CN217270240U - Waterproof board for subway construction tunnel - Google Patents

Waterproof board for subway construction tunnel Download PDF

Info

Publication number
CN217270240U
CN217270240U CN202220303905.6U CN202220303905U CN217270240U CN 217270240 U CN217270240 U CN 217270240U CN 202220303905 U CN202220303905 U CN 202220303905U CN 217270240 U CN217270240 U CN 217270240U
Authority
CN
China
Prior art keywords
waterproof board
tunnel
board body
water
anchoring rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220303905.6U
Other languages
Chinese (zh)
Inventor
王思远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220303905.6U priority Critical patent/CN217270240U/en
Application granted granted Critical
Publication of CN217270240U publication Critical patent/CN217270240U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to the technical field of subway tunnel construction, in particular to a waterproof board for a subway construction tunnel, which comprises a waterproof board body and an anchor rod, wherein the waterproof board body is fixedly arranged on the inner wall of the tunnel through the anchor rod, geotechnical cloth is clamped between the waterproof board body and the inner wall of the tunnel, and a fixed seat is fixedly arranged at the lower end of the waterproof board body and a corner of the bottom surface of the tunnel; the anchoring rod extends into the side wall of the tunnel, a drain hole is formed in the anchoring rod, a plurality of water seepage holes communicated with the drain hole are formed in the top surface of the anchoring rod, and a drain port communicated with the drain hole is formed in the outer end surface of the anchoring rod; the utility model discloses be provided with infiltration hole and wash port on the fixed stock of waterproof board, can collect and discharge the groundwater in the tunnel wall to prevent that groundwater from piling up in the tunnel wall, and then prevent groundwater from to seepage in the tunnel, with cooperation such as waterproof board, geotechnological cloth, can effectively improve the water-proof effects to the tunnel.

Description

Waterproof board for subway construction tunnel
Technical Field
The utility model relates to a subway tunnel construction technical field, specific waterproof board for subway construction tunnel that says so.
Background
The subway is the rapid, large-traffic and electric traction rail transit built in cities. The train runs on a totally closed line, the line located in the central urban area is basically arranged in the underground tunnel, and the line outside the central urban area is generally arranged on a viaduct or the ground. In the process of laying and constructing underground passages such as subway passages or tunnels, waterproof structures are required to be installed on walls to prevent underground water from permeating into the tunnels. The existing waterproof structure generally adopts the steps of firstly paving geotextile on the tunnel wall and then paving and installing a waterproof plate on the surface of the geotextile. However, when the waterproof sheet is used for a long time or the amount of underground water is large, underground water easily seeps out through gaps between the geotextile and the waterproof sheets and gaps between adjacent waterproof sheets, so that the waterproof effect is reduced, and the construction of the subway tunnel is influenced.
SUMMERY OF THE UTILITY MODEL
To the problem among the prior art, the utility model provides a subway construction waterproof board for tunnel.
The utility model provides a technical scheme that its technical problem adopted is: a waterproof board for a subway construction tunnel comprises a waterproof board body and an anchoring rod, wherein the waterproof board body is fixedly installed on the inner wall of the tunnel through the anchoring rod, geotextile is clamped between the waterproof board body and the inner wall of the tunnel, and a fixed seat is fixedly installed at the corner between the lower end of the waterproof board body and the bottom surface of the tunnel; the anchoring rod extends into the side wall of the tunnel, a drain hole is formed in the anchoring rod, a plurality of water seepage holes communicated with the drain hole are formed in the top surface of the anchoring rod, and a water outlet communicated with the drain hole is formed in the outer end face of the anchoring rod.
Furthermore, one side fixed mounting of waterproof board body has sealed card strip, the opposite side be provided with can with the sealed draw-in groove of sealed joint of sealed card strip.
Furthermore, the top surface of fixing base is provided with water drainage tank, water inlet and outlet all are provided with at water drainage tank's both ends.
Furthermore, one side of the fixing seat top surface, which is located on the waterproof board body, is provided with a drainage slope which inclines downwards towards the inside of the drainage groove.
Furthermore, filter screens are installed in the water seepage holes.
The utility model has the advantages that:
the utility model is provided with the seepage hole and the drain hole on the fixed anchor rod of the waterproof board, which can collect and drain the underground water in the tunnel wall, thereby preventing the underground water in the tunnel wall from accumulating, further preventing the underground water from leaking into the tunnel, and can effectively improve the waterproof effect to the tunnel by matching with the waterproof board, the geotextile and the like; the waterproof board downside is provided with the fixing base, can consolidate the waterproof board, makes the waterproof board installation more firm, and the fixing base top surface is provided with the water drainage tank that is used for accepting the wash port effluent simultaneously, and this water drainage tank can collect the interior exhaust groundwater of drainage hole, discharges outside the tunnel with groundwater again to need not artifical drainage, make the discharge of groundwater more convenient.
Drawings
The present invention will be further explained with reference to the drawings and examples.
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a side sectional view of the present invention;
in the figure: 1. a waterproof board body; 2. geotextile; 3. sealing the clamping strip; 4. sealing the clamping groove; 5. an anchor rod; 6. a drain hole; 7. a fixed seat; 8. a water discharge tank; 9. a water inlet and outlet; 10. a water seepage hole; 11. a filter screen; 12. a drainage ramp.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand and understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-2, the waterproof board for a subway construction tunnel of the present invention comprises a waterproof board body 1 and an anchoring rod 5, wherein the waterproof board body 1 is fixedly mounted on the inner wall of the tunnel through the anchoring rod 5, a geotextile 2 is sandwiched between the waterproof board body 1 and the inner wall of the tunnel, and a fixing seat 7 is fixedly mounted at a corner between the lower end of the waterproof board body 1 and the bottom surface of the tunnel; the anchoring rod 5 extends into the side wall of the tunnel, a drain hole 6 is formed in the anchoring rod 5, a plurality of water seepage holes 10 communicated with the drain hole 6 are formed in the top surface of the anchoring rod 5, and a water drainage port communicated with the drain hole 6 is formed in the outer end face of the anchoring rod 5.
One side fixed mounting of waterproof board body 1 has sealed card strip 3, the opposite side be provided with can with sealed card strip 3 sealed joint's sealed draw-in groove 4, when installing waterproof board body 1 along tunnel wall concatenation, through sealed card strip 3 and sealed draw-in groove 4 sealed joint between the adjacent waterproof board body 1 to improve the leakproofness between the 1 seam of adjacent waterproof board body, and then improve waterproof board body 1's water-proof effects.
The top surface of fixing base 7 is provided with water drainage tank 8, water drainage tank 8's both ends all are provided with inlet outlet 9, and water drainage tank 8 can accept the interior exhaust groundwater of wash port 6, simultaneously when fixing base 7 splices in proper order with waterproof board body 1 together, through inlet outlet 9 intercommunication between the adjacent water drainage tank 8 to make a plurality of water drainage tank 8 connect gradually and form a drainage channel in the tunnel, discharge the groundwater of collecting outside the tunnel, thereby need not artifical drainage, make the discharge of groundwater more convenient.
The top surface of the fixing seat 7 is located one side of the waterproof board body 1 is provided with a drainage slope 12 inclining downwards in the drainage groove 8, and the drainage groove 8 is guided and collected by groundwater sliding along the surface of the waterproof board body 1 through the drainage slope 12, so that the groundwater is prevented from flowing to the outside of the drainage groove 8.
All install filter screen 11 in the infiltration hole 10, can filter the groundwater of infiltrating in the infiltration hole 10, prevent that the ground in the tunnel wall from blockking up infiltration hole 10.
Specifically, when the device is used, the waterproof board bodies 1 are fixedly arranged on the tunnel wall through the anchoring rods 5, and the adjacent waterproof board bodies 1 are clamped and connected in a sealing mode through the sealing clamping strips 3 and the sealing clamping grooves 4 to form a waterproof wall for preventing water in the tunnel; meanwhile, the fixed seat 7 is arranged between the lower end of the waterproof board body 1 and an included angle of the bottom surface of the tunnel to reinforce the waterproof board body 1, and the adjacent water drainage grooves 8 are communicated through the water inlet and the water outlet 9, so that the water drainage grooves 8 are sequentially connected with each other to form a water drainage channel in the tunnel; when the underground water in the tunnel wall leaks into the water drainage holes 6 through the water seepage holes 10, the underground water is drained along the outlets of the water drainage holes 6, slides downwards along the waterproof board body 1, then slides into the corresponding water drainage grooves 8, and finally is drained out of the tunnel through the water drainage channel formed by the water drainage grooves 8; through the arranged drainage system, underground water in the tunnel wall can be drained, so that the underground water in the tunnel wall is prevented from accumulating and seeping out, and the waterproof effect of the device is further improved.
The foregoing illustrates and describes the principles, general features, and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the description in the above embodiments and the specification is only for illustrating the principles of the present invention, and that there may be various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall within the scope of the present invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. A waterproof board for a subway construction tunnel comprises a waterproof board body (1) and an anchoring rod (5), and is characterized in that the waterproof board body (1) is fixedly installed on the inner wall of the tunnel through the anchoring rod (5), geotextile (2) is clamped between the waterproof board body (1) and the inner wall of the tunnel, and a fixing seat (7) is fixedly installed at the lower end of the waterproof board body (1) and the corner of the bottom surface of the tunnel; the anchoring rod (5) extends to the inside of the side wall of the tunnel, a drain hole (6) is formed in the anchoring rod (5), a plurality of water seepage holes (10) communicated with the drain hole (6) are formed in the top surface of the anchoring rod (5), and a water drainage port communicated with the drain hole (6) is formed in the outer end face of the anchoring rod (5).
2. The waterproof board for the subway construction tunnel according to claim 1, wherein a sealing clamping strip (3) is fixedly installed on one side of the waterproof board body (1), and a sealing clamping groove (4) capable of being in sealing clamping connection with the sealing clamping strip (3) is formed in the other side of the waterproof board body.
3. The waterproof board for the subway construction tunnel according to claim 1, wherein a water drainage groove (8) is formed in the top surface of said fixing base (7), and water inlets and water outlets (9) are formed in both ends of said water drainage groove (8).
4. The waterproof board for the subway construction tunnel according to claim 3, wherein a drainage slope (12) inclining downwards towards the drainage groove (8) is arranged on one side of the top surface of the fixing base (7) on the waterproof board body (1).
5. The waterproof board for the subway construction tunnel according to claim 1, wherein said water seepage holes (10) are all installed with a filter screen (11).
CN202220303905.6U 2022-02-15 2022-02-15 Waterproof board for subway construction tunnel Active CN217270240U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220303905.6U CN217270240U (en) 2022-02-15 2022-02-15 Waterproof board for subway construction tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220303905.6U CN217270240U (en) 2022-02-15 2022-02-15 Waterproof board for subway construction tunnel

Publications (1)

Publication Number Publication Date
CN217270240U true CN217270240U (en) 2022-08-23

Family

ID=82855021

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220303905.6U Active CN217270240U (en) 2022-02-15 2022-02-15 Waterproof board for subway construction tunnel

Country Status (1)

Country Link
CN (1) CN217270240U (en)

Similar Documents

Publication Publication Date Title
CN110566273B (en) Drainage system and drainage method for treating tunnel surrounding rock fracture water
CN112982835B (en) Planting roofing siphon drainage collecting system
CN215329049U (en) Track structure with drainage pump station in integral ballast bed
CN217270240U (en) Waterproof board for subway construction tunnel
CN103726514B (en) The anti-leakage structure of diaphragm wall and anti-seepage construction method
CN114032937B (en) Foundation pit drainage device and construction method thereof
CN114086659B (en) Anti-floating and anti-water-leakage pressure-reducing structural system for double outer walls of basement
CN211972919U (en) Based on tunnel portal half cutting section bed mud pumping renovation system that turns over
CN210140780U (en) Anti-clogging ecological permeable box culvert
CN113323291A (en) Drainage channel and roof drainage system
CN219690417U (en) Flood control water-proof structure
CN216713123U (en) Basement roof waterproof construction
CN210167782U (en) Prefabricated assembled device of integrated cable pit and escape canal
CN217152024U (en) Tunnel drainage system
CN213478356U (en) Waterproof drainage structure of tunnel roof
CN211312602U (en) Mountain area valley tunnel structure
CN217479875U (en) Reinforced roadbed and pavement with geotechnical permeable pipes inside
CN115341426B (en) Roadbed construction method under special environmental conditions
CN110416959B (en) Prefabricated assembly type device integrating cable trench and drainage trench and use method thereof
CN219886951U (en) Waterproof device for road deformation joint part
CN217998317U (en) Barricade drainage system
CN219060259U (en) Waterproof structure for underground waterproof engineering with high structural strength
CN217354474U (en) Tunnel drainage structures
CN110513130B (en) Tunnel waterproof and drainage system
CN214271562U (en) Sponge is infiltration system for city

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant