CN217291033U - Pipe fitting welding set is used in petroleum engineering construction - Google Patents

Pipe fitting welding set is used in petroleum engineering construction Download PDF

Info

Publication number
CN217291033U
CN217291033U CN202220119295.4U CN202220119295U CN217291033U CN 217291033 U CN217291033 U CN 217291033U CN 202220119295 U CN202220119295 U CN 202220119295U CN 217291033 U CN217291033 U CN 217291033U
Authority
CN
China
Prior art keywords
water
water tank
water pump
collecting box
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220119295.4U
Other languages
Chinese (zh)
Inventor
商杰
于飞
陈宝
何洲
杨佰学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220119295.4U priority Critical patent/CN217291033U/en
Application granted granted Critical
Publication of CN217291033U publication Critical patent/CN217291033U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Arc Welding In General (AREA)

Abstract

The utility model discloses a pipe fitting welding set is used in petroleum engineering construction, comprising a base plate, the up end of bottom plate sets up the collecting box, the bottom both sides of collecting box all are provided with the backup pad, be provided with the motor on the backup pad of one side, the rotor shaft of motor is connected with the lead screw, threaded connection has two silk covers on the lead screw, be provided with the annular frame on the silk cover of one side, the inner wall of annular frame is provided with sprays the frame, be provided with the operation panel on the silk cover of the opposite side, the bottom of collecting box still is provided with the water tank, one side of water tank is provided with first water pump, the play water outlet end of first water pump passes through the access end that hose connection sprayed the frame, the access end of first water pump passes through pipeline and water tank intercommunication. The positive switch of the motor is started through the control switch, the two screw sleeves are driven to horizontally move leftwards on the screw rod, the annular frame is moved to the welding portion, then the first water pump is started to spray water to the welding portion of the pipe fitting through the high-pressure spray head, and the cooling operation of the welding portion is achieved.

Description

Pipe fitting welding set is used in petroleum engineering construction
Technical Field
The utility model belongs to the technical field of the oil engineering construction, concretely relates to pipe fitting welding set is used in oil engineering construction.
Background
The metal pipe welding device is an auxiliary device for welding metal pipes in the production and processing process, and is widely used in the field of production and processing.
After the metal pipe fitting is welded, when the welding part needs to be cooled, the existing metal pipe fitting welding device cannot enable the welding part to keep moist, cool and mostly adopt manual operation water pipes to spray and cool, the cooling effect is not good enough, manpower is consumed, the efficiency is low, and the effect is unstable.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pipe fitting welding set is used in oil engineering construction to there is the not good enough problem of cooling effect among the solution prior art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pipe fitting welding set for petroleum engineering construction, includes the bottom plate, the up end of bottom plate sets up the collecting box, the bottom both sides of collecting box all are provided with the backup pad, one side be provided with the motor in the backup pad, the rotor shaft of motor is connected with the lead screw, threaded connection has two silk covers on the lead screw, one side be provided with the annular frame on the silk cover, the inner wall of annular frame is provided with sprays the frame, the opposite side be provided with the operation panel on the silk cover, the bottom of collecting box still is provided with the water tank, one side of water tank is provided with first water pump, the play water end of first water pump passes through the entering end of hose connection spray frame, the entering end of first water pump passes through pipeline and water tank intercommunication.
Preferably, the top ends of the supporting plates on two sides are provided with supporting grooves, the inner walls of the supporting grooves are provided with protective pads, and one end of the lead screw is rotatably arranged on the supporting plate on one side.
Preferably, a limiting rod is arranged on one side of the upper end face of the water tank, two sliding sleeves are sleeved on the limiting rod, connecting plates are arranged on the sliding sleeves, and the top ends of the connecting plates are connected to the corresponding screw sleeves respectively.
Preferably, a second water pump is arranged on the other side of the water tank, the water outlet end of the second water pump is communicated with the water tank through a pipeline, a filter box is arranged at the bottom end of the collecting box, the water inlet end of the second water pump is communicated with the filter box through a pipeline, a filter screen plate is arranged in the filter box, and a water inlet hole is formed in one side of the filter box.
Preferably, a fixing frame is arranged on one side of the upper end face of the bottom plate, a welding gas cylinder is arranged on the fixing frame, a placing frame is arranged on one face of the collecting box, a gas welding gun is placed on the placing frame, and the gas inlet end of the gas welding gun is connected with the gas outlet end of the welding gas cylinder through a gas conveying pipe.
Preferably, one side of the collecting box is provided with a control switch.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses the pipe fitting welds the completion back on the operation panel, through control switch starter motor's positive switch, the motor drives the lead screw and rotates, the lead screw drives two silk braid horizontal migration left on the lead screw, shift out the operation panel from pipe fitting welding portion below, and remove the weld part with the ring frame, start the water of first water pump in with the water tank after that and take out, and go into in the spray rack through the hose pump, and spray the water at the pipe fitting weld part through high pressure nozzle, realize the quick cooling operation to the weld part, and convenient operation is simple.
2. The utility model discloses insert the pipe fitting in the support inslot in the backup pad of both sides to place the one end counterbalance of both sides pipe fitting on the operation panel, then open the end of giving vent to anger of welding gas cylinder, and carry out the welding part through using gas welding rifle to the welding part and carry out welding operation.
3. The utility model discloses back in the collecting box is fallen into to the cooling water that the cooling operation used, through control switch start-up second water pump, in the water pump suction drainage gets into the water tank with the rose box, in the water in the collecting box passes through the inlet opening and gets into the rose box, the water that filters the otter board and flow in filters, avoids impurity to get into in the water tank to accomplish the cyclic utilization operation to the water resource.
Drawings
Fig. 1 is a schematic view of the structure of the present invention;
FIG. 2 is a front cut-away schematic view of FIG. 1;
FIG. 3 is a partial cutaway view of the right side view A-A of FIG. 1;
fig. 4 is an enlarged schematic view of a portion of fig. 2.
In the figure: 1. a base plate; 2. a collection box; 3. a support plate; 4. a motor; 5. a lead screw; 6. sleeving the silk; 7. an annular frame; 8. a spray rack; 9. an operation table; 10. a water tank; 11. a first water pump; 110. a support groove; 12. a protective pad; 13. a limiting rod; 14. a sliding sleeve; 15. a connecting plate; 16. a second water pump; 17. a filter box; 18. a filter screen plate; 19. a water inlet hole; 20. a fixed mount; 21. welding the gas cylinder; 22. placing a rack; 23. a gas welding torch; 24. a gas delivery pipe; 25. and controlling the switch.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
As shown in figures 1, 2, 3 and 4, the embodiment of the utility model provides a pipe welding device for petroleum engineering construction, which comprises a bottom plate 1, a collecting box 2 is welded on the upper end surface of the bottom plate 1, supporting plates 3 are welded on the left and right sides of the bottom end of the collecting box 2, a motor 4 is fixedly installed on the right supporting plate 3 through bolts and nuts, the model of the motor 4 is YB2-132S-4, the input end of the motor 4 is connected with the control end of a control switch 25 through wires, a rotor shaft of the motor 4 is welded with a lead screw 5, two wire sleeves 6 are in threaded connection on the lead screw 5, an annular frame 7 is welded on the right wire sleeve 6, a spray frame 8 is welded on the inner wall of the annular frame 7, the spray frame 8 is in an annular frame structure, twelve high-pressure spray nozzles are welded on the inner ring of the spray frame 8, an operation platform 9 is welded on the left wire sleeve 6, the operation platform 9 is in a T-shaped platform structure, the bottom of collecting box 2 has still welded the water tank 10, the right side welding of water tank 10 has first water pump 11, first water pump 11's model is ISG40-125, the input of first water pump 11 passes through the control end of connection of electric lines control switch 25, the play water end of first water pump 11 passes through the entering end that hose interference connects spray rack 8, the entering end of first water pump 11 passes through pipeline and water tank 10 intercommunication, support groove 110 has all been seted up on the top of left and right sides backup pad 3, support groove 110 is U type groove structure, the inner wall that supports groove 110 has protection pad 12 through sealed glue adhesive bonding connection, protection pad 12 is the soft material of moulding, the ladder groove has been seted up on the backup pad 3 of left side, ladder inslot interference is connected with the bearing, the inner circle of bearing is connected in the one end interference of lead screw 5.
As shown in fig. 1, 2, 3 and 4, a limiting rod 13 is welded on the right side of the upper end face of a water tank 10, the limiting rod 13 is of a U-shaped rod structure, two sliding sleeves 14 are sleeved on the limiting rod 13, connecting plates 15 are welded on the two sliding sleeves 14, the top ends of the two connecting plates 15 are respectively connected to corresponding wire sleeves 6, a second water pump 16 is welded on the left side of the water tank 10, the model of the second water pump 16 is ISG40-125, the input end of the second water pump 16 is connected with the control end of a control switch 25 through an electric wire, the water outlet end of the second water pump 16 is communicated with the water tank 10 through a pipeline, a filter box 17 is welded on the bottom end of a collecting box 2, the water inlet end of the second water pump 16 is communicated with the filter box 17 through a pipeline, a filter screen plate 18 is welded in the filter box 17, the diameter of the filter screen plate 18 is 5mm, a water inlet 19 is arranged on the left side of the filter box 17, a fixing frame 20 is welded on the right side of the upper end face of a bottom plate 1, the welding gas bottle 21 is placed on the fixing frame 20, the placing frame 22 is welded in front of the collecting box 2, the gas welding gun 23 is placed on the placing frame 22, the gas inlet end of the gas welding gun 23 is connected with the gas outlet end of the welding gas bottle 21 through the gas conveying pipe 24, the control switch 25 is welded in front of the collecting box 2, and the input end of the control switch 25 is connected with the power supply through a wire.
The working principle of the embodiment is as follows: after the pipe fitting welding was accomplished on operation panel 9, forward switch through control switch 25 starter motor 4, motor 4 drives lead screw 5 and rotates, lead screw 5 drives two silk covers 6 horizontal migration left on lead screw 5, shift out operation panel 9 from pipe fitting welding portion below, and remove annular frame 7 to the welding part, start first water pump 11 and take out the water in the water tank 10 after that, and go into spray rack 8 through the hose pump, and spray water at the pipe fitting welding part through high pressure nozzle, realize the quick cooling operation to the welding part, and convenient operation is simple. The pipe is inserted into the support grooves 110 of the both side support plates 3 and one ends of the both side pipes are placed against each other on the operation table 9, then the end of the welding cylinder 21 where the air is discharged is opened, and the welding work is performed on the welded portion by using the gas welding torch 23. After the cooling water that the cooling operation used fell into collecting box 2, started second water pump 16 through control switch 25, in second water pump 16 got into water tank 10 with the drainage of rose box 17 internal water, the water in collecting box 2 passed through inlet opening 19 and got into rose box 17 in, the water that filter plate 18 flowed in filtered, avoided impurity to get into in the water tank 10 to accomplish the cyclic utilization operation to the water resource.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the scope of the present invention.

Claims (6)

1. The utility model provides a pipe fitting welding set for petroleum engineering construction which characterized in that: comprises a bottom plate (1), a collecting box (2) is arranged on the upper end surface of the bottom plate (1), two sides of the bottom end of the collecting box (2) are respectively provided with a supporting plate (3), a motor (4) is arranged on the supporting plate (3) at one side, a rotor shaft of the motor (4) is connected with a lead screw (5), the lead screw (5) is in threaded connection with two screw sleeves (6), the screw sleeve (6) on one side is provided with an annular frame (7), the inner wall of the annular frame (7) is provided with a spraying frame (8), the other side of the annular frame is provided with an operating platform (9) on the thread sleeve (6), the bottom end of the collecting box (2) is also provided with a water tank (10), one side of the water tank (10) is provided with a first water pump (11), the water outlet end of the first water pump (11) is connected with the inlet end of the spray rack (8) through a hose, the inlet end of the first water pump (11) is communicated with the water tank (10) through a pipeline.
2. The pipe welding device for petroleum engineering construction according to claim 1, wherein: support grooves (110) are formed in the top ends of the support plates (3) on the two sides, protective pads (12) are arranged on the inner walls of the support grooves (110), and one end of the lead screw (5) is rotatably arranged on the support plate (3) on one side.
3. The pipe welding device for petroleum engineering construction according to claim 1, wherein: the water tank is characterized in that a limiting rod (13) is arranged on one side of the upper end face of the water tank (10), two sliding sleeves (14) are sleeved on the limiting rod (13), two connecting plates (15) are arranged on the sliding sleeves (14), and the top ends of the connecting plates (15) are connected to the corresponding thread sleeves (6) respectively.
4. The pipe welding device for petroleum engineering construction according to claim 1, wherein: the water tank is characterized in that a second water pump (16) is arranged on the other side of the water tank (10), the water outlet end of the second water pump (16) is communicated with the water tank (10) through a pipeline, a filter box (17) is arranged at the bottom end of the collecting box (2), the water inlet end of the second water pump (16) is communicated with the filter box (17) through a pipeline, a filter screen plate (18) is arranged in the filter box (17), and a water inlet hole (19) is formed in one side of the filter box (17).
5. The pipe welding device for petroleum engineering construction according to claim 1, wherein: the gas welding device is characterized in that a fixing frame (20) is arranged on one side of the upper end face of the bottom plate (1), a welding gas bottle (21) is arranged on the fixing frame (20), a placing frame (22) is arranged on one side of the collecting box (2), a gas welding gun (23) is placed on the placing frame (22), and the gas inlet end of the gas welding gun (23) is connected with the gas outlet end of the welding gas bottle (21) through a gas conveying pipe (24).
6. The pipe welding device for petroleum engineering construction according to claim 5, wherein: one side of the collecting box (2) is provided with a control switch (25).
CN202220119295.4U 2022-01-17 2022-01-17 Pipe fitting welding set is used in petroleum engineering construction Expired - Fee Related CN217291033U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220119295.4U CN217291033U (en) 2022-01-17 2022-01-17 Pipe fitting welding set is used in petroleum engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220119295.4U CN217291033U (en) 2022-01-17 2022-01-17 Pipe fitting welding set is used in petroleum engineering construction

Publications (1)

Publication Number Publication Date
CN217291033U true CN217291033U (en) 2022-08-26

Family

ID=82923958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220119295.4U Expired - Fee Related CN217291033U (en) 2022-01-17 2022-01-17 Pipe fitting welding set is used in petroleum engineering construction

Country Status (1)

Country Link
CN (1) CN217291033U (en)

Similar Documents

Publication Publication Date Title
CN205995676U (en) A kind of control chamber paint spraying apparatus
CN106040478A (en) Control box paint spraying equipment
CN208961294U (en) A kind of cored wire bonding cooling device
CN109926618A (en) A kind of processing unit (plant) of the outer guide plate of oil groove type
CN217291033U (en) Pipe fitting welding set is used in petroleum engineering construction
CN215316246U (en) Stable form carbon dioxide protection welding machine
CN212496112U (en) Portable welding device for welding metal products
CN211274738U (en) Laboratory is with arranging convulsions laboratory bench down
CN210030805U (en) Quenching oil tank flue gas collection device
CN218169288U (en) General welding frock of pipeline fitting
CN209062317U (en) A kind of gas cutting machine
CN212443832U (en) Supporting base for water-cooled welding equipment
CN213052853U (en) Numerical control punching machine with cooling drill function
CN213289338U (en) Assembly platform is used in processing of battery package
CN210632995U (en) Machining cutter for hydraulic valve body
CN212370669U (en) Cleaning and drying device for internal combustion engine parts
CN112091387A (en) Novel welding machine for mine machining
CN208450814U (en) A kind of welding automobile stamping workpiece Plasma Welding equipment
CN213914391U (en) Energy-saving flush coater is used in waterproof material production
CN217570228U (en) Copper core wire drawing cooling device capable of being recycled
CN220834802U (en) Movable nitrogen making machine
CN213053920U (en) Cooling device for sheet metal working
CN216107088U (en) Cooling device for quenching water pump pliers
CN217094647U (en) Automobile engine cylinder body belt cleaning device
CN216097106U (en) Welding machine with cleaning device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220826