CN217299213U - Movable joint plastering operation platform device in prefabricated assembly pipeline - Google Patents

Movable joint plastering operation platform device in prefabricated assembly pipeline Download PDF

Info

Publication number
CN217299213U
CN217299213U CN202221061784.5U CN202221061784U CN217299213U CN 217299213 U CN217299213 U CN 217299213U CN 202221061784 U CN202221061784 U CN 202221061784U CN 217299213 U CN217299213 U CN 217299213U
Authority
CN
China
Prior art keywords
connecting pipe
storage box
platform device
fixedly connected
operation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221061784.5U
Other languages
Chinese (zh)
Inventor
杨秀洪
苏映钦
漆如磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Civil Engineering Co Ltd
Original Assignee
China Construction Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Civil Engineering Co Ltd filed Critical China Construction Civil Engineering Co Ltd
Priority to CN202221061784.5U priority Critical patent/CN217299213U/en
Application granted granted Critical
Publication of CN217299213U publication Critical patent/CN217299213U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a movable is prefabricated assembles interior work platform device of plastering a seam of pipeline, including the case: the front end and the rear end of the bottom of the storage box are both provided with first connecting pipes, the two sides of the bottom of the storage box are both provided with second connecting pipes, the bottom of the storage box is in contact with the top of the first connecting pipes, the bottom of the first connecting pipes is in contact with the top of the second connecting pipes and is fixed through fixing parts, the top of the storage box is provided with a guardrail, and the bottom of the guardrail is fixedly connected with the second connecting pipes through the fixing parts. The utility model discloses, through the case, can place construction material and miniature machines, through first connecting pipe, second connecting pipe and guardrail, can strengthen case stability, through support frame, third connecting pipe and pulley, solved the inconvenient removal of current operation platform device, in use needs many people to carry, greatly increased workman's labour, also reduced the problem of the efficiency of workman's work.

Description

Movable joint plastering operation platform device in prefabricated assembly pipeline
Technical Field
The utility model belongs to the technical field of engineering equipment, especially, relate to a movable is prefabricated assembles interior joint sealing operation platform device of pipeline.
Background
Engineering equipment refers to electromechanical equipment, metallic structural equipment, instrumentation and other similar equipment and devices that form or are intended to form part of permanent projects, including: equipment in the capital construction project and equipment in the enterprise technical transformation.
The drainage pipeline of the newly-built road is a prefabricated reinforced concrete assembled pipeline with the diameter of 2.4 meters and the length of 2 meters, and the joint of the assembled gap of the pipeline needs to be repaired by cement mortar.
When the gap at the joint of the pipeline is repaired, the operation platform device is needed to be used, the existing operation platform device is inconvenient to move, multiple persons are needed to carry in use, the labor force of workers is greatly increased, and the working efficiency of the workers is also reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a movable is prefabricated assembles interior work platform device of plastering a seam of pipeline has the convenient advantage of removal, has solved the inconvenient removal of current work platform device, and in use needs many people to carry, greatly increased workman's labour, also reduced the problem of the efficiency of workman's work.
The utility model provides an above-mentioned technical problem's technical scheme as follows: the utility model provides a movable is prefabricated assembles interior work platform device of plastering a seam of pipeline, includes the case: the utility model discloses a storage box, including case, storage box bottom, mounting, fixing piece, connecting pipe, mounting and rear end, the front end and the rear end of storage box bottom all are provided with first connecting pipe, the both sides of storage box bottom all are provided with the second connecting pipe, the bottom of storage box contacts with the top of first connecting pipe, the bottom of first connecting pipe contacts and is fixed through the mounting with the top of second connecting pipe, the top of storage box is provided with the guardrail, mounting and second connecting pipe fixed connection are passed through to the bottom of guardrail, the front end and the rear end of second connecting pipe one side all pass through mounting fixedly connected with support frame, mounting fixedly connected with third connecting pipe is passed through to the bottom of support frame, the front end and the rear end of third connecting pipe bottom all overlap and are equipped with the pulley.
The utility model discloses as above be used for a movable precast assembling pipeline interior joint sealing work platform device, including the case: the utility model discloses a storage box, including case, storage box bottom, mounting, fixing piece, connecting pipe, mounting and rear end, the front end and the rear end of storage box bottom all are provided with first connecting pipe, the both sides of storage box bottom all are provided with the second connecting pipe, the bottom of storage box contacts with the top of first connecting pipe, the bottom of first connecting pipe contacts and is fixed through the mounting with the top of second connecting pipe, the top of storage box is provided with the guardrail, mounting and second connecting pipe fixed connection are passed through to the bottom of guardrail, the front end and the rear end of second connecting pipe one side all pass through mounting fixedly connected with support frame, mounting fixedly connected with third connecting pipe is passed through to the bottom of support frame, the front end and the rear end of third connecting pipe bottom all overlap and are equipped with the pulley.
Further: and a fixed pipe is arranged between the third connecting pipes, and the surface of the fixed pipe is fixedly connected with the third connecting pipes through fixing pieces.
Further: the pulley is characterized in that the top parts of the two sides of the pulley are fixedly connected with L-shaped plates, the surfaces of the L-shaped plates are movably connected with pull rods, one side of each pull rod is fixedly connected with an inserted bar, one side of each inserted bar extends to the inside of a third connecting pipe, the two sides of the top part of each third connecting pipe are connected with first bolts in a threaded mode, and the bottoms of the first bolts are connected with the inserted bars in a threaded mode.
Further: and a second bolt is connected to the surface of the guardrail in a threaded manner, and one end of the second bolt is connected with the storage box in a threaded manner.
Further: the surface cover of pull rod is equipped with the spring, the one end and the inserted bar fixed connection of spring, the other end and the L shaped plate fixed connection of spring.
Further: a slot is formed in the third connecting pipe, and one side of the inserting rod is located in the slot.
Further: the surface of the L-shaped plate is provided with a through hole, and the pull rod is positioned inside the through hole.
The utility model has the advantages that:
1. the utility model discloses, through the case, can place construction material and miniature machines, through first connecting pipe, second connecting pipe and guardrail, can strengthen case stability, through support frame, third connecting pipe and pulley, can make things convenient for the case to remove, need not many people's transport, solved the inconvenient removal of current operation platform device, in use needs many people to carry, greatly increased workman's labour, also reduced the problem of the efficiency of workman's work.
2. The utility model discloses, through fixed pipe, can strengthen third connecting pipe stability, through fixed with L shaped plate and pulley, promote the pull rod simultaneously and remove, when the pull rod removes, take the inserted bar to insert the inside of pulley, rotate the rotatory removal in the surface of third connecting pipe of first bolt simultaneously, can fix the pulley, change is dismantled to the pulley to the convenience, through rotating the second bolt, can conveniently fix the case, through the elasticity of spring self, can assist the pull rod to reset, through the slot, can make things convenient for the inserted bar to remove, through seting up the through-hole, can make things convenient for the pull rod to remove.
Drawings
The above and/or other aspects and advantages of the present invention will become more apparent and more readily appreciated from the detailed description taken in conjunction with the following drawings, which are given by way of illustration only and not by way of limitation, wherein:
FIG. 1 is a sectional view of the structure of the present invention;
FIG. 2 is a schematic view of the structure placing box of the present invention;
FIG. 3 is a top view of a third connecting pipe of the present invention;
fig. 4 is a cross-sectional view of the structural pulley of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. the storage box comprises a storage box body, 2, a first connecting pipe, 3, a second connecting pipe, 4, a guardrail, 5, a supporting frame, 6, a third connecting pipe, 7, a pulley, 8, a fixing pipe, 9, an L-shaped plate, 10, a pull rod, 11, an inserting rod, 12, a first bolt, 13, a second bolt, 14, a spring, 15, a slot, 16 and a through hole.
Detailed Description
Hereinafter, embodiments of the present invention of a movable prefabricated assembly pipeline inner joint plastering operation platform device will be described with reference to the accompanying drawings.
The embodiments described herein are specific embodiments of the present invention, and are intended to be illustrative of the concepts of the present invention, which are intended to be illustrative and exemplary, and should not be construed as limiting the scope of the embodiments of the present invention. In addition to the embodiments described herein, those skilled in the art will be able to employ other technical solutions which are obvious based on the disclosure of the claims and the specification of the present application, and these technical solutions include technical solutions which make any obvious replacement or modification for the embodiments described herein.
The drawings in the present specification are schematic views to assist in explaining the concept of the present invention, and schematically show the shapes of the respective portions and the mutual relationships thereof. It should be noted that for the sake of clarity in showing the structures of the various components of the embodiments of the present invention, the drawings are not drawn to the same scale. Like reference numerals are used to denote like parts.
Fig. 1-4 show that the utility model relates to an embodiment of a movable is prefabricated assembles interior joint sealing operation platform device of pipeline, including case 1: the front end and the rear end of the bottom of the storage box 1 are both provided with a first connecting pipe 2, two sides of the bottom of the storage box 1 are both provided with a second connecting pipe 3, the bottom of the storage box 1 is in contact with the top of the first connecting pipe 2, the bottom of the first connecting pipe 2 is in contact with the top of the second connecting pipe 3 and is fixed through a fixing part, the top of the storage box 1 is provided with a guardrail 4, the surface of the guardrail 4 is in threaded connection with a second bolt 13, one end of the second bolt 13 is in threaded connection with the storage box 1, the storage box 1 can be conveniently fixed by rotating the second bolt 13, the bottom of the guardrail 4 is fixedly connected with the second connecting pipe 3 through a fixing part, the front end and the rear end of one side of the second connecting pipe 3 are both fixedly connected with a support frame 5 through fixing parts, the bottom of the support frame 5 is fixedly connected with a third connecting pipe 6 through a fixing part, a fixing pipe 8 is arranged between the two third connecting pipes 6, through the fixing tube 8, the stability of the third connecting tube 6 can be enhanced, the pull rod 10 is pushed to move by fixing the L-shaped plate 9 with the pulley 7, the pull rod 10 moves while the insertion rod 11 is inserted into the pulley 7, the first bolt 12 is rotated to rotate on the surface of the third connecting tube 6, the pulley 7 can be fixed, the pulley 7 can be conveniently detached and replaced, the surface of the fixing tube 8 is fixedly connected with the third connecting tube 6 through a fixing part, the insertion groove 15 is formed in the third connecting tube 6, the insertion rod 11 can be conveniently moved through the insertion groove 15, one side of the insertion rod 11 is positioned in the insertion groove 15, the front end and the rear end of the bottom of the third connecting tube 6 are both sleeved with the pulley 7, the top parts of the two sides of the pulley 7 are both fixedly connected with the L-shaped plate 9, the surface of the L-shaped plate 9 is provided with the through hole 16, the pull rod 10 is positioned in the through hole 16, the utility model has the advantages that the movement of the pull rod 10 can be facilitated, the surface of the L-shaped plate 9 is movably connected with the pull rod 10, the surface of the pull rod 10 is sleeved with the spring 14, the reset of the pull rod 10 can be assisted through the self elasticity of the spring 14, one end of the spring 14 is fixedly connected with the inserted bar 11, the other end of the spring 14 is fixedly connected with the L-shaped plate 9, one side of the pull rod 10 is fixedly connected with the inserted bar 11, one side of the inserted bar 11 extends into the third connecting pipe 6, the two sides of the top of the third connecting pipe 6 are both connected with the first bolt 12 in a threaded manner, the bottom of the first bolt 12 is connected with the inserted bar 11 in a threaded manner, the storage box 1 can be used for placing construction materials and small-sized machines and tools, the stability of the storage box 1 can be enhanced through the first connecting pipe 2, the second connecting pipe 3 and the guardrail 4, the movement of the storage box 1 can be facilitated through the supporting frame 5, the third connecting pipe 6 and the pulley 7, the movement of the storage box 1 can be facilitated without carrying by a plurality of people, the inconvenient movement of the existing operation platform device can be solved, in use, the multifunctional lifting tool needs to be carried by a plurality of people, so that the labor force of workers is greatly increased, and the working efficiency of the workers is also reduced.
The working principle is as follows: the utility model discloses during the use, the user assembles into the square with first connecting pipe 2 and second connecting pipe 3 through the mounting, it is fixed with support frame 5 and third connecting pipe 6 simultaneously, it is fixed with third connecting pipe 6 and pulley 7 and support frame 5 again, then place case 1 at the top of first connecting pipe 2, place the material and the instrument of smearing the seam in case 1's inside, push into the pipeline inside that needs to smear the seam with pulley 7 simultaneously, through pulley 7 and the contact of pipe inner wall, can make things convenient for the workman to remove case 1, brake block through the inside setting of pulley 7, can make things convenient for the workman to be in-situ according to the arrangement and the removal case 1 of actual conditions anytime and anywhere, can conveniently carry out the crack filling-up to the inside gap of pipeline, need not many people and carry.
The above-disclosed technical features are not limited to the combinations with other features disclosed, and other combinations between the technical features can be performed by those skilled in the art according to the purpose of the utility model, so as to achieve the purpose of the utility model.

Claims (7)

1. The utility model provides a movable precast assembly pipeline inner gap plastering operation platform device which is characterized in that, includes case (1): the front end and the rear end of the bottom of the storage box (1) are both provided with a first connecting pipe (2), the two sides of the bottom of the storage box (1) are respectively provided with a second connecting pipe (3), the bottom of the storage box (1) is contacted with the top of the first connecting pipe (2), the bottom of the first connecting pipe (2) is contacted with the top of the second connecting pipe (3) and fixed by a fixing piece, the top of the storage box (1) is provided with a guardrail (4), the bottom of the guardrail (4) is fixedly connected with the second connecting pipe (3) through a fixing piece, the front end and the rear end of one side of the second connecting pipe (3) are fixedly connected with a supporting frame (5) through fixing pieces, the bottom of the support frame (5) is fixedly connected with a third connecting pipe (6) through a fixing piece, and the front end and the rear end of the bottom of the third connecting pipe (6) are both sleeved with pulleys (7).
2. The movable prefabricated assembled pipeline internal joint coating operation platform device according to claim 1, wherein a fixed pipe (8) is arranged between the third connecting pipes (6), and the surface of the fixed pipe (8) is fixedly connected with the third connecting pipes (6) through a fixing piece.
3. The movable prefabricated assembled pipeline internal joint plastering operation platform device according to claim 1, wherein the top parts of two sides of the pulley (7) are fixedly connected with L-shaped plates (9), the surface of each L-shaped plate (9) is movably connected with a pull rod (10), one side of each pull rod (10) is fixedly connected with an insert rod (11), one side of each insert rod (11) extends to the inside of the corresponding third connecting pipe (6), two sides of the top part of each third connecting pipe (6) are connected with first bolts (12) in a threaded mode, and the bottoms of the first bolts (12) are connected with the insert rods (11) in a threaded mode.
4. The movable precast assembling pipeline inner plastering operation platform device according to claim 1, wherein a second bolt (13) is connected to the surface of the guardrail (4) in a threaded manner, and one end of the second bolt (13) is connected with the storage box (1) in a threaded manner.
5. The movable prefabricated assembled pipeline internal joint plastering operation platform device according to claim 3, wherein a spring (14) is sleeved on the surface of the pull rod (10), one end of the spring (14) is fixedly connected with the inserted rod (11), and the other end of the spring (14) is fixedly connected with the L-shaped plate (9).
6. The movable prefabricated assembly pipeline inner joint plastering operation platform device as claimed in claim 3, wherein a slot (15) is formed in the third connecting pipe (6), and one side of the inserted rod (11) is positioned in the slot (15).
7. The movable prefabricated assembled pipeline internal joint coating operation platform device according to claim 3, wherein a through hole (16) is formed in the surface of the L-shaped plate (9), and the pull rod (10) is located inside the through hole (16).
CN202221061784.5U 2022-05-06 2022-05-06 Movable joint plastering operation platform device in prefabricated assembly pipeline Expired - Fee Related CN217299213U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221061784.5U CN217299213U (en) 2022-05-06 2022-05-06 Movable joint plastering operation platform device in prefabricated assembly pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221061784.5U CN217299213U (en) 2022-05-06 2022-05-06 Movable joint plastering operation platform device in prefabricated assembly pipeline

Publications (1)

Publication Number Publication Date
CN217299213U true CN217299213U (en) 2022-08-26

Family

ID=82916867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221061784.5U Expired - Fee Related CN217299213U (en) 2022-05-06 2022-05-06 Movable joint plastering operation platform device in prefabricated assembly pipeline

Country Status (1)

Country Link
CN (1) CN217299213U (en)

Similar Documents

Publication Publication Date Title
CN214034055U (en) Ready-package steel construction
CN217299213U (en) Movable joint plastering operation platform device in prefabricated assembly pipeline
CN209837678U (en) Concrete square column template design reinforcing apparatus
CN204139622U (en) Adjustable segmented column steel bar positioning fixture
CN211922712U (en) Support arrangement that utility tunnel used
CN210127655U (en) Civil engineering is with assembled steel construction platform of falling material
CN209349547U (en) It is a kind of can automatic cleared of debris intelligent automation drilling machine
CN217325798U (en) Civil engineering is with assembled steel construction building structure
CN214784797U (en) Assembled steel construction building steel beam column combination wall
CN204626714U (en) A kind of dismantled and assembled stealthy partition wall system
CN111140008A (en) Post-pouring strip template supporting system with function of back jacking after disassembly
CN204781462U (en) Anti wall fixing sub -assembly that splits
CN216740569U (en) Building engineering is with whitewashing device
CN220953922U (en) Water stopping structure for outer wall construction joint
CN220184628U (en) A template for assembled beam column node concrete placement
CN215717383U (en) Tool for on-site installation and connection of prefabricated parts
CN216269332U (en) A collection instrument for aluminium template connecting piece
CN216476369U (en) Wooden building template convenient to position
CN221799188U (en) Support structure for cast-in-place concrete outer wall
CN220768824U (en) Spliced building template for building engineering
CN211341209U (en) Assembly type building linking component
CN221193941U (en) Preassembled building beam structure
CN215783604U (en) Garbage crushing device for municipal works
CN211622574U (en) Steel form for concrete building
CN214498484U (en) Be used for prosthetic template device of stone historical relic building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220826

CF01 Termination of patent right due to non-payment of annual fee