication number
- CN217345407U CN217345407U CN202220990767.3U CN202220990767U CN217345407U CN 217345407 U CN217345407 U CN 217345407U CN 202220990767 U CN202220990767 U CN 202220990767U CN 217345407 U CN217345407 U CN 217345407U
- Authority
- CN
- China
- Prior art keywords
- rod
- mounting frame
- pipe clamp
- fixing device
- sliding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a construction pipeline fixing device, which comprises an installation frame, wherein a movable plate is arranged in the installation frame, a fixed rod and a threaded rod which are parallel to each other are arranged on the movable plate in a penetrating way, and the movable plate is connected with the fixed rod in a sliding way and is in threaded connection with the threaded rod; the threaded rod is rotatably connected with the mounting frame, and one end of the threaded rod extends out of the mounting frame; the fixed rod is fixedly connected with the mounting frame; the lower surface of the moving plate is provided with an upper pipe clamp; a lower pipe clamp is arranged below the position, corresponding to the upper pipe clamp, in the mounting frame; and a buffer clamping assembly is arranged between the lower pipe clamp and the mounting frame.
Description
Technical Field
The utility model relates to a fixed technical field of construction pipeline, concretely relates to construction pipeline fixing device.
Background
In the building construction process, pipelines on a construction site are more and are often placed and pulled randomly, so that the construction site is messy, workers are easy to trip, and great potential safety hazards are caused; one of the existing methods for managing pipelines in the construction process is to use ropes to tie the pipelines section by section, and the ropes are used for binding, so that the pipeline fixing effect is poor, and time and labor are wasted; the other way is to use a pipe clamp fixed on the base to clamp the pipeline, but when the pipeline needs to be rotated, the whole device needs to be detached and fixed again to change the direction of the pipeline, and the practicability is poor.
SUMMERY OF THE UTILITY MODEL
In order to solve the above problem, the utility model discloses following technical scheme will be adopted:
a fixing device for a construction pipeline comprises an installation frame, wherein a movable plate is arranged in the installation frame, a fixed rod and a threaded rod which are parallel to each other are arranged on the movable plate in a penetrating mode, and the movable plate is connected with the fixed rod in a sliding mode and is in threaded connection with the threaded rod; the threaded rod is rotatably connected with the mounting frame, and one end of the threaded rod extends out of the mounting frame; the fixed rod is fixedly connected with the mounting frame; the lower surface of the moving plate is provided with an upper pipe clamp; a lower pipe clamp is arranged below the position, corresponding to the upper pipe clamp, in the mounting frame; and a buffer clamping assembly is arranged between the lower pipe clamp and the mounting frame.
Furthermore, the buffering clamping assembly comprises two supporting rods which are hinged with the lower surface of the lower pipe clamp and arranged in a splayed shape, and two first grooves which are formed in the bottom surface of the mounting frame; the two support rods are symmetrically arranged; the first grooves are arranged in one-to-one correspondence with the supporting rods; a sliding rod is arranged in the first groove, a sliding block is sleeved on the sliding rod in a sliding manner, and the lower end of the supporting rod is hinged with the upper surface of the sliding block at the corresponding position of the supporting rod; all the cover is equipped with first spring on the part that lies in sliding block one side on the slide bar, and the setting is kept away from each other to the first spring in two wherein first recesses.
Further, the lower surface of installing frame is provided with the support column, the support column lower extreme is provided with the base.
Furthermore, a guide rod is arranged at the center of the lower surface of the lower pipe clamp and is positioned between the two support rods; the lower end of the guide rod penetrates through the bottom plate of the mounting frame and is connected with the bottom plate of the mounting frame in a sliding manner; and a second spring is sleeved on the part of the guide rod positioned in the mounting frame.
Furthermore, a limiting block is arranged on the part of the guide rod, which is positioned outside the mounting frame.
Furthermore, the supporting column is rotatably connected with the base; the supporting column is fixedly sleeved with a gear; and the base is provided with a positioning mechanism used for limiting the position of the supporting column.
Furthermore, the positioning mechanism comprises a fixed block arranged on the base, an arc-shaped toothed plate matched with the gear, a second groove arranged on the fixed block, and a lead screw rotatably connected in the second groove; the fixed block is arranged on one side of the supporting column, and one end of the screw rod, which is far away from the supporting column, extends out of the fixed block; the lead screw is sleeved with a moving block, and the moving block is clamped in the second groove and is in threaded connection with the lead screw; an installation block is arranged on one side, away from the gear, of the arc toothed plate, a linkage rod extending downwards is arranged on the installation block, and the lower end of the linkage rod is connected with the moving block; when the lead screw is rotated, the arc-shaped toothed plate can be clamped on the gear.
Furthermore, clamping blocks are arranged on two sides of the moving block, a sliding groove matched with the clamping blocks is formed in the side wall of the second groove, and the clamping blocks are located in the sliding groove.
Furthermore, the end parts of the screw rod and the threaded rod are provided with handles convenient to rotate.
Further, a flexible material layer is arranged on the clamping surface of each of the upper pipe clamp and the lower pipe clamp.
The utility model has the advantages that: the utility model discloses a lower tube clamp with be provided with buffering clamping unit between the installing frame, when the rotation threaded rod makes the upper tube clamp move down, with the pipeline centre gripping between upper tube clamp and lower tube clamp, lower tube clamp is owing to the pressure that the upper tube clamp was applyed this moment, make lower tube clamp move down, owing to buffering clamping unit's existence, first spring and second spring are compressed, first spring and second spring give an ascending power of lower tube clamp simultaneously, thereby make the pipeline pressed from both sides tightly between upper tube clamp and lower tube clamp, because the existence of buffering clamping unit, when making the pipeline pressed from both sides tightly, buffering clamping unit also can play the effect of buffering when upper tube clamp moves down. Finally, the utility model discloses a rotate between support column and the base and be connected, when needs switching direction, only need will rotate the lead screw for the ARC toothed plate is kept away from the gear, then rotate the installing frame, make the direction of going up pipe clamp and lower pipe clamp can rotate, rotate the lead screw at last and make ARC toothed plate chucking on the gear, to the support column fix a position can.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a partial enlarged view of the position A of the present invention;
FIG. 3 is a schematic view of the structure of the present invention in the direction B-B;
reference numerals are as follows:
1. installing a frame; 2. a threaded rod; 3. moving the plate; 4. fixing the rod; 5. an upper pipe clamp; 6. a lower pipe clamp; 7. a support pillar; 8. a gear; 9. a support bar; 10. a slider; 11. a slide bar; 12. a first spring; 13. a guide bar; 14. a second spring; 15. a limiting block; 16. an arc toothed plate; 17. mounting blocks; 18. a linkage rod; 19. a moving block; 20. a clamping block; 21. a chute; 22. a lead screw; 23. a second groove; 24. a fixed block; 25. a handle bar; 26. a base; 27. a first groove.
Detailed Description
The technical solution of the present invention will be further described with reference to fig. 1-3 and the examples, so that those skilled in the art can more clearly understand the content of the technical solution.
Example 1:
the utility model discloses a construction pipeline fixing device, including the installing frame 1, be provided with the movable plate 3 in the installing frame 1, run through on the movable plate 3 and be provided with dead lever 4 and threaded rod 2 parallel to each other, wherein between movable plate 3 and the dead lever 4 sliding connection, and with threaded connection between the threaded rod 2; threaded rod 2 with rotate between the installing frame 1 and be connected, and its one end extends to outside the installing frame 1, the tip of threaded rod 2 is provided with the pivoted barre 25 of being convenient for. The fixing rod 4 is fixedly connected with the mounting frame 1; the lower surface of the moving plate 3 is provided with an upper pipe clamp 5; a lower pipe clamp 6 is arranged below the position, corresponding to the upper pipe clamp 5, in the mounting frame 1; and a buffer clamping assembly is arranged between the lower pipe clamp 6 and the mounting frame 1. The clamping surfaces of the upper pipe clamp 5 and the lower pipe clamp 6 are provided with flexible material layers, and the flexible material layers can be rubber pads, sponge pads and the like in the prior art. The upper pipe clamp and the lower pipe clamp in the embodiment can be in one group or multiple groups, the threaded rod can be arranged in the middle, and the two fixing rods are symmetrically arranged on two sides of the threaded rod respectively.
The buffer clamping assembly comprises two supporting rods 9 which are hinged with the lower surface of the lower pipe clamp 6 and arranged in a splayed shape, and two first grooves 27 arranged on the bottom surface of the mounting frame 1; the two support rods 9 are arranged symmetrically; the first grooves 27 are arranged corresponding to the support rods 9 one by one; a sliding rod 11 is arranged in the first groove 27, a sliding block 10 is slidably sleeved on the sliding rod 11, and the lower end of the supporting rod 9 is hinged with the upper surface of the sliding block 10 at the corresponding position; the sliding rod 11 is sleeved with first springs 12 at one side of the sliding block 10, wherein the first springs 12 in the two first grooves 27 are far away from each other. The buffering clamping assembly in this embodiment makes the upper tube clamp move down when rotating the threaded rod to press from both sides the pipeline between upper tube clamp and lower tube clamp, and first spring is compressed when the upper tube clamp moves down, then the existence of first spring makes the lower tube clamp pushed up, thereby is pressed from both sides the pipeline more firmly, and the existence of first spring, when the upper tube clamp moves down, can play the effect of buffering.
Example 2:
this example differs from example 1 in that: the lower surface of installing frame 1 is provided with support column 7, support column 7 lower extreme is provided with base 26. A guide rod 13 is arranged at the center of the lower surface of the lower pipe clamp 6, and the guide rod 13 is positioned between the two support rods 9; the lower end of the guide rod 13 penetrates through the bottom plate of the mounting frame 1 and is connected with the bottom plate of the mounting frame 1 in a sliding manner; the part of the guide rod 13 in the installation frame 1 is sleeved with a second spring 14. The part of the guide rod 13 outside the mounting frame 1 is provided with a limit block 15. In this embodiment, add the guide bar, the suit second spring on the guide bar, when last pipe clamp moved down, the second spring was compressed, and then has strengthened the clamping force degree. And when being provided with the stopper and preventing first spring and second spring from resetting, the lower extreme of guide bar is deviate from in the hole that passes on the installing frame. And the lower pipe clamp is provided with a supporting column, when the lower pipe clamp moves downwards, the length of the lower end of the guide rod extending out of the mounting frame is smaller than the height of the supporting column, and the base and the supporting column are prevented from interfering the guide rod. The base can be provided with a mounting hole, and a fixing bolt penetrates through the mounting hole so as to fix the base.
Example 3:
the present example differs from example 2 in that: the supporting column 7 is rotatably connected with the base 26; a gear 8 is fixedly sleeved on the supporting column 7; the base 26 is provided with a positioning mechanism for defining the position of the supporting column 7.
The positioning mechanism comprises a fixed block 24 arranged on a base 26, an arc toothed plate 16 matched with the gear 8, a second groove 23 arranged on the fixed block 24, and a lead screw 22 rotatably connected in the second groove 23; a fixed block 24 is arranged on one side of the supporting column 7, and one end of the screw rod 22, which is far away from the supporting column 7, extends out of the fixed block 24; the lead screw 22 is sleeved with a moving block 19, and the moving block 19 is clamped in the second groove 23 and is in threaded connection with the lead screw 22; an installation block 17 is arranged on one side of the arc toothed plate 16 far away from the gear 8, a linkage rod 18 extending downwards is arranged on the installation block 17, and the lower end of the linkage rod 18 is connected with the moving block 19; when the lead screw 22 is rotated, the arc-shaped toothed plate 16 can be clamped on the gear 8. Two sides of the moving block 19 are provided with a fixture block 20, a sliding groove 21 matched with the fixture block 20 is arranged on the side wall of the second groove 23, and the fixture block 20 is located in the sliding groove 21. The ends of the lead screw 22 are each provided with a lever 25 for facilitating rotation.
Rotate between support column in this embodiment and the base to be connected, when the pipeline direction needs to be changed, rotate the lead screw for the movable block moves to the direction of keeping away from the support column, and the movable block drives the arc pinion rack and removes simultaneously, thereby makes the gear be liberated, then rotates the support column, until suitable position, then rotates the lead screw, makes arc pinion rack chucking gear again, fix can.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (10)
1. The utility model provides a construction pipeline fixing device, includes installing frame (1), its characterized in that: a movable plate (3) is arranged in the mounting frame (1), a fixed rod (4) and a threaded rod (2) which are parallel to each other are arranged on the movable plate (3) in a penetrating mode, and the movable plate (3) is connected with the fixed rod (4) in a sliding mode and is connected with the threaded rod (2) in a threaded mode; the threaded rod (2) is rotatably connected with the mounting frame (1), and one end of the threaded rod extends out of the mounting frame (1); the fixing rod (4) is fixedly connected with the mounting frame (1); the lower surface of the moving plate (3) is provided with an upper pipe clamp (5); a lower pipe clamp (6) is arranged below the position, corresponding to the upper pipe clamp (5), in the mounting frame (1); and a buffer clamping assembly is arranged between the lower pipe clamp (6) and the mounting frame (1).
2. The construction pipeline fixing device as claimed in claim 1, wherein: the buffer clamping assembly comprises two supporting rods (9) which are hinged with the lower surface of the lower pipe clamp (6) and arranged in a splayed manner, and two first grooves (27) arranged on the bottom surface of the mounting frame (1); the two support rods (9) are arranged symmetrically; the first grooves (27) and the support rods (9) are arranged in a one-to-one correspondence manner; a sliding rod (11) is arranged in the first groove (27), a sliding block (10) is sleeved on the sliding rod (11) in a sliding mode, and the lower end of the supporting rod (9) is hinged to the upper surface of the sliding block (10) at the corresponding position; the sliding rod (11) is sleeved with a first spring (12) on the part located on one side of the sliding block (10), and the first springs (12) in the two first grooves (27) are arranged far away from each other.
3. A construction pipeline fixing device as claimed in claim 2, wherein: the lower surface of installing frame (1) is provided with support column (7), support column (7) lower extreme is provided with base (26).
4. A construction pipeline fixing device as claimed in claim 3, wherein: a guide rod (13) is arranged at the center of the lower surface of the lower pipe clamp (6), and the guide rod (13) is positioned between the two support rods (9); the lower end of the guide rod (13) penetrates through the bottom plate of the mounting frame (1) and is in sliding connection with the bottom plate of the mounting frame (1); the part of the guide rod (13) positioned in the mounting frame (1) is sleeved with a second spring (14).
5. The construction pipeline fixing device as claimed in claim 4, wherein: the guide rod (13) is provided with a limiting block (15) on the part outside the mounting frame (1).
6. A construction pipeline fixing device as claimed in claim 3, wherein: the supporting column (7) is rotatably connected with the base (26); a gear (8) is fixedly sleeved on the supporting column (7); the base (26) is provided with a positioning mechanism for limiting the position of the supporting column (7).
7. A construction pipeline fixing device as claimed in claim 6, wherein: the positioning mechanism comprises a fixed block (24) arranged on a base (26), an arc toothed plate (16) matched with the gear (8), a second groove (23) arranged on the fixed block (24), and a lead screw (22) rotatably connected in the second groove (23); a fixed block (24) is arranged on one side of the supporting column (7), and one end, far away from the supporting column (7), of the screw rod (22) extends out of the fixed block (24); a moving block (19) is sleeved on the lead screw (22), and the moving block (19) is clamped in the second groove (23) and is in threaded connection with the lead screw (22); an installation block (17) is arranged on one side, away from the gear (8), of the arc toothed plate (16), a linkage rod (18) extending downwards is arranged on the installation block (17), and the lower end of the linkage rod (18) is connected with the moving block (19); when the lead screw (22) is rotated, the arc-shaped toothed plate (16) can be clamped on the gear (8).
8. A construction pipeline fixing device as claimed in claim 7, wherein: clamping blocks (20) are arranged on two sides of the moving block (19), sliding grooves (21) matched with the clamping blocks (20) are formed in the side walls of the second grooves (23), and the clamping blocks (20) are located in the sliding grooves (21).
9. The construction pipeline fixing device as claimed in claim 7, wherein: the ends of the screw rod (22) and the threaded rod (2) are provided with handles (25) convenient to rotate.
10. A construction pipeline fixing device as claimed in claim 1, wherein: the clamping surfaces of the upper pipe clamp (5) and the lower pipe clamp (6) are provided with flexible material layers.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220990767.3U CN217345407U (en) | 2022-04-27 | 2022-04-27 | Construction pipeline fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220990767.3U CN217345407U (en) | 2022-04-27 | 2022-04-27 | Construction pipeline fixing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217345407U true CN217345407U (en) | 2022-09-02 |
Family
ID=83058049
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220990767.3U Active CN217345407U (en) | 2022-04-27 | 2022-04-27 | Construction pipeline fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217345407U (en) |
-
2022
- 2022-04-27 CN CN202220990767.3U patent/CN217345407U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN217345407U (en) | Construction pipeline fixing device | |
CN208614296U (en) | A kind of vertical machining centre tool positioning device | |
CN217111811U (en) | Bridge building steel structure quality detection equipment with protection function | |
CN216097688U (en) | Clamp for machining tubular steel structure | |
CN203114219U (en) | Drilling coring device | |
CN108222452B (en) | A kind of interior decoration ceramic tile plastering device | |
CN214622659U (en) | Self-compacting concrete compactness check out test set | |
CN218284611U (en) | Tubular product fixing device for civil engineering | |
CN2755390Y (en) | Multifunctional cable stand | |
CN216341969U (en) | Drilling engineering is with drilling elevator convenient to fixed drilling string | |
CN216830430U (en) | Engineering plastic plate processing and positioning device | |
CN213613853U (en) | Fixing mechanism for cable processing | |
CN220805283U (en) | Manual steel bar bending machine capable of preventing shaking for building construction | |
CN214173980U (en) | Building quality detects uses pulling force detection device | |
CN218444928U (en) | Fender bending resistance bears experimental apparatus | |
CN213744769U (en) | Screw rod fixing sleeve device | |
CN218226291U (en) | Clamping device | |
CN219732763U (en) | Template clamping device for building reinforcement | |
CN220729868U (en) | Tension testing device | |
CN219820621U (en) | Pipeline bending device | |
CN220903016U (en) | Quick-mounting fixture for circuit board | |
CN220725201U (en) | Foundation pile detection fixer | |
CN217331912U (en) | Stable bearing capacity test equipment for aluminum alloy bending component | |
CN220434331U (en) | Support frame for building engineering template | |
CN214687348U (en) | Cutting fixing device for wallboard cutting machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |