Detachable building construction design protection operation canopy Download PDFInfo
- Publication number
- CN217299941U CN217299941U CN202220567143.0U CN202220567143U CN217299941U CN 217299941 U CN217299941 U CN 217299941U CN 202220567143 U CN202220567143 U CN 202220567143U CN 217299941 U CN217299941 U CN 217299941U
- Authority
- CN
- China
- Prior art keywords
- ceiling
- buffer
- grooves
- protection operation
- construction design
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model discloses a detachable building construction shaping protection operation shed, which belongs to the field of building engineering and comprises an operation shed body, wherein the upper end of the operation shed body is provided with a first ceiling, the inside of the first ceiling is provided with a sliding groove, a second ceiling is connected in the sliding groove in a sliding way, the length of the first ceiling and the second ceiling which are arranged on the detachable building construction shaping protection operation shed can be adjusted, when the operation shed body is used, the operation shed can be installed after being adjusted to a proper position according to the length of the ceiling required on site, simultaneously, the upper ends of the first ceiling and the second ceiling are both provided with a buffer plate, a buffer spring and the like, if a high-altitude falling object hits the ceiling, the buffer plate has the functions of buffering and protecting the ceiling from sinking and deformation, the supporting leg of the operation shed is connected with the thread groove through a thread block, and the secondary fixation of a hoop is fixedly installed, this kind of mounting means is comparatively simple and firm, convenient dismantlement, transportation and use.
Description
Technical Field
The utility model relates to a building engineering field, more specifically say, relate to a construction design protection operation canopy is built in detachable room.
Background
The protection operation shed is built in site operation areas such as a house construction clean processing area and a woodworking processing area, and has the functions of preventing objects from falling from high places and injuring work, so that constructors and life safety of personnel in the protection operation area are protected.
At present, some detachable room that exist on the market is built construction design protection operation canopy's ceiling area and is fixed, when using, if the required operation canopy area in protection operation district is less, then the operation canopy can excessively occupy the building site area, if protection operation district area is great, then the operation canopy is difficult to the personnel's safety in the comprehensive protection operation district, still need a plurality of operation canopy to connect and use, current operation canopy is when the installation is fixed simultaneously, connect through the welded mode, though comparatively firm, but be difficult to dismantle, install in other places, also be difficult to dismantle and transport, inconvenient use.
SUMMERY OF THE UTILITY MODEL
Problem to exist among the prior art, an object of the utility model is to provide a construction design protection operation canopy is built in detachable room, the length of first ceiling and the second ceiling that it was provided with can be adjusted, when using operation canopy body, can install after the length adjustment to the suitable position of ceiling according to the scene needs, the upper end of first ceiling and second ceiling all is provided with buffer board and buffer spring etc. simultaneously, if the object that falls aloft pounces to the ceiling, the buffer board has cushioning effect and protects the ceiling not pounded the effect of sunken deformation, the supporting leg of this operation canopy passes through the threaded connection of thread block with the thread groove again, and the secondary of staple bolt is fixed installs fixedly, this kind of mounting means is comparatively simple and firm, convenient dismantlement, transportation and use.
In order to solve the above problems, the utility model adopts the following technical proposal.
A detachable building construction shaping protection operation shed comprises an operation shed body, wherein a first ceiling is arranged at the upper end of the operation shed body, a sliding groove is formed in the first ceiling, a second ceiling is connected in the sliding groove in a sliding mode, buffer grooves are formed in the first ceiling and the second ceiling, buffer circular plates are connected in the buffer grooves in a sliding mode, buffer springs are connected in the buffer grooves in a sliding mode, buffer rods are fixedly connected to the upper ends of the buffer circular plates, buffer plates are fixedly connected to the upper ends of the buffer rods, mounting blocks are arranged at the left lower end of the first ceiling and the right lower end of the second ceiling, thread grooves are formed in the inner lower ends of the mounting blocks, supporting legs are arranged on the operation shed body, thread blocks are fixedly connected to the upper ends of the supporting legs, and the thread blocks are connected with the thread grooves through threads, the staple bolt is installed through the bolt in the surface of screw thread piece and installation piece, the staple bolt can be adjusted to the length of first ceiling and the second ceiling that this detachable room was built construction design protection operation canopy and was provided with, when using operation canopy body, can install to suitable position after the length adjustment to the ceiling according to the scene needs, the upper end of first ceiling and second ceiling all is provided with buffer board and buffer spring etc. simultaneously, if the object that falls into the air smashes to the ceiling, the buffer board has cushioning effect and protects the ceiling not by smashing sunken effect of deformation, the supporting leg of this operation canopy passes through the threaded connection of screw thread piece and thread groove again, and the secondary of staple bolt is fixed installs fixedly, this kind of mounting means is comparatively simple and firm, convenient dismantlement, transportation and use.
Furthermore, the left end fixedly connected with stopper of second ceiling, the inside longitudinal symmetry of first ceiling is provided with the spacing groove, stopper and spacing groove sliding connection, stopper have limiting displacement, can restrict the position of second ceiling, make it only can the horizontal slip in first ceiling, nevertheless can not break away from first ceiling.
Furthermore, the upper end of the buffer spring is contacted with the buffer circular plate, the lower end of the buffer spring is contacted with the inner wall of the buffer groove, and the buffer spring has the buffer characteristic.
Further, the left end and the right end of staple bolt symmetry are provided with the fixture block, the fixture block is provided with four, and two right-hand members of left end are two, through the setting of four fixture blocks, have respectively the joint in the screwed block and in the installation piece, carry out the effect of fixing to the supporting leg.
Further, both ends symmetry is provided with the draw-in groove about installation piece and the thread piece, fixture block and draw-in groove joint are through the joint effect of fixture block with the draw-in groove for the staple bolt has the thread groove to thread piece and installation piece and carries out the effect that the secondary is fixed, prevents that it from taking place to take off the silk, rocking etc. and install unstable phenomenon.
Compared with the prior art, the utility model has the advantages of:
(1) the length of the first ceiling and the second ceiling that this scheme was provided with can be adjusted, when using operation canopy body, can install after adjusting to suitable position according to the required length to the ceiling in scene, the upper end of first ceiling and second ceiling all is provided with buffer board and buffer spring etc. simultaneously, if the object that falls aloft smashes to the ceiling, the buffer board has cushioning effect and protects the ceiling not by smashing the effect of sunken deformation, the supporting leg of this operation canopy passes through the threaded connection of thread block with the thread groove again, and the secondary of staple bolt is fixed installs fixedly, this kind of mounting means is comparatively simple and firm, convenient dismantlement, transportation and use.
(2) The left end fixedly connected with stopper of second ceiling, the inside longitudinal symmetry of first ceiling is provided with the spacing groove, stopper and spacing groove sliding connection, and the stopper has limiting displacement, can restrict the position of second ceiling, makes its horizontal slip in first ceiling only, nevertheless can not break away from first ceiling.
(3) The upper end of the buffer spring is contacted with the buffer circular plate, the lower end of the buffer spring is contacted with the inner wall of the buffer groove, and the buffer spring has the buffer characteristic.
(4) The staple bolt about both ends symmetry be provided with the fixture block, the fixture block is provided with four, two right-hand members of left end, through the setting of four fixture blocks, have respectively the joint in the screw thread piece and in the installation piece, carry out the effect of fixing to the supporting leg.
(5) The both ends symmetry about installation piece and screw thread piece is provided with the draw-in groove, and fixture block and draw-in groove joint are through the joint effect of fixture block and draw-in groove for the staple bolt has the effect of carrying out the secondary fixation to the screw thread piece and the thread groove of installation piece, prevents that it from taking place to take off the silk, rocking etc. and install unstable phenomenon.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the installation of the buffer board of the present invention;
fig. 3 is the schematic view of the installation of the supporting leg of the present invention.
The numbering in the figures illustrates:
1 operation canopy body, 2 first ceiling, 3 sliding tray, 4 second ceiling, 5 stopper, 6 spacing grooves, 7 dashpots, 8 buffering plectanes, 9 buffer spring, 10 buffer beam, 11 buffer boards, 12 installation pieces, 13 thread groove, 14 supporting legs, 15 thread piece, 16 staple bolts, 17 fixture block, 18 draw-in grooves.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention based on the embodiments of the present invention.
Referring to fig. 1-3, a detachable building construction shaping protection operation shed comprises an operation shed body 1, referring to fig. 1-3, a first ceiling 2 is arranged at the upper end of the operation shed body 1, the first ceiling 2 and a second ceiling 4 both have the function of protecting the safety of workers in an operation area, a sliding groove 3 is arranged in the first ceiling 2, the second ceiling 4 is connected in the sliding groove 3 in a sliding manner, buffer grooves 7 are arranged in the first ceiling 2 and the second ceiling 4, buffer circular plates 8 are connected in the buffer grooves 7 in a sliding manner, buffer springs 9 are connected in the buffer grooves 7 in a sliding manner, buffer rods 10 are fixedly connected at the upper ends of the buffer circular plates 8, buffer plates 11 are fixedly connected at the upper ends of the buffer rods 10, the buffer circular plates 8 and the buffer springs 9 are driven together to ensure that the buffer plates 11 also have certain buffer characteristics, can cushion the object that falls from the high altitude, prevent that its impact force is too big, pound first ceiling 2 and second ceiling 4 sunken, warp, the phenomenon of seriously taking place to collapse, the effect of staff's safety in having assurance operation canopy body 1 quality and the protection operation district, the left lower extreme of first ceiling 2 and the right lower extreme of second ceiling 4 all are provided with installation piece 12, the inside lower extreme of installation piece 12 is provided with thread groove 13, operation canopy body 1 is provided with supporting leg 14, supporting leg 14 has the effect of supporting and connecting fixed first ceiling 2 and second ceiling 4, the upper end fixedly connected with thread piece 15 of supporting leg 14, thread piece 15 is connected with thread groove 13 through the screw thread, staple bolt 16 is installed through the bolt to thread piece 15 and the surface of installation piece 12, staple bolt 16 has the effect of carrying out the secondary fixation to installation piece 12 and thread piece 15.
Referring to fig. 2, a limiting block 5 is fixedly connected to the left end of the second ceiling 4, limiting grooves 6 are symmetrically arranged in the first ceiling 2 from top to bottom, the limiting block 5 is slidably connected to the limiting grooves 6, the limiting block 5 has a limiting effect and can limit the position of the second ceiling 4, so that the second ceiling can only slide in the first ceiling 2 from left to right but cannot be separated from the first ceiling 2, the upper end of a buffer spring 9 is in contact with a buffer circular plate 8, the lower end of the buffer spring is in contact with the inner wall of the buffer groove 7, and the buffer spring 9 has a buffer characteristic.
Referring to fig. 3, the two ends of the anchor ear 16 are symmetrically provided with four fixture blocks 17, the two ends of the left end are two, the four fixture blocks 17 are respectively clamped in the threaded block 15 and the mounting block 12 to fix the supporting leg 14, the two ends of the mounting block 12 and the threaded block 15 are symmetrically provided with clamp grooves 18, the fixture blocks 17 are clamped with the clamp grooves 18, and the anchor ear 16 has an effect of fixing the threaded block 15 and the threaded groove 13 of the mounting block 12 for the second time through the clamping effect of the fixture blocks 17 and the clamp grooves 18, so as to prevent the anchor ear 16 from being instable in installation, such as thread falling off and shaking.
When the detachable building construction shaping protection operation shed is used, firstly, the lengths of a first ceiling 2 and a second ceiling 4 are adjusted according to the area of a construction site, the second ceiling 4 is pulled rightwards until the second ceiling 4 is moved to a proper position and then stopped, then, a supporting leg 14 is installed, a threaded block 15 arranged at the upper end of the supporting leg 14 is connected with a threaded groove 13 arranged on an installation block 12 through threads, then, an anchor ear 16 is clamped on the surfaces of the installation block 12 and the threaded block 15, a clamping block 17 arranged inside the anchor ear 16 is clamped with a clamping groove 18 arranged on the installation block 12 and the threaded block 15, then, two anchor ears 16 are screwed and fixed through bolts, the anchor ear 16 and the clamping block 17 have the function of limiting the vertical positions of the threaded block 15 and the installation block 12, so that the threaded block 15 cannot slide and loosen and the like, after the supporting leg 14 is installed, the operation shed body 1 is erected, fix supporting leg 14 again in construction site's ground, can accomplish the buildding of operation canopy body 1 this moment, thereby staff in the work to the operation in the operation district protects, prevent the object that falls into the air, injure the staff by a crashing object, because the setting of inside buffer board 11 of first ceiling 2 and second ceiling 4 and buffer spring 9 etc., the effect of buffering the impact force of object that falls into the air has, prevent because the impact force is too big, lead to first ceiling 2 or second ceiling 4 to take place sunken, phenomenons such as deformation, still can effectively prevent to take place the phenomenon of collapsing, not only have the first ceiling 2 of protection, second ceiling 4 and staff's effect, still have the effect of strengthening operation canopy body 1 quality, operation canopy body 1's supporting leg 14 mounting means is simple simultaneously, so convenient dismantlement, transport or change the local use to it.
The above description is only the preferred embodiment of the present invention; the scope of the present invention is not limited thereto. Any person skilled in the art should also be able to cover the technical scope of the present invention by replacing or changing the technical solution and the improvement concept of the present invention with equivalents and modifications within the technical scope of the present invention.
Claims (5)
1. The utility model provides a construction design protection operation canopy is built in detachable room, includes operation canopy body (1), its characterized in that: the working shed is characterized in that a first ceiling (2) is arranged at the upper end of the working shed body (1), a sliding groove (3) is arranged inside the first ceiling (2), a second ceiling (4) is connected in the sliding groove (3) in a sliding manner, buffer grooves (7) are arranged inside the first ceiling (2) and the second ceiling (4), buffer disks (8) are connected in the buffer grooves (7) in a sliding manner, buffer springs (9) are connected in the buffer grooves (7) in a sliding manner, buffer rods (10) are fixedly connected to the upper ends of the buffer disks (8), buffer plates (11) are fixedly connected to the upper ends of the buffer rods (10), mounting blocks (12) are arranged at the left lower end of the first ceiling (2) and the right lower end of the second ceiling (4), threaded grooves (13) are arranged at the inner lower ends of the mounting blocks (12), supporting legs (14) are arranged on the working shed body (1), the upper end fixedly connected with screw thread piece (15) of supporting leg (14), screw thread piece (15) are connected with thread groove (13) through the screw thread, staple bolt (16) are installed through the bolt in the surface of screw thread piece (15) and installation piece (12).
2. The utility model discloses a construction design protection operation canopy is built in detachable room according to claim 1, its characterized in that: the ceiling structure is characterized in that a limiting block (5) is fixedly connected to the left end of the second ceiling (4), limiting grooves (6) are symmetrically arranged in the first ceiling (2) up and down, and the limiting block (5) is connected with the limiting grooves (6) in a sliding mode.
3. The utility model discloses a construction design protection operation canopy is built in detachable room according to claim 1, its characterized in that: the upper end of the buffer spring (9) is contacted with the buffer circular plate (8), and the lower end is contacted with the inner wall of the buffer groove (7).
4. The utility model discloses a construction design protection operation canopy is built in detachable room according to claim 1, its characterized in that: the hoop (16) is symmetrically provided with four clamping blocks (17) at the left end and the right end, and the two right ends at the left end are two clamping blocks (17).
5. The construction design protection operation canopy is built in detachable room of claim 4, its characterized in that: clamping grooves (18) are symmetrically formed in the left end and the right end of the mounting block (12) and the threaded block (15), and the clamping blocks (17) are connected with the clamping grooves (18) in a clamped mode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220567143.0U CN217299941U (en) | 2022-03-16 | 2022-03-16 | Detachable building construction design protection operation canopy |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220567143.0U CN217299941U (en) | 2022-03-16 | 2022-03-16 | Detachable building construction design protection operation canopy |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217299941U true CN217299941U (en) | 2022-08-26 |
Family
ID=82936773
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220567143.0U Active CN217299941U (en) | 2022-03-16 | 2022-03-16 | Detachable building construction design protection operation canopy |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217299941U (en) |
-
2022
- 2022-03-16 CN CN202220567143.0U patent/CN217299941U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106602430A (en) | Damping and impact-resistant base for power distribution cabinet | |
CN211907164U (en) | Novel shockproof heat radiation structure of dry-type transformer | |
CN217299941U (en) | Detachable building construction design protection operation canopy | |
CN212429614U (en) | Wide antidetonation support for building electromechanical device of application scope | |
CN214835008U (en) | Safe anti-falling device for building construction | |
CN208581934U (en) | A kind of resistance to compression antidetonation protection desk | |
CN215594866U (en) | Anti-vibration collapse plug-in type stable base for engineering scaffold | |
CN214143731U (en) | Foundation pit supporting structure for civil engineering | |
CN210369986U (en) | Building safety protection equipment | |
CN210685497U (en) | Detachable design protection operation canopy of construction is built in room | |
CN211007762U (en) | Steel structure engineering support | |
CN213953060U (en) | Protector for construction | |
CN218296932U (en) | Auxiliary device is demolishd with shear force wall to building body blasting | |
CN211691575U (en) | Building engineering anti-falling strikes outer construction platform | |
CN209855180U (en) | Scaffold convenient to installation is dismantled | |
CN212613673U (en) | Hanging flower basket protector for construction | |
CN215253776U (en) | Curtain wall with anti-seismic structure | |
CN213806492U (en) | Anti-falling protection structure for scaffold | |
CN218541628U (en) | Safety device is used in real estate construction | |
CN211172996U (en) | Strutting arrangement is used in civil engineering construction | |
CN212338568U (en) | Hydraulic engineering pipeline protector | |
CN218205617U (en) | Construction hanging flower basket | |
CN221298728U (en) | Building engineering protection canopy that can build fast | |
CN219491653U (en) | Ladder for decoration | |
CN213746384U (en) | Mounting structure of night scene lamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |