CN217326743U - Pile hole protection device penetrating through whole construction period - Google Patents

Pile hole protection device penetrating through whole construction period Download PDF

Info

Publication number
CN217326743U
CN217326743U CN202220970692.2U CN202220970692U CN217326743U CN 217326743 U CN217326743 U CN 217326743U CN 202220970692 U CN202220970692 U CN 202220970692U CN 217326743 U CN217326743 U CN 217326743U
Authority
CN
China
Prior art keywords
steel pipe
horizontal rod
pipe horizontal
pile hole
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220970692.2U
Other languages
Chinese (zh)
Inventor
聂建平
高梦鸿
陶双喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Special Zone Construction Engineering Group Co ltd
Original Assignee
Shenzhen Special Zone Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Special Zone Construction Engineering Group Co ltd filed Critical Shenzhen Special Zone Construction Engineering Group Co ltd
Priority to CN202220970692.2U priority Critical patent/CN217326743U/en
Application granted granted Critical
Publication of CN217326743U publication Critical patent/CN217326743U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a run through full construction cycle's stake hole protector, including a plurality of guardrail units, and a plurality of guardrail unit end to end connection and fixed the formation and encircle the structure, every guardrail unit all includes steel pipe pole setting, first steel pipe horizon bar, second steel pipe horizon bar and protection network: the bottom of the steel pipe upright stanchion is inserted into the soil body; the first steel pipe horizontal rod is parallel to the second steel pipe horizontal rod, and one side end part of the first steel pipe horizontal rod and one side end part of the second steel pipe horizontal rod are fixed with the steel pipe vertical rod; the protection network is located the space that steel pipe pole setting, first steel pipe horizontal pole and second steel pipe horizontal pole enclose. The utility model is a square frame, which is arranged outside the pile hole, can run through the whole pile foundation construction period, and avoids the repeated movement, the lap and the tear between the connection of each process of the pile foundation construction; the utility model discloses an equal fixed connection of node of skeleton need not to dismantle the equipment, gets promptly and uses, possesses turnover nature, and resource utilization is high, drop into for a short time.

Description

Pile hole protection device penetrating through whole construction period
Technical Field
The utility model relates to a construction technical field, more specifically say, relate to a run through full construction cycle's stake hole protector.
Background
With the development of society, newly-built high-rise buildings are often rare, and pile foundations are used as a common foundation form of high-rise building structures and have the characteristics of good seismic performance, small settlement, high bearing capacity and the like. The pile foundation has the characteristics of large pile diameter and long pile body, the common pile diameter is different from 600mm to 2000mm, the common pile body length is about 20m, and the assumption that a person drops carelessly in the pile foundation construction process is not reasonable, so that the pile hole protection in the pile foundation construction process is especially important.
The traditional pile hole protection has the modes of reinforcing mesh sheets, fastener steel pipe frames and the like, the traditional pile hole protection of the reinforcing mesh sheets does not have a warning effect, and no fixing measures are taken, so that the pile hole is easily disturbed to cause incomplete coverage, and the protection effect is poor; the fastener steel pipe has higher setting up randomness and no uniformity, the transferring process needs to be completely disassembled and re-set up, the transferring property is not provided, and the warning effect at night is not good. Therefore, the protection device which is convenient to assemble, easy to transport, good in warning effect and capable of effectively preventing falling is invented aiming at the defects of the traditional pile hole protection.
Disclosure of Invention
In order to overcome the deficiencies of the prior art, the utility model provides a run through full construction cycle's stake hole protector.
The utility model discloses technical scheme as follows:
the utility model provides a run through full construction cycle's stake hole protector, includes a plurality of guardrail units, and is a plurality of guardrail unit end to end connection and fixed formation annular structure, every the guardrail unit all includes steel pipe pole setting, first steel pipe horizon bar, second steel pipe horizon bar and protection network: the bottom of the steel pipe upright stanchion is inserted into a soil body; the first steel pipe horizontal rod is parallel to the second steel pipe horizontal rod, and one side end part of the first steel pipe horizontal rod and one side end part of the second steel pipe horizontal rod are both fixed with the steel pipe vertical rod; the protective net is positioned in a space defined by the steel pipe vertical rod, the first steel pipe horizontal rod and the second steel pipe horizontal rod, and a safety warning sign is arranged on the protective net; the other side end of the first steel pipe horizontal rod, the other side end of the second steel pipe horizontal rod and the outer side of the protective net are fixed with the steel pipe upright post of the other guardrail unit.
According to the above scheme the utility model discloses, a serial communication port, the upside of first steel pipe horizon bar is equipped with infrared induction system.
According to the above scheme the utility model discloses, a serial communication port, the protection network in the downside of first steel pipe horizon bar is equipped with LED lamp area. .
According to the above scheme the utility model discloses, a serial communication port, the protection network is the reinforcing bar net, reinforcing bar net around respectively with two the steel pipe pole setting first steel pipe horizon bar with second steel pipe horizon bar welding.
Furthermore, a solar charging panel is arranged on the protective net.
According to the above scheme the utility model discloses, its characterized in that, the bottom of steel pipe pole setting is the toper.
According to above scheme the utility model discloses, the steel pipe pole setting first steel pipe horizon bar reaches the second steel pipe horizon bar is square steel pipe.
According to the above scheme the utility model discloses, its beneficial effect lies in:
compared with a reinforcing mesh protection method, the utility model is a square frame, which is arranged outside the pile hole, can run through the whole pile foundation construction period, and avoids repeated movement, lap and tear between the connection of each process of pile foundation construction; compare fastener steel pipe protection way, the utility model discloses an equal fixed connection of node of skeleton need not to dismantle the equipment, gets promptly and uses, possesses the turnover nature, and the project makes 3~4 covers according to stake hole type and can satisfy the required stake hole protection of project pile foundation construction stage and drop into, and resource utilization is high, drop into for a short time.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for the embodiments or the prior art descriptions will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a top view of the present invention;
fig. 3 is a schematic structural view of a single guardrail unit of the present invention;
fig. 4 is a schematic structural diagram of a preferred embodiment of the present invention;
fig. 5 is a top view of a preferred embodiment of the present invention.
Wherein, in the figures, the respective reference numerals:
1. erecting a steel pipe; 2. a protective net; 3. a first steel pipe horizontal rod; 4. a safety warning sign; 5. an infrared sensing device; 6. an LED light strip; 7. a solar charging panel; 8. a second steel pipe horizontal rod; 9. pile hole.
Detailed Description
In order to make the technical problem, technical solution and advantageous effects to be solved by the present invention more clearly understood, the following description is given in conjunction with the accompanying drawings and embodiments to illustrate the present invention in further detail. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the invention.
It will be understood that when an element is referred to as being "fixed" or "disposed" or "connected" to another element, it can be directly or indirectly located on the other element. The terms "upper", "lower", "inner", "outer", and the like indicate orientations or positions based on the orientations or positions shown in the drawings, and are only for convenience of description and not to be construed as limiting the technical solution. The terms "first," "second," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or to implicitly indicate a number of technical features.
A pile hole protection device penetrating through a whole construction period comprises a plurality of guardrail units, wherein the guardrail units are connected end to end and are fixed to form a ring-shaped structure, each guardrail unit comprises a steel pipe vertical rod 1, a first steel pipe horizontal rod 3, a second steel pipe horizontal rod 8 and a protective net 2, and the bottom of the steel pipe vertical rod 1 is inserted into a soil body; the first steel pipe horizontal rod 3 is parallel to the second steel pipe horizontal rod 8, and one side end part of the first steel pipe horizontal rod 3 and one side end part of the second steel pipe horizontal rod 8 are both fixed with the steel pipe vertical rod 1; the protective net 2 is positioned in a space enclosed by the steel pipe vertical rod 1, the first steel pipe horizontal rod 3 and the second steel pipe horizontal rod 8, and a safety warning sign is arranged on the protective net 2; the other end of the first steel pipe horizontal rod 3, the other end of the second steel pipe horizontal rod 8 and the outer side of the protection net 2 are fixed to the steel pipe column of the other guardrail unit.
Through the arrangement, the structural integrity and stability in the transfer process are ensured, repeated disassembly and assembly are not needed, and sustainable turnover is realized; compare traditional reinforcing bar net piece protection, the utility model discloses a insert the soil body with the bottom of steel pipe pole setting 1, avoided sliding of protection system, ensure pile foundation construction cycle in pile hole 9 protect not disappearance, guarantee on-the-spot safety in production, preferred, establish to the toper steel pipe pole setting 1's bottom to inlay the soil body more easily when the on-the-spot installation. Meanwhile, the utility model can complete pre-assembly outside the site, can be installed and used after the positioning of the open pore is completed, and can be dismantled after the concrete pouring of the pile foundation is completed, so that the pile foundation construction can be prevented from moving back and forth when each process is connected compared with the protection form of the reinforcing mesh, and the safety protection can be realized to run through the whole pile foundation construction period; and compare traditional fastener steel pipe and maintain the structure, avoided the risk that needs the operation at pile hole 9 periphery, realize installing promptly, safety protection is zero free position.
In this embodiment, the protection net 2 is a reinforcing bar net, and compared with a dense mesh type safe green net enclosure, the reinforcing bar net has higher strength and is not easy to damage. The periphery of the protective net 2 is welded with the two steel pipe vertical rods 1, the first steel pipe horizontal rod 3 and the second steel pipe horizontal rod 8 respectively, falling in the transportation process is avoided, the installation procedure is increased, and the working efficiency is reduced. Preferably, the steel pipe vertical rod 1, the first steel pipe horizontal rod 3, the second steel pipe horizontal rod 8 and the protective net 2 are all brushed with red and white paint, so that the warning effect is enhanced.
In a preferred scheme, the upper side of the first steel pipe horizontal rod 3 is provided with an infrared sensing device 5, so that when a person passes nearby, a reminder is given to a pile hole 9 which is not in time for pouring or a pile hole 9 which needs to be exposed for a long time due to the limitation of field conditions, and the alertness of the person is improved. The downside of protection network and first steel pipe horizontal pole is equipped with LED lamp area 6, ensures that during light is not enough or night work, the protection system is striking, further improves the safety warning effect in stake hole 9 operation region. Still be equipped with solar charging panel 7 on the protection network 2, provide the power for LED lamp area 6 on the spot, need not act as go-between from other places, avoid constructor to trip the electric wire and tumble in the course of the work, guarantee constructor's safety.
In this embodiment, the steel tube vertical rod 1, the first steel tube horizontal rod 3 and the second steel tube horizontal rod 8 are all square steel tubes, so that materials can be conveniently obtained; and square steel pipe can adopt the mode of fillet weld to connect, compares circular steel pipe, and the welding is more convenient, connects more firmly.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (8)

1. The utility model provides a run through full construction cycle's stake hole protector, its characterized in that includes a plurality of guardrail units, and is a plurality of guardrail unit end to end connection and fixed the annular structure that forms, every the guardrail unit all includes steel pipe pole setting, first steel pipe horizon bar, second steel pipe horizon bar and protection network:
the bottom of the steel pipe upright stanchion is inserted into a soil body;
the first steel pipe horizontal rod is parallel to the second steel pipe horizontal rod, and one side end part of the first steel pipe horizontal rod and one side end part of the second steel pipe horizontal rod are both fixed with the steel pipe vertical rod;
the protective net is positioned in a space defined by the steel pipe vertical rod, the first steel pipe horizontal rod and the second steel pipe horizontal rod, and a safety warning sign is arranged on the protective net;
the other side end of the first steel pipe horizontal rod, the other side end of the second steel pipe horizontal rod and the outer side of the protective net are fixed with the steel pipe upright post of the other guardrail unit.
2. The pile hole protection device throughout the entire construction period according to claim 1, wherein an infrared sensor device is provided on an upper side of the first steel pipe horizontal bar.
3. The pile hole protection device throughout the whole construction cycle according to claim 1, wherein the protection net is provided with an LED strip at the lower side of the first steel pipe horizontal rod.
4. The pile hole guard of claim 3, wherein a solar charging plate is provided on the mesh.
5. The pile hole protection device throughout the entire construction cycle of claim 1, wherein the first steel pipe horizontal bar and the second steel pipe horizontal bar are welded to the steel pipe vertical bar.
6. A pile hole protector according to claim 1 throughout the construction cycle, wherein the protective mesh is a mesh of steel reinforcement, and the mesh of steel reinforcement is welded around the two vertical steel pipe poles, the first horizontal steel pipe pole and the second horizontal steel pipe pole, respectively.
7. A pile hole guard as claimed in claim 1, wherein the base of the steel pipe uprights is tapered.
8. The pile hole protection device throughout the entire construction period according to claim 1, wherein the steel pipe vertical rod, the first steel pipe horizontal rod and the second steel pipe horizontal rod are all square steel pipes.
CN202220970692.2U 2022-04-25 2022-04-25 Pile hole protection device penetrating through whole construction period Active CN217326743U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220970692.2U CN217326743U (en) 2022-04-25 2022-04-25 Pile hole protection device penetrating through whole construction period

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220970692.2U CN217326743U (en) 2022-04-25 2022-04-25 Pile hole protection device penetrating through whole construction period

Publications (1)

Publication Number Publication Date
CN217326743U true CN217326743U (en) 2022-08-30

Family

ID=82949794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220970692.2U Active CN217326743U (en) 2022-04-25 2022-04-25 Pile hole protection device penetrating through whole construction period

Country Status (1)

Country Link
CN (1) CN217326743U (en)

Similar Documents

Publication Publication Date Title
CN103993735A (en) Support system of roof inclined beam and slab cantilever structure and construction method of support system
CN203867181U (en) Supporting system for roof inclined beam and slab cantilever structure
CN207143708U (en) A kind of across foundation ditch synthesis steel trestle of lift-on/lift-off type
CN217326743U (en) Pile hole protection device penetrating through whole construction period
CN212054063U (en) Novel high-voltage line protection device
CN215802536U (en) Novel hyperboloid curtain skeleton
CN212453934U (en) Can have enough to meet need assembled fender that encloses
CN204919989U (en) Collect steel - concrete combination special -shaped post of heat preservation bearing in an organic whole
CN211899584U (en) Super high-rise lower-hanging operation platform
CN210216816U (en) Anti-seismic concrete wall
CN204457079U (en) Enclosure upright post
CN208235587U (en) A kind of large-span deep foundation pit underground power house rack assembling construction platform
CN206987720U (en) A kind of double shield cage cat ladders
CN219710912U (en) Land-saving type construction temporary construction platform
CN215594393U (en) Integrally assembled movable house
CN213391551U (en) Windproof enclosure
CN211949703U (en) Foldable T-beam template safety protection system
CN210736044U (en) Tower crane attaches wall support installation, dismantles operation platform
CN213679551U (en) Tower crane pedestrian passageway
CN215632066U (en) Self-supporting high-speed rail crossing frame for power transmission line
CN221126697U (en) Electric box platform for erecting foundation pit slope
CN212926495U (en) Foundation anchor bolt node
CN220133513U (en) Integrated operation platform device of creeping formwork
CN220889412U (en) Hoop type hanging basket device without counterweight based on steel structure beam
CN214653222U (en) Anti-climbing device for tower crane

Legal Events

Date Code Title Description
GR01 Patent grant