CN217267476U - Concrete placement device for water conservancy construction - Google Patents
Concrete placement device for water conservancy construction Download PDFInfo
- Publication number
- CN217267476U CN217267476U CN202220553859.5U CN202220553859U CN217267476U CN 217267476 U CN217267476 U CN 217267476U CN 202220553859 U CN202220553859 U CN 202220553859U CN 217267476 U CN217267476 U CN 217267476U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- pouring
- water conservancy
- base
- conservancy construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Abstract
The utility model discloses a concrete pouring device for water conservancy construction, which comprises a base, wherein the top end of the base is fixedly connected with a driving motor, and the two sides of the top end of the base are symmetrically and fixedly connected with a vertical protective shell; by arranging the supporting plate, the pouring pipe is fixed on the inner side of the supporting plate through the fixing sleeve, and then pouring is performed through the pouring pipe, so that the traditional manual hand-held pouring mode is replaced, the concrete pouring is more convenient, and the labor intensity of workers is reduced; through setting up hoist mechanism, when needs pour in higher department, start the driving motor at base top, make the inside hoist mechanism of vertical protecting crust of driving motor drive, hoist mechanism can drive the slider and slide in the inboard of vertical protecting crust, and then make the slider drag the bracing piece rebound to promote the pipe of pouring that sets up the layer board inboard to higher department and pour, it is more convenient to make the messenger pour.
Description
Technical Field
The utility model belongs to the technical field of hydraulic engineering, concretely relates to concrete placement device for water conservancy construction.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in the nature to achieve the purposes of removing harmful substances and benefiting benefits, and is also called water engineering. Water is a valuable resource essential for human production and life, but the naturally existing state of water does not completely meet the needs of human beings; only when hydraulic engineering is built, water flow can be controlled, flood disasters are prevented, and water quantity is adjusted and distributed to meet the requirements of people on water resources in life and production. Hydraulic engineering needs to build various types of hydraulic buildings such as dams, dikes, spillways, water gates, water inlets, channels, transition troughs, rafts, fishways and the like so as to achieve the aims.
In the water conservancy work progress, generally need utilize concrete placement water conservancy facility, and current concrete placement device generally needs the handheld pipe of pouring of staff to pour in the use, and continuous work has increased staff's strength to higher position is not convenient for rely on staff self condition to pour a bit, has consequently proposed a concrete placement device for water conservancy construction.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome current defect, provide a concrete placement device for water conservancy construction to current concrete placement device that proposes in solving above-mentioned background art generally needs the staff to hand the pipe of pouring to pour in the use, and continuous work has increased staff's strength, and higher position is not convenient for rely on the problem that staff self condition was pour a bit.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a concrete placement device for water conservancy construction, includes the base, base top fixedly connected with driving motor, the vertical protecting crust of bilateral symmetry fixedly connected with on base top, driving motor's output rotates the inboard of connecting in vertical protecting crust, the inside hoist mechanism that is provided with of vertical protecting crust, both sides the equal sliding connection in one side that vertical protecting crust is close to each other has a slider, both sides the top fixedly connected with bracing piece of slider, the top of bracing piece is rotated and is connected with the layer board, the pipe is pour through fixed cover fixedly connected with to the inboard of layer board.
Preferably, hoist mechanism includes drive sprocket and driven sprocket, drive sprocket fixed connection is in driving motor's two output ends, drive sprocket and driven sprocket all rotate to be connected in the inboard of vertical protecting crust, connect through chain drive between drive sprocket and the driven sprocket, chain outside fixedly connected with slider.
Preferably, the outer side of the vertical protective shell is fixedly connected with a cover plate, one side of the cover plate is fixedly connected with a sliding rail, and the sliding block is connected to the outer side of the sliding rail in a sliding mode.
Preferably, the top end of the support rod is provided with a rotary table, the support rod is rotatably connected with the supporting plate through the rotary table, and the output end of the pouring pipe is fixedly connected with a conveying hose.
Preferably, the bottom four corners of base all fixedly connected with universal wheel, one side fixedly connected with that the pipe was pour is kept away from to the base pushes away the handle.
Preferably, the pouring pipe is a steel pipe with an elbow.
Preferably, the sliding block is fixedly connected with the supporting rod through a screw, and the fixed sleeve is fixedly connected with the supporting plate through a screw.
Compared with the prior art, the utility model provides a concrete placement device for water conservancy construction possesses following beneficial effect:
1. the utility model has the advantages that the supporting plate is arranged, the pouring pipe is fixed at the inner side of the supporting plate through the fixing sleeve, and then pouring is carried out through the pouring pipe, so that the traditional manual hand-held pouring mode is replaced, concrete pouring is more convenient, and the labor intensity of workers is reduced;
2. the utility model discloses a set up hoist mechanism, when need pour in higher place, start the driving motor at base top, make driving motor drive the hoist mechanism inside the vertical protective housing, hoist mechanism can drive the slider and slide in the inboard of vertical protective housing, and then make the slider drag the bracing piece to move upwards, thus promote the pouring pipe that the layer board inboard set up to higher place and pour, make and pour more convenient;
3. the utility model discloses a set up the bracing piece, rotate on the top of bracing piece and be connected with the layer board, can make to pour pipe and layer board and rotate on the top of bracing piece pouring the in-process, and then make and pour the pipe and pour in the certain limit to guarantee to pour efficiency.
The part that does not relate to in the device all is the same with prior art or can adopt prior art to realize, the utility model has the advantages of being scientific and reasonable in structure, convenience safe in utilization provides very big help for people.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and do not constitute a limitation on the invention, and in the drawings:
fig. 1 is a schematic axial view of a concrete pouring device for water conservancy construction according to the present invention;
fig. 2 is a schematic axial view of the other side of the concrete pouring device for water conservancy construction according to the present invention;
fig. 3 is a bottom structure schematic view of a concrete pouring device for water conservancy construction provided by the utility model;
fig. 4 is an explosion structure diagram of a concrete pouring device for water conservancy construction according to the present invention;
in the figure: the device comprises a base 1, a driving motor 2, a vertical protective shell 3, a sliding block 4, a supporting rod 5, a supporting plate 6, a fixing sleeve 7, a pouring pipe 8, a driving chain wheel 9, a driven chain wheel 10, a chain 11, a cover plate 12, a sliding rail 13, a rotary table 14, a conveying hose 15, a universal wheel 16 and a push handle 17.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a concrete pouring device for water conservancy construction comprises a base 1, wherein the top end of the base 1 is fixedly connected with a driving motor 2, the two sides of the top end of the base 1 are symmetrically and fixedly connected with vertical protective shells 3, the output end of the driving motor 2 is rotatably connected to the inner sides of the vertical protective shells 3, a lifting mechanism is arranged inside the vertical protective shells 3, one sides, close to each other, of the vertical protective shells 3 at the two sides are respectively and slidably connected with a sliding block 4, the top ends of the sliding blocks 4 at the two sides are fixedly connected with a supporting rod 5, the top ends of the supporting rods 5 are rotatably connected with a supporting plate 6, the inner sides of the supporting plates 6 are fixedly connected with pouring pipes 8 through fixing sleeves 7, the pouring pipes 8 are fixed on the inner sides of the supporting plates 6 through the fixing sleeves 7, and then pouring is carried out through the pouring pipes 8, the traditional manual hand-held pouring mode is replaced, the concrete pouring is more convenient, the labor intensity of workers is reduced, when pouring is required to be carried out at a higher position, the driving motor 2 at the top of the base 1 is started, the driving motor 2 drives the lifting mechanism inside the vertical protective shell 3, the lifting mechanism can drive the sliding block 4 to slide in the inner side of the vertical protective shell 3, and then the sliding block 4 drives the supporting rod 5 to move upwards, so that the pouring pipe 8 arranged on the inner side of the supporting plate 6 is lifted to a higher position for pouring, and the pouring is more convenient.
The utility model discloses in, it is preferred, hoist mechanism includes drive sprocket 9 and driven sprocket 10, drive sprocket 9 fixed connection is in driving motor 2's two output ends, drive sprocket 9 and driven sprocket 10 all rotate the inboard of connecting in vertical protecting crust 3, connect through the 11 transmissions of chain between drive sprocket 9 and the driven sprocket 10, 11 outside fixedly connected with sliders of chain 4, when driving motor 2 drives drive sprocket 9 and rotates, drive sprocket 9 passes through chain 11 and drives driven sprocket 10 and rotate together, and then make chain 11 carry out the transmission under the effect of drive sprocket 9 and driven sprocket 10, the outside fixedly connected with slider 4 of chain 11, slider 4 can slide at the inboard of vertical protecting crust 3 along with the transmission of chain 11, and then make slider 4 drag bracing piece 5 upwards remove.
The utility model discloses in, preferred, the equal fixedly connected with apron 12 in the outside of vertical protecting crust 3, the equal fixedly connected with slide rail 13 in apron 12 one side, 4 sliding connection of slider in the outside of slide rail 13, and then guaranteed the stability that bracing piece 5 promoted.
The utility model discloses in, it is preferred, 5 tops of bracing piece are provided with revolving stage 14, bracing piece 5 rotates with layer board 6 through revolving stage 14 and is connected, pour the output end fixedly connected with delivery hose 15 of managing 8, carry the inside of pouring pipe 8 with the concrete through delivery hose 15, through swing delivery hose 15 at the in-process of pouring, make delivery hose 15 drive pour pipe 8 and layer board 6 rotate on the top of bracing piece 5 through revolving stage 14, and then make and pour pipe 8 and pour at the certain limit.
The utility model discloses in, preferred, the equal fixedly connected with universal wheel 16 of bottom four corners department of base 1, one side fixedly connected with that base 1 kept away from pouring pipe 8 pushes away 17, promotes base 1 through pushing away 17, makes base 1 remove through the universal wheel 16 of bottom to use in order to remove the assigned position with the device.
The utility model discloses in, it is preferred, pour the steel pipe of pipe 8 for having the elbow, be convenient for export the concrete downwards.
The utility model discloses in, preferred, slider 4 passes through screw and 5 fixed connection of bracing piece, and fixed cover 7 passes through screw and 6 fixed connection of layer board, and the later stage of the device of being convenient for is dismantled and is maintained.
The utility model discloses a theory of operation and use flow: when the device is used, the base 1 is pushed through the push handle 17, the base 1 is moved through the universal wheel 16 at the bottom, so that the device can be moved to a specified position for use, then the pouring pipe 8 is fixed on the inner side of the supporting plate 6 through the fixing sleeve 7, the input end of the pouring pipe 8 is fixedly connected with the conveying hose 15, concrete is conveyed into the pouring pipe 8 through the conveying hose 15, and then pouring is carried out through the pouring pipe 8, the traditional manual handheld pouring mode is replaced, the bottom of the supporting plate 6 is rotatably connected to the top of the supporting rod 5, the conveying hose 15 is swung in the pouring process, the conveying hose 15 drives the pouring pipe 8 and the supporting plate 6 to rotate at the top end of the supporting rod 5, so that the pouring pipe 8 is poured within a certain range, the pouring efficiency is ensured, when pouring is required to be carried out at a higher position, the driving motor 2 at the top of the base 1 is started, so that the driving motor 2 drives the lifting mechanism in the vertical protective shell 3, the driving chain wheel 9 in the lifting mechanism is fixedly connected with two output ends of the driving motor 2, when the driving motor 2 drives the driving sprocket 9 to rotate, the driving sprocket 9 drives the driven sprocket 10 to rotate together through the chain 11, further, the chain 11 is driven by the driving sprocket 9 and the driven sprocket 10, the slide block 4 is fixedly connected with the outer side of the chain 11, the slide block 4 can slide on the inner side of the vertical protective shell 3 along with the drive of the chain 11, thereby leading the slide block 4 to drag the support rod 5 to move upwards, lifting the pouring pipe 8 arranged at the inner side of the supporting plate 6 to a higher position for pouring, leading the pouring to be more convenient, and in the equal fixedly connected with apron 12 in the outside of vertical protecting crust 3, one side fixedly connected with slide rail 13 of apron 12, slider 4 slides in the outside of slide rail 13, and then has guaranteed the stability that bracing piece 5 promoted.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. The utility model provides a concrete placement device for water conservancy construction, includes base (1), its characterized in that: base (1) top fixedly connected with driving motor (2), the vertical protecting crust of bilateral symmetry fixedly connected with (3) on base (1) top, the output of driving motor (2) rotates the inboard of connecting in vertical protecting crust (3), vertical protecting crust (3) inside is provided with hoist mechanism, both sides the equal sliding connection in one side that vertical protecting crust (3) are close to each other has slider (4), both sides the top fixedly connected with bracing piece (5) of slider (4), the top of bracing piece (5) is rotated and is connected with layer board (6), pipe (8) are pour through fixed cover (7) fixedly connected with to the inboard of layer board (6).
2. The concrete pouring device for water conservancy construction according to claim 1, characterized in that: the lifting mechanism comprises a driving chain wheel (9) and a driven chain wheel (10), the driving chain wheel (9) is fixedly connected to two output ends of the driving motor (2), the driving chain wheel (9) and the driven chain wheel (10) are connected to the inner side of the vertical protective shell (3) in a rotating mode, the driving chain wheel (9) is connected with the driven chain wheel (10) through a chain (11) in a transmission mode, and the chain (11) is fixedly connected with a sliding block (4) on the outer side of the chain (11).
3. The concrete pouring device for water conservancy construction according to claim 1, characterized in that: the outer side of the vertical protective shell (3) is fixedly connected with a cover plate (12), one side of the cover plate (12) is fixedly connected with a sliding rail (13), and the sliding block (4) is connected to the outer side of the sliding rail (13) in a sliding mode.
4. The concrete pouring device for water conservancy construction according to claim 1, characterized in that: the top end of the support rod (5) is provided with a rotary table (14), the support rod (5) is rotatably connected with the supporting plate (6) through the rotary table (14), and the output end of the pouring pipe (8) is fixedly connected with a conveying hose (15).
5. The concrete pouring device for water conservancy construction according to claim 1, characterized in that: the bottom four corners department of base (1) all fixedly connected with universal wheel (16), one side fixedly connected with that pipe (8) were pour in base (1) is kept away from pushes away handle (17).
6. The concrete pouring device for water conservancy construction according to claim 1, characterized in that: the pouring pipe (8) is a steel pipe with an elbow.
7. The concrete pouring device for water conservancy construction according to claim 1, characterized in that: the sliding block (4) is fixedly connected with the supporting rod (5) through a screw, and the fixing sleeve (7) is fixedly connected with the supporting plate (6) through a screw.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220553859.5U CN217267476U (en) | 2022-03-14 | 2022-03-14 | Concrete placement device for water conservancy construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220553859.5U CN217267476U (en) | 2022-03-14 | 2022-03-14 | Concrete placement device for water conservancy construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217267476U true CN217267476U (en) | 2022-08-23 |
Family
ID=82860481
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220553859.5U Active CN217267476U (en) | 2022-03-14 | 2022-03-14 | Concrete placement device for water conservancy construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217267476U (en) |
-
2022
- 2022-03-14 CN CN202220553859.5U patent/CN217267476U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108358096B (en) | Pipeline transportation overhead hoist for hydraulic engineering | |
CN111197468A (en) | Protective equipment for hydraulic engineering | |
CN217267476U (en) | Concrete placement device for water conservancy construction | |
CN212047505U (en) | Water conservancy construction handling device | |
CN210888019U (en) | Hanging basket for building convenient to remove | |
CN218454553U (en) | Concrete pouring equipment for construction | |
CN209799459U (en) | Civil engineering strutting arrangement | |
CN212270804U (en) | Building engineering construction dust collecting equipment | |
CN212248115U (en) | Reservoir sluice convenient to use for hydraulic engineering | |
CN215478452U (en) | Portable concrete conveying and lifting device | |
CN209907953U (en) | House concrete placement platform convenient to control | |
CN213921167U (en) | Pipeline handling device for hydraulic engineering with high stability | |
CN213573059U (en) | Concrete floating device for civil engineering | |
CN210914385U (en) | Be used for precast concrete handling device | |
CN212384222U (en) | Municipal works construction is with high-efficient cleaning device of husky bucket inner wall | |
CN211817933U (en) | Combined steel formwork | |
CN209755673U (en) | Construction is with multi-functional slip casting bucket that can stir cement | |
CN202248799U (en) | Full-automatic plastering machine | |
CN211413449U (en) | Reinforcing bar equipment of bending for water conservancy construction | |
CN218928209U (en) | Concrete placement equipment for hydraulic engineering construction | |
CN213055406U (en) | Feeding anti-blocking type mortar machine for building | |
CN210945044U (en) | Intelligent sewage stirring and flow pushing device | |
CN217146089U (en) | Waterproofing membrane's integral type turning device | |
CN210944493U (en) | PE pipe production is got device with lifting by crane clamp | |
CN213890607U (en) | Efficient agitating unit for concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |