CN217328813U - PERT II type central heating pipeline fixing device - Google Patents

PERT II type central heating pipeline fixing device Download PDF

Info

Publication number
CN217328813U
CN217328813U CN202221180165.8U CN202221180165U CN217328813U CN 217328813 U CN217328813 U CN 217328813U CN 202221180165 U CN202221180165 U CN 202221180165U CN 217328813 U CN217328813 U CN 217328813U
Authority
CN
China
Prior art keywords
bradyseism
spring
arc board
pert
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221180165.8U
Other languages
Chinese (zh)
Inventor
李小朋
蒋彦涛
贺筱燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Zhongpen Tianrun Industrial Co ltd
Original Assignee
Henan Zhongpen Tianrun Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Zhongpen Tianrun Industrial Co ltd filed Critical Henan Zhongpen Tianrun Industrial Co ltd
Priority to CN202221180165.8U priority Critical patent/CN217328813U/en
Application granted granted Critical
Publication of CN217328813U publication Critical patent/CN217328813U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a PERTII type central heating pipeline fixing device, and relates to the technical field of heating pipelines. The problems that in the prior art, when pipelines with different diameters are fixed, stable fixing cannot be achieved, and use is very inconvenient are solved. A lower arc plate is arranged below an upper arc plate, a second rubber sheet is fixedly arranged on the inner side of the lower arc plate, a pressing plate is arranged in the upper arc plate, a fastening screw is arranged above the upper arc plate, the fastening screw penetrates the upper arc plate and isin threaded connection with the upper arc plate, the fastening screw and the pressing plate are rotationally connected, a first rubber sheet is fixedly arranged on the inner side of the pressing plate, a bottom frame is fixedly arranged below the lower arc plate, a damping sleeve is fixedly arranged below the bottom frame, and a damping bottom block is arranged below the damping sleeve.

Description

PERT II type central heating pipeline fixing device
Technical Field
The utility model relates to a heating pipe technical field specifically is PERT II type central heating pipeline fixing device.
Background
In order to increase the indoor warmth of residents in cold weather, the residents often heat the residents, a heating pipeline is needed to be used in the heating process, and the PERT II type heating pipeline has excellent high temperature resistance and pressure resistance, so that the heating pipeline which is often used needs to be fixed in order to prevent the heating pipeline from moving;
for example, patent publication No. CN208417763U (a protective fixing device for heat supply pipeline): the device comprises a mounting plate, a support rod, a first semicircular sleeve, a second semicircular sleeve, a first elastic part, a second elastic part, a first arc-shaped block, a third elastic part, a fourth elastic part, a second arc-shaped block, a screw, a first fixing block and a second fixing block; the first semicircular sleeve is fixedly connected to the top of the mounting plate through a support rod;
although the prior art is convenient to protect and damp pipelines, the positions of the arc-shaped blocks in the pipelines cannot be adjusted, and the diameters of the heating pipelines are different sometimes when the heating pipelines are connected and used, so that the pipelines with different diameters cannot be stably fixed, and the use is very inconvenient; therefore, the market urgently needs to develop a PERT II type central heating pipeline fixing device to help people solve the existing problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a PERT II type central heating pipeline fixing device to the pipeline of fixed different diameters that proposes in solving above-mentioned background art can not stably be fixed, uses very inconvenient problem.
In order to achieve the above object, the utility model provides a following technical scheme: PERT II type central heating pipeline fixing device, including last arc board, the below of going up the arc board is provided with down the arc board, the inboard fixed mounting of arc board has the second sheet rubber down, the inside of going up the arc board is provided with the clamp plate, the top of going up the arc board is provided with fastening screw, and fastening screw run through the arc board and with last arc board threaded connection, fastening screw rotates with the clamp plate to be connected, the inboard fixed mounting of clamp plate has first sheet rubber.
Preferably, the lower portion of the lower arc plate is fixedly provided with a bottom frame, the lower portion of the bottom frame is fixedly provided with a cushioning sleeve, a cushioning bottom block is arranged below the cushioning sleeve, and the cushioning bottom block penetrates into the interior of the cushioning sleeve.
Preferably, the lower fixed mounting of bradyseism end piece has the mounting panel, the inside of mounting panel is provided with the mounting hole, the inside of bradyseism sleeve is provided with the bradyseism spring, the lower fixed mounting of bradyseism spring has the spring holder, and the spring holder passes through screw fixed connection with the bradyseism end piece.
Preferably, the top fixed mounting of bradyseism spring has down the pressure frame, and pushes down the frame and pass through screw fixed connection with the bradyseism sleeve, the both sides of bradyseism spring all are provided with the installation folded plate, the both sides of pushing down the frame top are the symmetry respectively and are provided with and stabilize gluey piece, and stabilize gluey piece and pass through glue fixed connection with the installation folded plate.
Preferably, a guide rod groove is formed in the shock absorption bottom block along the lower portion of the spring seat, a central guide rod is arranged in the shock absorption spring, and the central guide rod penetrates through the spring seat and extends to the inside of the guide rod groove.
Preferably, the two sides of the upper arc plate are respectively and symmetrically and fixedly provided with a first connecting plate, the two sides of the lower arc plate are respectively and symmetrically provided with a second connecting plate, the upper end of the first connecting plate is provided with a fixing bolt, and the first connecting plate and the second connecting plate are fixedly connected through the fixing bolt.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a through the setting of going up arc board and lower arc board, can fix heating pipe, and be provided with the clamp plate in last arc board, and the clamp plate can carry out altitude mixture control to when the heating pipe of fixed different diameters, can stabilize fixed heating pipe, increased the convenience of using, all be provided with the sheet rubber in the inside of clamp plate and lower arc board simultaneously, can increase the compactness that heating pipe is fixed, and the sheet rubber can absorb slight vibrations, improve heating pipe's stability.
2. The utility model discloses a setting through bradyseism sleeve and bradyseism bottom block wherein is provided with the bradyseism spring between the bradyseism sleeve and bradyseism bottom block to when heating pipe produces vibrations, through the effect of bradyseism spring, can carry out the bradyseism, reduce heating pipe's vibrations, and be provided with the stable piece of gluing in the top of pushing down the frame, can absorb the rebound effort of bradyseism spring, make the bradyseism process more steady, increased heating pipe's stability.
Drawings
FIG. 1 is a schematic view of a PERT II type central heating pipe fixing device of the present invention;
FIG. 2 is a cross-sectional view of a PERT II type central heating pipe fixing device of the present invention;
fig. 3 is an enlarged schematic view of the position a of the present invention.
In the figure: 1. an upper arc plate; 2. pressing the plate tightly; 3. a lower arc plate; 4. fastening a screw rod; 5. a first receiving plate; 6. a second receiving plate; 7. fixing the bolt; 8. a chassis; 9. a cushioning sleeve; 10. a cushioning bottom block; 11. mounting a plate; 12. a first rubber sheet; 13. a second rubber sheet; 14. a pressing frame; 15. a cushioning spring; 16. mounting a folded plate; 17. stabilizing the rubber block; 18. a center guide bar; 19. a spring seat; 20. a guide rod groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, the present invention provides an embodiment: PERT II type central heating pipeline fixing device, including last arc board 1, the below of going up arc board 1 is provided with lower arc board 3, the inboard fixed mounting of lower arc board 3 has second sheet rubber 13, the inside of going up arc board 1 is provided with clamp plate 2, be convenient for fix the heating pipeline of different diameters, the practicality has been improved, the top of going up arc board 1 is provided with fastening screw 4, and fastening screw 4 run through last arc board 1 and with last arc board 1 threaded connection, fastening screw 4 and clamp plate 2 rotate to be connected, through twisting fastening screw 4, make clamp plate 2 can go up and down to move, the inboard fixed mounting of clamp plate 2 has first sheet rubber 12, the setting of first sheet rubber 12 and second sheet rubber 13, increase the fixed compactness of heating pipeline, and the sheet rubber can absorb slight vibrations, heating pipeline's stability is improved.
Further, the below fixed mounting of lower arc board 3 has chassis 8, has increased the stability of lower arc board 3, and the below fixed mounting of chassis 8 has bradyseism sleeve 9, and the below of bradyseism sleeve 9 is provided with bradyseism bottom block 10, and bradyseism bottom block 10 wears into the inside of bradyseism sleeve 9, and the opening setting of bradyseism sleeve 9 is down, can reduce the entering of dust, improves the practicality.
Further, the below fixed mounting of bradyseism end piece 10 has mounting panel 11, and the inside of mounting panel 11 is provided with the mounting hole, has increased mounting panel 11 fixed mounting's convenience, and the inside of bradyseism sleeve 9 is provided with bradyseism spring 15, and the below fixed mounting of bradyseism spring 15 has spring holder 19, and spring holder 19 and bradyseism end piece 10 pass through screw fixed connection, and setting of bradyseism spring 15 can the shock absorption of buffering, has improved heating pipeline's stability.
Further, the top fixed mounting of bradyseism spring 15 has down pressure frame 14, and pressure frame 14 passes through screw fixed connection with bradyseism sleeve 9 down, the setting of pressure frame 14 down, make things convenient for the transmission vibrations effort, make bradyseism spring 15 can stabilize bradyseism work, the both sides of bradyseism spring 15 all are provided with installation folded plate 16, the both sides of pressure frame 14 top are provided with down and stabilize gluey piece 17 to the symmetry respectively, and it passes through glue fixed connection with installation folded plate 16 to stabilize gluey piece 17, stabilize the setting of gluey piece 17, when pressure frame 14 upwards removes under bradyseism spring 15 bounce-back top, can carry out the bradyseism to the rebound effort, make the bradyseism process of bradyseism spring 15 more steady.
Further, a guide rod groove 20 is formed in the interior of the cushioning bottom block 10 along the lower portion of the spring seat 19, a central guide rod 18 is arranged in the interior of the cushioning spring 15, the cushioning spring 15 can stably and linearly bounce, the central guide rod 18 penetrates through the spring seat 19 and extends into the guide rod groove 20, a through hole is formed in the interior of the spring seat 19, the diameter of the through hole is larger than that of the central guide rod 18, and the central guide rod 18 cannot be hindered in lifting movement.
Further, the both sides of going up arc board 1 are symmetrical fixed mounting respectively and are had first fishplate bar 5, second fishplate bar 6 is installed to the both sides of lower arc board 3 symmetry respectively, first fishplate bar 5 and second fishplate bar 6's setting has improved the convenience of going up arc board 1 and 3 fixed connection of lower arc board, the upper end of first fishplate bar 5 is provided with fixing bolt 7, and first fishplate bar 5 and second fishplate bar 6 pass through fixing bolt 7 fixed connection, fixing bolt 7 is provided with four groups, the steadiness that first fishplate bar 5 and second fishplate bar 6 are connected has been improved.
The working principle is as follows: during the use, put into heating pipeline in the arc plate 3 down, again with last arc plate 1 lid on it, effect through fixing bolt 7, make first fishplate bar 5 and 6 fixed connection of second fishplate bar, and then make last arc plate 1 and 3 stable connections of lower arc plate, then rotate fastening screw 4, make holding down plate 2 move down, sticis fixed to heating pipeline, when heating pipeline takes place vibrations, vibrations effect is down transmitted to bradyseism sleeve 9 through chassis 8, effect through bradyseism spring 15, can carry out the bradyseism, the absorption slows down vibrations, reduce heating pipeline's vibrations, and through the effect of stabilizing rubber block 17, can slow down the effort that absorption bradyseism spring 15 produced when the bounce, make the bradyseism process more steady, heating pipeline's stability has been increased.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

  1. PERT II type central heating pipeline fixing device, including last arc board (1), its characterized in that: go up the below of arc board (1) and be provided with down arc board (3), the inboard fixed mounting of arc board (3) has second sheet rubber (13) down, the inside of going up arc board (1) is provided with clamp plate (2), the top of going up arc board (1) is provided with fastening screw (4), and fastening screw (4) run through last arc board (1) and with last arc board (1) threaded connection, fastening screw (4) and clamp plate (2) rotate to be connected, the inboard fixed mounting of clamp plate (2) has first sheet rubber (12).
  2. 2. The PERT II central heating conduit fixing device of claim 1, wherein: the lower arc plate is characterized in that a bottom frame (8) is fixedly mounted below the lower arc plate (3), a cushioning sleeve (9) is fixedly mounted below the bottom frame (8), a cushioning bottom block (10) is arranged below the cushioning sleeve (9), and the cushioning bottom block (10) penetrates into the interior of the cushioning sleeve (9).
  3. 3. The PERT II type central heating pipe fixing device of claim 2, wherein: the utility model discloses a damping base block, including bradyseism end piece (10), the below fixed mounting of bradyseism end piece (10) has mounting panel (11), the inside of mounting panel (11) is provided with the mounting hole, the inside of bradyseism sleeve (9) is provided with bradyseism spring (15), the below fixed mounting of bradyseism spring (15) has spring holder (19), and spring holder (19) and bradyseism end piece (10) pass through screw fixed connection.
  4. 4. The PERT II central heating conduit fixing device of claim 3, wherein: the utility model discloses a damping spring, including bradyseism spring (15), mount (14) are pressed down to the top fixed mounting of bradyseism spring (15), and press down mount (14) and bradyseism sleeve (9) through screw fixed connection, the both sides of bradyseism spring (15) all are provided with installation folded plate (16), the both sides of suppressing frame (14) top are the symmetry respectively and are provided with and stabilize gluey piece (17), and stabilize gluey piece (17) and pass through glue fixed connection with installation folded plate (16).
  5. 5. The PERT II type central heating pipe fixing device of claim 4, wherein: a guide rod groove (20) is formed in the inner portion of the cushioning bottom block (10) along the lower portion of the spring seat (19), a central guide rod (18) is arranged in the cushioning spring (15), and the central guide rod (18) penetrates through the spring seat (19) and extends into the guide rod groove (20).
  6. 6. The PERT II type central heating pipe fixing device of claim 1, wherein: go up the both sides of arc board (1) symmetry fixed mounting respectively and have first fishplate bar (5), second fishplate bar (6) are installed to the both sides symmetry respectively of arc board (3) down, the upper end of first fishplate bar (5) is provided with fixing bolt (7), and first fishplate bar (5) and second fishplate bar (6) pass through fixing bolt (7) fixed connection.
CN202221180165.8U 2022-05-17 2022-05-17 PERT II type central heating pipeline fixing device Active CN217328813U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221180165.8U CN217328813U (en) 2022-05-17 2022-05-17 PERT II type central heating pipeline fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221180165.8U CN217328813U (en) 2022-05-17 2022-05-17 PERT II type central heating pipeline fixing device

Publications (1)

Publication Number Publication Date
CN217328813U true CN217328813U (en) 2022-08-30

Family

ID=82953770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221180165.8U Active CN217328813U (en) 2022-05-17 2022-05-17 PERT II type central heating pipeline fixing device

Country Status (1)

Country Link
CN (1) CN217328813U (en)

Similar Documents

Publication Publication Date Title
CN206503875U (en) A kind of damping device of electrical test pedestal
CN217328813U (en) PERT II type central heating pipeline fixing device
CN111653413B (en) New energy automobile transformer capable of damping
CN215745960U (en) Spinning processing device for lining bimetal composite pipe
CN114738601B (en) A fixed protector for water conservancy pipeline
CN211742858U (en) Dry-type transformer antidetonation bearing structure
CN211039499U (en) High-performance spring damper with adjustment function
CN211218816U (en) Portable drilling equipment for overhauling large natural gas pipeline
CN209833881U (en) Single shock-absorbing bicycle front fork
CN215981411U (en) Building construction pipeline fixed mounting device
CN111254819A (en) Steel structure bridge damping support
CN110939788A (en) Anti-drop pipeline fixing clamp
CN217280321U (en) Transformer with shock attenuation noise-proof function
CN220322139U (en) Vapor seal cooler
CN216331295U (en) Intelligent electronic adjustable rear shock absorber
CN219197775U (en) Mounting bracket for pneumatic element
CN219712180U (en) Vibration damper for motorcycle engine support
CN220865552U (en) Riding car cell phone stand
CN218895075U (en) Automobile air conditioner pipeline damping device
CN219242830U (en) Heat dissipation pipeline installation base convenient to installation
CN214248522U (en) Be used for pipeline fixing device
CN214662489U (en) Pipeline bracket convenient to install
CN212572281U (en) Motor shock attenuation installing support
CN219339639U (en) Double-rear shock absorption device of electric bicycle
CN218326910U (en) Shock attenuation installation fixing device for building electromechanical installation engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant