CN217300501U - Novel pipe well installation device matched with winch for use - Google Patents

Novel pipe well installation device matched with winch for use Download PDF

Info

Publication number
CN217300501U
CN217300501U CN202221009733.8U CN202221009733U CN217300501U CN 217300501 U CN217300501 U CN 217300501U CN 202221009733 U CN202221009733 U CN 202221009733U CN 217300501 U CN217300501 U CN 217300501U
Authority
CN
China
Prior art keywords
steel bar
pipe well
hoisting
transmission
installation device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221009733.8U
Other languages
Chinese (zh)
Inventor
杨智杰
张松华
王文彬
郎永尚
范志超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Stecol Corp
Original Assignee
Stecol Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Stecol Corp filed Critical Stecol Corp
Priority to CN202221009733.8U priority Critical patent/CN217300501U/en
Application granted granted Critical
Publication of CN217300501U publication Critical patent/CN217300501U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a novel pipe well installation device matched with a winch for use, which comprises a steel bar framework and hoisting structures arranged on the steel bar framework, wherein two groups of hoisting structures are arranged; the hoisting structure comprises a transmission steel bar, and a pivot is arranged between the transmission steel bar and the steel bar framework; the outer side of the transmission steel bar is provided with a bearing hook which is used for bearing the edge of the pipe well from the lower part; the top of the transmission steel bar is provided with a hoisting part, and the winch is connected with the transmission steel bar through the hoisting part; the transmission reinforcing steel bar has elasticity. The utility model discloses beneficial effect: when utilizing this device to carry out construction, alone the poling, alone control the hoist engine, 2 workman can accomplish, reduce the cost of labor and can not lead to the wall of a well to destroy.

Description

Novel pipe well installation device matched with winch for use
Technical Field
The utility model belongs to the construction equipment field especially relates to a novel pipe well installation that cooperation hoist engine used device.
Background
The existing pipe well adopts a pipe well point method to carry out precipitation construction, a winch is adopted to suspend an impact drilling machine for construction when the pipe well is lowered, a steel wire rope penetrates through a pipe well base support through the operation of a control main rocker, a section of well pipe is placed on the base support, 3 bamboo pieces are arranged around the pipe well, and then the binding and the fixing are carried out by iron wires. The pipe laying operation is carried out in this way. In the traditional process, 4 persons are needed for pipe descending, one person operates a winch, two persons control a pipe descending well frame, and one person is responsible for transferring a pipe well, so that time and labor are consumed. At last, the pipe well is finished, the bottom support of the pipe well is pumped, the pipe well is inclined, the pipe well is too fast to be lowered, the pipe well is broken, labor is consumed, materials are used, the verticality cannot be guaranteed, and the pipe well can be damaged.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model aims at providing a novel pipe well installation device that cooperation hoist engine used to solve and consume the manual work, the material, the technical problem that the straightness that hangs down can't be ensured.
In order to achieve the above purpose, the technical scheme of the utility model is realized as follows:
a novel pipe well installation device matched with a winch for use comprises a steel reinforcement framework and hoisting structures arranged on the steel reinforcement framework, wherein two groups of hoisting structures are arranged;
the hoisting structure comprises a transmission steel bar, and a pivot is arranged between the transmission steel bar and the steel bar framework;
the outer side of the transmission steel bar is provided with a bearing hook which is used for bearing the edge of the pipe well from the lower part;
the top of the transmission steel bar is provided with a hoisting part, and the winch is connected with the transmission steel bar through the hoisting part;
the transmission reinforcing steel bar has elasticity.
Furthermore, the transmission reinforcing steel bar comprises a first reinforcing steel bar and a second reinforcing steel bar, the lower portion of the first reinforcing steel bar is connected with the upper portion of the second reinforcing steel bar through a welding portion, and the first reinforcing steel bar is fixedly connected with the second reinforcing steel bar through rib welding or lap welding.
Furthermore, a limiting ring is arranged on the steel bar framework, and the lower portion of the second steel bar extends into the limiting ring.
Furthermore, an extension spring is arranged between the second steel bars of the two hoisting structures.
Further, hoist and mount portion has the tractive rope including setting up the rings at the transmission reinforcing bar top between the rings at two hoisting structure's transmission reinforcing bar tops, and tractive rope central point puts and is provided with the hoist and mount ring, and the hoist engine is through hoist and mount ring to tubular well installation device hoist and mount.
Furthermore, the steel reinforcement framework comprises deformed steel bars, and the deformed steel bars are welded with each other.
Furthermore, the first reinforcing steel bar and the second reinforcing steel bar are made of deformed steel bars.
Further, the side of the steel reinforcement framework is provided with an anti-drop pin hole, and the anti-drop pin hole is provided with a plurality of pairs.
Furthermore, the pivot comprises a hinged shaft, and the transmission steel bar is hinged with the steel bar framework.
Furthermore, the first steel bar is hinged with the steel bar framework.
Compared with the prior art, a novel pipe shaft installation device that cooperation hoist engine used have following beneficial effect:
(1) the utility model relates to a novel pipe well installation device used in cooperation with a winch, which is used for pipe well down pipe construction, when in use, the pipe well is firstly laid down, the top closing part at the bottom of a steel reinforcement framework penetrates into the pipe well and penetrates out from a bell socket on the pipe well, at the moment, the winch is connected with a hoisting ring through a hook to hoist the device, the top of a transmission steel bar is close to and contracts (namely, the tops of two first steel bars are dragged by the winch, two hoisting rings are close to and contract), acting force is transmitted to the bottom of the transmission steel bar (namely, a second steel bar) through a fulcrum according to the lever principle, a bearing hook arranged on the outer wall of the second steel bar moves outwards (the distance of the two hooks is far along with the approach of the two hoisting rings) to further resist and hook the wall of the pipe well, and then the whole device and the pipe well are hoisted to descend into the well together by the winch, when in the process of construction, one person penetrates through the pipe, one person controls the winch, and 2 workers can complete the operation, so that the labor cost is reduced, and the well wall cannot be damaged;
(2) a novel pipe well installation device that cooperation hoist engine used, after the pipe well was hoisted preset position, because the pipe well erects the setting, and peg graft through the pipe well bell and spigot between two adjacent pipe wells, steel reinforcement framework inserted to the pipe well opening of below this moment, because the pipe well below has met the supporter, the hoist engine continues hoist downwards, the haulage rope can become flexible, distance limit is far away between two rings this moment, according to lever principle, distance between two bearing hooks is close to, and then the pipe well wall of a well (perhaps break away from the wall of a well through the artifical supplementary bearing hook of using crowbar) in the pot, rethread hoisting machine hoists whole device, analogize in proper order and accomplish piling up of pipe well, increase low tube well pitch, accelerate the construction speed, the bell and spigot corresponds from top to bottom, the straightness that hangs down of a pipe well is guaranteed.
Drawings
The accompanying drawings, which form a part hereof, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention without undue limitation. In the drawings:
fig. 1 is a schematic view of a novel pipe well installation device used in cooperation with a winch according to an embodiment of the present invention;
fig. 2 is a bottom schematic view of a partial structure according to an embodiment of the present invention;
fig. 3 is a schematic view of a middle portion of a partial structure according to an embodiment of the present invention;
fig. 4 is a schematic view of a support hook according to an embodiment of the present invention;
fig. 5 is a partial schematic view of a transmission bar according to an embodiment of the present invention;
fig. 6 is a schematic structural diagram of the rear end of the installation pipe well according to the embodiment of the present invention;
fig. 7 is a schematic diagram of the local details after the installation of the pipe well according to the embodiment of the present invention.
Description of reference numerals:
1-a steel reinforcement framework; 11-a spacing ring; 2-driving the steel bar; 21-a first rebar; 22-a second rebar; 23-a weld; 24-an extension spring; 25-a hoisting ring; 26-a pulling rope; 27-hoisting rings; 3-a hinge shaft; 4-bearing hooks; 5-a pipe well; 6-anti-falling pin hole.
Detailed Description
It should be noted that, in the case of no conflict, the embodiments and features of the embodiments of the present invention may be combined with each other.
The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
When in use, the pipe well 5 is firstly laid down, the closing part at the top end of the bottom of the steel reinforcement framework 1 penetrates into the pipe well 5 and penetrates out of the bell socket on the well pipe, at the moment, the winch is connected with the hoisting ring 27 through the hook to hoist the device, the top of the transmission steel reinforcement 2 is close to and contracted (namely, the top of the two first steel reinforcements 21 is dragged by the winch, and the two hoisting rings 25 are close to and contracted), according to the lever principle, acting force is transmitted to the bottom of the transmission steel bar 2 (namely the second steel bar 22) through the fulcrum, the bearing hook 4 arranged on the outer wall of the second steel bar 22 moves outwards (at the moment, the distance between the two hooks is far along with the approach of the two hanging rings 25) to further abut against and hook the wall of the well of the pipe shaft 5, the whole device and the pipe well 5 are hoisted and lowered into the well by the hoist, during construction in the process, one person penetrates the pipe, one person controls the hoist, and 2 workers can complete the process, so that the labor cost is reduced, and the well wall is not damaged;
after the tube well 5 is hoisted to the preset position, because the tube well 5 is erect and is set up, and peg graft through tube well 5 bell and spigot between two adjacent tube wells 5, framework 1 of steel reinforcement inserts in the tube well 5 opening to the below this moment, because the support has been met to tube well 5 below, the hoist engine continues to hoist downwards, the haulage rope can become flexible, distance limit is far away between two rings 25 this moment, according to lever principle, the distance between two bearing hooks 4 is close to, and then the tube well 5 wall of a well (or break away from the wall of a well through artifical use crowbar assistance bearing hook 4) in the pot, hoist whole device by crane through the hoist engine again, analogize in proper order and accomplish piling up of tube well 5, increase lower tube well 5 knots, accelerate the construction speed, the bell and spigot up-down corresponds, the straightness that hangs down of tube well 5 is guaranteed.
The effect of anti-drop pinhole 6 does, can be at the hoist and mount in-process, uses parts such as reinforcing bar to insert to anti-drop pinhole 6 in, the reinforcing bar of level setting plays the bearing guard action when pipe shaft 5 accidentally drops from bearing hook 4.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not substantially depart from the scope of the embodiments of the present invention, and are intended to be covered by the claims and the specification.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. The utility model provides a novel pipe well installation that cooperation hoist engine used device which characterized in that: the steel bar framework hoisting device comprises a steel bar framework (1) and hoisting structures arranged on the steel bar framework (1), wherein two groups of hoisting structures are arranged;
the hoisting structure comprises a transmission steel bar (2), and a fulcrum is arranged between the transmission steel bar (2) and the steel bar framework (1);
a bearing hook (4) is arranged on the outer side of the transmission steel bar (2), and the bearing hook (4) is used for bearing the edge of the pipe well (5) from the lower part;
the top of the transmission steel bar (2) is provided with a hoisting part, and the winch is connected with the transmission steel bar (2) through the hoisting part; the transmission reinforcing steel bar (2) has elasticity.
2. The novel pipe well installation device used in cooperation with the winch according to claim 1, wherein: the transmission reinforcing steel bar (2) comprises a first reinforcing steel bar (21) and a second reinforcing steel bar (22), the lower portion of the first reinforcing steel bar (21) is connected with the upper portion of the second reinforcing steel bar (22) through a welding portion (23), and the first reinforcing steel bar (21) is fixedly connected with the second reinforcing steel bar (22) through rib welding or lap welding.
3. The novel pipe well installation device used in cooperation with the winch is characterized in that: a limiting ring (11) is arranged on the steel bar framework (1), and the lower part of the second steel bar (22) extends into the limiting ring (11).
4. The novel pipe well installation device used in cooperation with the winch according to claim 1, wherein: and an extension spring (24) is arranged between the second reinforcing steel bars (22) of the two hoisting structures.
5. The novel pipe well installation device used in cooperation with the winch according to claim 1, wherein: hoisting part has tractive rope (26) including setting up rings (25) at transmission reinforcing bar (2) top between rings (25) at transmission reinforcing bar (2) top of two hoisting structure, and tractive rope (26) central point puts and is provided with hoisting ring (27), and the hoist engine is passed through hoisting ring (27) and is hoisted tub well (5) installation device.
6. The novel pipe well installation device used in cooperation with the winch according to claim 1, wherein: the steel reinforcement framework (1) comprises deformed steel bars, and the deformed steel bars are welded with each other.
7. The novel pipe well installation device used in cooperation with the winch is characterized in that: the first reinforcing steel bar (21) and the second reinforcing steel bar (22) are made of screw-thread steel.
8. The novel pipe well installation device used in cooperation with the winch according to claim 1, wherein: the steel reinforcement framework (1) is laterally provided with an anti-drop pin hole (6), and the anti-drop pin hole (6) is provided with a plurality of pairs.
9. The novel pipe well installation device used in cooperation with the winch according to claim 1, wherein: the fulcrum includes articulated shaft (3), articulates between transmission reinforcing bar (2) and steel reinforcement cage (1).
10. The novel pipe well installation device used in cooperation with the winch according to any one of claims 1 or 9, wherein: the first steel bar (21) is hinged with the steel bar framework (1).
CN202221009733.8U 2022-04-28 2022-04-28 Novel pipe well installation device matched with winch for use Active CN217300501U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221009733.8U CN217300501U (en) 2022-04-28 2022-04-28 Novel pipe well installation device matched with winch for use

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221009733.8U CN217300501U (en) 2022-04-28 2022-04-28 Novel pipe well installation device matched with winch for use

Publications (1)

Publication Number Publication Date
CN217300501U true CN217300501U (en) 2022-08-26

Family

ID=82915334

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221009733.8U Active CN217300501U (en) 2022-04-28 2022-04-28 Novel pipe well installation device matched with winch for use

Country Status (1)

Country Link
CN (1) CN217300501U (en)

Similar Documents

Publication Publication Date Title
CN113353782B (en) Low-clearance ground wall-connected reinforcement cage rapid hoisting construction method
CN113387267B (en) Safe hoisting and lowering method for underground diaphragm wall reinforcement cage
CN207160585U (en) Superelevation outer wall of basement Bailey bracket single side formwork architecture
CN105256728B (en) A kind of cantilever erection method of the Chinese human relations formula steel truss girder of cable-stayed bridge
CN112408197A (en) Hoisting method for reinforcement cage of underground continuous wall
CN210366620U (en) A hang muscle system for steel reinforcement cage
CN217300501U (en) Novel pipe well installation device matched with winch for use
CN111498678B (en) Special lifting appliance for lifting cast-in-place pile overlong reinforcement cage and lifting method thereof
CN113264458A (en) Tower crane system and method for removing attachment rod thereof
CN201027135Y (en) Hanging tool mechanism for swinging 55mPHC pipe pile
CN214614095U (en) Suspension type concrete strutting arrangement
CN213865049U (en) Bulb tubular hydraulic generator spindle hoisting belt
CN205502574U (en) Mould mould is hung to swift formula
CN210658058U (en) Hanging basket for constructing cast-in-situ diaphragm plate joint of precast beam bridge
CN211034868U (en) Steel reinforcement cage hoist device
CN111827262A (en) Construction method of fold-line-shaped irregular underground continuous wall
CN206986877U (en) A kind of ground-connecting-wall steel reinforcement cage easily docked
CN212450248U (en) Steel reinforcement cage hoisting frame
CN217376980U (en) double-T-beam self-balancing hoisting sling
CN217577997U (en) Pipeline elevation orthotic devices
CN219078843U (en) Reinforcing cage hoisting auxiliary device
CN214359724U (en) Lifting appliance special for elevator shaft
CN218405379U (en) System for underground continuous wall construction
CN211393670U (en) Mechanical shed beam lifting mechanism
CN210395670U (en) Steel bar pull ring and pre-buried steel bar pull ring structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant