CN217299895U - Large eccentric stress lifting frame device serving as support frame - Google Patents

Large eccentric stress lifting frame device serving as support frame Download PDF

Info

Publication number
CN217299895U
CN217299895U CN202220034340.6U CN202220034340U CN217299895U CN 217299895 U CN217299895 U CN 217299895U CN 202220034340 U CN202220034340 U CN 202220034340U CN 217299895 U CN217299895 U CN 217299895U
Authority
CN
China
Prior art keywords
hoisting
support
support frame
frame section
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220034340.6U
Other languages
Chinese (zh)
Inventor
杨熙华
贾尚瑞
吴楚桥
刘粟雨
徐常森
吴迪
张之浩
王相阁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jinggong Steel Structure Group Co Ltd
Original Assignee
Zhejiang Jinggong Steel Structure Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jinggong Steel Structure Group Co Ltd filed Critical Zhejiang Jinggong Steel Structure Group Co Ltd
Priority to CN202220034340.6U priority Critical patent/CN217299895U/en
Application granted granted Critical
Publication of CN217299895U publication Critical patent/CN217299895U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a big eccentric atress hoisting frame device who does support frame concurrently, including the support frame section, the top fixedly connected with hoisting frame section of support frame section, the hoisting frame section is including promoting the support body, the top that promotes the support body is provided with the lifting beam of encorbelmenting, the lower part of the lifting beam of encorbelmenting with it is provided with the front stay to promote between the support body, promote support body top fixedly connected with back of the body pull rod, the back of the body pull rod is located encorbelment the relative one side of the lifting beam end of encorbelmenting. The utility model discloses with hoisting frame and support frame rational combination, the big eccentric bending moment that the hoisting frame body bore when balanced promotion construction guarantees the stability of hoisting frame body, and stable in structure, safety has reduced simultaneously to occuping in place, and it is convenient to ann tear open, has improved the efficiency of construction.

Description

Large eccentric stress lifting frame device serving as support frame
Technical Field
The utility model relates to a building steel structure installation field, more specifically relates to a big eccentric atress hoisting frame device who does the support frame concurrently.
Background
In the construction steel structure engineering installation process, a support frame is often adopted to temporarily support the structure. In projects with limited structural construction conditions, the construction by a lifting method has the advantages of reducing aloft work, no need of large-scale machinery, good comprehensive economy and the like, and is applied to more and more projects. In the structure promotion construction, need to set up the lifting mechanism on can providing the reliable hoisting frame that supports the counter-force, the following two kinds of modes are adopted in the setting of hoisting frame usually: firstly, arranging a lifting frame by utilizing original support points around a lifted structure; and the other is that the independent lifting frame is directly arranged on the ground or the floor. For the independent lifting frame arranged on the ground or the floor, because a certain distance needs to be kept between the lifted structure and the lifting frame, interference and collision in the lifting process are avoided, a door type form is generally adopted, namely a beam mode is arranged between two lattice supporting frames, the mode is large in measure amount, and the economy is poor; when only one independent lattice support frame is arranged as the lifting frame, the requirements of lifting stress and deformation are difficult to meet due to large eccentric stress during lifting.
SUMMERY OF THE UTILITY MODEL
The not enough to prior art, the utility model provides a big eccentric atress hoisting frame device of support frame is done concurrently, with hoisting frame and support frame rational combination, the big eccentric bending moment that the promotion support body bore when balanced promotion construction guarantees to promote the stability of support body, and stable in structure, safety has reduced simultaneously and has taken in the place, and it is convenient to ann tear open, has improved the efficiency of construction.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a do big eccentric atress hoisting frame device of support frame concurrently, includes the support frame section, the top fixedly connected with hoisting frame section of support frame section, the hoisting frame section is including promoting the support body, the top that promotes the support body is provided with the hoisting beam of encorbelmenting, the lower part of the hoisting beam of encorbelmenting with it is provided with the fore-stock to promote between the support body, promote support body top fixedly connected with back of the body pull rod, the back of the body pull rod is located the relative one side of the end of encorbelmenting of the hoisting beam of encorbelmenting.
The lifting frame section is arranged on the support frame section and is fixedly connected with the support frame section; the top of the hoisting frame is provided with an overhanging hoisting beam, and meanwhile, in order to ensure the rigidity and the strength of the overhanging hoisting beam when stressed, the lower part of the overhanging hoisting beam is provided with a front support rod which is fixedly connected with the support frame body and is used for transmitting hoisting load; in order to balance the large eccentric bending moment borne by the lifting frame body during lifting construction, a back pull rod is arranged between the top of the lifting frame body and the mounted structure, and load is transmitted to the mounted structure. When the hoisting frame section is installed, the installation of the upper structure of the support frame section is required to be completed. Firstly, a hoisting frame body is installed, then a top overhanging hoisting beam and a front support rod are installed, and finally a back pull rod is installed.
Further, the lifting frame body is connected with a temporary fixing rod, and the lifting frame body is fixedly connected with the installed structure. Partial web members of the lifting frame body cannot be installed due to the influence of the installed structure, and temporary fixing rods are suitable to be adopted to connect and fix the lifting frame body upright rod and the installed structure for ensuring the stability of the lifting frame body.
Furthermore, a steel strand hole is reserved in the overhanging lifting beam and is used for installation work of the lifting device.
Furthermore, the lifting frame section is positioned on the support frame section, the lifting frame section and the support frame section are fixedly connected, and the vertical positions of the vertical rods are kept consistent.
To sum up, the utility model discloses with hoisting frame and support frame rational combination, the stability of hoisting the support body is guaranteed to the big eccentric bending moment that the hoisting support body bore when balanced promotion construction, and stable in structure, safety have reduced simultaneously to occuping in place, and ann tears open conveniently, has improved the efficiency of construction. The utility model discloses still have following beneficial effect:
(1) the structure is simple, and the installation and the disassembly are convenient;
(2) the application range is wide, and the method can be used for construction of different steel structure engineering lifting methods;
(3) the structure arrangement is ingenious, the force transmission is direct, and the stress performance is good;
(4) the economical efficiency is good, the measure amount can be effectively reduced, the construction period is shortened, and the work efficiency is improved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a front view of the structure of the present invention;
fig. 3 is a left side view of the structure of the present invention.
Description of the labeling: 1. a support frame section; 2. a hoisting frame section; 3. a lifting device; 4. a structure to be lifted; 5. a completed structure has been installed; 21. lifting the frame body; 22. a lifting beam is cantilevered; 23. a back pull rod; 24. a front stay bar; 25. and (5) temporarily fixing the rod.
Detailed Description
The embodiment of the lifting frame device with large eccentric force of the present invention, which also serves as a supporting frame, will be further described with reference to fig. 1 to 3.
A lifting frame device doubling as a supporting frame comprises a supporting frame section 1 and a lifting frame section 2. The hoisting frame section 2 comprises a hoisting frame body 21, a cantilever hoisting beam 22, a back pull rod 23, a front support rod 24 and a temporary fixing rod 25. The lifting frame section 2 is arranged on the support frame section 1, the two sections are fixedly connected, and the vertical positions of the vertical rods are kept consistent; the top of the lifting frame body 21 is provided with an overhanging lifting beam 22 with a reserved steel strand hole for installing the lifting device 3, and the lower part of the overhanging lifting beam 22 is provided with a front support rod 24 for ensuring the rigidity and the strength of the overhanging lifting beam 22 when stressed; meanwhile, in order to balance the large eccentric bending moment borne by the hoisting frame body 21 during hoisting construction and ensure the stability of the hoisting frame body 21, a back pull rod 23 or a steel strand with the same strength as the back pull rod is arranged between the top of the hoisting frame body 21 and the installed structure 5. To ensure lateral stability of the lower limbs of the lifting frame body 21, temporary fixing bars 25 are provided between the lower part of the lifting frame body 21 and the mounted structure 5.
The utility model discloses a preparation as follows:
(1) according to the installation requirement of a steel structure, lofting and determining the position of a large eccentric stress lifting frame device which is also used as a support frame, and installing a support frame section 1 and an upper support structure of the support frame section 1;
(2) a lifting frame body 21 is arranged at the top of the support frame section 1, a temporary fixing rod 25, a cantilever lifting beam 22, a front support rod 24 and a back pull rod 23 are sequentially arranged;
(3) after the upper lifting frame device is installed, the lifting work of the structure 4 to be lifted by the lifting frame 2 can be started.
It is above only the utility model discloses a preferred embodiment, the utility model discloses a scope of protection does not only confine above-mentioned embodiment, the all belongs to the utility model discloses a technical scheme under the thinking all belongs to the utility model discloses a scope of protection. It should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (4)

1. The utility model provides a big eccentric atress hoisting frame device who doubles as support frame which characterized in that: including the support frame section, the top fixedly connected with hoisting frame section of support frame section, the hoisting frame section is including promoting the support body, the top of promoting the support body is provided with the hoisting beam of encorbelmenting, the lower part of the hoisting beam of encorbelmenting with it is provided with the fore-stock between the hoisting frame body, promote support body top fixedly connected with back of the body pull rod, the back of the body pull rod is located the relative one side of the end of encorbelmenting of the hoisting beam of encorbelmenting.
2. The large eccentric stress hoisting frame device doubling as a support frame according to claim 1, wherein: the hoisting frame body is connected with a temporary fixing rod, and the hoisting frame body is fixedly connected with the installed structure.
3. The large eccentric stress hoisting frame device doubling as a support frame according to claim 1, wherein: a steel strand hole is reserved in the overhanging lifting beam.
4. The large eccentric stress hoisting frame device doubling as a support frame according to claim 1, wherein: the lifting frame section is positioned above the support frame section, the lifting frame section and the support frame section are fixedly connected, and the vertical positions of the vertical rods are kept consistent.
CN202220034340.6U 2022-01-07 2022-01-07 Large eccentric stress lifting frame device serving as support frame Active CN217299895U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220034340.6U CN217299895U (en) 2022-01-07 2022-01-07 Large eccentric stress lifting frame device serving as support frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220034340.6U CN217299895U (en) 2022-01-07 2022-01-07 Large eccentric stress lifting frame device serving as support frame

Publications (1)

Publication Number Publication Date
CN217299895U true CN217299895U (en) 2022-08-26

Family

ID=82923752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220034340.6U Active CN217299895U (en) 2022-01-07 2022-01-07 Large eccentric stress lifting frame device serving as support frame

Country Status (1)

Country Link
CN (1) CN217299895U (en)

Similar Documents

Publication Publication Date Title
CN208055880U (en) A kind of crane's major girder hoisting frame
CN217299895U (en) Large eccentric stress lifting frame device serving as support frame
CN218364439U (en) A dismantle frock for coupling buffer
CN214833410U (en) PC assembled structure beam column node dry-type connection structure
CN213007570U (en) Roof battery fixing bracket and bus with same
CN205590111U (en) Construction elevator attaches wall structure
CN218114720U (en) Elevator pre-installation elevator car structure
CN220011958U (en) Lifting frame device arranged by utilizing grid structure
CN207293997U (en) A kind of chassis suitable for ultra-large type derrick crane
CN211949536U (en) Novel multifunctional lifting beam
CN211769955U (en) Steel construction staple bolt formula hoisting device
CN2558720Y (en) Tool type self-bearing combined beam form
CN211873783U (en) Fixing part for replacing front bracket of high-altitude operation hanging basket
CN211572669U (en) Steel structure supporting mechanism for assembly type building
CN220565779U (en) Combined space capsule
CN213710366U (en) Integral steel mould structure of stand
CN221052356U (en) Assembled bridge steel structure box girder
CN215374033U (en) Attached measuring support for super high-rise steel column
CN213359101U (en) Temporary fixing node structure for mounting overhanging steel truss
CN217297081U (en) Attached cross beam and upright post hoop device of tower crane
CN212271686U (en) Mounting structure of piece and a supporting beam encorbelments
CN212503524U (en) Elevator host installation structure suitable for reinforced concrete well
CN212130018U (en) Template support frame structure of triangle stores pylon encorbelments
CN221119166U (en) Novel hanging basket installation device
CN216663855U (en) Steel anchor beam hanger

Legal Events

Date Code Title Description
GR01 Patent grant