CN217281576U - Auxiliary positioning device for construction of electric power engineering grounding pile - Google Patents

Auxiliary positioning device for construction of electric power engineering grounding pile Download PDF

Info

Publication number
CN217281576U
CN217281576U CN202121143803.4U CN202121143803U CN217281576U CN 217281576 U CN217281576 U CN 217281576U CN 202121143803 U CN202121143803 U CN 202121143803U CN 217281576 U CN217281576 U CN 217281576U
Authority
CN
China
Prior art keywords
frame
fixedly connected
gear
protection box
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121143803.4U
Other languages
Chinese (zh)
Inventor
张铮
逯文娟
邵山
盖金明
李欣欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Ruining Electric Co ltd
Original Assignee
Shandong Ruining Electric Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Ruining Electric Co ltd filed Critical Shandong Ruining Electric Co ltd
Priority to CN202121143803.4U priority Critical patent/CN217281576U/en
Application granted granted Critical
Publication of CN217281576U publication Critical patent/CN217281576U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Motor Or Generator Frames (AREA)

Abstract

The utility model relates to a ground connection stake construction technical field discloses an electric power engineering ground connection stake construction is with auxiliary positioning device, which comprises a frame, frame lateral wall fixedly connected with second protection box, the second protects the box lateral wall and has seted up the knob groove, be equipped with the knob in the second protection box, the first bull stick of knob inside wall fixedly connected with. The utility model discloses, through the screw rod, first bull stick, first gear, the second gear, first clamp splice and knob mutually support, rotate the knob, the knob drives first bull stick and rotates, first bull stick drives second gear revolve, the second gear passes through the teeth of a cogwheel and drives the second bull stick, the rotation of second bull stick drives the screw rod, the screw rod promotes first clamp splice, first clamp splice is tight with the ground connection stake clamp, through mutually supporting between the simple structure, can be suitable for multiple size's ground connection stake, and only need alone just can accomplish the device operation, the labour cost is reduced.

Description

Auxiliary positioning device for construction of electric power engineering grounding pile
Technical Field
The utility model relates to an earth pile construction technical field especially relates to an electric power engineering earth pile construction is with auxiliary positioning device.
Background
The electric power engineering, namely the engineering related to the production, transmission and distribution of electric energy, also includes the engineering of applying electricity as power and energy in various fields in a broad sense, the rapid development and reasonable construction structure of the electric power engineering provide powerful guarantee for the economic development of China, and the strong 'muscles and bones' promote the good and rapid development of the national economy of China.
The construction of the grounding pile is a main construction process which cannot be lost in the electric power engineering, but in the existing construction mode, a plurality of workers are generally needed to be matched, one person knocks the grounding pile and holds the grounding pile stably to carry out the construction of the grounding pile, the labor cost required by the construction mode is high, the verticality of the grounding pile buried under the grounding pile is difficult to keep under the influence of manpower when the grounding pile is knocked, and the personal safety of workers cannot be effectively guaranteed and supported.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the auxiliary positioning device is used in construction of electric power engineering ground connection stake that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides an auxiliary positioning device is used in construction of electric power engineering ground connection stake, includes the frame, frame lateral wall fixedly connected with second protection box, the knob groove has been seted up to second protection box lateral wall, be equipped with the knob in the second protection box, the first bull stick of knob inside wall fixedly connected with, first bull stick runs through second protection box and fixedly connected with second gear, second gear lateral wall meshing is connected with first gear, first gear inside wall fixedly connected with second bull stick, the one end that first gear was kept away from to the second bull stick runs through frame and threaded connection has the screw rod, the first clamp splice of one end fixedly connected with of frame is kept away from to the screw rod.
As a further description of the above technical solution:
frame upper surface fixed connection has the third protection box, third protection box inside wall fixedly connected with spring, spring top fixedly connected with connecting rod, spring one end is kept away from to the connecting rod runs through third protection box and fixedly connected with second clamp splice.
As a further description of the above technical solution:
and the outer side wall of the second rotating rod is provided with a thread groove matched with the screw rod.
As a further description of the above technical solution:
the outer side wall of the frame is movably connected with two symmetrically arranged ground bolts.
As a further description of the above technical solution:
the frame inside wall fixedly connected with shrink pole, shrink pole is kept away from frame one end fixed connection on first clamp splice.
As a further description of the above technical solution:
the frame lateral wall fixedly connected with first protection box, first gear and second gear are located the first protection box that corresponds inside, the first protection box lateral wall seted up with the through-hole of first bull stick looks adaptation.
As a further description of the above technical solution:
the first clamping block and the second clamping block are arranged in an arc shape.
As a further description of the above technical solution:
the outer side wall of the frame is provided with a viewing port, and the outer side wall of the frame is rotatably connected with a door plate matched with the viewing port.
The utility model discloses following beneficial effect has:
1. compared with the prior art, this auxiliary positioning device is used in construction of electric power engineering ground connection stake, through the screw rod, first bull stick, first gear, the second gear, first clamp splice and knob are mutually supported, rotate the knob, the knob drives first bull stick and rotates, first bull stick drives second gear revolve, the second gear drives the second bull stick through the teeth of a cogwheel, the rotation of second bull stick drives the screw rod, the screw rod promotes first clamp splice, first clamp splice is tight with ground connection stake clamp, through mutually supporting between the simple structure, can be applicable to the ground connection stake of multiple size, and only need alone just can accomplish the device operation, the labour cost has been reduced.
2. Compared with the prior art, the auxiliary positioning device for the construction of the electric power engineering grounding pile has the advantages that the first clamping block, the second clamping block and the ground bolt are matched with each other, the device is placed on the ground, the ground bolt is driven into the ground, the grounding pile is inserted into the device, the first clamping block and the second clamping block clamp the grounding pile to enable the grounding pile to be vertical, the grounding pile is driven into the ground through an external force tool, manual walking is not needed, and the personal safety of construction workers is effectively guaranteed.
Drawings
Fig. 1 is a schematic structural view of an auxiliary positioning device for construction of an electric power engineering grounding pile provided by the present invention;
fig. 2 is an elevation view of the auxiliary positioning device for construction of the electric power engineering grounding pile provided by the utility model;
fig. 3 is an enlarged view of a positioning aid a for construction of an electric power engineering ground pile according to the present invention;
fig. 4 is a schematic view of the connection between the screw and the second rotating rod in the auxiliary positioning device for the construction of the grounding pile in the electric power engineering provided by the utility model;
fig. 5 is a schematic view of the connection between the first gear and the second gear in the auxiliary positioning device for the construction of the electric power engineering ground pile provided by the present invention;
fig. 6 is the utility model provides an electric power engineering ground pile construction is with auxiliary positioning device in ground pile and a schematic diagram is connected to clamp splice.
Illustration of the drawings:
1. a frame; 2. a door panel; 3. a ground bolt; 4. a first gear; 5. a first protective case; 6. a screw; 7. a retracting lever; 8. a first clamping block; 9. a connecting rod; 10. a second clamp block; 11. a knob slot; 12. a second protection box; 13. a knob; 14. a first rotating lever; 15. a second gear; 16. a third protection box; 17. a thread groove; 18. a second rotating rod; 19. a spring; 20. and (7) grounding piles.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-6, the utility model provides a pair of electric power engineering ground connection is auxiliary positioning device for pile construction: including frame 1, 1 lateral wall fixedly connected with second protection box 12 of frame, second protection box 12 lateral wall is seted up there is knob groove 11, be equipped with knob 13 in the second protection box 12, the first bull stick 14 of knob 13 inside wall fixedly connected with, first bull stick 14 runs through second protection box 12 and fixedly connected with second gear 15, the through-hole with 14 looks adaptations of first bull stick is seted up to second protection box 12 lateral wall, first bull stick 14 rotates with corresponding through-hole inside wall to be connected, second gear 15 pivoted stability has been guaranteed.
The outer side wall of the second gear 15 is engaged with the first gear 4, the inner side wall of the first gear 4 is fixedly connected with a second rotating rod 18, one end, far away from the first gear 4, of the second rotating rod 18 penetrates through the frame 1 and is in threaded connection with the screw 6, the outer side wall of the second rotating rod 18 is provided with a threaded groove 17 matched with the screw 6, one end, far away from the frame 1, of the screw 6 is fixedly connected with a first clamping block 8, the inner side wall of the frame 1 is fixedly connected with a contraction rod 7, one end, far away from the frame 1, of the contraction rod 7 is fixedly connected onto the first clamping block 8, the arrangement of the contraction rod 7 can effectively stabilize the movement of the first clamping block 8, the outer side wall of the frame 1 is fixedly connected with a first protection box 5, the first gear 4 and the second gear 15 are located inside the corresponding first protection box 5, the side wall of the first protection box 5 is provided with a penetrating port matched with the first rotating rod 14, and the longer service life of the first gear 4 and the second gear 15 is guaranteed.
Wherein, fixed surface is connected with third protection box 16 on frame 1, 16 inside wall fixedly connected with springs 19 of third protection box, 19 top fixedly connected with connecting rod 9 of spring, 19 one end of spring are kept away from to connecting rod 9 and are run through third protection box 16 and fixedly connected with second clamp splice 10, 1 outside wall swing joint of frame has the ground bolt 3 that two symmetries set up, the setting of ground bolt 3 can effectual stabilising arrangement, it can be fixed to make it, first clamp splice 8 is the arc setting with second clamp splice 10, can effectual tight ground connection stake 20 of clamp, the viewing aperture has been seted up to 1 outside wall of frame, 1 outside wall of frame rotates and is connected with the door plant 2 with viewing aperture looks adaptation.
The working principle is as follows: the device is placed and is needed to bury ground stake 20 position underground, smashes ground bolt 3 into ground after, inserts ground stake 20 in the device, and second clamp splice 10 is through the promotion of spring 19 power with ground stake 20 preliminary fixed for ground stake 20 is located the intermediate position of two first clamp splices 8.
The knob 13 is rotated after the ground connection stake 20 is fixed to the second clamp splice 10, the knob 13 drives the first bull stick 14 to rotate, the first bull stick 14 rotates and drives the second gear 15 to rotate, the second gear 15 drives the first gear 4 to rotate, the first gear 4 drives the second bull stick 18 to rotate, the rotation through the second bull stick 18 extends the screw rod 6 outwards, the screw rod 6 promotes the first clamp splice 8 and presss from both sides the ground connection stake 20 tightly, the home range of the first clamp splice 8 is adjusted through the rotation of the first bull stick 14, so can be applicable to the ground connection stake 20 of multiple size.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (8)

1. The utility model provides an electric power engineering ground connection stake construction is with auxiliary positioning device, includes frame (1), its characterized in that: frame (1) lateral wall fixedly connected with second protection box (12), knob groove (11) have been seted up to second protection box (12) lateral wall, be equipped with knob (13) in second protection box (12), first bull stick (14) of knob (13) inside wall fixedly connected with, first bull stick (14) run through second protection box (12) and fixedly connected with second gear (15), second gear (15) lateral wall meshing is connected with first gear (4), first gear (4) inside wall fixedly connected with second bull stick (18), the one end that first gear (4) were kept away from in second bull stick (18) runs through frame (1) and threaded connection has screw rod (6), the first clamp splice (8) of one end fixedly connected with of frame (1) are kept away from in screw rod (6).
2. The auxiliary positioning device for the construction of the power engineering grounding pile of claim 1, wherein: fixed surface is connected with third protection box (16) on frame (1), third protection box (16) inside wall fixedly connected with spring (19), spring (19) top fixedly connected with connecting rod (9), spring (19) one end is kept away from in connecting rod (9) and third protection box (16) and fixedly connected with second clamp splice (10) are run through.
3. The auxiliary positioning device for construction of the electric power engineering grounding pile of claim 1, characterized in that: the outer side wall of the second rotating rod (18) is provided with a thread groove (17) matched with the screw rod (6).
4. The auxiliary positioning device for the construction of the power engineering grounding pile of claim 1, wherein: the outer side wall of the frame (1) is movably connected with two symmetrically arranged ground bolts (3).
5. The auxiliary positioning device for the construction of the power engineering grounding pile of claim 1, wherein: the frame (1) inside wall fixedly connected with shrink pole (7), shrink pole (7) are kept away from frame (1) one end fixed connection on first clamp splice (8).
6. The auxiliary positioning device for the construction of the power engineering grounding pile of claim 1, wherein: frame (1) lateral wall fixedly connected with first protection box (5), first gear (4) and second gear (15) are located inside corresponding first protection box (5), the opening that runs through with first bull stick (14) looks adaptation is seted up to first protection box (5) lateral wall.
7. The auxiliary positioning device for the construction of the power engineering grounding pile of claim 1, wherein: the first clamping block (8) and the second clamping block (10) are arranged in an arc shape.
8. The auxiliary positioning device for construction of the electric power engineering grounding pile of claim 1, characterized in that: the outer side wall of the frame (1) is provided with an observation port, and the outer side wall of the frame (1) is rotatably connected with a door plate (2) matched with the observation port.
CN202121143803.4U 2021-05-26 2021-05-26 Auxiliary positioning device for construction of electric power engineering grounding pile Active CN217281576U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121143803.4U CN217281576U (en) 2021-05-26 2021-05-26 Auxiliary positioning device for construction of electric power engineering grounding pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121143803.4U CN217281576U (en) 2021-05-26 2021-05-26 Auxiliary positioning device for construction of electric power engineering grounding pile

Publications (1)

Publication Number Publication Date
CN217281576U true CN217281576U (en) 2022-08-23

Family

ID=82852988

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121143803.4U Active CN217281576U (en) 2021-05-26 2021-05-26 Auxiliary positioning device for construction of electric power engineering grounding pile

Country Status (1)

Country Link
CN (1) CN217281576U (en)

Similar Documents

Publication Publication Date Title
CN217281576U (en) Auxiliary positioning device for construction of electric power engineering grounding pile
CN207314317U (en) Geomembrane installation aiding device and arranging system
CN107761698A (en) Geomembrane installation aiding device and distribution method
CN211719798U (en) Grounding device for electric power capable of preventing cable from loosening
CN215518888U (en) Whole basement tower crane foundation and raft joint structure
CN212614028U (en) High-strength combined transmission tower
CN212518185U (en) Erection supporting device for electromechanical installation
CN115459159A (en) Telescopic cable laying device along tunnel steel arch and using method
CN212571398U (en) Shaft tower lightning grounding device that lightning protection engineering used
CN109301787B (en) Outdoor abrupt slope cable channel sectional type combination apron
CN204343778U (en) A kind of line bar
CN216252961U (en) A portable wireless video monitoring device for water conservancy is supervised
CN214273132U (en) Fixing device of electric power tower base
CN215802301U (en) Reinforced structure is used in civil structure connection
CN214943038U (en) Corrosion-resistant tent for rescue
CN206385541U (en) Aid is pulled out in angle bar stake
CN213234456U (en) Power transmission equipment installation device for electrical engineering
CN217298957U (en) Deep foundation pit supporting structure
CN217923616U (en) Foundation pit supporting device for building construction
CN213812673U (en) Instrument for monitoring stress of reinforcing steel bar
CN221466836U (en) Grounding pile for power engineering
CN210157606U (en) Garden engineering is with device of digging fast
CN220768101U (en) Foundation pit supporting structure device
CN220789512U (en) Temporary isolation device for oilfield construction
CN213805318U (en) Portable ramming machine for house construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant