CN217325482U - Open-type municipal administration utility tunnel structure - Google Patents

Open-type municipal administration utility tunnel structure Download PDF

Info

Publication number
CN217325482U
CN217325482U CN202220292456.XU CN202220292456U CN217325482U CN 217325482 U CN217325482 U CN 217325482U CN 202220292456 U CN202220292456 U CN 202220292456U CN 217325482 U CN217325482 U CN 217325482U
Authority
CN
China
Prior art keywords
pipeline
layer
open
groove
comprehensive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220292456.XU
Other languages
Chinese (zh)
Inventor
郭福龙
刘丽倩
王豪勇
冯雨芹
范翔
袁明
罗昉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Design And Research Institute Co ltd
Original Assignee
China Construction Design And Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Design And Research Institute Co ltd filed Critical China Construction Design And Research Institute Co ltd
Priority to CN202220292456.XU priority Critical patent/CN217325482U/en
Application granted granted Critical
Publication of CN217325482U publication Critical patent/CN217325482U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Sewage (AREA)

Abstract

The utility model provides an open-type municipal administration utility tunnel structure, include: the integrated pipeline arranging groove is arranged at a position with a preset topographic height difference, and one side of the integrated pipeline arranging groove in the horizontal direction is provided with an opening; the supporting pieces are arranged inside the comprehensive pipeline arrangement groove and are sequentially arranged in the vertical or horizontal direction, and the supporting pieces are respectively fixedly connected with the inner wall of the comprehensive pipeline arrangement groove; the first panel is arranged on one side, provided with an opening, of the comprehensive pipeline arrangement groove and used for shielding the opening, and the first panel is detachably connected with the comprehensive pipeline arrangement groove; the liquid arranges the layer, is located a plurality of support piece's lower part sets up, the liquid arranges the layer and is used for collecting, handling and carrying municipal pipeline seepage or maintenance liquid, first panel rainwater seepage, peripheral rainfall catchment etc. that synthesize the pipeline and set up the inslot.

Description

Open-type municipal administration utility tunnel structure
Technical Field
The utility model relates to a pipeline safety technical field is synthesized in the municipal administration, in particular to pipeline fixed knot constructs is synthesized in open-type municipal administration.
Background
The utility tunnel is a tunnel space constructed underground in the city and is used for integrating strong and weak electric pipelines, energy pipelines, water supply and drainage pipelines, other public medium conveying pipelines and the like. The utility tunnel is provided with special personnel and equipment material inlet and outlet and ventilation ports, and is a city infrastructure of a monitoring and dangerous case processing system.
The eminence that the country advocated now is suitable for living in the city, green low carbon environmental protection especially infrastructure benefit short plate orientation, "thirteen five" period china has built a large amount of utility corridors, has now become the super big country of the city utility tunnel that the name is genuine now, but utility tunnel's drawback has also shown, and pipeline income corridor rate end, the pipe gallery internal system is various after a large amount of pipe corridors are built.
To present utility tunnel self energy consumption height, fire control and alarm system loaded down with trivial details complicacy, toxic and harmful gas easily gathers under the airtight space, erection equipment or material need lift in inside after getting into through the dog-house and move difficultly, and the drainage can only mechanical lifting, and the security is outstanding when overhauing maintenance or conflagration, personnel experience the not good enough above-mentioned problem of waiting, utility model provides an open-type municipal administration pipeline laying structure.
SUMMERY OF THE UTILITY MODEL
The utility model provides an open-type municipal administration utility tunnel structure for this city utility tunnel structure internal system is simple, easily centralized management, maintain convenient, prevent that the groundwater from corroding, extension pipeline life-span, security are high, intelligent degree is high.
The utility model discloses a first aspect of the embodiment provides an open-type municipal utility tunnel structure, include: the integrated pipeline arranging groove is arranged at a position with a preset topographic height difference, and one side of the integrated pipeline arranging groove in the horizontal direction is provided with an opening;
the supporting pieces are arranged inside the comprehensive pipeline arrangement groove and are sequentially arranged in the vertical or horizontal direction, and the supporting pieces are respectively fixedly connected with the inner wall of the comprehensive pipeline arrangement groove;
the first panel is arranged on one side, provided with an opening, of the comprehensive pipeline arrangement groove and used for shielding the opening, and the first panel is detachably connected with the comprehensive pipeline arrangement groove;
the liquid arrangement layer is arranged on the lower portions of the support pieces and used for containing, treating and conveying municipal pipeline leakage liquid, first panel leakage liquid, peripheral rainfall catchment and the like in the comprehensive pipeline arrangement groove.
Optionally, in one possible implementation manner of the first aspect, the support comprises a partition plate and a service access grid plate, wherein the partition plate is a pipeline layer partition plate or a reinforced concrete partition plate;
the upper or side portion of each separator forms a piping layer.
Optionally, in one possible implementation of the first aspect, the first panel is a detachable ventilation privacy panel.
Optionally, in a possible implementation manner of the first aspect, a manhole entrance is provided at an upper portion of the integrated pipeline installation tank, and a sealing device is provided at the manhole entrance and is used for being opened and closed by a user through a key from the outside.
Optionally, in a possible implementation manner of the first aspect, the supporting member includes a pipeline layer, one end of the pipeline layer is fixed to an inner wall of the comprehensive pipeline installation groove, and the other end of the pipeline layer is fixed to the guardrail.
Optionally, in a possible implementation manner of the first aspect, a manhole inlet is provided at an upper portion of the integrated pipeline installation tank;
the upper part of the liquid arrangement layer is provided with a grid plate;
a ladder stand is arranged between the manhole inlet and the grating plate and is fixedly connected with the supporting pieces with different horizontal heights respectively.
Optionally, in a possible implementation manner of the first aspect, the support member is any one or more of a bracket, a branch pipe, a hanger, and a hanging pipe;
at least one bracket is fixed on the side wall in the comprehensive pipeline setting groove;
at least one branch pipe is fixed on the bottom wall in the comprehensive pipeline setting groove;
at least one hanging rack and/or hanging pipe is fixed on the upper wall of the comprehensive pipeline setting groove.
Optionally, in one possible implementation manner of the first aspect, the liquid arrangement layer includes a rainwater layer, a sewage layer, and a preset drainage layer, which are connected in sequence.
The utility model provides a second aspect of embodiment provides a construction method of open-type municipal utility tunnel structure, include:
selecting a position with a preset topographic height difference to open an open type municipal comprehensive pipe gallery, and arranging an opening at one side of the open type municipal comprehensive pipe gallery in the horizontal direction;
arranging a manhole on an upper protection layer and/or a planting soil layer of the open type municipal comprehensive pipe gallery;
the detachable ventilation peep-proof plate is arranged at the opening side of the open type municipal comprehensive pipe gallery, and each ventilation peep-proof plate with a preset distance is provided with a corresponding door hole;
a greening shielding belt is arranged on the outer side of the opening position, and green plants matched in height are planted in the greening shielding belt and used for shielding the open type municipal comprehensive pipeline laying space belt;
a supporting piece for supporting the pipeline is arranged in the open type municipal comprehensive pipe gallery and is any one or more of a partition plate, an overhaul channel grid plate, a support, a branch pipe, a hanging frame and a hanging pipe.
Optionally, in a possible implementation manner of the second aspect, an environment monitoring device, a door opening and closing detection device and a video monitoring device are arranged in the open municipal pipe gallery;
environmental data in the open-type municipal comprehensive pipe gallery are collected through an environmental monitoring alarm device, a door hole opening and closing detection device and a video monitoring device and are sent to a remote monitoring end or a remote data platform.
Additional features and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by the practice of the invention. The objectives and other advantages of the invention will be realized and attained by the structure particularly pointed out in the written description and claims hereof as well as the appended drawings.
The technical solution of the present invention is further described in detail by the accompanying drawings and examples.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the principles of the invention. In the drawings:
fig. 1A is a schematic view of an open-type municipal utility tunnel arranged at a middle position of a road (arranged opposite to a roadway in a staggered manner);
FIG. 1B is a schematic view of the open municipal utility tunnel being arranged at a position to the left of the red line of the road (arranged on the same layer as the opposite roadway);
fig. 1C is a schematic view of the open-type municipal utility tunnel being arranged at a position (arranged on the same layer as the roadway) to the right of the red line of the road;
FIG. 1D is a schematic diagram of the open municipal utility tunnel being arranged at any position of a red line of a plot;
FIG. 2A is a schematic view of a vertical semi-partitioned self-draining pipe gallery structure of an unmanned hole secondary recessed type cantilever plate;
FIG. 2B is a schematic view of a stepped partition tube lane structure with a manhole and a liquid layer;
FIG. 2C is a schematic view of a vertical semi-partitioned self-draining pipe gallery structure with a manhole ram;
FIG. 2D is a schematic view of a vertical full-partition corridor structure of a pick plate with a manhole and a liquid layer;
FIG. 2E is a schematic diagram showing the arrangement of the uppermost pipeline layer of the open-type municipal pipe gallery;
FIG. 2F is a schematic diagram of the arrangement of intermediate layer line layers of the open-type municipal utility tunnel;
FIG. 2G is a schematic diagram of the arrangement of the lowermost pipeline layer of the open-type municipal pipe gallery;
fig. 2H is a schematic diagram of the arrangement of the liquid arrangement layer (drainage layer) of the open-type municipal pipe gallery;
fig. 3 is a flow chart of a construction method of an open municipal utility tunnel structure.
Reference numerals:
11. a comprehensive pipeline arrangement space; 111. red line for plot; 112. half-width roads and green belts; 113. A comprehensive pipeline arrangement belt B; 114. a masking tape; 115. a protective or planting layer; 116. a comprehensive pipeline arrangement layer; 117. a comprehensive pipeline arrangement space; 118. red line and one-sided green line range of the road; 210. overhauling the channel; 211. a grid plate; 212. the ventilation peep-proof plate can be disassembled; 213. a pipeline layer separator; 214. a reinforced concrete slab; 216. a manhole entrance; 217. a guardrail; 218. hooking; 219. a support; 220. climbing a ladder; 221. a hanger; 222. hanging a pipe; 223. a branch pipe; 224. overhauling the channel; 311. a rainwater layer; 312. A sewage layer; 313. and other drainage layers.
Detailed Description
To make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The terms "first," "second," "third," "fourth," and the like (if any) in the description and claims of the present invention and in the above-described drawings are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It is to be understood that the data so used is interchangeable under appropriate circumstances such that the embodiments of the invention described herein are capable of operation in sequences other than those illustrated or otherwise described herein.
It should be understood that, in various embodiments of the present invention, the sequence numbers of the processes do not mean the execution sequence, and the execution sequence of the processes should be determined by the functions and the internal logic, and should not constitute any limitation to the implementation process of the embodiments of the present invention.
It should be understood that in the present application, "comprising" and "having" and any variations thereof, is intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
It should be understood that, in the present invention, "a plurality" means two or more. "and/or" is merely an association describing an associated object, meaning that three relationships may exist, e.g., a and/or B, may mean: a exists alone, A and B exist simultaneously, and B exists alone. The character "/" generally indicates that the former and latter associated objects are in an "or" relationship. "comprises A, B and C" and "comprises A, B, C" means that all three of A, B, C comprise, "comprises A, B or C" means that one of A, B, C comprises, "comprises A, B and/or C" means that any 1 or any 2 or 3 of A, B, C comprises.
It should be understood that, in the present invention, "B corresponding to a", "a corresponds to B", or "B corresponds to a" means that B is associated with a, and B can be determined from a. Determining B from a does not mean determining B from a alone, but may be determined from a and/or other information. And the matching of A and B means that the similarity of A and B is greater than or equal to a preset threshold value.
As used herein, "if" may be interpreted as "at … …" or "when … …" or "in response to a determination" or "in response to a detection", depending on the context.
The technical solution of the present invention will be described in detail with specific examples. The following several specific embodiments may be combined with each other, and details of the same or similar concepts or processes may not be repeated in some embodiments.
The utility model provides an open-type municipal administration utility tunnel structure, suitable hills, mountain area etc. have certain shape of land difference in the town road or the development ground. The method can also be applied to urban roads or development plots which are subjected to regional earthwork allocation balance and specific vertical planning, and can also be applied to open municipal comprehensive pipeline laying engineering of new construction, extension and reconstruction of other towns.
The utility model discloses have multiple setting, embodiment, as shown in fig. 1A to fig. 1D, the utility model discloses a 4 kinds of setting position modes of open-type municipal utility tunnel.
The 1 st installation mode is as shown in fig. 1A, and comprises a red line for the plot, a half road and a green belt, a comprehensive pipeline arrangement belt, a shielding belt, a half road and a green belt, and a red line for the plot, which are connected in sequence.
The 2 nd setting mode is shown in fig. 1B, and comprises a land red line for the land, a comprehensive pipeline arrangement belt, a shielding belt and a land red line for the land which are connected in sequence.
The 3 rd arrangement mode is shown in fig. 1C, and comprises a land used red line, a comprehensive pipeline arrangement belt, a shielding belt and a land used red line which are connected in sequence.
The 4 th arrangement is as shown in fig. 1D, and includes a land red line, a road red line and a one-side green line, a comprehensive pipeline arrangement belt, a shielding belt and a land red line for a land.
The embodiment of the utility model provides an open-type municipal administration utility tunnel structure, include:
synthesize pipeline and set up the groove, synthesize pipeline and set up the groove and set up the position department that has the topographic height difference of predetermineeing, synthesize the ascending one side in the horizontal direction of pipeline and set up the groove and be provided with the opening. The utility model provides a technical scheme, aim at found open-type municipal utility tunnel structure, and current municipal utility tunnel all buries in the underground, and the seal is too strong, difficult management. The utility model discloses position department to having the topographic height difference of predetermineeing sets up synthesizes the pipeline and sets up the groove for the comprehensive pipeline that sets up the groove and has the opening, makes through this opening synthesize the pipeline and sets up the groove and directly exchange the air with the outside.
A plurality of support pieces, a plurality of support pieces set up in synthesize pipeline and set up inslot portion, a plurality of support pieces set gradually in vertical or horizontal direction, a plurality of support pieces respectively with synthesize pipeline and set up inslot wall fixed connection. The utility model provides a technical scheme can set up a plurality of support piece in advance, can support the circuit in the comprehensive pipeline through support piece, plays the effect of protection, separation, support to the circuit.
The first panel, set up in synthesize pipeline and set up the groove and have open-ended one side, be used for right the opening hides the close processing, first panel with synthesize pipeline and set up the groove and can dismantle the connection. The utility model discloses be provided with first panel in open-ended one side, can set up the inside and the outside space in groove with synthesizing through first panel and separate, play to pipeline protection, ventilation and non-light tight effect and purpose.
The liquid arrangement layer is arranged on the lower portions of the support pieces and used for containing, treating and conveying municipal pipeline leakage liquid, first panel leakage liquid, peripheral rainfall catchment and the like in the comprehensive pipeline arrangement groove. The utility model discloses can set up liquid in the bottom that the comprehensive pipeline set up the groove and arrange the layer, it can be right to arrange the layer through liquid the utility model provides a self leakage liquid, manhole leakage liquid, first panel leakage liquid in the open-type municipal administration utility tunnel structure collect the emission, avoid appearing the condition of hydrops, liquid is arranged the layer and can be accomodate rainwater, peripheral landmass drainage and industrial waste water in the red line of road for carry or regulation simultaneously.
In one possible embodiment, the present invention provides a technical solution, as shown in fig. 2A, the support member includes a partition plate and a service access grid plate, and the partition plate is a pipeline layer partition plate or a reinforced concrete partition plate. The upper portion of each partition forms a piping layer. The utility model discloses can set up different baffle and access way grid board in the high department of difference, form a plurality of pipeline layers, different pipeline layers are used for laying, place the circuit of different grade type, function.
The utility model provides a technical scheme, as shown in FIG. 2B, the pipeline is separated including step and vertical and horizontal separators, first panel is for dismantling the peep-proof board of ventilation. Because first panel is used for setting up the groove with comprehensive pipeline and keeps apart with the outside, in order to avoid other people to master the inside condition of walking the line, the utility model discloses can set up the board is looked to the dismantlement ventilation peep-proof that has can dismantle, ventilate, peep-proof function.
The utility model provides a technical scheme, as shown in FIG. 2C, the upper portion of synthesizing the pipeline setting groove is provided with the manhole entry, manhole entrance is provided with obturator, obturator is used for being opened, closed through the key by the user from the outside. When lines and equipment in the comprehensive pipeline arrangement groove need to be maintained, workers can go into the comprehensive pipeline arrangement groove through a manhole inlet. Play the effect of protection through obturator, avoid other people to go into to synthesize the pipeline through the manhole entry and set up the inslot.
The utility model provides a technical scheme, support piece include the pipeline layer, pipeline layer one end with it is fixed to synthesize the inner wall that the pipeline set up the groove, and the opposite side is fixed with the guardrail. Can play the effect of support to the pipeline through the pipeline layer, can play the function of location to the pipeline through the guardrail, avoid its condition that drops to appear, the guardrail also can protect maintainer safety, prevents to fall.
The utility model provides a technical scheme, as shown in FIG. 2D, the upper portion of synthesizing pipeline setting groove is provided with the manhole entry. The upper part of the liquid arrangement layer (drainage layer) is provided with a grating plate. Can make through the grid board overhaul or patrol personnel and walk on it, also can separate drainage blanket and pipeline layer, avoid the intraformational pipeline of pipeline to fall into to the drainage blanket.
A ladder stand is arranged between the manhole inlet and the grating plate and is fixedly connected with the supporting pieces with different horizontal heights respectively. The utility model discloses can set up the cat ladder, staff's accessible cat ladder to different level support piece department lays, operates corresponding pipeline.
The utility model provides a technical scheme can set up certain slope to pipeline layer baffle according to actual need for circuit on the pipeline layer baffle can assemble in corresponding position department as required.
The utility model provides a technical scheme, as shown in fig. 2E to 2G, support piece is in support, branch pipe, stores pylon and the string pipe arbitrary one or more. Different pipelines may have different specifications, for example the material of pipeline is different, the thickness is different, stability is different, based on the different specifications of pipeline, the utility model discloses can adopt the mode of multiple difference, form to adopt arbitrary one or more device in support, branch pipe, stores pylon and the string pipe to support the pipeline.
In one possible embodiment, at least one support is fixed at the side wall in the comprehensive pipeline arrangement groove; at least one branch pipe is fixed on the bottom wall in the comprehensive pipeline setting groove; at least one hanging rack and/or hanging pipe is fixed on the upper wall of the comprehensive pipeline setting groove.
The technical scheme provided by the utility model, as shown in fig. 2H, liquid is arranged including rainwater layer, sewage layer and the predetermined drainage blanket that connects gradually. The predetermined drainage layer is the other drainage layers in fig. 2H.
The technical scheme of the utility model, still provide a construction method of open-type municipal utility tunnel structure, as shown in fig. 3, include:
and S110, selecting a position with a preset topographic height difference to open the open type municipal comprehensive pipe gallery, and enabling one side of the open type municipal comprehensive pipe gallery in the horizontal direction to be provided with an opening.
In the implementation of step S110, the utility model provides an open-type municipal administration utility tunnel area, it can set up in the vertical side wall position of the upper and lower staggered floor of ground, makes an open rule of side direction or irregular banding municipal administration utility tunnel lay the space along this vertical side wall.
In a preferred mode, the strip-shaped lateral opening municipal comprehensive pipeline laying space can be arranged along the center of the road or a side of the road, and can also be arranged in a mode of extending along a direction in the development area.
In the construction process, the open type municipal comprehensive pipeline laying space is firm, reliable, safe and stable to manufacture, the municipal comprehensive pipeline is convenient to lay and overhaul, and the manufacturing can be performed by adopting modes of reinforced concrete cast-in-place, steel frame welding, prefabricated reinforced concrete assembly and the like.
And S120, arranging a manhole on an upper protection layer and/or a planting soil layer of the open type municipal comprehensive pipe rack.
The utility model provides an among the technical scheme, survey on the pipeline laying space roof of open-type municipal administration and have protective layer or planting soil layer, the roof should have the ability of bearing upper portion protective layer or planting soil layer static load and other dynamic loads, and leave the surplus, protective layer or planting soil layer can make one manhole that lets in open-type municipal administration pipeline laying space downwards at every certain distance, make things convenient for the maintainer to go into from top to bottom, this outside of the hole needs to use special key or authorizes the side and can get into, this downthehole side can be manually opened away, install on the hole and open and close induction system.
The soil outside the side plate on one side of the open type municipal comprehensive pipeline laying space has reliable bearing capacity, is dense and stable, and the side plate has the capacity of resisting the transverse or oblique acting force of the soil and is provided with a margin.
And S130, arranging a detachable ventilation peep-proof plate at the opening side of the open-type municipal comprehensive pipe gallery, and arranging a corresponding door hole on each ventilation peep-proof plate at a preset distance.
The other side of the open type municipal comprehensive pipeline laying space is an open type space, a detachable, ventilated, peep-proof, light-permeable, foreign matter-proof, inner space-protecting, drop-proof and easy-to-install-maintain material is required to be arranged at the side opening position, a door opening capable of passing in and out of a maintainer is manufactured at a certain distance, the outer side of the door can be accessed by a special key or an authorized party, the inner side of the door can be manually opened, and an opening and closing sensing device is arranged on the door.
And S140, arranging a greening shielding belt outside the opening position, wherein the greening shielding belt is used for planting green plants matched in height and used for shielding the open-type municipal comprehensive pipeline laying space belt.
The bottom plate of the open municipal comprehensive pipelaying space is provided with a natural good foundation or a usable good foundation or foundation treated by engineering measures.
A greening shielding belt is arranged on the outer side of the lateral opening position of the space, the greening shielding belt is suitable for planting a green plant shielding open type municipal comprehensive pipeline laying space belt with matched height, and spaces for people or equipment to enter and exit and maintain are reserved in the greening shielding belt at certain intervals.
The cross section of the strip-shaped lateral opening municipal comprehensive pipeline laying space can be in a combination of one or more of the following shapes: rectangular, triangular, circular (preferably rectangular).
The net height of the laying space of the open-type municipal comprehensive pipeline is H, the width of the laying space is B, the length of the laying space is L, H and B are determined according to the type, the size and the spatial arrangement form of the laid municipal pipeline, and L is suitable to be consistent with the length of a road or is selected according to the use requirement when the L is in a plot.
And S150, arranging a supporting piece for supporting the pipeline in the open type municipal comprehensive pipe gallery, wherein the supporting piece is any one or more of a partition plate, an overhaul channel grid plate, a support, a branch pipe, a hanging frame and a hanging pipe.
The open municipal comprehensive pipeline laying space is preferably divided into different extension spaces, which can be in the combination of one or more of the following shapes: pipeline support space, pipeline erecting space, pipeline hoisting space, personnel operation walking space, equipment placing space, air circulation space, rest space and the like.
The separation form of the pipeline layer of the cross section of the laying space of the open municipal comprehensive pipeline can be a combination of one or more of the following shapes: steps, fire-proof partition boards, reinforced concrete interlayer, lower pits, lateral pits, grating plates and the like.
The ground of the pipeline layer of the cross section of the laying space of the open-type municipal comprehensive pipeline is required to have a certain slope in the transverse direction or the longitudinal direction, so that the drainage is convenient.
The lowest layer (n +1 layer) of the open type municipal comprehensive pipeline laying space is preferably provided with a rainwater and sewage pipeline layer or a drainage layer, the width of the rainwater and sewage pipeline layer or the drainage layer can be equivalent to that of a comprehensive pipeline laying belt B, the depth of the rainwater and sewage pipeline layer or the drainage layer can be comprehensively determined according to the water quantity, the width and the like, the top of the layer can be provided with a movable grid plate, the drainage layer needs to consider winter anti-freezing measures, when the rainwater and sewage pipeline layer or the drainage layer is not arranged, internal drainage can flow into a greening shielding belt through a gap below the bottom of an open side, and when the rainwater and sewage pipeline layer or the drainage layer is arranged, internal overhaul leakage liquid can be drained into the layer.
The laying space of the open type municipal comprehensive pipeline is preferably provided with n layers, and the layer height and the layer width of each layer are determined according to the type, the size and the spatial arrangement form of the pipeline of the layer.
The open type municipal comprehensive pipeline laying space can be provided with fire detection and automatic fire extinguishing devices as required, and fire walls (plates and doors) are arranged at intervals when flammable pipelines are laid too long.
The detachable material at the open side is opened when the comprehensive pipeline is laid in the open type municipal comprehensive pipeline laying space or is subjected to major maintenance, and the operation is carried out by utilizing an outdoor special machine, so that personnel and equipment can enter and exit through a door opening or a manhole during simple maintenance.
The technical scheme provided by the utility model, still include:
arranging an environment monitoring device in the open type municipal comprehensive pipe gallery;
environmental data in the open-type municipal comprehensive pipe gallery is collected through the environmental monitoring device and sent to a remote monitoring end.
And an open municipal comprehensive pipeline laying space is suitable for being provided with intelligent systems for monitoring, alarming, 5G internet of things, sensing action and the like, so that management and safe operation are facilitated.
An intelligent system arranged in the open type municipal comprehensive pipeline laying space is required to establish a unified cooperative management and protection platform, and is required to reserve interfaces for urban system platforms such as disaster prevention and reduction, fire rescue, traffic logistics and the like, so that the urban system platforms jointly form a part of an urban brain.
It will be apparent to those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (8)

1. The utility model provides an open-type municipal administration utility tunnel structure which characterized in that includes:
the integrated pipeline arranging groove is arranged at a position with a preset topographic height difference, and one side of the integrated pipeline arranging groove in the horizontal direction is provided with an opening;
the supporting pieces are arranged inside the comprehensive pipeline arrangement groove and are sequentially arranged in the vertical direction or the horizontal direction, and the supporting pieces are respectively fixedly connected with the inner wall of the comprehensive pipeline arrangement groove;
the first panel is arranged on one side, provided with an opening, of the comprehensive pipeline arrangement groove and used for shielding the opening, and the first panel is detachably connected with the comprehensive pipeline arrangement groove;
the liquid arrangement layer is located at the lower parts of the support pieces and used for containing, treating and conveying municipal pipeline leakage liquid, first panel leakage liquid and peripheral rainfall catchment in the comprehensive pipeline arrangement groove.
2. The open municipal pipe gallery structure of claim 1,
the supporting piece comprises a partition board and an inspection passage grating board, wherein the partition board is any one or more of a metal partition board, a plastic partition board or a reinforced concrete partition board;
each space portion surrounded by the partition plates disposed in the vertical or horizontal direction forms one pipe arrangement layer.
3. The open municipal pipe gallery structure of claim 1,
the first panel is a detachable ventilation peep-proof plate.
4. The open municipal pipe gallery structure of claim 1,
the upper portion of synthesizing pipeline setting groove is provided with the manhole entry, the manhole entry is provided with obturator, obturator is used for being opened, closed through the key by the user from the outside.
5. The open municipal pipe gallery structure of claim 1,
the support piece comprises a pipeline layer, one end of the pipeline layer is fixed with the inner wall of the comprehensive pipeline setting groove, and the other end of the pipeline layer is fixed with the guardrail.
6. The open municipal pipe gallery structure of claim 1,
the upper part of the liquid arrangement is provided with a grating plate;
when the rainwater and sewage pipeline layer or the drainage layer is not arranged, internal drainage can flow into the greening shielding belt through the lower gap at the bottom of the open side;
when setting up rain sewage pipeline layer or drainage blanket, the inside inspection leaks liquid can be discharged into rain sewage pipeline layer or drainage blanket.
7. The open municipal pipe gallery structure of claim 1,
the support part is any one or more of a bracket, a branch pipe, a hanging rack and a hanging pipe;
at least one bracket is fixed on the side wall in the comprehensive pipeline setting groove;
at least one branch pipe is fixed on the bottom wall in the comprehensive pipeline setting groove;
at least one hanging rack and/or hanging pipe is fixed on the upper wall of the comprehensive pipeline setting groove.
8. The open municipal pipe gallery structure of claim 4, wherein,
synthesize the pipeline and set up the upper portion in groove and be provided with the manhole entry be provided with the cat ladder between manhole entry and the grid plate, the cat ladder respectively with different level's support piece fixed connection.
CN202220292456.XU 2022-02-08 2022-02-08 Open-type municipal administration utility tunnel structure Expired - Fee Related CN217325482U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220292456.XU CN217325482U (en) 2022-02-08 2022-02-08 Open-type municipal administration utility tunnel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220292456.XU CN217325482U (en) 2022-02-08 2022-02-08 Open-type municipal administration utility tunnel structure

Publications (1)

Publication Number Publication Date
CN217325482U true CN217325482U (en) 2022-08-30

Family

ID=82997608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220292456.XU Expired - Fee Related CN217325482U (en) 2022-02-08 2022-02-08 Open-type municipal administration utility tunnel structure

Country Status (1)

Country Link
CN (1) CN217325482U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114482126A (en) * 2022-02-08 2022-05-13 中国中建设计研究院有限公司 Open type municipal comprehensive pipe gallery structure and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114482126A (en) * 2022-02-08 2022-05-13 中国中建设计研究院有限公司 Open type municipal comprehensive pipe gallery structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN103775099B (en) 3+X city main pipeline network system
CN205296224U (en) Air intake, hoist and mount mouthful and mouthful combined layout's utility tunnel node structure of fleing
CN205062838U (en) Combination cabin concrete structure is assembled to shallow utility tunnel of burying
CN107059919A (en) A kind of underground pipe gallery
CN106351254A (en) Multilayer urban underground comprehensive pipe gallery
CN106285074A (en) A kind of design specification of Logistics Park
CN217325482U (en) Open-type municipal administration utility tunnel structure
CN208996086U (en) A kind of three cabin pipe gallery systems
KR20120092743A (en) Decentralized fire-fighting water management system for wide area disaster prevention
CN110295624A (en) Crossroad underground pedestrian walk and pipe gallery build structure and its construction method jointly
CN207130778U (en) A kind of pipe gallery gravity-flow ventilation booth for integrating manhole
CN212270994U (en) Prevent looped netowrk cabinet foundation structure of condensation
JPH09170241A (en) Disaster-prevention city
Macaulay Underground
CN114482126A (en) Open type municipal comprehensive pipe gallery structure and construction method thereof
CN208996085U (en) A kind of four cabin pipe gallery systems
CN215906846U (en) Underground pipe gallery
Bobylev Sustainability and vulnerability analysis of critical underground infrastructure
CN110735463A (en) Fire-fighting water supply system for super-long tunnels
CN211257072U (en) Utility tunnel ventilation unit, utility tunnel and utility tunnel system
CN210562294U (en) Underground structure of open cut tunnel and piping lane built jointly
CN210766871U (en) Be applied to municipal road's basic type utility tunnel
CN107059918A (en) Get down the highway to Double Multi-Arch, pipe gallery and sponge City complex
CN208183799U (en) A kind of drainage system comprising permeable pavement unit
CN201377092Y (en) Underground pipe network coverway

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220830

CF01 Termination of patent right due to non-payment of annual fee