CN217278377U - Energy-saving mortar setting time tester - Google Patents

Energy-saving mortar setting time tester Download PDF

Info

Publication number
CN217278377U
CN217278377U CN202221078444.3U CN202221078444U CN217278377U CN 217278377 U CN217278377 U CN 217278377U CN 202221078444 U CN202221078444 U CN 202221078444U CN 217278377 U CN217278377 U CN 217278377U
Authority
CN
China
Prior art keywords
mortar
setting time
energy
circular arc
top end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221078444.3U
Other languages
Chinese (zh)
Inventor
刘岩然
贾晓文
马菲飞
李富山
蓝浩源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Guochengtai Material Technology Co ltd
Original Assignee
Tianjin Guochengtai Metal Wire Rope Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Guochengtai Metal Wire Rope Co ltd filed Critical Tianjin Guochengtai Metal Wire Rope Co ltd
Priority to CN202221078444.3U priority Critical patent/CN217278377U/en
Application granted granted Critical
Publication of CN217278377U publication Critical patent/CN217278377U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model discloses an energy-saving mortar setting time tester, which comprises a fixed base, a rod barrel is installed on one side of the top end of the fixed base, a handle and a stress cylinder are installed on one side of the rod barrel, the stress cylinder is positioned under the handle, a pressure-bearing device is installed in the middle of the top end of the fixed base, a loading plate is installed on the top end of the pressure-bearing device, a mortar box is installed on the top end of the loading plate, a circular groove is formed in the top end of the loading plate under the mortar box, circular arc plates are installed on two inner sides of the circular groove, rubber strips are installed on one opposite sides of two groups of circular arc plates, springs are installed at two ends of one side of each circular arc plate, and a telescopic rod is installed on one side of each circular arc plate under the middle part of the circular arc plate; an energy-conserving mortar setting time tester, increased the translation structure, when removing the structure of placing the mortar, the reduction rocks to avoid the unrestrained of mortar.

Description

Energy-saving mortar setting time tester
Technical Field
The utility model relates to a tester field, in particular to energy-conserving mortar setting time tester.
Background
The mortar setting time tester is a professional instrument in the aspect of industrial buildings, and consists of a handle, a detachable test needle, an upright post, a base, a pressure display, a test mold, a contact piece, a drill chuck, a bracket, a main shaft and the like, and is particularly important for mastering the mortar setting time in the building construction process, so that the mortar setting time is more important in construction, the construction quality is ensured, the construction progress is improved and the like;
the existing energy-saving mortar setting time tester has certain defects to be improved when in use, and the existing energy-saving mortar setting time tester lacks a fixing structure on the outer side of a mortar box when in use, so that shaking possibly exists in the testing process, and the testing data is influenced; when the existing energy-saving mortar setting time tester is used for testing, the stability of a mortar box when the mortar box is required to be placed is ensured, but the existing mortar needs to be lifted and placed, so that the mortar is easy to spill, and the using effect is general.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims at providing an energy-saving mortar setting time tester, which can effectively solve the problem that the existing energy-saving mortar setting time tester in the background art lacks a fixed structure outside a mortar box, so that shaking possibly exists in the test process and the test data is influenced; when the existing energy-saving mortar setting time tester is used for testing, the stability of a mortar box when the mortar box is placed needs to be guaranteed, but the existing mortar needs to be lifted and placed, so that the mortar is easy to fall off.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
an energy-saving mortar setting time tester comprises a fixed base, wherein a rod cylinder is installed on one side of the top end of the fixed base, a handle and a stress cylinder are installed on one side of the rod cylinder, the stress cylinder is located right below the handle, a pressure-bearing device is installed in the middle of the top end of the fixed base, a loading plate is installed at the top end of the pressure-bearing device, and a mortar box is installed at the top end of the loading plate;
load the top of board and lean on the mortar box under seted up the circular slot, the circular arc board that has all been installed to the inside both sides of circular slot is two sets of the rubber strip is all installed to relative one side of circular arc board, the spring is all installed at one side both ends of circular arc board, one side of circular arc board is leaned on the mid-mounting and is had the telescopic link.
As a further scheme of the utility model, the rectangular channel has been seted up by the pressure-bearing device under on unable adjustment base's top, the internally mounted of rectangular channel has the stretching plate, the slider is all installed to the both sides of stretching plate, the stretching plate is kept away from the pull ring that unable adjustment base's one end was installed, the top of stretching plate is seted up flutedly.
As a further aspect of the present invention, the bottom diameter of the mortar box is smaller than the diameter of the circular groove, and the outside of the mortar box is fixedly connected to the top of the pressure-bearing device through the circular groove.
As a further aspect of the utility model, same one side is two sets of the one end fixed connection of spring is in one side of circular arc board, and the both sides of circular arc board pass through spring swing joint in the inside of loading the board.
As a further aspect of the present invention, it is two sets of one end of the telescopic rod is fixedly connected to one side of the two sets of arc plates, and the other end of the telescopic rod is fixedly connected to the inner wall of the loading plate.
As a further scheme of the utility model, the spout has all been seted up by the outside of two sets of sliders to unable adjustment base's inner wall, and slider and spout swing joint are passed through in unable adjustment base's inside in tensile board's both sides.
Compared with the prior art, the utility model discloses following beneficial effect has: the utility model discloses an installed load plate, place the bottom of mortar box in the inside of circular slot, thereby position to the mortar box is injectd, two sets of circular arc boards this moment when the mortar box gets into, its one side can utilize the spring to accomodate the inside of load plate, after the mortar box is placed completely, two sets of circular arc boards can reuse the thrust of spring to fix the outside of mortar box, and circular arc board one side is leaned on the telescopic link of mid-mounting and can be when the circular arc board removes, remain the horizontality all the time, simultaneously the rubber strip of the relative one side installation of circular arc board is when pressing from both sides and getting fixed, reduce the damage to the mortar box, can be when testing through installing the load plate, fix the outside of mortar box, avoid in the test process, the position of mortar box takes place to remove, influence test data;
through installation unable adjustment base, hold the pull ring of tensile board one end installation, with tensile board to one side removal, make tensile board both sides pass through slider and spout and remove to the inside of recess, and the rectangular channel that tensile board top was seted up provides for the installation of loading board and places the space, and then with mortar box translation to the atress drum under, follow-up leading to the angle that changes between handle and the pole section of thick bamboo, come to survey the time that the mortar condenses, can be when removing the mortar box through setting up unable adjustment base, make it control the horizontally state, thereby avoid when removing, the unrestrained condition takes place for the mortar, hoisting device's practicality.
Drawings
FIG. 1 is a schematic view of the overall structure of an energy-saving mortar setting time tester of the present invention;
FIG. 2 is a cross-sectional view of a loading plate of the energy-saving mortar setting time tester of the present invention;
FIG. 3 is a side sectional view of the fixing base of the energy-saving mortar setting time tester of the present invention;
fig. 4 is the utility model relates to a unable adjustment base's of energy-conserving mortar setting time tester structural schematic.
In the figure: 1. a barrel; 2. a fixed base; 3. a pressure-bearing device; 4. a handle; 5. a force-bearing cylinder; 6. a mortar box; 7. a circular groove; 8. a rubber strip; 9. a circular arc plate; 10. a spring; 11. a telescopic rod; 12. a pull ring; 13. stretching the plate; 14. a groove; 15. a rectangular groove; 16. a slider; 17. and loading the plate.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-4, an energy-saving mortar setting time tester comprises a fixed base 2, a rod barrel 1 is installed on one side of the top end of the fixed base 2, a handle 4 and a stress barrel 5 are installed on one side of the rod barrel 1, the stress barrel 5 is located right below the handle 4, a pressure-bearing device 3 is installed in the middle of the top end of the fixed base 2, a loading plate 17 is installed at the top end of the pressure-bearing device 3, and a mortar box 6 is installed at the top end of the loading plate 17;
load plate 17's top and lean on mortar box 6 to have seted up circular slot 7 under, circular slot 7's the inside both sides arc board 9 that all install, rubber strip 8 is all installed to two sets of relative one sides of arc board 9, and spring 10 is all installed at one side both ends of arc board 9, and one side of arc board 9 is leaned on mid-mounting to have telescopic link 11.
In this embodiment, in order to limit the outer position of the mortar box 6, a rectangular groove 15 is formed in the top end of the fixing base 2 just below the pressure-receiving device 3, a stretching plate 13 is mounted inside the rectangular groove 15, sliders 16 are mounted on both sides of the stretching plate 13, a pull ring 12 is mounted on one end of the stretching plate 13 far away from the fixing base 2, and a groove 14 is formed in the top end of the stretching plate 13.
In the embodiment, in order to enable the mortar box 6 to be placed into the circular groove 7, the diameter of the bottom end of the mortar box 6 is smaller than that of the circular groove 7, and the outer side of the mortar box 6 is fixedly connected to the top end of the pressure-bearing device 3 through the circular groove 7.
In the embodiment, in order to make the two sets of circular arc plates 9 define the outer side of the mortar box 6, one end of the two sets of springs 10 on the same side are fixedly connected to one side of the circular arc plate 9, and two sides of the circular arc plate 9 are movably connected to the inner part of the loading plate 17 through the springs 10.
In this embodiment, in order to ensure that the circular arc plates 9 are kept vertical in the moving process, one ends of two sets of telescopic rods 11 are respectively and fixedly connected to one side of the two sets of circular arc plates 9, and the other ends of the telescopic rods 11 are fixedly connected to the inner wall of the loading plate 17.
In this embodiment, in order to enable the stretching plate 13 to move, the inner wall of the fixing base 2 has sliding grooves formed on the outer sides of the two sets of sliding blocks 16, and the two sides of the stretching plate 13 are movably connected to the inside of the fixing base 2 through the sliding blocks 16 and the sliding grooves.
It should be noted that, the utility model relates to an energy-saving mortar setting time tester, when using, at first, load plate 17 is placed on top of pressure-bearing device 3, at this time, the mortar is poured into the inside of mortar box 6, after the mortar is poured into and is accomplished, the bottom of mortar box 6 is placed inside circular groove 7, thereby limiting 6 positions of mortar box, at this time, two sets of circular arc plates 9, when mortar box 6 enters, one side of each circular arc plate 9 can be accommodated into the inside of load plate 17 by spring 10, after mortar box 6 is completely placed, two sets of circular arc plates 9 can be fixed outside mortar box 6 by thrust of spring 10 again, and telescopic rod 11 installed near the middle part of one side of circular arc plate 9 can be moved by circular arc plate 9, the horizontal state is maintained all the time, simultaneously, rubber strip 8 installed on the opposite side of circular arc plate 9 is clamped and fixed, the damage to mortar box 6 is reduced, after mortar box 6 placed the completion, hold pull ring 12 of tensile board 13 one end installation, will tensile board 13 moves to one side for tensile board 13 both sides are passed through slider 16 and spout and are removed to the inside of recess 14, and rectangular channel 15 that tensile board 13 top was seted up is loading plate 17's installation, provides and places the space, and then translates mortar box 6 under atress drum 5, follow-up changing the angle between handle 4 and the pole section of thick bamboo 1, come to survey the time that the mortar condenses.
The utility model discloses a loading plate 17 of installation, place the inside at circular slot 7 with the bottom of mortar box 6, thereby to restrict 6 positions of mortar box, two sets of circular arc boards 9 are when mortar box 6 gets into this moment, its one side can utilize spring 10 to accomodate the inside of getting into loading plate 17, after mortar box 6 places the completion completely, two sets of circular arc boards 9 can reuse the thrust of spring 10 to fix the outside of mortar box 6, and circular arc board 9 one side leans on middle part installation's telescopic link 11 can be when circular arc board 9 moves, remain the horizontality all the time, rubber strip 8 of the relative side installation of circular arc board 9 is when pressing from both sides and getting fixedly simultaneously, reduce the damage to mortar box 6, can be when testing through installing loading plate 17, fix the outside of mortar box 6, avoid in the test process, the position of mortar box 6 takes place to move, influence test data; through installation unable adjustment base 2, hold pull ring 12 of tensile board 13 one end installation, with tensile board 13 to one side removal, make tensile board 13 both sides pass through slider 16 and spout and to the inside removal of recess 14, and rectangular channel 15 that tensile board 13 top was seted up provides for the installation of loading plate 17 and placed the space, and then with mortar box 6 translation to atress drum 5 under, follow-up changing the angle between handle 4 and the pole section of thick bamboo 1, come to survey the time that the mortar condenses, can be when removing mortar box 6 through setting up unable adjustment base 2, make it control the horizontally state, thereby avoid when removing, the condition that the mortar takes place to spill, hoisting device's practicality.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides an energy-conserving mortar setting time tester, includes unable adjustment base (2), its characterized in that: a rod barrel (1) is installed on one side of the top end of the fixed base (2), a handle (4) and a stress cylinder (5) are installed on one side of the rod barrel (1), the stress cylinder (5) is located right below the handle (4), a pressure-bearing device (3) is installed in the middle of the top end of the fixed base (2), a loading plate (17) is installed on the top end of the pressure-bearing device (3), and a mortar box (6) is installed on the top end of the loading plate (17);
load the top of board (17) and lean on mortar box (6) to have seted up circular slot (7) under, circular arc board (9) that all installed in the inside both sides of circular slot (7), two sets of rubber strip (8) are all installed to relative one side of circular arc board (9), spring (10) are all installed at one side both ends of circular arc board (9), one side of circular arc board (9) is leaned on mid-mounting to have telescopic link (11).
2. The energy-saving mortar setting time tester of claim 1, characterized in that: the top of unable adjustment base (2) leans on pressure-bearing device (3) to have seted up rectangular channel (15) under, stretching plate (13) of internally mounted of rectangular channel (15), slider (16) are all installed to the both sides of stretching plate (13), pull ring (12) that the one end of unable adjustment base (2) was installed are kept away from to stretching plate (13), the top of stretching plate (13) is seted up flutedly (14).
3. The energy-saving mortar setting time tester of claim 1, characterized in that: the diameter of the bottom end of the mortar box (6) is smaller than that of the circular groove (7), and the outer side of the mortar box (6) is fixedly connected to the top end of the pressure-bearing device (3) through the circular groove (7).
4. The energy-saving mortar setting time tester of claim 1, characterized in that: one ends of two groups of springs (10) on the same side are fixedly connected to one side of the arc plate (9), and two sides of the arc plate (9) are movably connected to the inner part of the loading plate (17) through the springs (10).
5. The energy-saving mortar setting time tester of claim 1, characterized in that: one ends of the two groups of telescopic rods (11) are respectively and fixedly connected to one side of the two groups of arc plates (9), and the other ends of the telescopic rods (11) are fixedly connected to the inner wall of the loading plate (17).
6. The energy-saving mortar setting time tester of claim 1, characterized in that: the inner wall of the fixed base (2) is provided with sliding grooves by the outer sides of the two groups of sliding blocks (16), and the two sides of the stretching plate (13) are movably connected with the sliding grooves in the fixed base (2) through the sliding blocks (16).
CN202221078444.3U 2022-05-07 2022-05-07 Energy-saving mortar setting time tester Active CN217278377U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221078444.3U CN217278377U (en) 2022-05-07 2022-05-07 Energy-saving mortar setting time tester

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221078444.3U CN217278377U (en) 2022-05-07 2022-05-07 Energy-saving mortar setting time tester

Publications (1)

Publication Number Publication Date
CN217278377U true CN217278377U (en) 2022-08-23

Family

ID=82879609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221078444.3U Active CN217278377U (en) 2022-05-07 2022-05-07 Energy-saving mortar setting time tester

Country Status (1)

Country Link
CN (1) CN217278377U (en)

Similar Documents

Publication Publication Date Title
CN203422326U (en) Shooting device for interior of hollow pile hole
CN112683926B (en) Glass defect detection device
CN215865180U (en) Be applicable to building settlement auxiliary device for measurement
CN207396318U (en) A kind of plastic-aluminum veneer stripping performance test fixture
CN217278377U (en) Energy-saving mortar setting time tester
CN117269462A (en) Device and method for detecting freezing and thawing plasticity of self-compacting concrete
CN206552553U (en) Teaching appliance arranging apparatus with buffer structure
CN210950538U (en) Fixing device for projecting apparatus convenient to angle modulation goes up and down
CN215857753U (en) Civil engineering is safety support structure for excavation supporting
CN112072581A (en) Pipeline erecting device for assembled wall
CN211036565U (en) Base template reinforced structure
CN207775739U (en) A kind of bridge maintenance jacking reaction frame
CN219317986U (en) Multimedia teaching device
CN220891693U (en) Atmosphere harmful gas monitoring device
CN212412689U (en) Pipeline erecting device for assembled wall
CN210460025U (en) Limiting device for block building assembly construction wall piece
CN218912350U (en) Basement steelframe reinforced structure of commercial center
CN221006652U (en) Pressure sensor test fixture
CN221075974U (en) Engineering detecting instrument fixed bolster
CN220289251U (en) Reinforcing steel bar detection device for construction engineering site
CN219083945U (en) Front suspension bracket hole site gauge
CN218563106U (en) Light steel villa support column convenient to positioning and assembling
CN216978663U (en) Steel structure manufacturing and testing equipment
CN220688488U (en) Metering detection is with adjusting support
CN221066223U (en) Electromechanical device installation and debugging platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 300000 Tianjin Bingang High tech Casting Industrial Zone, Jinghai District, Tianjin

Patentee after: Tianjin Guochengtai Material Technology Co.,Ltd.

Address before: 301615 Bingang High-tech Foundry Industrial Zone, Jinghai District, Tianjin

Patentee before: Tianjin guochengtai metal wire rope Co.,Ltd.