CN217301917U - Novel antidetonation jib tube bank - Google Patents

Novel antidetonation jib tube bank Download PDF

Info

Publication number
CN217301917U
CN217301917U CN202220196426.9U CN202220196426U CN217301917U CN 217301917 U CN217301917 U CN 217301917U CN 202220196426 U CN202220196426 U CN 202220196426U CN 217301917 U CN217301917 U CN 217301917U
Authority
CN
China
Prior art keywords
bundle
suspender
main body
tube
mounting groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220196426.9U
Other languages
Chinese (zh)
Inventor
李平生
曾念翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Zhihua Electromechanical Equipment Co ltd
Original Assignee
Shenzhen Zhihua Electromechanical Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Zhihua Electromechanical Equipment Co ltd filed Critical Shenzhen Zhihua Electromechanical Equipment Co ltd
Priority to CN202220196426.9U priority Critical patent/CN217301917U/en
Application granted granted Critical
Publication of CN217301917U publication Critical patent/CN217301917U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a novel anti-seismic suspender pipe bundle, which comprises a ceiling, a connecting suspender and a pipe bundle mechanism, wherein the connecting suspender is connected with the bottom end of the ceiling, and the pipe bundle mechanism is connected with the bottom end of the connecting suspender; the tube bundle mechanism comprises a tube bundle upper main body, a tube bundle lower main body and a connecting assembly; the main part includes bellying, connecting portion, first connecting plate and mounting groove on the tube bank, and the mounting groove is seted up in one side of bellying. The utility model discloses utilize main part and tube bank lower main part matched with mode of setting up on the tube bank, through seting up of mounting groove, need not break curved off with the fingers and thumb connecting the jib, just can realize connecting the interlude between bellying and the connecting boom, when reducing the human input, also avoid the injury that causes connecting the jib, through the integration setting of bellying and connecting portion, not only reduced the input of raw and other materials, saved this process of welding moreover for the production efficiency of main part improves greatly on the tube bank.

Description

Novel antidetonation jib tube bank
Technical Field
The utility model relates to a tube bank field, in particular to novel antidetonation jib tube bank.
Background
At present, after installing pipelines such as water pipes, it is fixed to need install the relative position of pipeline and ceiling through jib and tube bank, the general welding in top of tube bank has the arch, alternate the installation with the bottom and the arch of jib, then tighten with the bolt, alright realize the installation to tube bank and jib, in order to realize the fixed to the pipeline, but because the arch among the prior art generally is that the round hole is seted up to the top, after bending off with the jib, just can install the tube bank, such mounting means, on the one hand is harder, cause the damage of jib easily, on the other hand protruding welded connected mode with tube bank, also comparatively loaded down with trivial details, the practicality is lower.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel antidetonation jib tube bank to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a novel anti-seismic suspender pipe bundle comprises a ceiling, a connecting suspender and a pipe bundle mechanism, wherein the connecting suspender is connected to the bottom end of the ceiling, and the pipe bundle mechanism is connected to the bottom end of the connecting suspender;
the tube bundle mechanism comprises a tube bundle upper main body, a tube bundle lower main body and connecting components, wherein the tube bundle lower main body is connected to the bottom end of the tube bundle upper main body, and the two connecting components are respectively connected to two sides between the tube bundle upper main body and the tube bundle lower main body;
the main part includes bellying, connecting portion, first connecting plate and mounting groove on the tube bank, two connecting portion connect in the both sides of bellying bottom, two first connecting plate is connected with the bottom of two connecting portion respectively, one side in the bellying is seted up to the mounting groove.
Preferably, the protruding portion, the connecting portion and the first connecting plate are integrally arranged, the protruding portion is in a C shape, and the connecting portion is in a circular arc shape.
Preferably, the mounting groove is arranged in the middle of the protruding portion, an inner cavity of the mounting groove is L-shaped, and one side of the top of the inner wall of the mounting groove is semicircular.
Preferably, the lower main body of the tube bundle comprises a tube bundle part and second connecting plates, the second connecting plates are connected to two ends of the tube bundle part, and the tube bundle part and the second connecting plates are integrally arranged.
Preferably, the tube bundling part is arc-shaped, the positions of the tube bundling part and the two connecting parts correspond, and the positions of the second connecting plate and the first connecting plate correspond.
Preferably, coupling assembling includes bolt and fixation nut, the bolt alternates with second connecting plate and first connecting plate to be connected, second connecting plate screw thread cup joints in the one end of bolt.
Preferably, through holes are formed in the middle of the second connecting plate and the middle of the first connecting plate, and the bolts are connected with inner cavities of the through holes in an inserting mode.
The utility model discloses a technological effect and advantage:
(1) the utility model discloses utilize the upper main part of tube bank and tube bank under the main part matched with setting mode, through the establishment of mounting groove, need not break the connecting boom off with the fingers and thumb, just can realize the interlude connection between bellying and the connecting boom, when reducing the human input, also avoid the injury that causes the connecting boom, through the integrated setting of bellying and connecting portion, not only reduced the input of raw and other materials, saved welding this process moreover, make the production efficiency of the upper main part of tube bank improve greatly;
(2) the utility model discloses utilize bellying and connecting portion matched with to set up the mode, through the integration setting of bellying and connecting portion to make the bellying have the space of opening deformation, thereby elastic deformation through the bellying, cushion the shock attenuation to the relative position between pipeline and the connection jib.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic front structural view of the present invention.
Fig. 3 is one of the three-dimensional structural diagrams of the tube bundle mechanism of the present invention.
Fig. 4 is a schematic view of the front structure of the tube bundle mechanism of the present invention.
Fig. 5 is a schematic diagram of a second three-dimensional structure of the tube bundle mechanism of the present invention.
In the figure: 1. a ceiling; 2. connecting the hanger rod; 3. a tube bundle mechanism; 31. a tube bundle upper body; 311. a boss portion; 312. a connecting portion; 313. a first connecting plate; 314. mounting grooves; 32. a tube bundle lower body; 321. a bundle pipe section; 322. a second connecting plate; 33. a connecting assembly; 331. a bolt; 332. and (5) fixing the nut.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a novel antidetonation jib tube bank as shown in fig. 1-5, including ceiling 1, connecting boom 2 and tube bank mechanism 3, connecting boom 2 connects in the bottom of ceiling 1, and tube bank mechanism 3 connects in the bottom of connecting boom 2, and it is fixed to be convenient for the parcel of pipeline through tube bank mechanism 3, is convenient for be connected fixedly to the relative position between tube bank mechanism 3 and the ceiling 1 through connecting boom 2.
Tube bank mechanism 3 includes main part 31 on the tube bank, main part 32 and coupling assembling 33 under the tube bank, main part 32 is connected in the bottom of main part 31 on the tube bank under the tube bank, two coupling assembling 33 connect respectively in the tube bank on main part 31 and tube bank under the both sides between the main part 32, be convenient for be connected with connecting boom 2 through main part 31 on the tube bank, cooperation between main part 32 under main part 31 and the tube bank through the tube bank, be convenient for tie the pipeline outside, then through the fixed of two coupling assembling 33, so that be connected the relative position of main part 32 under main part 31 and the tube bank on the tube bank, thereby be convenient for be connected fixedly to the relative position between main part 31 and the tube bank under main part 32 on the tube bank.
Main part 31 includes bellying 311 on the tube bank, connecting portion 312, first connecting plate 313 and mounting groove 314, two connecting portion 312 are connected in the both sides of bellying 311 bottom, two first connecting plates 313 are connected with the bottom of two connecting portion 312 respectively, one side of bellying 311 is seted up to mounting groove 314, integration through bellying 311 and connecting portion 312 sets up, thereby make bellying 311 have the space of opening deformation, thereby elastic deformation through bellying 311, cushion the shock attenuation to the relative position between pipeline and the connection jib 2, be convenient for wrap up the pipeline through connecting portion 312, make the position of pipeline more stable.
The bellying 311, connecting portion 312 and first connecting plate 313 are the integration setting, bellying 311 is the C style of calligraphy, C style of calligraphy setting through bellying 311, thereby make the relative pipeline of bellying 311 still leave certain space, so that after the bottom that will connect jib 2 alternates in, threaded connection is carried out with external nut seat and the bottom of being connected jib 2, so that relative fixed between main part 31 on connecting jib 2 and the tube bank, connecting portion 312 is arc, mounting groove 314 is seted up in the middle part of bellying 311, the inner chamber of mounting groove 314 is the L style of calligraphy, one side at mounting groove 314 inner wall top is semi-circular, be convenient for connect the interlude of jib 2 bottom, be convenient for connect the interlude of jib 2 through mounting groove 314 and slide in.
The lower tube bundle main body 32 comprises a tube bundle portion 321 and second connecting plates 322, the two second connecting plates 322 are connected to two ends of the tube bundle portion 321, the tube bundle portion 321 and the second connecting plates 322 are integrally arranged, the tube bundle portion 321 is arc-shaped, the tube bundle portion 321 corresponds to the two connecting portions 312, the second connecting plates 322 correspond to the first connecting plates 313, the bottom of the pipeline is conveniently wrapped and bound through the tube bundle portion 321, and the connecting assembly 33 is conveniently connected and fixed through the second connecting plates 322.
The connecting assembly 33 comprises a bolt 331 and a fixing nut 332, the bolt 331 is in threaded connection with the second connecting plate 322 and the first connecting plate 313, the second connecting plate 322 is in threaded sleeve connection with one end of the bolt 331, through holes are formed in the middle of the second connecting plate 322 and the middle of the first connecting plate 313, the bolt 331 is in threaded connection with an inner cavity of the through holes, the fixing nut 332 is in threaded sleeve connection after the bolt 331 is inserted into the through holes of the second connecting plate 322 and the first connecting plate 313, and therefore the main body 31 on the tube bundle and the main body 32 under the tube bundle are fixed.
The utility model discloses the theory of operation:
in use, the connecting suspender 2 is firstly fixedly installed on the ceiling 1, then the upper body 31 of the tube bundle is clamped outside the pipeline in an inclined state, at the moment, the bottom of the connecting suspender 2 is aligned with the inner cavity of the installation groove 314, then the upper body 31 of the tube bundle is rotated, so that the protrusion part 311 moves towards the bottom of the connecting suspender 2, the bottom of the connecting suspender 2 is inserted into the inner cavity of the installation groove 314 until the top of the protrusion part 311 rotates to be perpendicular to the connecting suspender 2, the bottom of the connecting suspender 2 is attached to the top of the inner wall of the installation groove 314, at the moment, the insertion between the connecting suspender 2 and the protrusion part 311 can be realized, and therefore, through the installation groove 314, the insertion connection between the protrusion part 311 and the connecting suspender 2 can be realized without bending the connecting suspender 2, the human input is reduced, and the damage to the connecting suspender 2 is also avoided, the projection 311 and the connection 312 are integrally provided, so that the raw material input is reduced, and the welding process is omitted.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the principles of the present invention.

Claims (7)

1. A novel anti-seismic suspender pipe bundle comprises a ceiling (1), a connecting suspender (2) and a pipe bundle mechanism (3), and is characterized in that the connecting suspender (2) is connected to the bottom end of the ceiling (1), and the pipe bundle mechanism (3) is connected to the bottom end of the connecting suspender (2);
the tube bundle mechanism (3) comprises a tube bundle upper main body (31), a tube bundle lower main body (32) and connecting assemblies (33), the tube bundle lower main body (32) is connected to the bottom end of the tube bundle upper main body (31), and the two connecting assemblies (33) are respectively connected to two sides between the tube bundle upper main body (31) and the tube bundle lower main body (32);
the pipe bundle upper main body (31) comprises a protruding portion (311), a connecting portion (312), a first connecting plate (313) and a mounting groove (314), the connecting portion (312) are connected to two sides of the bottom end of the protruding portion (311), the first connecting plate (313) is connected with the bottoms of the two connecting portions (312) respectively, and the mounting groove (314) is arranged on one side of the protruding portion (311).
2. The novel anti-seismic boom pipe bundle according to claim 1, characterized in that the protrusion (311), the connecting portion (312) and the first connecting plate (313) are integrally arranged, the protrusion (311) is C-shaped, and the connecting portion (312) is arc-shaped.
3. The novel anti-seismic hanger bar bundle according to claim 1, characterized in that said mounting groove (314) is opened in the middle of said protrusion (311), the inner cavity of said mounting groove (314) is L-shaped, and one side of the top of the inner wall of said mounting groove (314) is semicircular.
4. A novel seismic boom pipe bundle according to claim 1, characterized in that said lower bundle body (32) comprises a bundle pipe portion (321) and second attachment plates (322), two of said second attachment plates (322) being connected to both ends of said bundle pipe portion (321), said bundle pipe portion (321) being integrated with said second attachment plates (322).
5. A novel seismic boom pipe bundle according to claim 4, characterized in that said beam pipe section (321) is in the shape of a circular arc, said beam pipe section (321) corresponding to the position of the two connection sections (312), said second connection plate (322) corresponding to the position of the first connection plate (313).
6. A novel seismic boom pipe bundle according to claim 1, characterized in that said connection assembly (33) comprises a bolt (331) and a fixing nut (332), said bolt (331) is inserted into and connected with a second connection plate (322) and a first connection plate (313), said second connection plate (322) is threaded onto one end of the bolt (331).
7. The novel anti-seismic suspender bundle of claim 6, wherein the second connecting plate (322) and the first connecting plate (313) are provided with through holes in the middle, and the bolts (331) are inserted into and connected with the inner cavities of the through holes.
CN202220196426.9U 2022-01-24 2022-01-24 Novel antidetonation jib tube bank Active CN217301917U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220196426.9U CN217301917U (en) 2022-01-24 2022-01-24 Novel antidetonation jib tube bank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220196426.9U CN217301917U (en) 2022-01-24 2022-01-24 Novel antidetonation jib tube bank

Publications (1)

Publication Number Publication Date
CN217301917U true CN217301917U (en) 2022-08-26

Family

ID=82927116

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220196426.9U Active CN217301917U (en) 2022-01-24 2022-01-24 Novel antidetonation jib tube bank

Country Status (1)

Country Link
CN (1) CN217301917U (en)

Similar Documents

Publication Publication Date Title
JP3221316U (en) Tension line clamp for carbon fiber composite core
CN217301917U (en) Novel antidetonation jib tube bank
CN209130471U (en) A kind of antidetonation suspension and support
CN110873247A (en) Hydraulic engineering is with pipeline of convenient concatenation
CN209146496U (en) A kind of dual U-shaped para-seismic support pipe clamp
CN208939531U (en) A kind of stockbridge damper
CN209743782U (en) Anti-seismic support with high reliability
CN209146497U (en) A kind of building pipe antishock device
CN110518540B (en) Multipurpose 5G signal cable butt-joint device
CN208235800U (en) Teeprofile concrete combination column with internal connector
CN210013455U (en) High-stability steel pipe mounting structure
CN213745479U (en) double-C-shaped anti-seismic support joint
CN202125300U (en) U-shaped device for longitudinally connecting arch centers
KR200390879Y1 (en) A fixing device for fittings of flexible tube
CN218385810U (en) Saddle-shaped wire clamp
CN205025885U (en) Tubular product embedded connection spare
CN2416325Y (en) Pipes joints
CN213145729U (en) Auxiliary device for heating ventilation installation
CN109307104A (en) A kind of building pipe antishock device
CN217680729U (en) Expansion filling type external prestress CFRP material transverse tensioning system
CN218000812U (en) Steel is moulded and is changeed pipe fitting convenient to connect and seal
CN201610639U (en) Improved placing type double-open type beam-buckling trammel tenacity supporting structure
CN208886280U (en) Para-seismic support connector
CN212318982U (en) Antidetonation support convenient to installation
CN209743786U (en) U-shaped connecting base

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant