CN217327419U - Accumulated water drainage device for mine construction - Google Patents

Accumulated water drainage device for mine construction Download PDF

Info

Publication number
CN217327419U
CN217327419U CN202220994641.3U CN202220994641U CN217327419U CN 217327419 U CN217327419 U CN 217327419U CN 202220994641 U CN202220994641 U CN 202220994641U CN 217327419 U CN217327419 U CN 217327419U
Authority
CN
China
Prior art keywords
subassembly
bottom plate
drainage
drainage device
ponding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220994641.3U
Other languages
Chinese (zh)
Inventor
卢吉明
张民
刘广飞
杨宏勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinhehe Construction Co ltd
Original Assignee
Jinhehe Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinhehe Construction Co ltd filed Critical Jinhehe Construction Co ltd
Priority to CN202220994641.3U priority Critical patent/CN217327419U/en
Application granted granted Critical
Publication of CN217327419U publication Critical patent/CN217327419U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a mine construction is with ponding drainage device, including the device bottom plate, the upper end fixed surface of device bottom plate installs catchment rose box and drainage subassembly, drainage subassembly is located one side of catchment rose box, the lower extreme fixed surface of device bottom plate installs four groups and removes pulley and a set of location firm subassembly, the location firm subassembly is located between four groups's removal pulleys. A mine construction is with ponding drainage device, the subassembly that stabilizes in location through setting up for whole drainage device is more stable when using, is difficult for the skew, this a ponding drainage device for mine construction absorbs the subassembly through the ponding that sets up, makes whole drainage device be difficult for producing when the drainage and blocks up, increases drainage efficiency, during the use, semicircle fretwork lag set up can effectively the separation ore fragment, prevent that ore fragment from getting into the inside production of inlet spout and blockking up.

Description

Accumulated water drainage device for mine construction
Technical Field
The utility model relates to a mine construction equipment field specifically is a mine construction is with ponding drainage device.
Background
In the mine building work progress for produce a large amount of ponding in the tunnel, for making can quick effectual discharge ponding, need carry out the drainage to ponding, need collect ponding for the messenger can carry out reuse to ponding.
In the prior art, a Chinese patent document with the patent application number of CN202121217863.6 describes a roadway accumulated water drainage device for mine construction, and discloses the structure of the accumulated water drainage device, wherein the defects of the drainage device in the prior art are that the drainage device is easy to block when accumulated water is introduced, and then the drainage efficiency is influenced.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a mine construction is with ponding drainage device possesses more stable when whole drainage device places in the mine construction area, and the problem in the background art can effectively be solved to advantages such as difficult jam during the drainage.
(II) technical scheme
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a mine construction is with ponding drainage device, includes the device bottom plate, the upper end external fixed surface of device bottom plate installs catchment rose box and drainage subassembly, the drainage subassembly is located one side of catchment rose box, the lower extreme external fixed surface of device bottom plate installs four groups and removes the pulley and a set of firm subassembly in location, the firm subassembly in location is located between four groups of removal pulleys, the upper end external fixed surface of catchment rose box penetrates into and installs the diversion subassembly, one side external fixed surface of diversion subassembly is connected with ponding and absorbs the subassembly, and ponding absorbs the subassembly and is located one side that the drainage subassembly was kept away from to the catchment rose box.
Preferably, the positioning and stabilizing assembly comprises an installation support plate, an in-cylinder rod, an air cylinder sleeve rod, an installation bottom groove, a balancing rod, a balancing groove, anti-skidding teeth and a stabilizing bottom plate, and the outer surface of the lower end of the installation support plate is fixedly connected with the in-cylinder rod and four groups of balancing rods.
Preferably, the lower end of the rod in the cylinder is movably penetrated into the cylinder sleeve rod, and the outer surface of the lower end of the cylinder sleeve rod is fixedly connected with the inner surface of the lower end of the mounting bottom groove.
Preferably, an installation bottom groove and four groups of balance grooves are formed in the stabilizing bottom plate, a balance rod is movably installed in each balance groove, the installation bottom groove is located between the four groups of balance grooves, and a plurality of groups of anti-skidding teeth are fixedly connected to the outer surface of the lower end of the stabilizing bottom plate.
Preferably, the accumulated water sucking assembly comprises an installation sleeve plate, a supporting sleeve plate, a roller, a water diversion port, a semicircular hollow-out protection sleeve and a water diversion pipe, the supporting sleeve is fixedly sleeved on the outer wall of the lower end of the water diversion pipe, the installation sleeve plate is fixedly sleeved on the outer wall of the upper end of the supporting sleeve, and the supporting sleeve plate is fixedly sleeved on the outer wall of the lower end of the supporting sleeve.
Preferably, the supporting sleeve plate is located at the lower end of the installing sleeve plate, a water diversion port is fixedly connected to the outer surface of the lower end of the water diversion pipe, a semicircular hollow-out protecting sleeve is fixedly connected to the outer surface of the lower end of the installing sleeve plate, a plurality of groups of rollers are fixedly installed on the outer wall of the semicircular hollow-out protecting sleeve, and the supporting sleeve plate and the water diversion port are located inside the semicircular hollow-out protecting sleeve.
(III) advantageous effects
Compared with the prior art, the utility model provides a ponding drainage device for mine construction possesses following beneficial effect:
1. this a mine construction is with ponding drainage device, the subassembly that stabilizes in location through setting up, make whole drainage device more stable when using, be difficult for the skew, during the use, the pole can go up and down in cylinder loop bar and the cylinder, the cylinder loop bar can drive the firm bottom plate when going up and down and go up and down the activity, can be with antiskid tooth and mine ground inlay card when firm bottom plate moves down, increase the stability of integrated device, the balancing pole is located the inside of compensating groove, and the balancing pole is flexible in the inside of compensating groove, increase the equilibrium of firm bottom plate when removing, the installation of the cylinder loop bar of being convenient for of setting up of installation kerve.
2. This ponding drainage device for mine construction absorbs the subassembly through the ponding that sets up for whole drainage device is difficult for producing the jam when the drainage, increases drainage efficiency, and during the use, the setting of semicircle fretwork lag can effectively separate the ore fragment, prevents that the ore fragment from getting into the inside production of water diversion mouth and blockking up, and the setting of backup pad, backup sleeve and installation lagging is convenient for the installation and the fixed of semicircle fretwork lag, and the leading pipe is convenient for the introduction of ponding with setting up of water diversion mouth.
Drawings
Fig. 1 is the utility model relates to a mine construction is with ponding drainage device's overall structure schematic diagram.
Fig. 2 is a front view of the positioning and stabilizing assembly of the accumulated water drainage device for mine construction.
Fig. 3 is a front view of the utility model of a ponding absorbing assembly in a ponding drainage device for mine construction.
In the figure: 1. a device chassis; 2. a movable pulley; 3. positioning the stabilizing component; 4. a ponding water suction assembly; 5. a water diversion assembly; 6. a water collecting and filtering tank; 7. a drainage assembly; 8. mounting a support plate; 9. an inner rod of the cylinder; 10. a cylinder sleeve rod; 11. installing a bottom groove; 12. a balancing pole; 13. a balancing tank; 14. anti-slip teeth; 15. a stable bottom plate; 16. installing a sleeve plate; 17. a support sleeve; 18. a support sleeve plate; 19. a roller; 20. a water diversion port; 21. a semicircular hollow protecting sleeve; 22. a water conduit.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
Detailed description of the preferred embodiment
The embodiment is a ponding drainage device for mine construction.
As shown in fig. 1-3, a ponding drainage device for mine construction, including device bottom plate 1, the outer fixed surface in upper end of device bottom plate 1 installs catchment rose box 6 and drainage component 7, drainage component 7 is located one side of catchment rose box 6, the outer fixed surface in lower extreme of device bottom plate 1 installs four groups of removal pulleys 2 and a set of location stabilizing component 3, location stabilizing component 3 is located between four groups of removal pulleys 2, the outer fixed surface in upper end of catchment rose box 6 inserts and installs diversion subassembly 5, one side outer fixed surface of diversion subassembly 5 is connected with ponding and absorbs subassembly 4, and ponding absorbs subassembly 4 and is located catchment rose box 6 and keeps away from one side of drainage component 7.
The firm subassembly 3 in location is including installation extension board 8, pole 9 in the cylinder, cylinder loop bar 10, installation kerve 11, balancing pole 12, balancing groove 13, antiskid tooth 14 and firm bottom plate 15, pole 9 and four groups of balancing poles 12 in the lower extreme external surface fixedly connected with cylinder of installation extension board 8, the inside that the lower extreme activity of pole 9 penetrates into cylinder loop bar 10 in the cylinder, the lower extreme surface of cylinder loop bar 10 and the lower extreme internal surface fixed connection of installation kerve 11, an installation kerve 11 and four groups of balancing grooves 13 have been seted up to firm bottom plate 15's inside, the equal movable mounting in inside of every balancing groove 13 has balancing pole 12, installation kerve 11 is located between four groups of balancing grooves 13, firm bottom plate 15's lower extreme external surface fixedly connected with multiunit antiskid tooth 14.
It should be noted that the utility model relates to a ponding drainage device for mine construction, which is characterized in that the ponding drainage device for mine construction is more stable and not easy to shift when in use through the arranged positioning and stabilizing component 3, the cylinder sleeve rod 10 and the inner rod 9 of the cylinder can be lifted when in use, the cylinder sleeve rod 10 can drive the stabilizing bottom plate 15 to lift when lifted, the anti-skid teeth 14 can be embedded with the ground of the mine when the stabilizing bottom plate 15 moves downwards, the stability of the whole device is increased, the balancing rod 12 is positioned in the balancing groove 13, the balancing rod 12 can be stretched and contracted in the balancing groove 13, the balance of the stabilizing bottom plate 15 when moving is increased, the arrangement of the mounting bottom groove 11 is convenient for mounting the cylinder sleeve rod 10, the ponding drainage device for mine construction is characterized in that the ponding suction component 4 is arranged, the whole drainage device is not easy to block when in drainage, increase drainage efficiency, during the use, the setting of semicircle fretwork lag 21 can effectively the separation ore fragment, prevents that the ore fragment from getting into the inside production of inlet 20 and blockking up, supports lagging 18. The arrangement of the supporting sleeve 17 and the installation sleeve plate 16 is convenient for the installation and fixation of the semicircular hollow-out protecting sleeve 21, and the arrangement of the water conduit 22 and the water inlet 20 is convenient for the introduction of accumulated water.
Detailed description of the preferred embodiment
The embodiment is an embodiment of an accumulated water sucking assembly for an accumulated water drainage device for mine construction.
As shown in fig. 1 and 3, the accumulated water sucking assembly for the accumulated water drainage device for mine construction comprises a mounting sleeve plate 16, a supporting sleeve 17, a supporting sleeve plate 18, rollers 19, a water diversion port 20, a semicircular hollow-out protecting sleeve 21 and a water diversion pipe 22, wherein the supporting sleeve 17 is fixedly sleeved on the outer wall of the lower end of the water diversion pipe 22, the mounting sleeve plate 16 is fixedly sleeved on the outer wall of the upper end of the supporting sleeve 17, the supporting sleeve plate 18 is fixedly sleeved on the outer wall of the lower end of the supporting sleeve 17, the supporting sleeve plate 18 is located at the lower end of the mounting sleeve plate 16, the water diversion port 20 is fixedly connected on the outer surface of the lower end of the water diversion pipe 22, the semicircular hollow-out protecting sleeve 21 is fixedly connected on the outer surface of the mounting sleeve plate 16, a plurality of groups of rollers 19 are fixedly mounted on the outer wall of the semicircular hollow-out protecting sleeve 21, and the supporting sleeve plate 18 and the water diversion port 20 are located inside the semicircular hollow-out protecting sleeve 21.
It is noted that, herein, relational terms such as first and second (a, b, etc.) and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention.

Claims (6)

1. The utility model provides a mine construction is with ponding drainage device, includes device bottom plate (1), its characterized in that: the utility model discloses a drainage device, including device bottom plate (1), device bottom plate, drainage subassembly (7), water collection filter tank (6) and drainage subassembly (7) are installed to the upper end external fixed surface of device bottom plate (1), drainage subassembly (7) are located one side of water collection filter tank (6), the lower extreme external fixed surface of device bottom plate (1) installs four groups and removes pulley (2) and a set of location firm subassembly (3), the location firm subassembly (3) are located between four groups of removal pulley (2), the upper end external fixed surface of water collection filter tank (6) is penetrated and is installed diversion subassembly (5), one side external fixed surface of diversion subassembly (5) is connected with ponding and is drawn subassembly (4), and ponding draws subassembly (4) to be located one side that drainage subassembly (7) were kept away from in water collection filter tank (6).
2. The accumulated water drainage device for mine construction according to claim 1, which is characterized in that: the positioning and stabilizing component (3) comprises an installation support plate (8), an in-cylinder rod (9), an air cylinder sleeve rod (10), an installation bottom groove (11), a balancing rod (12), a balancing groove (13), anti-skidding teeth (14) and a stabilizing bottom plate (15), wherein the outer surface of the lower end of the installation support plate (8) is fixedly connected with the in-cylinder rod (9) and four groups of balancing rods (12).
3. The accumulated water drainage device for mine construction according to claim 2, characterized in that: the lower end of the in-cylinder rod (9) movably penetrates into the cylinder sleeve rod (10), and the outer surface of the lower end of the cylinder sleeve rod (10) is fixedly connected with the inner surface of the lower end of the mounting bottom groove (11).
4. The accumulated water drainage device for mine construction as claimed in claim 2, wherein: an installation bottom groove (11) and four groups of balance grooves (13) are formed in the stabilizing bottom plate (15), each group of balance grooves (13) is provided with a balance rod (12) in the inner part, the installation bottom groove (11) is located between the four groups of balance grooves (13), and the outer surface of the lower end of the stabilizing bottom plate (15) is fixedly connected with multiple groups of anti-skidding teeth (14).
5. The accumulated water drainage device for mine construction as claimed in claim 1, wherein: ponding absorb subassembly (4) including installation lagging (16), support sleeve (17), support lagging (18), gyro wheel (19), inlet (20), semicircle fretwork lag (21) and leading water pipe (22), the fixed cover of lower extreme outer wall of leading water pipe (22) has cup jointed support sleeve (17), the fixed cover of upper end outer wall of support sleeve (17) has cup jointed installation lagging (16), the fixed cover of lower extreme outer wall of support sleeve (17) has cup jointed support lagging (18).
6. The accumulated water drainage device for mine construction according to claim 5, wherein: support lagging (18) and be located the lower extreme of installation lagging (16), the lower extreme external surface fixedly connected with diversion opening (20) of diversion conduit (22), the lower extreme external surface fixedly connected with semicircle fretwork lag (21) of installation lagging (16), the outer wall fixed mounting of semicircle fretwork lag (21) has multiunit gyro wheel (19), support lagging (18) and diversion opening (20) are located the inside of semicircle fretwork lag (21).
CN202220994641.3U 2022-04-27 2022-04-27 Accumulated water drainage device for mine construction Active CN217327419U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220994641.3U CN217327419U (en) 2022-04-27 2022-04-27 Accumulated water drainage device for mine construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220994641.3U CN217327419U (en) 2022-04-27 2022-04-27 Accumulated water drainage device for mine construction

Publications (1)

Publication Number Publication Date
CN217327419U true CN217327419U (en) 2022-08-30

Family

ID=82949570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220994641.3U Active CN217327419U (en) 2022-04-27 2022-04-27 Accumulated water drainage device for mine construction

Country Status (1)

Country Link
CN (1) CN217327419U (en)

Similar Documents

Publication Publication Date Title
CN210395611U (en) Road rainwater treatment system
CN217327419U (en) Accumulated water drainage device for mine construction
CN213114166U (en) Road drainage device for civil engineering
CN214219706U (en) Adjustable water collecting and draining device for building construction deep foundation pit
CN210917423U (en) Drainage structures falls in foundation ditch
CN205975639U (en) Side slope drainage structure
CN204850011U (en) Inlet for stom water rubbish filtering cycle system
CN205637055U (en) A inspection shaft that catchments for constructed wetland
CN212800103U (en) Fold spiral shell formula sludge dewatering machine preprocessing device
CN211420963U (en) Highway greenbelt water collecting system
CN213772788U (en) Pavement structure
CN205199079U (en) A processing apparatus for initial stage rainwater is recycled
CN207331724U (en) A kind of precipitation well construction being used in subway foundation pit
CN210122739U (en) Rainwater is retrieved and is sprayed dust fall system for green construction
CN210887500U (en) Ground road drainage system
CN214680637U (en) Pulse dust collector is used in gypsum production of plastering
CN207228294U (en) A kind of gardens well lid
CN218521239U (en) Microorganism collecting and filtering device
CN206577432U (en) Rural drinking water safety special water purification device
CN214328942U (en) Deep foundation pit drainage structure
CN218813435U (en) Ponding drainage device for urban road
CN212866256U (en) Roadbed drainage structure for municipal road construction
CN213329363U (en) Flow guide pipe for garage roof siphon drainage collection system
CN212091259U (en) Sedimentation tank mud water recovery unit
CN211113692U (en) Accumulated water removing device for foundation pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant