CN217268412U - Roof cooling tower braced system - Google Patents

Roof cooling tower braced system Download PDF

Info

Publication number
CN217268412U
CN217268412U CN202220498456.5U CN202220498456U CN217268412U CN 217268412 U CN217268412 U CN 217268412U CN 202220498456 U CN202220498456 U CN 202220498456U CN 217268412 U CN217268412 U CN 217268412U
Authority
CN
China
Prior art keywords
prefabricated
fixedly connected
frame
cooling tower
roofing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220498456.5U
Other languages
Chinese (zh)
Inventor
刘占强
李雪伟
宫大鹏
李营
马兴胜
姜立涛
王升辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction First Bureau Group North China Construction Co Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction First Bureau Group North China Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction First Bureau Group North China Construction Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202220498456.5U priority Critical patent/CN217268412U/en
Application granted granted Critical
Publication of CN217268412U publication Critical patent/CN217268412U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a roofing cooling tower braced system, including building roofing, building roofing's top fixedly connected with symmetric distribution's concrete foundation, the prefabrication of a plurality of equidistance distributions of concrete foundation's top fixedly connected with increases the frame, and two sets of prefabrications increase the prefabricated link of fixedly connected with between the frame, and prefabricated link is located the top of prefabrication increase frame, and the top of prefabrication link is equipped with prefabricated mounting bracket, installs the bumper shock absorber that multiunit equidistance distributes between prefabricated link and the prefabricated mounting bracket, the top fixedly connected with cooling tower main part of prefabricated mounting bracket. The utility model discloses a cooling tower main part and pipeline carry out whole support by concrete and steel construction combination basis, and the wholeness is good, safe and reliable, form integration braced system, and the shock attenuation is effectual, has reduced simultaneously alternately with the roofing decoration way, and the process is clear and definite, has shortened the time limit for a project.

Description

Roof cooling tower braced system
Technical Field
The utility model relates to a cooling tower field especially relates to a roofing cooling tower braced system.
Background
Cooling towers are devices that use water as a circulating coolant to absorb heat from a system and discharge it to the atmosphere to reduce the temperature of the water. When installing on the roofing, its bearing structure is comparatively unstable for current roofing cooling tower, and the cooling tower does not have the shock attenuation when the installation, and is impaired when leading to the cooling tower installation easily, secondly, produces easily when making the cooling tower use owing to adopt rigid connection and rocks, produces the noise simultaneously, is not convenient for use.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a roof cooling tower supporting system.
In order to realize the above aim, the utility model provides a roofing cooling tower braced system, including the building roofing, the concrete foundation of the top fixedly connected with symmetric distribution of building roofing, the prefabrication of a plurality of equidistance distributions of top fixedly connected with of concrete foundation increases the frame, two sets of prefabrications increase the prefabricated link of fixedly connected with between the frame, and prefabricated link is located the prefabricated top that increases the frame, the top of prefabricated link is equipped with prefabricated mounting bracket, install the bumper shock absorber of multiunit equidistance distribution between prefabricated link and the prefabricated mounting bracket, the top fixedly connected with cooling tower main part of prefabricated mounting bracket.
In a preferred embodiment, the shock absorber comprises connecting pieces which are symmetrically distributed, wherein one group of the connecting pieces is fixedly connected with the top of the prefabricated connecting frame, the other group of the connecting pieces is fixedly connected with the bottom of the prefabricated mounting frame, and symmetrically distributed springs are fixedly connected between the two groups of the connecting pieces.
In a preferred embodiment, the prefabricated mounting frame is connected with a connecting bolt in a threaded mode, and the connecting bolt is connected with the connecting piece in a threaded mode.
In a preferred embodiment, be provided with the fixed column between two sets of connection pieces, fixed column and connecting bolt threaded connection, the bottom inner wall sliding connection of fixed column has the activity post, and the activity post stretches out the one end and another group connection piece fixed connection of fixed column.
In a preferred embodiment, the bottom of the prefabricated connecting frame is fixedly connected with prefabricated reinforcing rods which are symmetrically distributed, one end, far away from the prefabricated connecting frame, of each prefabricated reinforcing rod is fixedly connected with a prefabricated connecting plate, and the prefabricated connecting plates are fixedly connected with the concrete foundation.
In a preferred embodiment, the prefabricated bearing frame is fixedly connected to two sides of the concrete foundation, the prefabricated bearing frame is L-shaped, and the prefabricated bearing frame is fixedly connected to the top of the building roof.
In a preferred embodiment, the pipe is mounted on the top of the prefabricated bearing frame, and a double-layer shock absorption pad is arranged between the pipe and the prefabricated bearing frame.
Compared with the prior art, the utility model discloses following beneficial effect has:
the utility model discloses an install the prefabrication additional at concrete foundation's top and increase the frame, set up the prefabricated link that multiunit equidistance distributes at the top of prefabrication increase frame, and the bumper shock absorber is all installed to the top both sides of prefabricated link, when installing the cooling tower main part, make prefabricated mounting bracket fixed with the bumper shock absorber top, and rotate connecting bolt and make connecting bolt and fixed column threaded connection, when using or installing, the spring through on the bumper shock absorber carries out the shock attenuation to the cooling tower main part, guaranteed that the cooling tower main part makes stability in installation and use. The prefabricated reinforcing rod is additionally arranged at the bottom of the prefabricated connecting frame, so that the supporting performance of the prefabricated connecting frame is improved, the prefabricated bearing frame is installed on two sides of a concrete foundation, the double-layer shock pad is arranged when a pipeline is installed, the pipeline is protected, and the overall shock absorption performance is improved through the shock absorber and the double-layer shock pad. The cooling tower main part and the pipeline are integrally supported by the concrete and steel structure combined foundation, the integrity is good, the safety and the reliability are realized, an integrated supporting system is formed, the damping effect is good, the number of crossing roof decoration methods is reduced, the working procedure is clear, and the construction period is shortened.
Drawings
Fig. 1 is a schematic structural view of a roof cooling tower support system according to the present invention;
fig. 2 is a schematic top view of the prefabricated connecting frame of the roof cooling tower supporting system according to the present invention;
FIG. 3 is an enlarged schematic view of the structure at A in FIG. 1;
fig. 4 is an enlarged schematic view of a portion B in fig. 1.
Description of reference numerals:
1-cooling tower main body, 2-concrete foundation, 3-prefabricated heightening frame, 4-prefabricated connecting frame, 5-prefabricated reinforcing rod, 6-prefabricated mounting frame, 7-shock absorber, 8-connecting sheet, 9-connecting bolt, 10-spring, 11-fixed column, 12-movable column, 13-pipeline, 14-prefabricated connecting plate, 15-prefabricated bearing frame, 16-double-layer shock absorption pad and 17-building roof.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of the description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1-4, the utility model discloses a roofing cooling tower braced system, including building roofing 17, the concrete foundation 2 of the top fixedly connected with symmetric distribution of building roofing 17, the prefabrication of a plurality of equidistance distributions of top fixedly connected with of concrete foundation 2 increases frame 3, and two sets of prefabrications increase and put up prefabricated link 4 of fixedly connected with between 3, and prefabricated link 4 is located the prefabrication and increases the top of frame 3. Prefabricated mounting bracket 6 is equipped with above prefabricated link 4, installs the bumper shock absorber 7 that the multiunit equidistance distributes between prefabricated link 4 and the prefabricated mounting bracket 6, and the top fixedly connected with cooling tower main part 1 of prefabricated mounting bracket 6.
Further, bumper shock absorber 7 includes the connection piece 8 of symmetric distribution, and wherein a set of connection piece 8 and the top fixed connection of prefabricated link 4, another group of connection piece 8 and the bottom fixed connection of prefabricated mounting bracket 6, fixedly connected with symmetric distribution's spring 10 between two sets of connection pieces 8.
Further, the prefabricated mounting frame 6 is connected with a connecting bolt 9 in a threaded mode, and the connecting bolt 9 is connected with the connecting piece 8 in a threaded mode.
Further, be provided with fixed column 11 between two sets of connection pieces 8, fixed column 11 and connecting bolt 9 threaded connection, the bottom inner wall sliding connection of fixed column 11 has movable post 12, and movable post 12 stretches out fixed column 11's one end and another set of connection piece 8 fixed connection.
Further, the bottom of the prefabricated connecting frame 4 is fixedly connected with prefabricated reinforcing rods 5 which are symmetrically distributed, one end of each prefabricated reinforcing rod 5, far away from the prefabricated connecting frame 4, is fixedly connected with a prefabricated connecting plate 14, and the prefabricated connecting plates 14 are fixedly connected with the concrete foundation 2.
Further, the prefabricated bearing frame 15 is fixedly connected to the two sides of the concrete foundation 2, the prefabricated bearing frame 15 is L-shaped, and the prefabricated bearing frame 15 is fixedly connected to the top of the building roof 17.
Further, the pipe 13 is mounted on the top of the prefabricated bearing frame 15, and a double-layer shock pad 16 is arranged between the pipe 13 and the prefabricated bearing frame 15.
The working principle of the roof cooling tower supporting system of the utility model is introduced as follows:
the utility model discloses a during the installation of roofing cooling tower braced system, install the prefabrication additional at concrete foundation 2's top and increase frame 3, later increase the prefabricated link 4 that the top of frame 3 set up multiunit equidistance and distribute in the prefabrication, and all install bumper shock absorber 7 in the top both sides of prefabricated link 4. When the cooling tower main body 1 is installed, the prefabricated installation frame 6 is fixed to the top of the shock absorber 7, and the connecting bolt 9 is rotated to enable the connecting bolt 9 to be in threaded connection with the fixed column 11. When the cooling tower body 1 is used or installed, the spring 10 on the damper 7 is used for damping the cooling tower body 1, and the stability of the cooling tower body 1 in installation and use is guaranteed. Afterwards, install prefabricated stiffener 5 additional in the bottom of prefabricated link 4 and improve the support nature to prefabricated link 4, all install prefabricated bearing frame 15 in the both sides of concrete foundation 2 to set up double-deck shock pad 16 when installing pipeline 13, protect pipeline 13, improved holistic damping performance through bumper shock absorber 7 and double-deck shock pad 16. The cooling tower main body 1 and the pipeline 13 are integrally supported by a concrete and steel structure combined foundation, the integrity is good, the safety and the reliability are realized, an integrated supporting system is formed, the damping effect is good, the number of crossing with roof decoration methods is reduced, the working procedure is clear, and the construction period is shortened.
Finally, it should be noted that the above mentioned is only a preferred embodiment of the present invention, and the present invention is not limited to the above mentioned, and although the present invention has been described in detail with reference to the above mentioned embodiments, it will be obvious to those skilled in the art that the technical solutions described in the above mentioned embodiments can be modified, or some technical features can be equally replaced, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. A roofing cooling tower braced system, includes building roofing (17), its characterized in that: concrete foundation (2) of the top fixedly connected with symmetric distribution of building roof (17), the prefabrication that a plurality of equidistance of top fixedly connected with of concrete foundation (2) distribute increases frame (3), and is two sets of the prefabrication increases prefabricated link (4) of fixedly connected with between frame (3), just prefabricated link (4) are located the prefabrication increases the top of frame (3), the top of prefabricated link (4) is equipped with prefabricated mounting bracket (6), prefabricated link (4) with install bumper shock absorber (7) that multiunit equidistance distributes between prefabricated mounting bracket (6), the top fixedly connected with cooling tower main part (1) of prefabricated mounting bracket (6).
2. The roofing cooling tower support system of claim 1, wherein: the shock absorber (7) comprises connecting pieces (8) which are symmetrically distributed, wherein one group of the connecting pieces (8) is fixedly connected with the top of the prefabricated connecting frame (4), the other group of the connecting pieces (8) is fixedly connected with the bottom of the prefabricated mounting frame (6), and springs (10) which are symmetrically distributed are fixedly connected between the two groups of the connecting pieces (8).
3. The roofing cooling tower support system of claim 2, wherein: and the prefabricated mounting frame (6) is connected with a connecting bolt (9) through threads, and the connecting bolt (9) is in threaded connection with the connecting piece (8).
4. The roofing cooling tower support system of claim 3, wherein: a fixed column (11) is arranged between the two groups of connecting sheets (8), the fixed column (11) is in threaded connection with the connecting bolt (9), the inner wall of the bottom of the fixed column (11) is connected with a movable column (12) in a sliding mode, and one end, extending out of the fixed column (11), of the movable column (12) is fixedly connected with the other group of connecting sheets (8).
5. The roofing cooling tower support system of claim 4, wherein: the prefabricated connecting frame is characterized in that the bottom of the prefabricated connecting frame (4) is fixedly connected with prefabricated reinforcing rods (5) which are symmetrically distributed, the prefabricated reinforcing rods (5) are far away from one end of the prefabricated connecting frame (4) which is fixedly connected with prefabricated connecting plates (14), and the prefabricated connecting plates (14) are fixedly connected with the concrete foundation (2).
6. The roofing cooling tower support system of claim 5, wherein: the prefabricated bearing frame (15) is fixedly connected to the two sides of the concrete foundation (2), the prefabricated bearing frame (15) is L-shaped, and the prefabricated bearing frame (15) is fixedly connected with the top of a building roof (17).
7. The roofing cooling tower support system of claim 6, wherein: the prefabricated bearing frame is characterized in that a pipeline (13) is installed at the top of the prefabricated bearing frame (15), and a double-layer shock pad (16) is arranged between the pipeline (13) and the prefabricated bearing frame (15).
CN202220498456.5U 2022-03-09 2022-03-09 Roof cooling tower braced system Expired - Fee Related CN217268412U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220498456.5U CN217268412U (en) 2022-03-09 2022-03-09 Roof cooling tower braced system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220498456.5U CN217268412U (en) 2022-03-09 2022-03-09 Roof cooling tower braced system

Publications (1)

Publication Number Publication Date
CN217268412U true CN217268412U (en) 2022-08-23

Family

ID=82861121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220498456.5U Expired - Fee Related CN217268412U (en) 2022-03-09 2022-03-09 Roof cooling tower braced system

Country Status (1)

Country Link
CN (1) CN217268412U (en)

Similar Documents

Publication Publication Date Title
CN217268412U (en) Roof cooling tower braced system
CN207685858U (en) A kind of prefabricated assembled underground pipe gallery
CN206815574U (en) A kind of single-hole steel plate energy consuming shock absorber for building
CN109931361B (en) Large-scale fan assembled is along with adjustable high-efficient spring damping vibration damper of shape
CN209011214U (en) A kind of TMD damping cisten mechanism
CN208202653U (en) A kind of steel house
CN201895530U (en) Ground sill structure of rail transit station
CN210562601U (en) Assembled steel construction building
CN210348795U (en) Have protection machanism wisdom traffic equipment of shooing
CN212455793U (en) Shock insulation and damping type pipeline bearing support
CN211080565U (en) Building body reinforcing steel structure
CN211572272U (en) Heat-insulating flame-retardant building partition plate
CN210041705U (en) Multifunctional integrated water surface photovoltaic supporting system for floating body suitable for alpine region
CN214696092U (en) Fireproof steel structure for building
CN217378675U (en) Wisdom is control pole setting for traffic system
CN215907072U (en) Equipment mounting structure with shock insulation shock-absorbing function
CN217759278U (en) Steel structure beam connecting node based on steel structure house system
CN209958584U (en) Steel construction with antidetonation function
CN221399583U (en) Anti-seismic composite beam for house building
CN216379099U (en) Bridge anti-seismic buffer device
CN217734416U (en) Earthquake-resistant device for multi-storey building
CN213509619U (en) Steel construction building supports
CN220929588U (en) Wind power tower tube energy dissipation and shock absorption device
CN220379075U (en) Piping lane support unit
CN219432324U (en) Spring damper of cooling tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220823